Table 4-1: 2019-2031 Projects – Base Scenario

Key: Road / Public & Active Transport

No. Project Description Notes Transport Council Region Type 1 Sunshine Coast Light Rail (Stage 1) Kawana to the CBD via Project focused on connecting the northern Sunshine Coast parts of the SCRC Enterprise Corridor

2 Upgrade Upgrade to 4 lanes from Kawana Way to the MRI Sunshine Coast

Projects and an upgrade to 6 lanes from the Mooloolaba Road to the MRI 3 North Coast Rail Line Duplication Urban Passenger Rail Line Duplication for the Partial funding committed for the full Sunshine Coast (Beerburrum to Nambour Project) Beerburrum to Landsborough Section $722M project

(B2N) 4 Bruce Upgrade Projects 6 lane upgrade Bribie Island Road to Caloundra Moreton Bay; Sunshine

Road and interchange upgrade at Deception Bay Coast; Somerset Road 5 North South Urban Arterial Pine River Crossing to Boundary Road (remaining Also related to the Strathpine East Arterial Moreton Bay

(NSUA) sections) 6 North-West Transport Corridor Urban passenger rail and 4 lane urban motorway ; Moreton Bay (NWTC) from Bald Hills to Stafford Road (road) and Alderley Station (rail)

7 Cross River Rail Project Dutton Park to Mayne Rail Yards Fully committed funding Brisbane

8 Upgrade to Sumners Road Interchange 6 $65M for Sumners Road Interchange Brisbane; Ipswich

Projects lanes; to Springfield and Springfield to Yamanto (4 lane upgrade) 9 Cleveland Rail Line Duplication Manly to Cleveland Rail Line Duplication Redland

10 Norman Street Bridge New river crossing of the Bremer River in the Ipswich centre of Ipswich

No. Project Description Notes Transport Council Region Type

11 Ipswich to Springfield Rail Line Urban passenger rail Springfield to Ripley section Ipswich (Springfield to Ripley section)

12 Upgrade Darra to Rocklea (Centenary Motorway to Committed funding for Stage 1 including Brisbane; Ipswich

Projects Sherwood Road) Boundary Road connection, Granard Road to east of the Oxley Road interchange 13 Salisbury to Beaudesert Rail Line Urban passenger rail Salisbury to Undullah Brisbane; Logan; Scenic (Salisbury to Undullah section) section, to Beaudesert subject to further studies Rim

14 Pacific Motorway Upgrade (Eight Mile Plains) to Tugun; /M3 Merge ($190M), Mudgeeraba to Brisbane; Logan; Gold

Projects 8 lanes Gateway Motorway to Logan Motorway; Varsity Lakes ($198M), Eight Miles Plains to Coast 6 lanes Varsity Lakes to Stewart Road at Tugun; Daisy Hill Upgrade ($749M) Interchanges upgrades at Yatala, Ormeau and Pimpama 15 Mt Lindesay Highway Upgrade Chambers Flat Rd to Woodhill; Browns Plains Various sections funded Brisbane; Logan

Project Road to Compton Road 16 Gold Coast Light Rail (Stages 3 & Broadbeach to Coolangatta Airport Gold Coast 4)

17 Inter-Regional Transport Corridor 4 lanes Coomera to Nerang-Broadbeach Rd Gold Coast

(IRTC) (Coomera Connector) (Arundell) 18 Gold Coast Urban Rail Line Tallebudgera to Coolangatta Airport Gold Coast Extension Project

19 Upgrade Ipswich (Dinmore) to - 6 lanes Ipswich; Lockyer Valley;

Projects Dinmore to and 4 lane Somerset; Toowoomba upgrades (safety, realignment) and interchanges to Toowoomba 20 Gateway Motorway Upgrade Stage 2 - Old Gateway Motorway to Bruce Brisbane; Moreton Bay

Project Highway (six lanes) 21 North-South Link (Inner Western Tunnel corridor linking from Toowong Brisbane

Bypass) (Centenary Motorway and ) to the North-West Transport Corridor at Everton Park No. Project Description Notes Transport Council Region Type 22 Multi-Modal Transport Corridor Kawana Town Centre (Main Drive) to Mooloolah Sunshine Coast

(MMTC) River Interchange (MRI); Bells Creek Connection from Aura to the 23 New Rail Stabling Facilities New Rail Stabling at Robina and Banyo Brisbane; Gold Coast

24 Open Level Crossing (OLC) Beams Road (Aspley); These are the six high priority projects as Brisbane; Ipswich Removal Projects (Coorparoo); Wacol Station Road (Wacol); per TMR’s studies

