Gateway Upgrade North Map Large

Total Page:16

File Type:pdf, Size:1020Kb

Gateway Upgrade North Map Large Sandgate Station BCC Transfer Centre Gateway Upgrade North REVISED DESIGN Nudgee Extended on and off-ramps at Boar Rd Bicentennial Road interchange New bridges over Nundah Creek d St Rd e Deagon Boondall Station Wetlands Ridg New Nudgee Road n bridge over Gateway Redcliffe Nudgee acke Brisbane Realignment of motorway to Motorway Br New northbound Deagon Access to Deagon Deviation via Golf Course Entertainment ease curves and improve safety Deviation connection separate upgraded Braun Street/Depot Centre B k ic e from Gateway Motorway Rd intersection e e Childs Rd n r t C e Nudgee Waterhole n h Deagon Deagon Wetlands n a Realignment of d Reserve New northbound bridge over i a Deviatio Connect to existing Deagon n l u motorway to ease curves n bikeway bridge Racecourse Sandgate Road/Shorncliffe R N Extended on and rail line, including new d and improve safety off-ramps at Nudgee Nudgee shared pathway Road interchange Brau Connect to existing bikeways Service n St Centre New signalised intersection Nudgee Airport Depot Road widened to North at Bracken Ridge Road/ Line Station four lanes between Braun Boondall ncliffe Rail Barfoot Street to replace Station Stanwor Shor existing roundabout Street and the Gateway Boondall Motorway ramps Station Australian Connect to existing Catholic New northbound access Closure of Sandgate Road th River ay University Pine w bikeways to Deagon Deviation and northbound on-ramp or Rd ot Redcliffe via overpass from M Tinchi Tamba ay St the Gateway Motorway Legend w t e et New signalised intersection Wetlands Reserve at G rr ek at Sandgate Road/Holroyd Ba Cre Main alignment – 3 lanes minimum New shared cycle/pedestrian pathway Connect to existing e Street for improved access to Nudgee Jim Soorley Bikeway re in each direction Rd T North Boondall train station Sa Access to shared cycle/pedestrian pathway e Rd e nd t ag ga b te Off-ramp Pedestrian overpass Ridg b Incorporation of already a Rd Rd Br n C uc Bruce Highway Depo completed works from Gateway Pedestrian underpass e acke Additional Lane Project On-ramp High k e Br Rest area along shared pathway e wa r Modifications to local road C Fauna underpass y s l l i Fauna overpass (rope ladders) Bridge structure H d l a B 0 enlarge 50 y Highwa Bruce.
Recommended publications
  • Annual Report 2013—2014 Volume 1 of 2
    Volume 1 of 2 About the report What the report contains For more information The Department of Transport and Main Roads Annual Phone: +617 3066 7381 Report 2013–14 describes the department’s operations for the financial year from 1 July 2013 to 30 June 2014. It also Email: [email protected] presents our priorities for the forthcoming financial year Visit: Transport and Main Roads website www.tmr.qld.gov.au of 2014–15. Annual report website: www.qld.gov.au/about/staying- informed/reports-publications/annual-reports/ Why we have an annual report You can provide feedback on the annual report at the Queensland Government Get Involved website at As well as meeting the statutory requirement set out in www.qld.gov.au/annualreportfeedback. the Financial Accountability Act 2009 and the Financial and Performance Management Standard 2009, the annual The Queensland Government is committed to report is a vital tool in keeping the community, industry, providing accessible services to Queenslanders government and organisations informed about our from all culturally and linguistically diverse performance and future direction. backgrounds. If you have difficulty in understanding the annual report, you can contact us on 13 23 80* and we will arrange an interpreter to effectively Accessing the report communicate the report to you. The annual report is available on the Department of * Local call charge in Australia. Higher rates apply from mobile phones and payphones. Check with your service provider for call costs. For Transport and Main Roads website at www.tmr.qld.gov.au international callers, please phone +61 7 3834 2011.
    [Show full text]
  • Annual Report 2013—2014 Volume 1 of 2
    Volume 1 of 2 About the report What the report contains For more information The Department of Transport and Main Roads Annual Phone: +617 3066 7381 Report 2013–14 describes the department’s operations for the financial year from 1 July 2013 to 30 June 2014. It also Email: [email protected] presents our priorities for the forthcoming financial year Visit: Transport and Main Roads website www.tmr.qld.gov.au of 2014–15. Annual report website: www.qld.gov.au/about/staying- informed/reports-publications/annual-reports/ Why we have an annual report You can provide feedback on the annual report at the Queensland Government Get Involved website at As well as meeting the statutory requirement set out in www.qld.gov.au/annualreportfeedback. the Financial Accountability Act 2009 and the Financial and Performance Management Standard 2009, the annual The Queensland Government is committed to report is a vital tool in keeping the community, industry, providing accessible services to Queenslanders government and organisations informed about our from all culturally and linguistically diverse performance and future direction. backgrounds. If you have difficulty in understanding the annual report, you can contact us on 13 23 80* and we will arrange an interpreter to effectively Accessing the report communicate the report to you. The annual report is available on the Department of * Local call charge in Australia. Higher rates apply from mobile phones and payphones. Check with your service provider for call costs. For Transport and Main Roads website at www.tmr.qld.gov.au international callers, please phone +61 7 3834 2011.
