Local Plan Call for Sites Consultation Form (July 2018)

Total Page:16

File Type:pdf, Size:1020Kb

Local Plan Call for Sites Consultation Form (July 2018) Regulation 18 Local Plan Call for Sites Consultation Form (July 2018) The Local Plan will make site specific allocations for housing, employment and green spaces, similar to those in the Revised Trafford UDP. As part of the Issues Paper consultation we welcome the submission of any sites you wish to be considered for development, protection or for some other purpose within Trafford. Each submission will be assessed in terms of its ‘fit’ with the Local Plan and against sustainability criteria, which may ultimately lead to the site being allocated. Sites submitted for development will be assessed to establish their capacity, suitability, availability and achievability, taking into account planning policy, the environment and local constraints and the extent to which they can be mitigated or addressed. Sites submitted to be considered for protection or another purpose will be assessed on their suitability for the proposed use. The Call for Sites will not determine whether a site should be allocated for a particular use, it is a technical exercise aimed at identifying the potential of sites for different allocations. Guidelines Use a separate Call for Sites form for each site Submit an Ordnance Survey map clearly showing the boundaries of the site. If there is more than one landowner, please ensure the land ownership boundaries are clearly defined on the map, and please provide confirmation that each landowner is in agreement of the consideration of the land for possible development. If the site is to be considered in conjunction with other sites, to form a larger development area, please ensure details are clearly provided within the form. This form and accompanying information should be submitted by email to [email protected] or by post to Strategic Planning, Strategic Growth Services, Trafford Council, Trafford Town Hall, Talbot Road, Manchester, M32 0TH. If you have any enquiries regarding the Call for Sites, please email [email protected] or call 0161 912 3149, and a member of the Strategic Plan will be able to assist. Site submissions are invited on the Call for Sites from 23rd July 2018 until 14th September 2018 when the consultation will close. Data protection Please note all comments will be held by the Council and will be available to view publicly. Comments cannot be treated as confidential. Your personal information such as your postal and e-mail address will not be published, but your name and organisation (if relevant) will. Trafford Council maintains a database of consultees who wish to be kept informed about strategic planning matters such as the Local Plan. In responding to this consultation your contact details will automatically be added to the consultation database (if not already held). If you do not want to be on the consultation database and therefore not be contacted about future strategic planning consultations please state this in your response. 1 | P a g e Personal details Title Miss Forename Olivia Surname Carr Organisation Turley (if applicable) Position/title Planner (if applicable) Address 1 New York Street Manchester Postcode M1 4HD Email address [email protected] Landline phone no 0161 233 7676 Mobile phone no n/a Your interest in the site Owner of (all or part of) the site (please tick or highlight all that Agent acting on behalf of landowner or developer apply to you) X A planning consultant A developer Resident Community group Other (please specify) If you are representing another person, please provide their details as follows: Title Mr Forename Richard Surname Knight Organisation Peel Holdings (Land and Property) Limited (if applicable) Position/title Planning Director (if applicable) Address Peel Dome The Trafford Centre Manchester Postcode M17 8PL Email address [email protected] Landline phone no n/a Mobile phone no n/a 2 | P a g e If you are not the landowner or the site is in multiple ownership, please submit the details of all land owner/s. Please attach an additional sheet giving multiple ownership details if necessary. Title Forename Surname Organisation (if applicable) Position/title (if applicable) Address Postcode Email address Landline phone no Mobile phone no Does the owner of the site n/a know you are proposing the site for consideration? Do you have a legal option to n/a purchase the land in question? Do all landowners consent to n/a their land being considered? Are there any leaseholders on Yes. There are several leaseholders within TraffordCity, any the site? (If yes, please leaseholders which relate to the sites proposed for development provide details) are included on the separate call for sites form for individual sites. 