RACQ Recommended Projects for Acceleration and Funding

Total Page:16

File Type:pdf, Size:1020Kb

RACQ Recommended Projects for Acceleration and Funding RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise and Coolum SRN South Pine Road / Stafford Road intersection Deliver Stage 2 of South Pine Road / Stafford Road intersection upgrade SRN Page 1 of 5 Logan Road / Miles Platting Road / Padstow Road intersection (MPPL) – Deliver all stages of MPPL Logan Road project SRN Brisbane Urban Corridor Investigate grade separation of Kessels Road / Mt Gravatt Capalaba Road / Logan Road NHN Accelerate the Kenmore Roundabout upgrade SRN Moggill Road Kenmore Bypass project SRN Linkfield Road overpass Accelerate delivery of full overpass project SRN Warrego Highway Upgrade Strategy Fast track all projects (Toowoomba – Roma) NHN Ipswich to Helidon Spa Planning and Corridor Preservation ($54M) NHN Warrego Highway, Ipswich – Toowoomba Warrego Highway: Ipswich to Toowoomba Safety Package ($107M) NHN Warrego Highway: Haigslea Upgrade ($263M) NHN Flinders to Yamanto ($338M) NHN Cunningham Highway Cunningham Highway: Yamanto to Ebenezer ($352M) NHN Mount Lindesay Highway Deliver project identified in 10 year upgrade program SRN High Risk Roads program TRSP Township Entry Treatments (TET’s) TRSP Targeted Road Safety Program (TRSP) fast tracking Safety Works packages including pavement widening e.g., NLTN projects (e.g., Landsborough Hwy), Kennedy Highway, Gregory Hwy, Flinders Hwy, Peak Downs Hwy, Burnett Hwy, D'Aguilar Hwy, New England Hwy, Cunningham Hwy, Gore Hwy, Carnarvon Hwy TRSP School Zone signs TRSP Commuter Car Park: Beenleigh Station UCF Urban Congestion Fund (deferred projects) Indooroopilly Roundabout Intersection Upgrade UCF Newnham Road and Wecker Road, Mount Gravatt UCF Bring forward or further boost the Black Spot program to deliver ‘Technically Sound’ projects in 2019-20 Black Spot program BS Program that were not awarded due to lack of available funds. BS State Government to work with Council’s to bring forward projects that have been awarded under current approved BS programs BS Page 2 of 5 Work with Council’s to increase proactive project nominations in 2020-21 BS Program - including using AusRAP Star Rating to identify projects to address roadside hazards and upgraded intersection treatments BS Safer Roads Sooner Bring forward or further boost the Safer Roads Sooner (SRS) program to deliver ‘Technically Sound’ projects in 2019-20 SRS Program that were not awarded due to lack of available funds. SRS Increase maintenance to 2% of gross replacement value of State Controlled Network (~$1.5 billion/year) to address backlog of maintenance and % of network with seal age, roughness and rutting above intervention level. MPE Maintenance, Preservation, and Environment program Queensland National Land Transport Network maintenance program identified as 'High Priority Initiative' through Infrastructure Australia MPE National road maintenance strategy identified as 'High Priority Initiative' through Infrastructure Australia MPE Bridge and Culvert rehabilitation program Bring forward bridge and culvert replacement projects BCRP Level Crossing upgrade program Grade separation or other treatments to reduce congestion and improve safety at urban crossings LCUP Active Cycle network program Accelerate PCN priority projects including filling in gaps in current network Transport Veloway projects – Birdwood Road, O’Keefe Street, Veloway to Kangaroo Point Bikeway transition (Lower Active River Tce, Woolloongabba) Transport Accelerate Kangaroo Point pedestrian bridge and others under Brisbane City Council Green Bridges Active Green Bridges for Brisbane program Transport