Tideway Heritage Interpretation Strategy

Total Page:16

File Type:pdf, Size:1020Kb

Tideway Heritage Interpretation Strategy HERITAGE INTERPRETATION STRATEGY ‘RIVER OF LIBERTY’ SUMMARY DOCUMENT Contemporary Culture Liquid History | 1 Foreword I am delighted that Historic England is working with Tideway and its partners to deliver this Heritage Interpretation Strategy. The Thames Tideway Tunnel will provide many new opportunities to better understand and appreciate our relationship with the Thames. The Heritage Interpretation Strategy It was a triumph of Victorian ambition is a project-wide framework for the and engineering for the public good. Thames Tideway Tunnel Project, Running alongside and integrating with prepared in consultation with Historic the historic system, the new 25km England. The Strategy sets out the tunnel will stretch from Acton Storm historic and cultural themes that will Tanks in the west to Abbey Mills and inspire the project designers, artists, on to Beckton Sewage Treatment and engineers in delivering the new Works in the east. The scheme is public realm, landscaping, art and driven from 24 work sites, and will infrastructure created by this project. create four acres of new publically This approach is key to getting the accessible land. best for the public out of any new infrastructure project, and the Tideway Taking the concept “River of Liberty” Project is truly monumental. as its overarching theme, the Heritage Interpretation Strategy looks at the While the project is challenging, it is Thames as a rich and complex an immensely exciting opportunity to allegory, encompassing the delivery of build on the achievements and vision London from the tyranny of disease, Duncan Wilson - of Sir Joseph Bazalgette and those dynamic concepts of personal liberty, Chief Executive, Historic England brave Victorian engineers who fought and individual stories which reflect the to build a cleaner, healthier London many communities and aspirations for the benefit of all its inhabitants. associated with the Thames. Bazalgette’s sewer system, built between 1855 and 1865, used 318 The project will not only safeguard our million hand-laid bricks. It saw the precious environment. It will create construction of the Chelsea and new landscapes, artworks, and public Victoria embankments and the experiences which reflect the river’s fabulous pumping stations at Chelsea, rich history and reconnect us to the Greenwich, Crossness and Abbey Thames, which is in many ways the Mills. The historic sewer system lifeblood of our great capital. This changed not just the quality of the strategy establishes a compelling environment, but the appearance and cultural and historical narrative for the relationship of London to the Thames. Tideway Tunnel Project. 2 | | 3 Contents Foreword .............................1 Introduction 5 History ...............................6 Thames Tideway Tunnel 15 Project Overview ...................... 16 Interpretation Strategy 21 Principles, Aims and Objectives ........... 22 Interpretation Framework 29 Approach ............................ 31 Principle Theme: ‘River of Liberty’ .......... 32 Cultural Meanders and their Liberty Sites ....34 Heritage Design and Engagement 51 Implementation ........................ 52 4 | INTRODUCTION | 5 Introduction Landing fish at Billingsgate Market 1881 © Illustrated London News Ltd/ Mary Evans Picture Library 6 | INTRODUCTION INTRODUCTION | 7 History The River Thames has always played a central role in the life of London; its rich and varied history encompasses all aspects of the city’s life – economic, social, political and cultural. It has been a source of food and water, a commercial routeway, a crossing-point, a cultural conduit, an international port and a focus of political power. The Thames’s ability to reach and influence people’s River has acted as a catalyst for the exponential growth ways of life has been far-reaching and is fundamental to of the city it has also not remained untouched and has understanding its long-term cultural legacy and heritage suffered as a result, not least through its continued use as a value. This has been both positive and negative. While the conduit for the removal of waste products. Thames Waterman – about to row two women across the River 1810 © Mary Evans Picture Library The Temple and River Thames 18th century © Antiquarian Images/Mary Evans 8 | INTRODUCTION INTRODUCTION | 9 river users and introducing aesthetic pollution from waste products remaining on the foreshore. All of which contributes negatively on the health and wellbeing of the population and the city as a whole. The Thames Tideway Tunnel aims to address this. Its implementation will ensure that the ecology of the Thames in London continues to improve along with economic and social benefits. For the most part the scale and engineering of this major infrastructure project will remain unseen to the public, but will be represented and announced through the creation of four acres of new or improved public realm, comprising landscaped permanent structures connecting the existing sewer to the tunnel. The City Narcissus – London’s authorities are accused of being complacent about the city’s filth 1849 © Mary Evans Picture Library The physical condition of the river would have been deposited by the deteriorated over time to a point in sluggish movement of the water. the 19th century where it assumed The architect of this grand plan was Sir Joseph Bazalgette political importance and was the engineer Sir Joseph Bazalgette, perceived as an embodiment of the whose sewer system, embankments rotten heart of the body politic. Public and bridges not only shaped the health crises, in