3 | P a g e Site information Site address (if no formal TraffordCity Strategic Location for Growth address, please describe as Land bounded by M60, Bridgewater Canal, Manchester Ship best able to) Canal and Parkway Site postcode (if known) Grid reference (if known) Eastings 377866 Northings 396434 Site size (if known) please Approximately 200 hectares specify unit of measurement Has the land been previously Yes developed? Significant vacant sites within the identified area. Warehousing/industry and are predominant historic use. Existing use of site Mixed use – extensive retail (including the Intu Trafford Centre) and quasi retail, tourism, office, hotel, food and drink, sport/leisure exhibition/conferencing, warehousing/industrial. Description of surrounding land Surrounding land comprises a mix of employment and residential uses development. Medium level density, generally up to five storeys in height and of varying age and quality. In addition to established residential uses, notable landmark commercial uses within the surrounding area include, Port Salford (under construction), Intu Trafford Centre, Trafford Retail Park, Trafford Leisure Park and Trafford Park Industrial Estate. Does the site have any See individual site submissions relating to: relevant previous or existing Trafford Waters planning history? Barton Bridges Heritage Project EventCity Container base site, Barton Dock Road Compound behind Holiday Inn, Trafford Park Bridgewater Centre Fords of Winsford Site Land between Junction 10 of the M60 and Trafford Golf Centre Land at Trafford Leisure Village Land adjoining Manchester Ship Canal and Western Gateway Infrastructure Scheme Any other details on the site n/a relating to current or previous use 4 | P a g e Sites proposed for development Developable area, stating unit c. 200 hectares of measurement Development type Details Residential See Trafford Waters site submission. Area has capacity for at least 3,000 residential dwellings. Gypsy and traveller sites n/a Offices See individual site submissions relating to: Trafford Waters Bridgewater Centre Fords of Winsford Site Land between Junction 10 of the M60 and Trafford Golf Centre Land at Trafford Leisure Village Land between Manchester Ship Canal and WGIS Compound behind Holiday Inn Industry / warehousing See former container base site submission. Retail n/a 5 | P a g e Other sites for consideration Other proposal Hotels Leisure use (e.g. for protection, designation Tourist and cultural facilities as open space, conservation Food and drink uses area etc.) Suitability Physical and infrastructure Please refer to separate call for site forms for individual sites features within TraffordCity Strategic Location: • Trafford Waters • Barton Bridges Heritage Project • EventCity • Container base site, Barton Dock Road • Compound behind Holiday Inn, Trafford Park • Bridgewater Centre / Fords of Winsford Site • Land between Junction 10 of the M60 and Trafford Golf Centre • Land at Trafford Leisure Village • Land adjoining Manchester Ship Canal and Western Gateway Infrastructure Scheme Environmental features Please refer to separate call for site forms for individual sites within the TraffordCity Strategic Locations (as above). Ecology features Please refer to separate call for sites forms for individual sites within the TraffordCity Strategic Location (as above). Heritage features Please refer to separate call for sites forms for individual sites within the TraffordCity Strategic Location (as above). 6 | P a g e Protected recreation/open Please refer to separate call for sites forms for individual sites space within the TraffordCity Strategic Location (as above). Could interventions be made to Should constraints be identified throughout the planning overcome any constraints to applications for the individual sites, the process and the relevant development? technical work and mitigation measures will be put in place, where appropriate. What road would provide Please refer to separate call for sites forms for individual sites access to the site if required? within the TraffordCity Strategic Locations (as above). This includes where a new road would be required to link an existing road. Do you own, or have Yes. unrestricted rights over the existing or proposed access to the site? Would the occupiers of any Yes. new development have full access rights to the site? When would you anticipate the Immediately site being available for X 0 – 5 years development to start? X 5 – 10 years X 10 – 15 years X Beyond 15 years Has the site received any Please refer to separate call for sites forms for individual sites interest from developers? within the TraffordCity Strategic Locations (as above). 7 | P a g e Are there any legal constraints Please refer to separate call for sites forms for individual sites on the site that may impede
Recommended publications
  • Port Salford and Western Gateway Infrastructure Scheme Environmental Statement Addendum