    [Show full text]
  • ASX Release Template 2016-9 New Logo
    asx release 31 October 2016 TRANSURBAN QUEENSLAND EURO MEDIUM TERM NOTE PROGRAMME UPDATE Transurban announces that Transurban Queensland, in which Transurban has a 62.5% interest, has updated its Euro Medium Term Note Programme today by lodging the following Second Supplemental Offering Circular with the Singapore Exchange. Amanda Street Company Secretary Investor enquiries Jessica O’Brien Investor Relations Manager +61 3 8656 8364 For personal use only Classification Transurban Group Transurban International Limited ABN 90 121 746 825 Transurban Holdings Limited ABN 86 098 143 429 Level 23 Transurban Holding Trust Tower One, Collins Square ABN 30 169 362 255 727 Collins Street Docklands ARSN 098 807 419 Victoria 3008 Australia [email protected] Telephone +613 8656 8900 www.transurban.com Facsimile +613 9649 7380 IMPORTANT NOTICE NOT FOR DISTRIBUTION TO ANY U.S. PERSON OR TO ANY PERSON OR ADDRESS IN THE U.S. IMPORTANT: You must read the following before continuing. The following applies to the supplemental offering circular following this page, and you are therefore advised to read this carefully before reading, accessing or making any other use of the supplemental offering circular. In accessing the supplemental offering circular, you agree to be bound by the following terms and conditions, including any modifications to them any time you receive any information from us as a result of such access. NOTHING IN THIS ELECTRONIC TRANSMISSION CONSTITUTES AN OFFER OF SECURITIES FOR SALE IN THE UNITED STATES OR ANY OTHER JURISDICTION WHERE IT IS UNLAWFUL TO DO SO. THE SECURITIES HAVE NOT BEEN, AND WILL NOT BE, REGISTERED UNDER THE U.S.
    [Show full text]
  • Gateway Motorway and Bruce Highway Upgrades – North Brisbane to Moreton Bay Region Initial Consultation Summary
    Gateway Motorway and Bruce Highway Upgrades – north Brisbane to Moreton Bay Region Initial Consultation Summary February 2021 Copyright This publication is protected by the Copyright Act 1968. © State of Queensland (Department of Transport and Main Roads), February 2021. Licence The material in this work is licensed by the Department of Transport and Main Roads under a Creative Commons Attribution 4.0 International licence (CC BY 4.0), with the exception of: • the Queensland Coat of Arms • the Australian Government Coat of Arms • this department’s logo • any third party material, and • any material protected by a trademark. More information on the CC BY licence is set out as follows: • Creative Commons website–www.creativecommons.org • Attribution 4.0 international (CC BY 4.0)–https://creativecommons.org/licenses/by/4.0/ Third party copyright Third party material that is not licensed under a Creative Commons licence is referenced within this document: • all photographs, graphics, images and maps All content not licensed under a Creative Commons licence is all rights reserved. Please contact the Department of Transport and Main Roads (the copyright owner) if you wish to use this material. Attribution The CC BY licence is a standard form licence agreement that allows you to copy and redistribute the material in any medium or format, as well as remix, transform, and build upon the material, on the condition that you provide a link to the licence, you indicate if changes were made, and you attribute the material as follows: © State of Queensland
    [Show full text]
  • Connecting SEQ 2031 an Integrated Regional Transport Plan for South East Queensland
    Connecting SEQ 2031 An Integrated Regional Transport Plan for South East Queensland Tomorrow’s Queensland: strong, green, smart, healthy and fair Queensland AUSTRALIA south-east Queensland 1 Foreword Vision for a sustainable transport system As south-east Queensland's population continues to grow, we need a transport system that will foster our economic prosperity, sustainability and quality of life into the future. It is clear that road traffic cannot continue to grow at current rates without significant environmental and economic impacts on our communities. Connecting SEQ 2031 – An Integrated Regional Transport Plan for South East Queensland is the Queensland Government's vision for meeting the transport challenge over the next 20 years. Its purpose is to provide a coherent guide to all levels of government in making transport policy and investment decisions. Land use planning and transport planning go hand in hand, so Connecting SEQ 2031 is designed to work in partnership with the South East Queensland Regional Plan 2009–2031 and the Queensland Government's new Queensland Infrastructure Plan. By planning for and managing growth within the existing urban footprint, we can create higher density communities and move people around more easily – whether by car, bus, train, ferry or by walking and cycling. To achieve this, our travel patterns need to fundamentally change by: • doubling the share of active transport (such as walking and cycling) from 10% to 20% of all trips • doubling the share of public transport from 7% to 14% of all trips • reducing the share of trips taken in private motor vehicles from 83% to 66%.
