6 Pavement Surface Condition

Total Page:16

File Type:pdf, Size:1020Kb

6 Pavement Surface Condition FINAL REPORT Project Title: P15: Queensland Trial of High Standard Granular Base TrackStar Alliance Project (Year 4 - 2016/17) ARRB Project No: PRP16023 Author/s: Dr. Jeffrey Lee, Jonathon Griffin, Alan Conaghan Client: Queensland Department of Transport and Main Roads Date: 09/02/2018 AN INITIATIVE BY: TC-710-4-4-8 SUMMARY A significant portion of the Australian sealed road network is composed of Although the Report is believed to be unbound granular pavement layers with a sprayed seal surface. correct at the time of publication, Traditionally, unbound granular pavements are used in rural or light to ARRB, to the extent lawful, excludes moderately traffic applications, with higher quality asphalt, stabilised or all liability for loss (whether arising concrete pavements generally used in urban areas and in more heavily under contract, tort, statute or trafficked applications. otherwise) arising from the contents of the Report or from its use. Where Growing demands on infrastructure budgets has led to the desire to such liability cannot be excluded, it is investigate the use of unbound granular structures for heavy duty reduced to the full extent lawful. applications in Queensland. However, initial construction cost savings Without limiting the foregoing, people resulting from the provision of unbound granular pavements may be should apply their own skill and counteracted by increased maintenance requirements, the risk of premature judgement when using the information distress development and the potential for rapid failure. contained in the Report. The Queensland Department of Transport and Main Roads (TMR) is trialing a heavy-duty unbound granular pavement with a sprayed seal surfacing (denoted as SG(HD) TMR(2017)) incorporating high-standard granular (HSG) basecourse as part of the Centenary Motorway duplication project. The proximity of the project to Brisbane makes it an ideal candidate for long- term evaluation and monitoring. The project also includes a number of non- standard requirement for Queensland, including additional specification controls, material characterisation techniques, and construction methods. This report presents an overview of the Centenary Motorway duplication project, observations on material production and construction, and reports the results of regular surface and structural condition assessments. Observation of the Centenary Motorway trial began in August 2013, and was followed by subsequent monitoring surveys conducted using the network survey vehicle (NSV) and the falling weight deflectometer (FWD). Based on the information available to-date, after being trafficked for approximately 40% of the pavements 10 year design life, the heavy duty unbound granular pavement constructed on the Centenary Highway as part of the TrackStar Alliance Project is performing satisfactorily. While there are some signs of continuing pavement deterioration (e.g. increased roughness, increased rutting and increased deflection), the pavement is considered to be performing as expected. Throughout the four year monitoring period, the data collected and observations made on the pavement do not suggest earlier maintenance intervention is required. FWD testing and back analysis of the deflection data shows the overall pavement strength has reduced since initial construction, however the modulus of the base course has generally increased or remained steady. Overall the remaining pavement life calculated still significantly exceeds the residual design life anticipated for the pavement. It is suggested that the site is continued to be monitored under the current NACoE Long Term Pavement Performance (LTPP) project. Based on the findings of this research project and other inputs from the industry, TMR has published the following in July 2017: • An update to Technical Specification MRTS05 Unbound Pavements TC-710-4-4-8 Page i • Technical Note 171 Use of High Standard Granular (HSG) Bases in Heavy Duty Unbound Granular Pavements ACKNOWLEDGEMENTS The author would like to acknowledge the support of the National Asset Centre of Excellence (NACoE), an initiative of the Queensland Department of Transport and Main Roads (TMR) and the Australian Road Research Board (ARRB). Also, the significant contributions of time and effort, in addition to open sharing of information, from TMR and TrackStar Alliance personnel were instrumental to the development of this document. TC-710-4-4-8 Page ii This page is intentionally left blank TC-710-4-4-8 Page iii CONTENTS 1 INTRODUCTION ................................................................................................................... 1 1.1 Background ........................................................................................................................... 1 1.2 Previous Queensland HSG Trial ............................................................................................ 1 1.3 Project Descriptions ............................................................................................................... 2 2 UNBOUND GRANULAR PAVEMENTS ................................................................................ 4 2.1 Introduction ............................................................................................................................ 4 2.2 Granular Material Requirements ............................................................................................ 4 2.2.1 Specifications ........................................................................................................... 5 2.2.2 Mineralogy ............................................................................................................... 8 2.2.3 Particle Shape .......................................................................................................... 8 2.2.4 Particle Size ............................................................................................................. 8 2.2.5 Surface Texture ........................................................................................................ 9 2.2.6 Plasticity ................................................................................................................... 9 2.2.7 Hardness/Toughness ............................................................................................. 10 2.2.8 Soundness ............................................................................................................. 