    Port Salford and Western Gateway Infrastructure Scheme Environmental Statement Addendum June 2013 Port Salford and Western Gateway Infrastructure Scheme Environmental Statement Addendum Contents 1. Introduction 2. Site Description 3. Amended Development Proposals 4. Planning Policy Context 5. Alternatives 6. Ground Engineering and Construction 7. Water Quality 8. Traffic and Transport 9. Air Quality 10. Noise and Vibration 11. Nature Conservation 12. Landscape and Visual Amenity 13. Archaeology 14. Heritage Features 15. Agricultural Land Quality 16. Socio-Economic 17. Hazard and Risk 18. Overall Conclusions 2 Port Salford & WGIS ES Addendum Rail Realignment June 2013 1. Introduction Introduction 1.1. In August 2009 planning permission (Ref: 03/47344/EIAHYB) was granted by Salford City Council (SCC) on behalf of Peel Investments (North) Ltd, for the development of the Port Salford (PS) multimodal freight interchange including rail served distribution warehousing, rail link and sidings, intermodal and ancillary facilities and strategic road improvements (referred to as the Western Gateway Infrastructure Scheme (WGIS)). 1.2. The proposals were accompanied by a comprehensive Environmental Impact Assessment. 1.3. The WGIS and Port Salford proposals have now received a significant award from the Regional Growth Fund and are listed within Government’s National Infrastructure Plan 2011 in recognition of the economic benefits that the scheme will deliver. 1.4. In September 2012 two further permissions were granted to cover minor amendments to the approved A57 road alignment. At the same time the opportunity was taken to amend planning conditions to facilitate a phased approach and update policy references. The two permissions are: I) 12/61611/EIAHYB Application to vary or remove a number of conditions attached to planning permission 03/47344/EIAHYB; and II) 12/61631/EIA Construction of a highway in connection with the re-alignment of the Western Gateway Infrastructure Scheme (WGIS) and planning application 12/61611/EIAHYB.
    [Show full text]
  • Manchester M2 6AN Boyle 7 C Brook Emetery Track Telephone 0161 836 6910 - Facsimile 0161 836 6911
    Port Salford Project Building Demolitions and Tree Removal Plan Peel Investments (North) Ltd Client Salford CC LPA Date: 28.04.04 Drawing No.: 010022/SLP2 Rev C Scale: 1:10 000 @Application A3 Site Boundary KEY Trees in these areas to be retained. Scattered or occasional trees within these areas to be removed SB 32 Bdy t & Ward Co Cons SL 42 Const Bdy Boro Chat Moss CR 52 Buildings to be Demolished MP 25.25 OAD B 62 ODDINGTON ROA STANNARD R Drain 9 8 72 D 83 43 5 6 GMA PLANNING M 62 36 35 SP 28 35 27 48 3 7 2 0 19 4 0 Drain C HA Drain TLEY ROAD 3 MP 25.25 6 23 King Street, Manchester M2 6AN 12 Planning and Development Consultants Chat Moss 11 CR 32 rd Bdy Wa nst & Co Co Bdy Const e-mail [email protected] o Bor 2 53 8 1 Telephone 0161 836 6910 - Facsimile 0161 836 6911 22 Barton Moss 10 16 ROAD F ETON OXHIL BRER 9 rain 43 D L ROAD 23 Drain 2 0 St Gilbert's 33 Catholic Church MP 25 Presbytery 10 3 2 2 4 Drain Barton Moss 2 Drain Drain CR Drain 1 13 15 Co Const Bdy 6 Track Barton Moss 16 Dra Boro Const and Ward Bdy in MP 24.75 27 Eccles C of E High S Drain FLEET ROAD 6 3 ORTH 26 N SL chool D rain 0 3 Drain 39 Drai n 36 Drain BUC KT HORN D E L OA R Drain AN E D ra ILEY in H M 62 53 44 51 55 Dra 5 9 0 5 in M 62 Drain Brookhouse k Sports Centre Barton Moss Primary School rac T 0 6 63 H ILEY ROA D 6 N 5 O BU RTH D 78 rai 2 CK FLEE n T 67 4 35 H O 3 3 54 RN LA 6 T Pavilion 3 ROAD 75 N 74 E 34 27 25 18 78 6 20 7 80 88 Drain 1 1 TRIPPIER ROAD 6 56 23 58 0 30 6 3 1 n 32 55 89 9 2 7 Drai 6 1 9 6 93 64 3 2 15 95 59 ROCHFORD R 59 2 9 15 66
    [Show full text]
  • Cadishead Viaduct and the Cheshire Lines Rail Line
    Proposal to re-open Cadishead Viaduct and the Cheshire Lines rail line The art of the possible! This document has been produced by Hamilton Davies Trust (HDT) to provide background and scope for the Cadishead Viaduct potential re-opening debate. HDT has been heavily involved in the regeneration of Irlam and Cadishead since 2008, working with key local, regional and national stakeholders to make Irlam and Cadishead an even better place to live, work and enjoy. As part of our regeneration agenda, the poor state and appearance of Cadishead Viaduct has been a topic of conversation for some time. Two years ago we started to investigate the possibility of improving its appearance and putting the bridge back into use. This document summarises the history of the bridge and the compelling opportunities re-opening the viaduct would bring. HDT has now adopted the project and is championing the reopening of the viaduct for multi modal use including a new section of the national cycleway, footpath and heritage railway amongst other options. Cadishead Viaduct Built in 1893, Cadishead Viaduct is a magnificent structure which dominates the landscape across the Manchester Ship Canal. Originally constructed to run the Cheshire Lines railway over the newly built canal, the viaduct helped to service the busy factories in the area, transporting raw materials and finished goods, as well as some passenger services. Due to the decline in industry, the rail line closed to passengers in 1965 and eventually to freight in 1984 when coal exports ceased. With the line no longer in use and the high cost of maintenance, the bridge was eventually closed and industrial containers positioned at either side to prevent access to the structure.