Transport Infrastructure Development Scheme Increase TIDS funding allocated to Councils TIDS Cairns to Northern Territory Border ROSI Cooktown to Weipa ROSI Mount Isa to Rockhampton ROSI Roads of Strategic Importance Yeppoon Road Duplication ROSI (ROSI) Tennant Creek to Townsville - Queensland ROSI Hann Highway ROSI Townsville to Roma ROSI Springsure to Tambo Road ROSI Page 3 of 5 Toowoomba to Ipswich ROSI Toowoomba to Seymour – Queensland ROSI Bargara Road Upgrade, Bundaberg ROSI Biloela Heavy Vehicle Bypass ROSI Burnett Highway-Gayndah-Mount Perry Road-Wetherton Road Intersection Upgrade ROSI Delusion Creek Bridge Upgrade, Camboon ROSI Emu Swamp Dam Supporting Infrastructure, Stanthorpe ROSI Gogango Creek Bridge, Gogango ROSI Isis Overtaking Lanes ROSI John Petersen Bridge Upgrade, Mundubbera ROSI Additional Queensland ROSI projects New England Highway Upgrade, Cabarlah ROSI Quay Street Upgrade, Bundaberg ROSI Rosedale Road and Winfield Road Intersection Upgrade, Watalgan ROSI Stanage Bay Road Upgrade, Shoalwater Bay ROSI Shute Harbour Road Upgrades ROSI Theodore Water Treatment Plant Supporting Infrastructure, Theodore ROSI Torbanlea Pialba Road Upgrade ROSI Urraween/Boundary Road Extension ROSI Willies Creek Royles Road Upgrade, Bingegang ROSI Deliver HVSPP ‘planned’ projects from Round 6 and fast track delivery of those approved under future Round 7 approvals HVSPP Rockhampton Regional Council - Macquarie Street, Gracemere – Widen and Strengthen HVSPP Heavy Vehicle Safety & Livingstone Shire Council – Paddys Swamp Road and Ingrey Road, Bungundarra - Intersection Upgrade HVSPP Productivity Program (HVSPP) Southern Downs Regional Council – East Street Ogilvie Road and Depot Road, Warwick - Widen and Seal Road and Intersections Upgrade HVSPP Banana Shire Council - Dunn Street and Quarrie Road, Biloela - Widen, strengthen and seal HVSPP Gulf Developmental Road, Gilbert River - Strengthen Little River Bridge HVSPP Page 4 of 5 Gulf Developmental Road, Routh Creek - Strengthen Routh Creek Bridge HVSPP Carnarvon Highway, Upper Dawson -Widen Road and Upgrade Five Culverts HVSPP Carnarvon Highway, St George – Widen Road and Upgrade Four Culverts HVSPP Wandoan Road, Jackson - Widen Road and Replace One Bridge HVSPP New England Highway, Emu Creek – Emu Creek Bridge Replacement HVSPP Peak Downs Highway, Wolfang – Widen and Seal HVSPP D'Aguilar Highway, Winya - Kilcoy Creek Bridge Replacement HVSPP Public Beerburrum to Nambour duplication – deliver full project Transport Public Springfield to Ripley and Ipswich Rail Extension Transport Public Manly to Cleveland Rail Duplication Transport Public Transport Public Pimpama, Helensvale North and Merrimac Rail Stations Transport Public Salisbury to Beaudesert Passenger Rail Transport Public Gold Coast Rail Line capacity upgrade - Kuraby to Beenleigh Transport Queensland inland road network Progress priority initiative under Infrastructure Australia's Infrastructure Priority List, including Beef Roads upgrade Program, CSIRO - Transit model, IQRAP, etc. SRN National electric vehicle fast- Progress public access EV fast charger network as identified in Infrastructure Australia's Infrastructure charging network Priority List EV SRN – State Road Network; NHN – National Highway Network; TRSP – Targeted Road Safety Program; UCF – Urban Congestion Fund; BS – Black Spot Program; SRS – Safer Roads Sooner program, MPE – Maintenance, Preservation, and Environment program; BCRP – Bridge and Culvert rehabilitation program; LCRP – Level Crossing upgrade program, TIDS – Transport Infrastructure Development Scheme; ROSI – Roads of Strategic Importance; HVSPP – Heavy Vehicle Safety & Productivity Program; EV – Electric Vehicle Page 5 of 5 .