the form of cholera London we see today but are still epidemics, were the catalyst for action required to perform the same job. and the introduction of the first Public With continued growth London has Health Acts controlling the provision outgrown this sewerage system. The of water and the removal of waste. capacities originally allowed for have Fundamental to the success of these been significantly exceeded with measures was the development and the result that the sewers overflow, implementation of a drainage strategy discharging quantities of combined designed to capture London’s waste sewage into the River Thames. before it reached the Thames, while at Sewage discharges have a significant the same time reconfiguring the banks impact on the ecology of the river, as of the river in order to use the flow to well as posing risks to recreational wash away any detritus that previously Satire on the polluted water of London 1866 © Mary Evans Picture Library 10 | INTRODUCTION INTRODUCTION | 11 18th century map of London © Antiquarian Images / Mary Evans Picture Library 16th century map of London and the River © Antiquarian Images / Mary Evans Picture Library 19th century map of London and the River © Antiquarian Images / Mary Evans Picture Library 12 | INTRODUCTION INTRODUCTION | 13 What is unique about this work is that the design of the new public realm will be informed by the heritage of the River Thames and its riparian landscape. The approach to this is set out in the Tideway Heritage Interpretation Strategy. This document is a summary of the key points of that Strategy. The full document can be found at www.tideway.london/ art-and-heritage The Embankment and the River Thames 1940s © Mary Evans Picture Library / Photo Union Collection 14 | INTRODUCTION THAMES TiDEWAY TUNNEL | 15 Thames Tideway Tunnel Combined Sewer Outlet 16 | THAMES TiDEWAY TUNNEL THAMES TiDEWAY TUNNEL | 17 23 NEWHAM Tideway’s vision is to build a new sewer for London to TOWER HAMLETS Project Overview prevent the frequent pollution of the River Thames. It is not 24 Lee Tunnel 22 just to clean up the Thames but more excitingly to promote The Thames Tideway Tunnel project will extend London’s sewerage system21 to CITY OF LONDON CITY OF WESTMINSTER a change in the relationship between Londoners and their The Limehouse Cut cope with the demands of the city well into the 22nd century. It will comprise river: Reconnecting London with the Thames. 15 EALING the construction of a 25km storage and transfer tunnel14 running up to 65m Tideway has established bold legacy objectives: below the river. Starting1 in west London, the route of the tunnel generally 17 to protect and enhance the environment; to contribute to 16 KENSINGTON follows the course of the River ThamesAND CHELSEA to Limehouse where it then continues the rejuvenation of London’s river economy; to provide a HOUNSLOW 10 2 Greenwich 18 greater well-being for all and improved health for river users; north-east to Abbey Mills Pumping Station. There it will13 connect to connectionthe Lee HAMMERSMITH tunnel to provide improved public realm and safer communities. RICHMOND AND FULHAM 9 20 Tunnel, which will transferUPON the sewage to Beckton Sewage Treatment Works. 11 12 THAMES 19 The commitment to delivering this vision is embedded Construction of the tunnel3 will take place from 24 worksites spread out along 7 GREENWICH throughout the project organisation. The capital and the route, with the majority of sites adjacent8 to the river. On completion of the engagement projects and their target audiences have the potential to create a solid foundation upon which to LAMBETH SOUTHWARK works, Tideway will create new4 public realm with integrated artworks inspired 5 Frogmore connection enhance the River Thames as a defining landscape and tunnel LEWISHAM by the history of the riverWANDSWORTH and individual locales. cultural resource. 6 23 Map key NEWHAM West - Recreation to Industry: Society in Transition 1 Acton Storm
Recommended publications
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • The Great Stink of London
    This is an introduction to Stephen Halliday's book The Great Stink of London. During Victorian times, there were serious problems with water supply and sanitation in London. Crisis point was reached in the summer of 1858. The Great Stink of London In the mid-19th century, Britain was gripped by the fear of cholera, a highly infectious and deadly disease. When cholera struck Hamburg in Germany, the British government grew alarmed that this latest outbreak might spread to Britain. They decided to create a special committee to deal with the expected epidemic. However, the epidemic never happened because of the work of one man: Sir Joseph Bazalgette. At that time, London’s sewage flowed straight into the River Thames. From here it leaked into adjacent springs, wells and other sources of drinking water. This was the root cause of cholera, a waterborne disease. Contemporary accounts describe London being crowded with men, women and children struggling to survive in terrible conditions. In 1849, one journalist reported that the air had 'the smell of a graveyard, and a feeling of nausea comes over anyone unaccustomed to it.' About the Thames, he wrote, 'heavy bubbles now and then rise up in the water, which is covered with a scum like an encrusted cobweb. In it float large masses of noxious, tangled weed and against the posts of the bridges are swollen carcasses of dead animals.' In the summer of 1858, the stench from the Thames was so bad that Members of Parliament fled from the rooms overlooking the river. The Prime Minister, Benjamin Disraeli, rushed from the debating chamber, handkerchief to nose.