    [Show full text]
  • Gateway Upgrade North—Nudgee to Bracken Ridge, Newsletter May 2015
    Gateway Project Newsletter UPGRADE NORTH May 2015 The Gateway Upgrade North Preferred Plan was released to the public in October 2013. This $1.162 billion upgrade project jointly funded by the Australian and Queensland governments has now progressed to the delivery phase. The Preferred Plan concepts include: ` reconfiguring the Nudgee interchange, including a new Nudgee Road overpass and a relocated and extended northbound on-ramp ` widening the Deagon Deviation between Depot Road and Bracken Ridge Road to provide two lanes in each direction, separate to the motorway ` modifications to the Bicentennial and Depot Road interchanges including extensions to the on and off-ramps ` construction of off-road cycle and pedestrian facilities. When complete, the Gateway Upgrade North project will reduce congestion, accommodate This Preferred Plan will be developed further future growth and improve motorists’ Sustainability over the coming months. safety by: The Australian and The Department of Transport and Main Roads ` upgrading the motorway from four to six Queensland governments and Transurban Queensland have been lanes between Nudgee and Bracken Ridge and Transurban working together to manage the Gateway ` constructing wider shoulders Queensland are Upgrade North Project. ` extending on and off-ramps committed to sustainable Tenders have now closed for the major works ` installing new safety barriers outcomes on the project. contract for the design and construction Tenderers have been phase of the works. The tender evaluation ` separating local
    [Show full text]
  • RACQ Recommended Projects for Acceleration and Funding
    RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise
    [Show full text]
  • 1 December 2020 Mr Neil Laurie the Clerk of the Parliament Parliament House George Street BRISBANE QLD 4000 Dear Mr Laurie
    Our ref: PET 38491 Your ref: A600274 1 December 2020 Mr Neil Laurie The Clerk of the Parliament Parliament House George Street BRISBANE QLD 4000 Dear Mr Laurie I refer to my interim response to petition 3361-20 about Dohles Rocks Road on/off ramps at Murrumba Downs and Griffin, which was tabled on 8 October 2020. The Australian and Queensland governments have committed $2.1 billion of joint funding (on an 80:20 federal:state funding basis) for upgrades to the Gateway Motorway and the Bruce Highway. As part of this joint funding, on 3 April 2018, without any prior consultation with the Queensland Government, the Australian Government announced a commitment of $120 million towards a $150 million project (on an 80:20 federal:state funding basis) to construct northbound entry and southbound exit (north-facing) ramps to the Bruce Highway at the Dohles Rocks Road interchange, Murrumba Downs. The Department of Transport and Main Roads (TMR) is unaware of the costing methodology adopted by the Australian Government for the proposed north-facing ramps, and the true cost of construction has yet to be determined. The Dohles Rocks Road north-facing ramps form part of integrated planning underway for the Gateway Motorway and Bruce Highway Upgrades (GMBHU) project to achieve the optimum whole-of-network solution for the North Brisbane and South Moreton area. TMR’s initial modelling has identified that introducing north-facing ramps at Dohles Rocks Road interchange, as a standalone solution, will significantly increase congestion and result in increased travel time for the Bruce Highway during the morning and afternoon peak times, as more vehicles access the highway to make local trips.
