Infrastructure Tracker – RAILS
Total Page:16
File Type:pdf, Size:1020Kb
TAPP II: Infrastructure Tracker as of November 20, 2017 Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Phase 1: 50.5 km from the Malolos end of North-South Commuter Railway up to Clark Rails North-South Railway Project (north line) Phase 1 construction: Q2 2019 1 Luzon DOTr airport will have five stations—Malolos, ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 1) Completion: Q2 2022 Apalit, San Fernando City, Clark and Clark ₱ 211.42 International Airport. Phase 2: 19 km railway to connect airport to Rails North-South Railway Project (north line) Clark Green City through three more 2 Luzon DOTr ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 2) stations—Calumpit, Angeles City and Clark Green City. Financing, design, construction, operation & maintenance of 23km elevated railway line with 14 stations from San Jose Del Monte, Under Construction Rails 3 NCR MRT Line 7 Project ₱ 69.30 DOTr SMC Bulacan to MRT 3 North Avenue in Quezon PPP (unsolicited) On-going civil works 20-Oct-17 Projects City and 22km asphalt road from Bocaue (10.35% complete) Interchange of NLEX to intermodal terminal in Tala. A Brown Construction, operation and maintenance of Company Inc., Rails 11-station East-West Rail (EWR), a mostly 4 NCR East-West Rail Project $ 1.00 PNR and MTD PPP (unsolicited) For evaluation by ICC-TWG 20-Nov-17 Projects elevated 9.4km railway line from Diliman, Philippines, Quezon City to Lerma, Manila. Inc. Design and construction of LRT2 3km West extension, which will run from Recto Station to Pier 4, including the turn-back track. Three Rails proposed additional stations: Tutuban (next to 5 NCR LRT-2 west extension ₱ 10.12 DOTr PPP For bidding 05-Jun-17 Projects the Cluster Mall); Divisoria (west of the Recto Avenue and Asuncion Street intersection); and Pier 4 (located 50 meters north of Zaragoza Street). Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Ongoing soft renovation and upgrades of LRT Line 1 existing system; LRMC LRT 1 will be extended from Baclaran Station Groundbreaking for the (Ayala Corp, to future Niyog Station in Bacoor, Cavite Common Station held on Rails LRT Line 1 Cavite Extension and O&M MPIC, approximately 11.7km. Of this length, 10.5km 6 NCR ₱ 64.90 DOTr PPP September 29, 2017 20-Oct-17 Projects (of existing LRT 1) Macquarie will be elevated and 1.2km will be at-grade. Infrastructure Eight passenger stations are proposed to be Ongoing pre-construction Holdings) constructed. activities: ROW acquisition; relocation of informal settlers; utility diversion; finalization of alignment. Financing, design, construction, operations Rails and maintenance of a new 19km light rail line 7 NCR LRT Line 4 Project TBD DOTr PPP Under Development 09-May-17 Projects running west from SM City in Taytay to Sta.Mesa, Manila. Rehabilitation of MRT3 from North Ave. Rails 8 NCR MRT 3 Rehabilitation $ 0.15 DOTr Sumitomo station in Quezon City to Taft station in PPP For awarding 27-Nov-17 Projects Pasay. A subway connecting the cities of Makati, Pasay, and Taguig. The project would be a Rails 9 NCR Metro Manila Subway ₱ 374.50 DOTr JICA 20 km system that will consist of a 16 km ODA Pre-construction 04-Sep-17 Projects tunnel, a 4 km elevated railway, and 11 stations. A 25km underground mass transportation system connecting major business districts and government centers. It is expected to serve around 370,000 passengers per day in its opening year. The proposed 13 stations of the subway system are: Rails a) Along Mindanao Avenue, North Avenue, for project