    [Show full text]
  • Civil Engineering
    Civil Engineering Volume 169 Issue CE2 May 2016 ■ Design and top-down construction at the Nanjing Youth Olympic Centre, China ■ Unleashing potential – the benefits of new infrastructure in the Balkans ■ Building to beat Ebola: the Royal Engineers in Sierra Leone ■ Use of shape-memory alloys in construction: a critical review www.civilengineering-ice.com ISSN 0965 089 X Call for Papers Proceedings of the Institution of Civil Engineers Civil Engineering Panel Chair and Honorary Editor: Emma Kent, Cundall Johnston & Partners LLP, UK Civil Engineering, indexed Why Publish with ICE? in Web of Science, is the ICE Publishing has been uniting research and ICE’s flagship journal. practice in engineering and science since 1836. As the publishing arm of the Institution of Civil Practical and diverse in its scope, Engineers, we provide exclusive access to over Civil Engineering publishes overview 80,000 active ICE members in 160 countries. papers for the non-specialist on any subject relevant to civil engineering By publishing with ICE, you will benefit from today. Multi-disciplined in approach, our quality, visibility and advocacy. topics range from landmark projects to philosophical, ethical, QUALITY environmental, management and safety issues. • Rigorous blind peer review by an international panel of experts Civil Engineering gives a wide- • Author editorial support and guidance to ranging insight into the engineering help you develop your work profession with full-colour papers 0.714 • Professional copy editing, typesetting and and articles on topics across the proof-reading services spectrum of civil engineering activity, topics range from landmark projects to debates on philosophical, ethical, • No publication charges, it is entirely free to environmental, management and safety issues.
    [Show full text]
  • Thames Tideway
    www.WaterProjectsOnline.com Wastewater Treatment & Sewerage Thames Tideway Tunnel - Cofferdams Blackfriars & Albert Embankment marine works: Complex temporary works to enable the delivery of the new London’s super sewer by Maria Fernandez Ciudad, Francisco J Quesada Colmenero, Jose Flors Villaverde and Tim Harman he Thames Tideway Tunnel is a new super sewer that will intercept, store and convey the CSO discharges to Beckton STW for treatment. The project is divided into three main work contracts: West, Central and East. The TFerrovial Construction and Laing O’Rourke joint venture (FLO JV) has been appointed as principal contractor for the Central Section with an original estimated budget of £745m. The scope of the works of the Central Section includes the construction of a 12.7km new sewer tunnel under the River Thames between Fulham and Bermondsey. Eight CSO’s spread along the river will be connected through culverts to a new interception chamber and then to a 60m deep shaft structure. From the shaft, the flows will be conveyed into the main tunnel which is being excavated with two 8.8m diameter tunnel boring machines. Albert Embankment Foreshore shaft excavation - Courtesy of FLO JV Blackfriars Bridge Foreshore twin wall cofferdam - Courtesy of FLO JV Background The cofferdams are U-shaped structures tying-in against the London sewerage system dates from the 19th century, developed existing river wall and designed as either double skin or single by Joseph Bazalgette to serve a population of 4 million, with an skin cofferdams. This paper outlines the design and construction original capacity of 6mm rainfall per hour across the catchment.