Recommended publications
  • Queensland Transport and Roads Investment Program for 2021–22 to 2024-25: Far North
    Far North 272,216 km2 Area covered by location1 5.68% Population of Queensland1 2,939 km Other state-controlled road network 217 km National Land Transport Network2 211 km National rail network See references section (notes for map pages) for further details on footnotes. Cairns Office 15 Lake Street | Cairns | Qld 4870 PO Box 6185 | Cairns | Qld 4870 (07) 4045 7144 | [email protected] • continue construction of road safety improvements on • commence installation of new Intelligent Transport Program Highlights Gillies Range Road Systems on the Kuranda Range section of Kennedy Highway, jointly funded by the Australian Government • commence construction of the Bruce Highway – Cairns and Queensland Government as part of the COVID-19 In 2020–21 we completed: Southern Access Cycleway, jointly funded by the economic recovery response Australian Government and Queensland Government • completed paving and sealing paving of a section of • commence early works on the Cairns Ring Road (CBD Peninsula Development Road at Fairview (Part B) • continue design of a flood immunity upgrade on the to Smithfield) project, jointly funded by the Australian Bruce Highway at Dallachy Road, jointly funded by the Government and Queensland Government • an upgrade of the Clump Point boating infrastructure at Australian Government and Queensland Government Mission Beach • commence upgrade of the culvert at Parker Creek • continue construction of a new overtaking lane on Crossing on Captain Cook Highway, Mossman, as part • construction of the Harley Street
    [Show full text]
  • Section 3.7 – Local Area Frameworks
    Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual
    [Show full text]
  • The Gateway Upgrade Project
    TheCommunity Gateway Upgrade Notice Project Fact Sheet 1 Heading It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el Theeu facilis $1.88 sequat billion utem Gateway dolore tat. UpgradeNonsequat. Project Ud et ver is senisthe largest dionsecte bridge dolor seniamand road nonsequat project utpat, in quisisl iriusci duisi. Queensland’s history. Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo- Whoborem is eugue delivering tat dunt the iustie upgrade? modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi. Queensland Motorways is delivering the Gateway UpgradeGiametum Project nibh onenim behalf velisisl of the ulla Queensland cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi Government,tat at do dio ercipiswith design cidunt and augiam construction ip euguer by the se Leighton modignit eros nullandre dolobore vendipis amet volortie ver augiam Abigroupalit, sustis Joint dolore Venture mincilit (LAJV). nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud What does the upgrade involve? min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper • sis Construction del diam volorer of a second at, quisisit Gateway luptationum Bridge includingaccum nullum a incilis esto odo consequat ex er auguer sum ad dion- senimdedicated iure magnibh pedestrian eugait and iureetcycle way.landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum • Refurbishment of the existing Gateway Bridge.
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016-17 to 2019-20
    Far North Far North | Map and Contact Details Cairns office Floor 4, Cairns Corporate Tower | 15 Lake Street | Cairns | Qld 4870 PO Box 6185 | Cairns | Qld 4870 (07) 4050 7144 | [email protected] Divider Image: Gravel laid on wet bitumen at Sorayas Hill on the Peninsula Developmental Road, part of the Cape York Region Package. Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Far North Overview In 2016-17 we will: • Complete paving and sealing sections of the Peninsula Developmental Road at Coen South, Musgrave, between The Far North District covers an area of about 273,158km2, • Progressively seal sections of the Kennedy Archer and Wolverton, and between Little Laura and or around 15.8% of Queensland1. It extends from the Torres Developmental Road (The Lynd-Hughenden), known Fairview, through the Cape York Region Package, jointly Strait Islands in the north to the top of the Cardwell Range locally as the Hann Highway, which is currently funded by the Australian Government and Queensland in the south, and from Cairns in the east to Croydon in the reporting under North West District. As the Hann Government. west. Highway spans both Far North District and North West District, project funding may be allocated to Far North • Install variable message signs on the Kuranda Range The district has an estimated residential population of about District when scope and costings have been finalised. Road section of the Kennedy Highway. 272,609 or around 5.9% of Queensland’s total population1. • Complete widening and sealing of various sections of • Commence a package of works to improve safety at The district looks after about 2,941km of other state- the Gulf Developmental Road between Croydon and priority intersections on the Atherton Tablelands, under controlled road and about 217km of the National Land Georgetown, near Forsayth, funded by the Queensland the Queensland Government’s Safer Roads Sooner Transport Network.
    [Show full text]
  • RACQ Ipswich Motorway Policy Analysis
    Policy Analysis 9/05 Economic & Public Policy Ipswich Motorway Introduction The Ipswich Motorway is a vital link between Brisbane and Ipswich. It connects Ipswich and Granard Roads at Rocklea to the Warrego and Cunningham Highways and Brisbane Road at Dinmore. For many years, it formed part of the National Highway System (NHS), which was a Commonwealth Government funding responsibility. Since the release of the Commonwealth’s AusLink land transport policy in June 2004, the Ipswich Motorway has been part of a broader National Network. The AusLink policy decreed that the states must share costs of the National Network, particularly in urban areas. The Ipswich Motorway is one of Queensland’s most congested roads, with stop-start conditions during morning and afternoon peak periods. It also has one of the highest vehicle accident rates in Queensland. Yet, the upgrading of this hopelessly inadequate and dangerous road has been subjected to extraordinary delays because of political bickering and dithering. This document summarises the history of recent proposals to upgrade the Ipswich Motorway, analyses Commonwealth and State Government policies regarding the road, and outlines RACQ’s position. Background The Ipswich Motorway upgrade project has been dogged by delays, conflict between governments, and political manoeuvring. In the meantime, road trauma and congestion continue to worsen on this very sub-standard stretch of the National Network. The following brief chronology highlights key events in this sad, sorry saga. 1997 The Integrated Regional Transport Plan for South East Queensland, which was released in 1997, proposed commencement in 1997-98 of a major investigation in respect of an Ipswich Motorway upgrade.