development 10 NCR Mega Manila Subway $ 4.50 DOTr N/A ODA 26-May-17 Projects Quezon Avenue, East Avenue, Anonas and (Aug 2017) Katipunan in Quezon City b) Ortigas North and Ortigas South in Pasig City c) Kalayaan Avenue in Makati City d) Bonifacio Global City, Cayetano Boulevard and Food Terminal Inc. (FTI) in Taguig e) and the Ninoy Aquino International Airport in Pasay City Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Rails A 4km extension of existing LRT-2 system Groundbreaking - May 2017 11 NCR LRT-2 east extension (construction) ₱ 1.80 DOTr DM Consunji PPP 05-Jun-17 Projects from Santolan, Pasig to Masinag, Antipolo. (Target completion Aug. 2018) O&M of the existing LRT Line 2 from Recto to Rails Operation & Maintenance of LRT Line-2 East DOTr and 12 NCR ₱ 1.20 Santolan, the 4km East Extension from PPP Under review 20-Oct-17 Projects Extension LRTA Santolan to Masinag. SM Prime Common station will link existing MRT Line 3, Holdings Inc., Rails LRT Line 1 and to-be-built MRT-7, providing a 13 NCR Common Train Station ₱ 2.80 DOTr SMC., and GPH For MOA 11-May-17 Projects convenient access point for 1.5 M commuters Light Rail daily. Manila Corp. Construction of railway from San Mateo connecting to the MRT 7, passing through Rails 14 NCR Manila East-Rail Transit System Project TBD DOTr Ortigas Avenue. It will link the municipalities PPP Under Development 09-Aug-17 Projects of Rodriguez and San Mateo in Rizal to cities of Marikina, Pasig, Taguig, and Makati. Financing, design, construction, operations and maintenance, including procurement of rolling stock and systems, of a new 19km Rails 15 NCR LRT Line 6 Project ₱ 65.09 DOTr light rail line along Aguinaldo Highway from PPP Under review 09-May-17 Projects Niyog, Bacoor (terminus of LRT Line 1 Cavite Extension Project) to Dasmariñas City in Cavite. 38km railway linking Tutuban, Manila to Malolos, Bulacan. It will run across 10 Rails North-South Railway Project (central line) DOTr and To start construction in 2019; 16 NCR $ 1.99 JICA elevated stations, and will have 13 train sets ODA/GOJ 16-Mar-17 Projects (Phase 1) PNR operations in 2022. with 8 cars that can carry 2,238 passengers per train. Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Following DOTr's manifestation NCR/ Region IV-A during March 21, 2017 ICC-CC Rails North-South Railway Project (south line) DOTr and 56 km Commuter Line from Manila to 17 (CALABARZON)/ $ 3.01 JICA ODA/GOJ meeting, O&M component for 16-Mar-17 Projects (Segment 1) PNR Calamba City, Laguna. Region V (Bicol) Commuter Line will still be procured through PPP Long-Haul Line from Manila to Legazpi City NCR/ Region IV-A Rails North-South Railway Project (south line) DOTr and in Bicol Region (478 km main line), 18 (CALABARZON)/ $ 3.01 ODA 09-Jun-17 Projects (Segment 2) PNR which may be developed on a phased basis Region V (Bicol) based on delivery of right of way Long-Haul Line Expansion consisting of (a) an extension from Legazpi City to NCR/ Region IV-A Matnog in Sorsogon (117km) (the “Long Haul Rails North-South Railway Project (south line) DOTr and 19 (CALABARZON)/ $ 3.01 Line Extension”) and (b) a branch line ODA 09-Jun-17 Projects (Segment 3) PNR Region V (Bicol) from Calamba to Batangas City (58km) (the “Long Haul Line Branch”), to be developed once right of way is available. Tagum, Davao del Rails Mindanao Railway: Tagum-Davao City-Digos A 105 km segment of the larger $9 billion, for project development 20 Norte, Davao City, ₱ 31.50 DOTr GAA 26-May-17 Projects (TDD) Segment 2,000 km Mindanao Railway network. (May 2017) Digos, Davao del Sur.