10 2.2.9 Permeability ........................................................................................................... 11 2.2.10 Bearing Capacity .................................................................................................... 11 2.3 Granular Material Production ............................................................................................... 11 2.4 Sprayed Bituminous Seal ..................................................................................................... 12 2.4.1 Introduction ............................................................................................................ 12 2.4.2 Bitumen .................................................................................................................. 12 2.4.3 Cover Aggregate .................................................................................................... 13 2.5 Pavement Structural Design ................................................................................................ 14 2.5.1 Introduction ............................................................................................................ 14 2.5.2 Mechanistic Design ................................................................................................ 14 2.5.3 Empirical Design .................................................................................................... 15 2.6 Pavement Construction ........................................................................................................ 15 2.6.1 Introduction ............................................................................................................ 15 2.6.2 Unbound Granular Layers ...................................................................................... 15 2.6.3 Bituminous Sprayed Seal ....................................................................................... 16 2.7 Quality Control ..................................................................................................................... 17 2.7.1 Introduction ............................................................................................................ 17 2.7.2 Segregation ............................................................................................................ 17 2.7.3 Compaction ............................................................................................................ 17 2.7.4 Evenness ............................................................................................................... 18 2.7.5 Horizontal Deviation ............................................................................................... 18 2.7.6 Deflection ............................................................................................................... 18 2.8 Performance ........................................................................................................................ 18 2.8.1 Introduction ...........................................................................................................
Recommended publications
  • Section 3.7 – Local Area Frameworks
    Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual
    [Show full text]
  • Brisbane City Council (Council)
    volume 1 environmental impact statement supplementary report June 2009 Northern Link Environmental Impact Statement Supplementary Report June 2009 PAGE i PAGE 1-3 Northern Link Supplementary Report Table of Contents 1. Introduction 1-7 1.1 Purpose of the Supplementary Report 1-7 1.2 Consultation on the EIS 1-7 1.3 Coordinator General’s Evaluation Report 1-8 2. Overview and Development of the Project 2-9 2.1 Background to the notification of the EIS submission period 2-9 2.2 Further development of the Project 2-9 2.3 Overview of Submissions Received 2-10 2.3.1 Submissions from Government Agencies 2-10 2.3.2 Public Submissions 2-12 2.3.3 Response to submissions 2-14 2.4 Draft Outline Environmental Management Plan 2-14 2.5 Urban Mitigations 2-14 3. Description of the Project 3-16 3.1 General Description of Northern Link 3-16 3.2 Project Design 3-16 3.2.1 Surface Road Connections 3-17 3.2.2 Ventilation Stations and Outlets 3-18 3.3 Project Delivery Mode 3-18 3.3.1 Program and Responsibilities 3-18 3.3.2 Establishment and Preliminary Works 3-20 3.3.3 Tunnel Construction 3-20 3.4 Project Operations Mode 3-22 4. Assessment of the Northern Link Project 4-25 4.1 Traffic and Transport 4-28 4.1.1 Forecast Demand for Northern Link 4-29 4.1.2 Function of Northern Link 4-33 4.1.3 Function of the Project connections 4-36 4.1.4 Traffic Volume Effects on Regional and Connecting Roads and Intersections 4-37 4.1.5 Effects on Local Roads 4-54 4.1.6 Metropolitan Area Network Performance 4-62 4.1.7 Travel Time Benefits 4-65 4.1.8 Local Access Effects 4-72
    [Show full text]
  • Question on Notice
    Question on Notice No. 211 Asked on 10 March 2021 MR M BERKMAN ASKED MINISTER FOR TRANSPORT AND MAIN ROADS (HON M BAILEY) QUESTION: With reference to the Director-General’s response during Budget Estimates hearings on 11 December 2020 that the Department of Transport and Main Roads will not support priority bus lanes on the Centenary Motorway following completion of the Centenary Motorway planning study— Will the Minister advise (a) what is the basis for this decision by the department, (b) what specific plans other than priority bus lanes, if any, is the department progressing to improve public transport along this corridor and (c) what is the government’s plan to cut congestion on the Centenary Motorway, particularly for travel to and from suburbs in the electorate of Maiwar? ANSWER: I thank the Member for Maiwar for the question. a) An additional general-purpose traffic lane will deliver travel time benefits for all road users, including public transport passengers. Currently, the number of express pre-paid services delivered in this area is low and does not support the need for dedicated bus lanes. Installing a dedicated bus lane on the Centenary Motorway will exacerbate congestion on the motorway by reducing the number of lanes for traffic to flow through and it presents major challenges in terms of enforcement as it is difficult for the police to undertake enforcement on a constrained, high-volume and high-speed environment. b) The first stage of the proposed Centenary Motorway Upgrade is the Centenary Bridge Upgrade, which includes a new three-lane northbound bridge, reconfiguration of the existing bridge to provide three lanes southbound and improved active transport facilities.