    [Show full text]
  • Brisbane City Council (Council)
    volume 1 environmental impact statement supplementary report June 2009 Northern Link Environmental Impact Statement Supplementary Report June 2009 PAGE i PAGE 1-3 Northern Link Supplementary Report Table of Contents 1. Introduction 1-7 1.1 Purpose of the Supplementary Report 1-7 1.2 Consultation on the EIS 1-7 1.3 Coordinator General’s Evaluation Report 1-8 2. Overview and Development of the Project 2-9 2.1 Background to the notification of the EIS submission period 2-9 2.2 Further development of the Project 2-9 2.3 Overview of Submissions Received 2-10 2.3.1 Submissions from Government Agencies 2-10 2.3.2 Public Submissions 2-12 2.3.3 Response to submissions 2-14 2.4 Draft Outline Environmental Management Plan 2-14 2.5 Urban Mitigations 2-14 3. Description of the Project 3-16 3.1 General Description of Northern Link 3-16 3.2 Project Design 3-16 3.2.1 Surface Road Connections 3-17 3.2.2 Ventilation Stations and Outlets 3-18 3.3 Project Delivery Mode 3-18 3.3.1 Program and Responsibilities 3-18 3.3.2 Establishment and Preliminary Works 3-20 3.3.3 Tunnel Construction 3-20 3.4 Project Operations Mode 3-22 4. Assessment of the Northern Link Project 4-25 4.1 Traffic and Transport 4-28 4.1.1 Forecast Demand for Northern Link 4-29 4.1.2 Function of Northern Link 4-33 4.1.3 Function of the Project connections 4-36 4.1.4 Traffic Volume Effects on Regional and Connecting Roads and Intersections 4-37 4.1.5 Effects on Local Roads 4-54 4.1.6 Metropolitan Area Network Performance 4-62 4.1.7 Travel Time Benefits 4-65 4.1.8 Local Access Effects 4-72
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016
    Metropolitan Metropolitan | Map and Contact Details Brisbane office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Spring Hill | Qld 4004 (07) 3066 5499 | [email protected] Divider Image: Moggill Road Cycle Bridge looking north east towards Brisbane central business district (bridge spans Moggill Road, Indooroopilly). Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Metropolitan Overview • A two-lane bus-only extension road from Warrigal Road • Commence intersection improvements on Mount Crosby through to Logan Road in Eight Mile Plains. Road, at the Delacy Street and Pine Street intersection. The Metropolitan District covers an area of about 2,968km2, or around 0.2% of Queensland1. It straddles the Brisbane In 2016-17 we will: • Continue to seek Australian Government funding River and extends from Mount Glorious in the north to Logan for the Pacific Motorway-Gateway Motorway merge City in the south, and from Point Lookout in the east to west • Continue construction of the Gateway Upgrade North upgrade (southbound lanes), with $42 million provided of Helidon and the major centre of Ipswich. project that will widen the Gateway Motorway to towards this $210 million project by the Queensland six lanes, between Nudgee and Bracken Ridge, jointly Government as part of the State Infrastructure Fund. The district has an estimated residential population of funded by the Australian Government and Queensland about 1,461,733 or around 31.4% of Queensland’s total Government. population1. Future plans • Commence the Ipswich Motorway (Rocklea to Darra) The district looks after about 414km of other state-controlled Stage 1 project, to construct additional lanes between We are continuing to plan for the future transport roads, about 112km of the National Land Transport Network, Oxley Road and Suscatand Street, jointly funded by the requirements of residents in the Metropolitan District.