    [Show full text]
  • Thames Path Walk Section 2 North Bank Albert Bridge to Tower Bridge
    Thames Path Walk With the Thames on the right, set off along the Chelsea Embankment past Section 2 north bank the plaque to Victorian engineer Sir Joseph Bazalgette, who also created the Victoria and Albert Embankments. His plan reclaimed land from the Albert Bridge to Tower Bridge river to accommodate a new road with sewers beneath - until then, sewage had drained straight into the Thames and disease was rife in the city. Carry on past the junction with Royal Hospital Road, to peek into the walled garden of the Chelsea Physic Garden. Version 1 : March 2011 The Chelsea Physic Garden was founded by the Worshipful Society of Start: Albert Bridge (TQ274776) Apothecaries in 1673 to promote the study of botany in relation to medicine, Station: Clippers from Cadogan Pier or bus known at the time as the "psychic" or healing arts. As the second-oldest stops along Chelsea Embankment botanic garden in England, it still fulfils its traditional function of scientific research and plant conservation and undertakes ‘to educate and inform’. Finish: Tower Bridge (TQ336801) Station: Clippers (St Katharine’s Pier), many bus stops, or Tower Hill or Tower Gateway tube Carry on along the embankment passed gracious riverside dwellings that line the route to reach Sir Christopher Wren’s magnificent Royal Hospital Distance: 6 miles (9.5 km) Chelsea with its famous Chelsea Pensioners in their red uniforms. Introduction: Discover central London’s most famous sights along this stretch of the River Thames. The Houses of Parliament, St Paul’s The Royal Hospital Chelsea was founded in 1682 by King Charles II for the Cathedral, Tate Modern and the Tower of London, the Thames Path links 'succour and relief of veterans broken by age and war'.
    [Show full text]
  • Historical Perspectives of Urban Drainage
    Historical Perspectives of Urban Drainage Steven J. Burian* and Findlay G. Edwards* *Assistant Professor, Dept. of Civil Engineering, University of Arkansas, 4190 Bell Engineering Center, Fayetteville, AR 72701 USA, Phone: (479) 575-4182; [email protected] / [email protected] Abstract Historically, urban drainage systems have been viewed with various perspectives. During different time periods and in different locations, urban drainage has been considered a vital natural resource, a convenient cleansing mechanism, an efficient waste transport medium, a flooding concern, a nuisance wastewater, and a transmitter of disease. In general, climate, topography, geology, scientific knowledge, engineering and construction capabilities, societal values, religious beliefs, and other factors have influenced the local perspective of urban drainage. For as long as humans have been constructing cities these factors have guided and constrained the development of urban drainage solutions. Historical accounts provide glimpses of many interesting and unique urban drainage techniques. This paper will highlight several of these techniques dating from as early as 3000 BC to as recently as the twentieth century. For each example discussed, the overriding perspective of urban drainage for that particular time and place is identified. The presentation will follow a chronological path with the examples categorized into the following four time periods: (1) ancient civilizations, (2) Roman Empire, (3) Post-Roman era to the nineteenth century, and (4) modern day. The paper culminates with a brief summary of the present day perspective of urban drainage. Introduction The relation of modern engineering to ancient engineering is difficult to comprehend considering that modern engineering is so highly specialized and technologically advanced.
    [Show full text]
  • Victoria Embankment Foreshore Hoarding Commission
    Victoria Embankment Foreshore Hoarding Commission 1 Introduction ‘The Thames Wunderkammer: Tales from Victoria Embankment in Two Parts’, 2017, by Simon Roberts, commissioned by Tideway This is a temporary commission located on the Thames Tideway Tunnel construction site hoardings at Victoria Embankment, 2017-19. Responding to the rich heritage of the Victoria Embankment, Simon Roberts has created a metaphorical ‘cabinet of curiosities’ along two 25- metre foreshore hoardings. Roberts describes his approach as an ‘aesthetic excavation of the area’, creating an artwork that reflects the literal and metaphorical layering of the landscape, in which objects from the past and present are juxtaposed to evoke new meanings. Monumental statues are placed alongside items that are more ordinary; diverse elements, both man-made and natural, co-exist in new ways. All these components symbolise the landscape’s complex history, culture, geology, and development. Credits Artist: Simon Roberts Images: details from ‘The Thames Wunderkammer: Tales from Victoria Embankment in Two Parts’ © Simon Roberts, 2017. Archival images: © Copyright Museum of London; Courtesy the Trustees of the British Museum; Wellcome Library, London; © Imperial War Museums (COM 548); Courtesy the Parliamentary Archives, London. Special thanks due to Luke Brown, Demian Gozzelino (Simon Roberts Studio); staff at the Museum of London, British Museum, Houses of Parliament, Parliamentary Archives, Parliamentary Art Collection, Wellcome Trust, and Thames21; and Flowers Gallery London. 1 About the Artist Simon Roberts (b.1974) is a British photographic artist whose work deals with our relationship to landscape and notions of identity and belonging. He predominantly takes large format photographs with great technical precision, frequently from elevated positions.