    [Show full text]
  • Western Brisbane Transport Network Strategy
    Western Brisbane Transport Network Strategy Contents Foreword 1 Strategy highlights 2 Introduction 6 Community input and strategy development 10 Rail 12 Bus 16 Active transport 20 Road and freight 24 Implementation 28 Benefits of the strategy 32 This is a strategic vision to provide a framework for planning and delivery of the transport network in western Brisbane. The information on the maps in this document is not intended for reference to specific parcels of land. It should be treated as indicative only and subject to ongoing refinement. 2009 Contact details: Phone 1800 636 896 www.transport.qld.gov.au/wbtni Foreword Western Brisbane Transport Network Strategy The Western Brisbane Transport Network Investigation In relation to road transport, the Investigation is a coordinated approach to the ongoing supports the need for Brisbane City Council’s development of the transport network for western proposed Northern Link tunnel and it proposes an Brisbane. improved north south road connection including a tunnel linking Toowong to Everton Park. More than a million people were asked for their input into a plan which integrates all modes of transport, Much of the work identified in the Western Brisbane such as rail, bus, road, walking and cycling. Transport Network Investigation is already underway. The rail network is being extended to Richlands and The Investigation commenced in 2007, in large part capacity is being expanded between Corinda and as a means of determining whether the long talked- Darra. The Northern Busway to Kedron is under about Western Brisbane Bypass would happen. construction and so is Airport Link. In addition, the That option was ruled out in 2008 after detailed Brisbane City Council is actively pursuing the Northern traffic projections showed insufficient demand but, Link tunnel.
    [Show full text]
  • Final Year He Had an Accident Which Resulted in Serious Injuries and a Four-Month Hospital Stay, and That Is Where He Met His First Wife, Leone
    ISSN 1322-0330 RECORD OF PROCEEDINGS Hansard Home Page: http://www.parliament.qld.gov.au/work-of-assembly/hansard Email: [email protected] Phone (07) 3553 6344 FIRST SESSION OF THE FIFTY-SEVENTH PARLIAMENT Friday, 18 June 2021 Subject Page SPEAKER’S STATEMENT ..................................................................................................................................................2093 School Group Tour...........................................................................................................................................2093 MOTION OF CONDOLENCE ...............................................................................................................................................2093 Edwards, Hon. Sir LR, AC ................................................................................................................................2093 Tabled paper: Article from the Telegraph, dated 31 August 1983, titled ‘Grand first for Llew …’. ......2098 Tabled paper: Article from the Fassifern Guardian & Tribune, dated 29 May 2021, titled ‘“What a politician should be” tributes flood in for former Ipswich MP and Queensland Great’. .........2104 Tabled paper: Photograph of a plaque for the opening of the Ipswich Hospitals Board Boonah Hospital. ..........................................................................................................................................2104 MINISTERIAL STATEMENTS ..............................................................................................................................................2106
    [Show full text]
  • Capital Program 2020 Update Copyright Disclaimer This Publication Is Protected by the Copyright Act 1968
    Capital Program 2020 update Copyright Disclaimer This publication is protected by the Copyright Act 1968. While every care has been taken in preparing this publication, to the extent permitted by law, the State of Queensland accepts Licence no responsibility and disclaims all liability (including without limitation, liability in negligence) for all expenses, losses This work, except as identified below, is (including direct and indirect loss), damages and costs incurred licensed by Queensland Treasury under a as a result of decisions or actions taken as a result of any data, Creative Commons Attribution-No Derivative information, statement or advice, expressed or implied, contained Works (CC BY-ND) 4.0 Australia licence. To view a copy of this within. To the best of our knowledge, the content was correct at the licence, visit: http://creativecommons.org.au/ time of publishing. You are free to copy and communicate this publication, Copies of this publication are available on our website at as long as you attribute it as follows: www.treasury.qld.gov.au and further copies are available © State of Queensland, Queensland Treasury, August 2020 upon request to: Third party material that is not licensed under a Creative Commons Queensland Treasury licence is referenced within this publication. All content not PO Box 15009, City East, QLD 4000 licensed under a Creative Commons licence is all rights reserved. Please contact Queensland Treasury / the copyright owner if you Phone: 13 QGOV (13 7468) wish to use this material. Email: [email protected] Web: www.treasury.qld.gov.au The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds.