    [Show full text]
  • 4 Port Salford Heritage Assessment All Sites
    Salford City Council Revised Draft Salford Local Plan Heritage Assessments of Site Allocations February 2019 1 Contents Page number Introduction 3 Land west of Hayes Road 12 Charlestown Riverside 18 Brackley Golf Course 33 Land west of Kenyon Way 34 Orchard Street 35 Land south of the Church of St Augustine 48 Land north of Lumber Lane 64 Land at A J Bell Stadium 71 Hazelhurst Farm 80 Land east of Boothstown 81 Western Cadishead and Irlam 91 Extension to Port Salford 107 Appendix A – Historic England Response to the Draft Salford 124 Local Plan Consultation December 2016 Appendix B – Salford City Council Initial Screening Assessment and 136 GMAAS Archaeological Screening Assessment Introduction These background papers have been produced to form part of the evidence base for the local plan. The assessments have been based on the site allocations and boundaries as proposed in the Draft Local Plan (November 2016) and used to inform the development of the Revised Draft Local Plan and specifically, the site requirements included within the site allocation policies. Background The Draft Local Plan was published for consultation for a 10 week period commencing 8 November 2016 to 16 January 2017. In response to the Draft Local Plan consultation, representations were received from Historic England as a statutory consultee in relation, in part, to the supporting evidence base to the local plan. Historic England did not consider that the city council had adequately demonstrated that the policies and proposals contained within the Draft Local Plan had been informed by a proper assessment of the significance of the heritage assets in the area.
    [Show full text]
  • Area Footpath Secretary
    MANCHESTER AND Manchester and Salford SALFORD Local Group Newsletter and Walks (M & S Ramblers) No 43 December 2019 CHRISTMAS SOCIAL!!! MONDAY DECEMBER 16TH We are going to meet up at the Gold Royal Mail Post Box on the corner of Albert Square outside the Slug and Lettuce at 6.30. From there we will go across to the Windmill bar in the Christmas market for our first drink. Following that we will walk to the Paramount Wetherspoons, Oxford Road for food, drink and of course a quiz. If you prefer to meet us at the venue that's fine. Hopefully we'll see lots of familiar faces and maybe some new ones too. There is no need to book this event just come along on the night. Chris Quinn Future Socials Nothing booked yet but here are some of our suggested events for next year. Tour of RHS gardens in Worsley Tour of the Refuge Building/Principal Hotel. Ramsbottom and the ELR railway Styal Mill Rochdale heritage walk Pia's geology walk part 3 Theatre trip to Oldham Coliseum Creative Manchester with Emma Fox Summer social A visit to a recycling plant ...and of course our Christmas social 2020 SALFORD TRAIL IMPROVEMENT WORK 1 A long time in the planning, and after various setbacks, one weekend in November saw the improvement of a footpath by the River Irwell near Clifton Junction. A small team of M&S Ramblers and a couple of contractors with super mini diggers managed to resurface over 300m of path. Well done to David Yates, for doggedly getting this project done.