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • Mt Lindesay/Beaudesert Strategic Transport Network Investigation Draft Report for Consultation, 2009 138
    13.0 NETWORK STAGING The purpose of the network staging modelling is to establish priorities for the Department of Transport and Main Roads in terms of future corridor presentation. The 2036 time frame was selected as it is 10 years after the current timeframe of committed infrastructure projects (i.e. projects in South East Queensland Infrastructure Plan and Program) to provide an indication of the next round of priority projects in the region. 13.1 2036 Land Use The 2036 population for the South East Queensland region was based on a linear extrapolation between 2026 and 2056. This resulted in an additional 470,000 people across the region at 2036, and a total of 4.4 million. Locality population growth in areas, besides the Study Focus Area and Ipswich City area, were also distributed based on this linear extrapolation. In the Study Focus Area and Ipswich City area, the linear extrapolation was used as an overall total however locality population growths have been adjusted. Additional population, based on linear extrapolation, at 2036 for the former Beaudesert Shire is 79,600 and for Ipswich City 103,800 people. The South East Queensland Strategic Transport Model and 2005 Regional Plan predicts a 2026 population for the former Beaudesert Shire of approximately 116,600 people. More recent investigations by the former Beaudesert Shire Council indicate this may be closer to 140,000 people at 2026. As a result the 2036 demographics were adjusted for this additional 24,000 persons to 2026 plus the amount added from the linear extrapolation process. A total of an additional 103,600 people was therefore utilised for the 2036 population growth Staging Scenario.
    [Show full text]
  • 6 Pavement Surface Condition
    FINAL REPORT Project Title: P15: Queensland Trial of High Standard Granular Base TrackStar Alliance Project (Year 4 - 2016/17) ARRB Project No: PRP16023 Author/s: Dr. Jeffrey Lee, Jonathon Griffin, Alan Conaghan Client: Queensland Department of Transport and Main Roads Date: 09/02/2018 AN INITIATIVE BY: TC-710-4-4-8 SUMMARY A significant portion of the Australian sealed road network is composed of Although the Report is believed to be unbound granular pavement layers with a sprayed seal surface. correct at the time of publication, Traditionally, unbound granular pavements are used in rural or light to ARRB, to the extent lawful, excludes moderately traffic applications, with higher quality asphalt, stabilised or all liability for loss (whether arising concrete pavements generally used in urban areas and in more heavily under contract, tort, statute or trafficked applications. otherwise) arising from the contents of the Report or from its use. Where Growing demands on infrastructure budgets has led to the desire to such liability cannot be excluded, it is investigate the use of unbound granular structures for heavy duty reduced to the full extent lawful. applications in Queensland. However, initial construction cost savings Without limiting the foregoing, people resulting from the provision of unbound granular pavements may be should apply their own skill and counteracted by increased maintenance requirements, the risk of premature judgement when using the information distress development and the potential for rapid failure. contained in the Report. The Queensland Department of Transport and Main Roads (TMR) is trialing a heavy-duty unbound granular pavement with a sprayed seal surfacing (denoted as SG(HD) TMR(2017)) incorporating high-standard granular (HSG) basecourse as part of the Centenary Motorway duplication project.
    [Show full text]
  • RACQ Unroadworthy Roads Technical Appendix
    RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7
    [Show full text]
  • Annual Report 2013—2014 Volume 1 of 2
    Volume 1 of 2 About the report What the report contains For more information The Department of Transport and Main Roads Annual Phone: +617 3066 7381 Report 2013–14 describes the department’s operations for the financial year from 1 July 2013 to 30 June 2014. It also Email: [email protected] presents our priorities for the forthcoming financial year Visit: Transport and Main Roads website www.tmr.qld.gov.au of 2014–15. Annual report website: www.qld.gov.au/about/staying- informed/reports-publications/annual-reports/ Why we have an annual report You can provide feedback on the annual report at the Queensland Government Get Involved website at As well as meeting the statutory requirement set out in www.qld.gov.au/annualreportfeedback. the Financial Accountability Act 2009 and the Financial and Performance Management Standard 2009, the annual The Queensland Government is committed to report is a vital tool in keeping the community, industry, providing accessible services to Queenslanders government and organisations informed about our from all culturally and linguistically diverse performance and future direction. backgrounds. If you have difficulty in understanding the annual report, you can contact us on 13 23 80* and we will arrange an interpreter to effectively Accessing the report communicate the report to you. The annual report is available on the Department of * Local call charge in Australia. Higher rates apply from mobile phones and payphones. Check with your service provider for call costs. For Transport and Main Roads website at www.tmr.qld.gov.au international callers, please phone +61 7 3834 2011.
    [Show full text]