    [Show full text]
  • Table 4-1: 2019-2031 Projects – Base Scenario Key: Road / Public
    Table 4-1: 2019-2031 Projects – Base Scenario Key: Road / Public & Active Transport No. Project Description Notes Transport Council Region Type 1 Sunshine Coast Light Rail (Stage 1) Kawana to the Maroochydore CBD via Project focused on connecting the northern Sunshine Coast Mooloolaba parts of the SCRC Enterprise Corridor 2 Sunshine Motorway Upgrade Upgrade to 4 lanes from Kawana Way to the MRI Sunshine Coast Projects and an upgrade to 6 lanes from the Mooloolaba Road interchange to the MRI 3 North Coast Rail Line Duplication Urban Passenger Rail Line Duplication for the Partial funding committed for the full Sunshine Coast (Beerburrum to Nambour Project) Beerburrum to Landsborough Section $722M project (B2N) 4 Bruce Highway Upgrade Projects 6 lane upgrade Bribie Island Road to Caloundra Moreton Bay; Sunshine Road and interchange upgrade at Deception Bay Coast; Somerset Road 5 North South Urban Arterial Pine River Crossing to Boundary Road (remaining Also related to the Strathpine East Arterial Moreton Bay (NSUA) sections) 6 North-West Transport Corridor Urban passenger rail and 4 lane urban motorway Brisbane; Moreton Bay (NWTC) from Bald Hills to Stafford Road (road) and Alderley Station (rail) 7 Cross River Rail Project Dutton Park to Mayne Rail Yards Fully committed funding Brisbane 8 Centenary Motorway Upgrade Moggill Road to Sumners Road Interchange 6 $65M for Sumners Road Interchange Brisbane; Ipswich Projects lanes; Logan Motorway to Springfield and Springfield to Yamanto (4 lane upgrade) 9 Cleveland Rail Line Duplication Manly to Cleveland Rail Line Duplication Redland 10 Norman Street Bridge New river crossing of the Bremer River in the Ipswich centre of Ipswich No.
    [Show full text]
  • Northern Link Road Tunnel
    Coordinator-General’s report Northern Link Road Tunnel Released: April 2010 Report evaluating the Environmental Impact Statement pursuant to section 35(3) of the State Development and Public Works Organisation Act 1971 Coordinator-General’s report – Northern Link Road Tunnel project Contents Synopsis.........................................................................................................4 1. Introduction.............................................................................................6 2. Project description .................................................................................7 2.1 The proponent ...................................................................................7 2.2 Project description .............................................................................7 2.3 Rationale for the project.....................................................................8 3. The impact assessment process............................................................11 3.1 Significant project declaration and controlled action........................11 3.2 Terms of reference for the EIS ........................................................11 3.3 Public notification of the EIS ............................................................12 3.4 Submissions on the EIS...................................................................12 3.5 Change to the project after the EIS..................................................13 3.6 Review of the further information provided (supplementary report to
    [Show full text]
  • 27Th ARRB Full Paper Sae
    27th ARRB Conference – Linking people, places and opportunities, Melbourne, Victoria 2016 COMPARATIVE CASE STUDY ON COST-BENEFIT ANALYSIS FOR TOLL ROAD PROJECTS Chi, S., Bunker, J., Kajewski, S., Queensland University of Technology, Australia ABSTRACT Project evaluation is a process to measure impacts and risks of a project as a public good. Cost-Benefit Analysis is a most commonly used project evaluation methodology for major road projects. Cost-Benefit Analysis conducted for Australian toll road projects have tended to mirror those for non-toll road projects, because they generally treat tolls as a financial transfer. However, a number of project impacts and risk characteristics are unique to toll road projects. It is therefore hypothesised that Cost-Benefit Analysis for toll road projects should treat tolls uniquely, on the basis that risk allocations and concession arrangements are different. This paper reviews Cost-Benefit Analysis methodologies used to evaluate major public road projects. Examining the treatment of project impacts and risks in practice, and the outcomes of the analyses revealed both the advantages and limitations of each extant Cost-Benefit Analysis methodology used in practice. Moreover, the suitability of different methodologies in terms of Cost-Benefit Analysis for toll roads was assessed by studying project characteristics and risk characteristics of each project. Identifying an appropriate treatment of tolls contributes to determining an appropriate Cost-Benefit Analysis methodology for toll road projects. The refined methodology would ensure that all relevant impacts and risks of the toll road project are addressed in decision-making. This will provide a basis for ensuring that the full and true impact to the community is properly assessed.