    [Show full text]
  • Locality Plan for Salford
    GM H&SC DEVOLUTION – SALFORD LOCALITY PLAN Greater Manchester Health and Social Care Devolution Locality Plan for Salford August 2017 1 GM H&SC DEVOLUTION – SALFORD LOCALITY PLAN CONTENTS 1 STRATEGY AND OUTCOMES Page NOTES TO THIS VERSION 3 EXECUTIVE SUMMARY 5 KEY TERMS – Glossary 15 1.1 INTRODUCTION – PURPOSE 16 1.2 LOCAL CONTEXT 17 1.3 PARTNERS IN THIS LOCALITY PLAN 19 1.4 METHODOLOGY 20 1.5 RATIONALE – the case for change 21 1.6 VISION AND OUTCOMES 24 1.7 TIMESCALES FOR CHANGE 25 1.8 SETTING OUT OUR AMBITION 26 1.9 OUTCOME MEASURES 27 2 THE LIFE COURSE 2.1 STARTING WELL 30 2.2 LIVING WELL 35 2.3 AGEING WELL 39 3 TRANSFORMATION 3.1 OUR TRANSFORMATION PRIORITIES 43 3.2 DRIVING CHANGE 46 3.3 ENABLING TRANSFORMATION 50 Standardisation of clinical support and back office functions Enabling better care 3.4 PREVENTION 62 Upgrading population health, prevention and self-care 3.5 BETTER CARE 77 Transformation of community based care and support Standardisation of acute and specialist care 4 GOVERNANCE and FINANCE 4.1 GOVERNANCE 95 4.2 PERFORMANCE REPORTING ARRANGEMENTS 96 4.3 GM GOVERNANCE ARRANGEMENTS 96 4.4 FINANCIAL PLAN 98 4.5 MANAGING RISK LIST OF APPENDICES AND SUPPORTING PAPERS 106 2 GM H&SC DEVOLUTION – SALFORD LOCALITY PLAN NOTES TO THIS VERSION August 2017 This document is a living and breathing blueprint for change and is intended to be reviewed on a periodic basis. The following issues should be noted whilst reading this Plan: This version has been prepared to accompany Salford’s applications into the 2016/17 Transformation Fund.
    [Show full text]
  • PHASE THREE of FORTIS QUAY - SALFORD QUAYS 2 Frontal View - Grapnel Apartments SALFORD QUAYS
    PHASE THREE OF FORTIS QUAY - SALFORD QUAYS 2 Frontal View - Grapnel Apartments SALFORD QUAYS PHASE THREE OF FORTIS QUAY - SALFORD QUAYS The images provided in this document are intended as a guide and could be subject to change 3 Fortis Quay is a premier residential destination in the heart of Salford Quays comprising four unique developments which, when combined, create the perfect village environment - a go-to destination to live, work and play. 4 SALFORD QUAYS The Fortis Quay concept was formed to recognise the history of the now iconic Salford Quays waterfront, with a nod to the area’s illustrious past as one of the UK’s most popular ports despite its inland position. The canals that still exist to this day give Salford Quays a unique identity, and make them a picturesque and peaceful place to live. The four distinct phases of Fortis Quay will each take the name of a type of anchor in honour of the waterways which give Salford Quays their personality, and will each focus on a key area of Salford and why the area has become a key tenant destination. Phase 1: Herreshoff Apartments Phase 2: Danforth Apartments Phase 3: Grapnel Apartments Phase 4: Northill Apartments Although these four phases exist as separate and distinct entities in their own right, together they make up Fortis Quay, a collection of desirable residential apartment buildings ofering future tenants the best in quayside living. 5 Why Grapnel Apartments Salford Quays is one of the UK’s best rental markets High-end apartments close to Manchester city centre Short walk to MediaCityUK 27th collaboration between Knight Knox and Fortis Developments 321 metres to Salford Quays tram stop All apartments fully let and managed by experienced letting agency 6 SALFORD QUAYS Grapnel Apartments is the third phase of the stunning Fortis Quay development located in the heart of Salford Quays, one of the most desirable rental locations in the UK.