    [Show full text]
  • London Sustainable Drainage Action Plan 2016
    LONDON SUSTAINABLE DRAINAGE ACTION PLAN 2016 LONDON SUSTAINABLE DRAINAGE ACTION PLAN COPYRIGHT Greater London Authority December 2016 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 ISBN Photographs © Copies of this report are available from www.london.gov.uk This document is supported by: LONDON SUSTAINABLE DRAINAGE ACTION PLAN CONTENTS EXECUTIVE SUMMARY 2 PART 1: WHY WE NEED AND WANT MORE SUSTAINABLE DRAINAGE 3 Surface water management in London 4 Surface water management challenges 5 What is sustainable drainage? 8 International experience of sustainable drainage 11 The case for sustainable drainage in London 12 Sustainable drainage vision 13 PART 2: THE SUSTAINABLE DRAINAGE ACTION PLAN 19 The Sustainable Drainage Action Plan 20 Understanding the opportunities and benefits of sustainable drainage 21 Delivering sustainable drainage through new developments via the planning system 23 Retrofitting sustainable drainage across London 25 What can you do? Delivering sustainable drainage through domestic and local neighbourhood measures 56 Funding opportunities and regulatory incentives 59 Monitoring 61 Appendix 1: Action plan by year 62 Appendix 2: References 71 LONDON SUSTAINABLE DRAINAGE ACTION PLAN 2 EXECUTIVE SUMMARY London is outgrowing its drains and sewers. The combined sewer system originally built over 150 years ago by Joseph Bazalgette has served us well, but it was designed for a smaller city with more green surfaces. The combined challenges of London’s growing population, changing land uses and changing climate mean that if we continue to rely on our current drains and sewers, we face an increasing risk of flooding.
    [Show full text]
  • London and Its Main Drainage, 1847-1865: a Study of One Aspect of the Public Health Movement in Victorian England
    University of Nebraska at Omaha DigitalCommons@UNO Student Work 6-1-1971 London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England Lester J. Palmquist University of Nebraska at Omaha Follow this and additional works at: https://digitalcommons.unomaha.edu/studentwork Recommended Citation Palmquist, Lester J., "London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England" (1971). Student Work. 395. https://digitalcommons.unomaha.edu/studentwork/395 This Thesis is brought to you for free and open access by DigitalCommons@UNO. It has been accepted for inclusion in Student Work by an authorized administrator of DigitalCommons@UNO. For more information, please contact [email protected]. LONDON .ML' ITS MAIN DRAINAGE, 1847-1865: A STUDY OF ONE ASPECT OP TEE PUBLIC HEALTH MOVEMENT IN VICTORIAN ENGLAND A Thesis Presented to the Department of History and the Faculty of the Graduate College University of Nebraska at Omaha In Partial Fulfillment of the Requirements for the Degree Master of Arts by Lester J. Palmquist June 1971 UMI Number: EP73033 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. Dissertation Publishing UMI EP73033 Published by ProQuest LLC (2015). Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC.