    [Show full text]
  • Northern Link Road Tunnel Project
    PAGE i PAGE ii Contents 1. Introduction 1 1.1. Background 1 1.2. Project Change Process 2 1.3. Approvals for the Project 2 1.4. Consultation 2 2. Overview of Changed Project 4 2.1. General Arrangement 4 2.2. Main Alignment 4 2.3. Western Connection 4 2.4. Eastern Connection 4 2.5. Spoil handling, haulage and placement 4 3. Project Changes to Main Alignment 5 3.1. Changes to Design – Main Alignment 5 3.2. Changes to Delivery – Main Alignment 5 3.3. Effects of Project Changes – Main Alignment 5 3.3.1. Geology and soils 6 3.3.2. Hydrology (groundwater) 7 3.3.3. Noise and vibration 7 3.3.4. Planning and land use 9 3.3.5. Cultural heritage 9 4. Project Changes to Western Connection 10 4.1. Changes to Project Design – Western Connection 10 4.2. Changes to Delivery – Western Connection 10 4.2.1. Worksite Layout and Construction Areas 10 4.2.2. Workforce Car Parking 10 4.2.2.1. Construction project office and visitor centre 10 4.2.2.2. Anzac Park temporary construction workforce car park 10 4.2.2.3. Alternatives 11 4.2.3. Spoil Handling, Haulage and Placement – Western Worksite 11 4.2.3.1. Construction Truck Movements 11 4.3. Effects of Project Changes – Western Connection 12 4.3.1. Traffic and Transport 12 4.3.1.1. Safety 12 4.3.1.2. Traffic 13 4.3.1.3. Pedestrian and Cyclist Bridge 13 4.3.1.4. Parking 14 4.3.2.
    [Show full text]
  • GREATER BRISBANE KEY CORRIDORS PERFORMANCE REPORT Contents
    JANUARY-JUNE 2016 GREATER BRISBANE KEY CORRIDORS PERFORMANCE REPORT Contents GREATER BRISBANE ROAD NETWORK 1 Report findings 1 Highlights 1 GREATER BRISBANE KEY CORRIDORS 2 CORRIDOR TRAFFIC VOLUME SUMMARY 4 NETWORK VEHICLE KILOMETRES TRAVELLED SUMMARY 6 Traffic volume and vehicle kilometres travelled 6 CORRIDOR AVERAGE SPEED 7 AVERAGE NETWORK SPEED SUMMARY 9 Average speed 9 CAUSES OF CONGESTION: CASE STUDY 10 STATE GOVERNMENT CONGESTION INITIATIVES 11 Ipswich Motorway: Rocklea to Darra – Stage 1 and Oxley roundabout 11 Gateway Upgrade North 12 Sandgate Road and Junction Road 12 COUNCIL CONGESTION INITIATIVES 13 Telegraph Road corridor upgrade project: Stage 1B detailed design and Stage 2 concept design 13 Congestion reduction projects for January to June 2016 15 BRISBANE METROPOLITAN TRANSPORT MANAGEMENT CENTRE (BMTMC): CASE STUDY 16 FACTORS AFFECTING NETWORK PERFORMANCE 17 B GREATER BRISBANE ROAD NETWORK This report provides information on the traffic Report findings volume and average speed for the Greater Brisbane key transport corridors over the January to June There are 38 key corridors, covering 337.5 kilometres, in the 2016 period. The corridors include Brisbane City Greater Brisbane area. Council (Council) and Department of Transport and Network vehicle kilometres travelled increased by 0.7% from Main Roads (TMR) managed roads. 2015 to 2016 for the January to June period. A new Transport and Main Roads’ corridor, Mt Gravatt-Capalaba AM peak average network speed on the 38 corridors is Road-Kessels Road-Riawena Road-Granard Road, has been 39.1 km/h. PM peak average network speed is 39.7 km/h. introduced in this report. Network summaries are presented in vehicle kilometres travelled (VKT) and average network speeds.
    [Show full text]
  • RACQ Recommended Projects for Acceleration and Funding
    RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise
    [Show full text]