    [Show full text]
  • Gateway Upgrade North Project Newsletter—January 2018
    Working towards sustainability Gateway excellence UPGRADE Following the project’s Infrastructure Project Newsletter NORTH Sustainability Council of Australia (ISCA) January 2018 Design rating award of ‘Excellent’, the team is now working towards achieving an equally ‘Excellent’ As Built rating. The ISCA As Built rating assesses the project’s construction phase ensuring the New bridge for Nudgee - sustainable innovations and opportunities About the project: identified during the design phase are successfully implemented. Some of first new major structure ` Involves upgrading the The Turrbal people monitor works to ensure that any artifacts and items of cultural significance are correctly identified. the innovations being implemented Gateway Motorway to six on the Gateway Upgrade North project completed lanes between Nudgee and include the use of EME2 asphalt, fauna Building cultural awareness connectivity and the use of sustainable Deagon and renewable resources. The project’s The Gateway Upgrade North project has a team of Cultural Heritage Officers who work As Built rating will be determined towards ` Will widen the Deagon closely with the Turrbal people, across various aspects of design and construction. This work is part of the project team’s duty of care under the Aboriginal Cultural Heritage completion of construction in late 2018. Deviation to provide two Act (2003). lanes in each direction Some of the activities the Turrbal between Depot Road and people have been involved in on this Bracken Ridge Road project, include: ` working
    [Show full text]
  • South East Queensland Regional Plan 2017 Shapingseq
    South East Queensland Regional Plan 2017 ShapingSEQ Consultation report August 2017 This report provides an overview of the statutory and non-statutory consultation undertaken on the draft South East Queensland Regional Plan 2016 (draft ShapingSEQ). The findings of this report have been considered by the Minister for Infrastructure and Planning, and where relevant have been incorporated into the final ShapingSEQ. © State of Queensland, August 2017. Published by the Department of Infrastructure, Local Government and Planning, 1 William Street, Brisbane Qld 4000, Australia. Licence: This work is licensed under the Creative Commons CC BY 4.0 Australia Licence. In essence, you are free to copy and distribute this material in any format, as long as you attribute the work to the State of Queensland (Department of Infrastructure, Local Government and Planning) and indicate if any changes have been made. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/. Attribution: The State of Queensland, Department of Infrastructure, Local Government and Planning. The Queensland Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on 131 450 and ask them to telephone the Queensland Department of Infrastructure, Local Government and Planning on 13 QGOV (13 74 68).
    [Show full text]
  • Queensland Transport and Roads Investment Program for 2021–22 To
    Metropolitan 2,965 km2 Area covered by location1 32.10% Population of Queensland1 438 km Other state-controlled road network 89 km National Land Transport Network2 88 km National rail network See references section (notes for map pages) for further details on footnotes. Brisbane Office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Brisbane | Qld 4000 (07) 3066 4338 | [email protected] Program Highlights • continue design and construction of the Salisbury Future Plans park ‘n’ ride upgrade We continue to plan for the future transport requirements of Metropolitan. In 2020–21 we completed: • complete construction of the Carseldine park ‘n’ ride upgrade In 2021–22 key planning includes: • the Ipswich Motorway (Rocklea – Darra) Stage 1 project, to upgrade the motorway from four to six • commence construction for the upgrade of • continue planning of the Boundary Road rail level lanes from just east of the Oxley Road roundabout Cleveland – Redland Bay Road between Anita Street crossing removal at Coopers Plains to the Granard Road interchange at Rocklea, jointly and Magnolia Parade, as part of the Queensland funded by the Australian Government and Queensland Government’s COVID-19 economic recovery response • continue planning of the Beams Road rail level Government crossing at Carseldine and Fitzgibbon • continue planning for the upgrade of the Centenary • the Sumners Road interchange upgrade over the Motorway and Logan Motorway interchange, as part • continue planning for six lanes on the Gateway Centenary Motorway of the Queensland Government’s COVID-19 economic Motorway from Bracken Ridge to Pine River recovery response • strengthening work on the Gateway Motorway Flyover, • continue planning for the Lindum station precinct.
    [Show full text]
  • Queensland Transport and Roads Investment Program 2019–20 to 2022–23 Metropolitan 2,965 Km2 Area Covered by District1
    Queensland Transport and Roads Investment Program 2019–20 to 2022–23 Metropolitan 2,965 km2 Area covered by district1 31.97% Population of Queensland1 438 km Other state-controlled road network 89 km National Land Transport Network 88 km National rail network 1Queensland Government Statistician’s Office (Queensland Treasury) Queensland Regional Profiles. www.qgso.qld.gov.au (retrieved 16 May 2019) Legend Brisbane Office 313 Adelaide Street | Brisbane | Qld 4000 National road network PO Box 70 | Spring Hill | Qld 4004 State strategic road network (07) 3066 4338 | [email protected] State regional and other district road National rail network Other railway Local government boundary Divider image: The upgraded Deagon Deviation on the Gateway Motorway. District program highlights • commence construction of the Northern Transitway • complete a planning study for the Victoria Point bypass, project to deliver bus priority measures along Gympie an alternative route along council roads to bypass the In 2018–19 we completed: Arterial Road between Sadlier Street and Hamilton Road busy Victoria Point key activity precinct • construction of the Gateway Upgrade North project • complete construction of the Eight Mile Plains bus • continue planning of the Boundary Road rail level to widen the Gateway Motorway to six lanes between station park ‘n’ ride expansion crossing at Coopers Plains Nudgee and Bracken Ridge, jointly funded by the Australian Government and Queensland Government • continue construction of the North Brisbane Bikeway • continue planning of the Beams Road rail level crossing (stage 2 and 3) between Windsor and Wooloowin, to at Carseldine • safety improvements at the Mount Cotton Road and link Brisbane’s CBD to the northern suburbs Sanctuary Drive intersection • commence planning for the Griffith Arterial Road • commence construction of the Everton Park Link Road cycleway.
    [Show full text]