    [Show full text]
  • Peel in the Northern Powerhouse the Peel Group With
    Contents Peel in the Northern Powerhouse with Powerful Partnerships working together to deliver Foreword 2 150 projects in the North Introduction 3 Joint objectives 4 What we bring 5 150 Projects 6 Our past 7 Our present 8 150 Our future 9 Shared agency 10 Joint benefits 11 1 October 2015 Foreword The North of England led the Industrial Revolution, by a combination of people, natural resources, ideas and place. Having faced major challenges in the 20th century, the North is now repositioning itself – through regeneration, technology and science, connectivity and sustainable resources. The Peel Group has, through powerful partnerships, played a part in this renaissance, by investing in transport infrastructure, media, energy and property. The Northern Powerhouse is a recognition of the scale and potential of the Northern economy, and the objective to achieve significant growth to rebalance the UK economy. As a strategic private sector investor that reinvests and recycles capital in the North, our prosperity and wellbeing is inherently linked to that of the North. We work with a wide range of partners, bringing ideas and solutions, land and water resources, expertise and capital. We take a long term perspective and have a strong track record of facilitating and delivering investment, driven by our motto of ‘determination, perseverance and patience’. We are greatly excited by the potential of the Northern Powerhouse and devolution to our public sector partners in the North. It is vital that strong leadership and clear, ambitious plans are put in place to secure direct investment in the Northern Powerhouse by both the private sector and by Government.
    [Show full text]
  • Greater Manchester Local Transport Plan 3: Capital Programme 2015/16 – 2020/21
    2 Greater Manchester Local Transport Plan 3 | Capital Programme 2015/16 – 2020/21 Greater Manchester Local Transport Plan 3: Capital Programme 2015/16 – 2020/21 1. Summary Greater Manchester’s Third Local Transport Plan (2011) set out a long-term strategy for the period to 2026 along with more detailed spending plans for the four years to 2015. Since that time we have made significant progress in delivering a £1.5 billion programme of major transport schemes which are transforming the public transport network. Metrolink lines have been opened to East Didsbury, Oldham and Rochdale and Ashton-under-Lyne, while the Airport line and Second City Crossing (2CC) are under construction. Also underway is a major bus priority programme, consisting of the Cross-city Bus Package and the Leigh-Salford- Manchester Busway, the number of bus stations has increased, and park and ride has seen a major expansion. Greater Manchester has recently been awarded funding of £314 million for major schemes (costing more than £5 million) and £15.2 million for small schemes (costing less than £5 million) for the period 2015/16 to 2020/21 and has also agreed the ‘Earnback’ deal with Government. Earnback means that the investment we have raised locally for major transport schemes will be ‘paid back’ as economic growth is achieved, enabling us to invest in more schemes. We have also been awarded £5 million from the Local Sustainable Transport Fund for 2015/16 to continue our travel choices programme, which encourages people to walk, cycle or use public transport, particularly for journeys to work or school.
    [Show full text]
  • £1.14Bn £ Net Additional GVA to the North West Economy
    projects years | Liverpool Waters | Wirral Waters | Port of Liverpool | intu Trafford Centre, Manchester Ocean Gateway £billion An internationally50 significant programme of private sector investment TRANSPORT LOGISTICS COMMUNITIES REGENERATION SUSTAINABLE RESOURCES Nearly £1bn Over £2bn of private of private investment | Port Warrington | Port Salford from The | EventCity | AJ Bell Stadium investment Peel Group since 2008 since 2008 £1.14bn £ net additional GVA to the North West economy | MediaCityUK | Liverpool2 11,280 | Lowry Outlet Shopping | Manchester Ship Canal jobs created in its first five years prompted the construction of 1,300 homes forecast to generate 37,000 GWh of power, save 12 million tonnes of carbon & 14 million tonnes of waste | Liverpool John Lennon Airport | Scout Moor Wind Farm Source:www.oceangateway.co.uk AMION Consulting | Ince Biomass Park, Cheshire | Mersey Tidal Power 42 Ocean Gateway – more than 50 projects over 17 29 41 50 years with £50 billion of investment – is 43 566 The Peel Group’s vision for the renaissance 15 47 Manchesterhestes of the strategic corridor encompassing 16 8 39 2 20 494 25 40 455 101 Manchester, Liverpool and adjacent areas 333 46 4 505 within Cheshire and Warrington. The focus 1 13 9 27 52 39 is on the regeneration of land and assets 48 6 fronting the Manchester Ship Canal and the 23 5 Liverpool 38 River Mersey. 28 53 Warrington 55 54 Birkenhead Ocean Gateway projects embrace ports; logistics; 7 3 51 retail and leisure; residential; commercial development; 34 media infrastructure and renewable energy. Signature 26 schemes include Liverpool Waters; Liverpool2; Wirral 21 22 444 Waters; MediaCityUK, Manchester; Port Salford; 32 Runcorn Key Liverpool John Lennon Airport and the planned 37 11 1 Transport and logistics expansion of Scout Moor wind farm in Lancashire.