    [Show full text]
  • Tideway Tunnel
    . from the Foundation for Water Research www.fwr.org Issue 1, February 2015 Welcome to the winter issue of the FWR Newsletter THAMES TIDEWAY TUNNEL Building for a 22nd century London In September 2014 a Nationally Significant Infrastructure Project (NSIP) was granted a Development Consent Order – the Thames Tideway Tunnel is the largest ever NSIP in the UK. This ‘super sewer’ will be 25km long, running from Acton in the west to Abbey Mills in the east. In our lead article, Andy Mitchell, CEO of the Tideway Tunnel, presents the story so far. The Environment Agency is consulting on both its draft River Basin Management Plans (RBMPs) and Flood Risk Management Plans. The RBMPs set out measures to improve water in rivers, lakes, estuaries, coasts and in groundwater. The draft plans relate to the second cycle of the Water Framework Directive. See page 5 for details. In ‘Wastewater Matters’ Tim Evans considers the issue of endocrine active substances and whether or not they constitute a serious pollutant threat. For information on events and news highlights please go to our website www.fwr.org. You can also contact us via email ([email protected]. uk) or telephone (01628 891589). The Lee Tunnel, which will eventually connect to the Thames Tideway Tunnel Maxine Forshaw - Editor As we welcomed in the New Year, Andy Mitchell THIS ISSUE the Thames Tideway Tunnel team CEO of Thames Tideway Tunnel Thames Tideway Tunnel was reflecting on – and recovering from – what was probably the most significant by Andy Mitchell, CEO of Thames Tideway Tunnel 1 12 months on the project so far, and the culmination of years of work.
    [Show full text]
  • Reconnecting London with the River Thames
    RECONNECTING LONDON WITH THE RIVER THAMES ANNUAL REPORT 2017/18 Contents Vision and Purpose 03 Strategic Report Tideway is an independent regulated 05 Chairman’s Introduction water company, with a vision to reconnect 06 Chief Executive Officer’s Report London with the river Thames. 09 Who We Are and What We Do 16 Business Model 20 Reconnecting London with the River Thames We will achieve this vision by delivering the 22 Our Vision and Strategy Thames Tideway Tunnel, a major new sewer 26 Risk Management 32 Long-Term Viability Statement which is urgently needed to protect the tidal 36 Performance Review River Thames from pollution. 59 Financial Performance Review 65 Governance The tunnel is the largest project in the water 67 Chairman’s Introduction sector since the construction of Sir Joseph 68 Board Leadership, Bazalgette’s interceptor sewers in the 1860s. Transparency and Governance – The Board It is being financed by the private sector, 90 Audit Committee Report with half the equity provided by UK investors. 94 Remuneration Committee Report This includes a large number of UK pensioners, 104 Board Leadership, through investment by major pension funds. Transparency and Governance – Relationship with Shareholders We aim to deliver on time and budget, at the 108 Directors’ Report right quality. The health, safety and wellbeing 111 Financial Statements of our people and the public are paramount 112 Independent Auditor’s Report – we intend to work safely or not at all. 116 Financial Statements 120 Notes to the Financial Statements We are working closely with our local stakeholders in delivering the tunnel, delivering 137 Regulatory Reporting benefits for them, our investors, Thames Water’s 138 Introduction 142 Regulatory Annual Performance bill payers and the environment.
    [Show full text]
  • London Tideway Tunnels Modernising London's Sewerage System
    London Tideway Tunnels Modernising London’s Sewerage System Rob Furniss AECOM Water Global Director of Community Infrastructure The Background to London’s Sewers 1848 – Cholera deaths peak In London 1858 - The Great Stink – Parliament suspended London Cholera Deaths 16000 14000 12000 10000 8000 6000 4000 2000 0 1831 1833 1848 3 “Lost” rivers of London Stoke River Roding Hampstead Newington Islington Bow Barking Creek Black Notting Hill Ditch Erith Waterloo Chelsea Woolwich Battersea Eltham Roehampton Forest Hill Streatham BevBev erley erley Brook Brook 8383 4 London’s Sewers - Evolution and Complexity Original sewers and local collectors River Wall Plan River Thames Bazalgette’s Storm relief Interceptor sewers and Sewers pumping station Ground level High Tide Low Tide Section 5 Intercepting sewers H rn i the g Nor h L Hampstead e Central London Stoke ve Newington l Middle Level No. 2 Intercepting Sewers W i ck L at the present day Islington a n Abbey Mills e B Pumping o. 1 r vel N a Station Middle Le n Bow c Notting Hill h L c D n h I o ra s W llyB o N i L w o 2 l o d w . g ca Level o e rth e c N i s L s P No er Crossness e o rth n e te rn B O f Pumping Station v u r mping r Se t u e f n Western P Lo lNo. 1 a w al e l wL ev n er l Station c Waterloo h am N Be m lh r o u h l o n F nc ve .
    [Show full text]