    [Show full text]
  • Greater Manchester Freight and Logistics Transport
    GREATER MANCHESTER FREIGHT AND LOGISTICS TRANSPORT STRATEGY Contents Chapter Pages 1. Introduction 3 Background 3 The vision 4 Wider strategic objectives 4 2. Context 5 Our freight transport network 6 The origins and destinations of our freight 8 Our logistics sites 9 Our commodity types 10 Employment and GVA 11 Urban freight 11 Safety 12 Air quality 13 The changing nature of freight and logistics 13 New technologies affecting freight 15 Embracing opportunities and rising to the challenges 16 Issues identified 17 3. The future of freight and logistics 20 Overview of change over the next 10 years 20 The vision for freight and logistics 21 Key objectives 21 Our approach 22 4. Proposals and interventions 23 Strategy and stakeholder engagement 23 Safety and regulation 24 Operational activity 25 Infrastructure 26 Planning and research 28 Evaluating success 29 Tables Table 2-1 Origins and destinations of freight across Greater Manchester 8 Table 2-2 Euro engine emissions standards 13 Figures Figure 2-1 Areas of highways congestion in Greater Manchester 6 Figure 2-2 Greater Manchester rail freight network and terminals 7 Figure 2-3 Density of freight goods movements 9 Figure 2-4 Warehouses over 9,000 square metres in Greater Manchester 9 Figure 2-5 Logistics business employment 11 Figure 2-6 Manchester city centre cordon LGV and OGV trends 12 Figure 2-7 UK HGV and LGV registrations by year 14 Figure 2-8 Stakeholders 21 2 1. Introduction Background Greater Manchester (GM) is at the heart of the North of England and is the origin and destination of significant levels of freight distribution, delivery and servicing activity as well as acting as a through-route for logistics activities across the region.
    [Show full text]
  • Salford's Priorities for Rail Service and Station Investment
    SALFORD’S PRIORITIES FOR RAIL SERVICE AND STATION INVESTMENT TO INFORM THE DEVELOPMENT OF A SALFORD RAIL STRATEGY LYNWOOD TRANSTEC LTD, CONSULTANTS TO THE RAILWAY & TRANSPORT INDUSTRIES, Lynwood House, 7 Lynwood Grove, STOCKPORT SK4 5DP STRUCTURE OF THE REPORT 1. THE PURPOSE OF A SALFORD RAIL STRATEGY 2. THE OBJECTIVES OF THE RAIL STRATEGY 3. THE CONTEXT OF THE RAIL STRATEGY Local / Regional context The Local Context The Regional Context The Rail North Long Term Rail Strategy (LTRS) Transport for the North ‘Northern Transport Strategy’ and the first Independent Economic Review for the North The Northern Hub The Re-Franchising of the Northern Railway and TransPennine Express Future franchises Transport for Greater Manchester Ten Year Rail Plan The Greater Manchester Transport Vision for 2040 4. RAIL IMPROVEMENTS IN THE SHORT TERM ELECTRIFICATION Proposals for Future Electrification Currently Committed Schemes TRAIN SERVICE DEVELOPMENT Summary of Key Service Changes – TransPennine Summary of Key Service Changes – Arriva Northern Railway IMPROVEMENTS TO SALFORD RAILWAY STATIONS Existing commitments Accessibility initiatives Salford Central Irlam Salford Crescent Walkden 5. INTERCHANGE AND INTEGRATION Regenerating communities through station development zones Station retail shops 6. RAIL IN THE COMMUNITY The National Context The Regional Context The Local Context - Station Adoption Community Rail Partnerships in practice The Journey Forward 7. RAIL FREIGHT IN GREATER MANCHESTER 8. LONGER TERM INTERVENTIONS Light rail, tram-train and associated
    [Show full text]