Boundary Road (Coopers Plains); South Pine Road (Alderley) 25 Brisbane Metro Metro 1 Eight Mile Plains to Roma Street, Metro Metro 1 and 2 are fully committed funding. Brisbane; Logan 2 UQ to RBWH, Mass Transit Extension Buranda Transitway (on-road) sections where

to Chandler, Mass Transit Extension RBH to appropriate and subject to further Chermside, Mass Transit Extension Eight Mile investigations. Future Mass Transit Plains to Springwood Extensions will require State Government agreement in relation to busway corridors. 26 Caboolture to Maroochydore CAMCOS Urban Passenger Rail (Beerwah to Beerwah to Kawana linking to the SC Light Moreton Bay; Sunshine Corridor (CAMCOS) Urban Kawana) Rail Coast

Passenger Rail 27 Bus Rapid Transit (BRT) High quality bus service linking key nodes Ipswich; Lockyer Valley; Toowoomba to Ipswich between Ipswich and Toowoomba, including the Toowoomba

Lockyer Valley 28 Park Ridge Connector Stage 1 Logan Motorway / Gateway Motorway Extension Brisbane; Logan

to Park Ridge to Granger Road (Park Ridge). 4 lane motorway

Table 4-2: 2032-2041 Projects – Base Scenario

Key: Road / Public & Active Transport

No. Project Description Notes Transport Council Region Type 1 Sunshine Coast Light Rail (Stage 2) Kawana to Caloundra via Caloundra CBD Project focused on connecting the southern Sunshine Coast parts of the SCRC Enterprise Corridor

2 Western Ipswich Bypass and Connecting the Warrego Highway and Ipswich

Cunningham Highway Upgrades Cunningham Highways and Upgrades to the from Yamanto to Amberley (including the Amberley Interchange) 3 Caboolture to Maroochydore CAMCOS Urban Passenger Rail (Kawana to Sunshine Coast Corridor (CAMCOS) Urban Maroochydore)

Passenger Rail 4 Crossing and Green Consideration for public and active transport River crossing and green bridge strategy Brisbane Bridges links and implementation

5 Ipswich to Springfield Rail Line Urban passenger rail Ripley to Ipswich via Ipswich (Ripley to Ipswich section) Yamanto section

6 Bus Rapid Transit (BRT) Nerang to High quality bus corridor (on-road and off-road) Gold Coast Broadbeach

7 Mass Transit Corridor Extensions Mass Transit Extension Springwood to the Logan Transitway (on-road) sections where Brisbane; Logan Hyperdome, Mass Transit Extension UQ to appropriate. Future Mass Transit Extensions

Indooroopilly, Mass Transit Extension Chandler will require State Government agreement to Capalaba in relation to busway corridors. 8 Bus Rapid Transit (BRT) Nambour High quality bus corridor (on-road and off-road) Sunshine Coast to Maroochydore

9 Open Level Crossing (OLC) Pumicestone Road (Caboolture); Beenleigh Road These are the six medium priority projects Moreton Bay; Sunshine Removal Projects (Kuraby); Caloundra Street (Landsborough); as per TMR’s studies Coast; Brisbane; Logan

Dawson Parade (Keperra); McKean Street (Caboolture); Nathan Road (Runcorn) No. Project Description Notes Transport Council Region Type 10 Park Ridge Connector Stage 2 Granger Road (Park Ridge) to Camp Cable Road Logan

(McLean). 4 lane motorway

Table 4-3: 2019-2031 Projects – Advanced Scenario

Key: Road / Public & Active Transport

No. Project Description Notes Transport Council Region Type 1 Faster Rail (Brisbane to the Gold Brisbane to the Gold Coast (at Southport Gold Link into GC University Hospital Precinct Brisbane; Logan; Gold Coast) Coast University Hospital) and GoldLinQ Light Rail Coast

2 Faster Rail (Brisbane to Ipswich) Brisbane to Ipswich Central Brisbane; Ipswich

3 Logan Motorway Upgrade Project Ipswich Motorway to Mt Lindesay Highway and asset Ipswich; Logan

Wembley Road to the Pacific Motorway 4 Faster Rail (Brisbane to the Brisbane to the Sunshine Coast via Moreton Bay Subject to current Business Case Brisbane; Moreton Bay; Sunshine Coast) Regional Council NorthCoastConnect Project Sunshine Coast

Table 4-4: 2032-2041 Projects – Advanced Scenario

Key: Road / Public & Active Transport

No. Project Description Notes Transport Council Region Type 1 Gold Coast Light Rail Extension Miami to Robina Light Rail Extension Gold Coast (Miami to Robina)

2 Mt Lindesay Highway Deviation Woodhill to Bromelton Logan; Scenic Rim

(Bromelton North-South Arterial Road) 3 Faster Rail (Ipswich to Ipswich; Toowoomba) Lockyer Valley; Somerset;

Toowoomba 4 Centenary Motorway Bypass Sumners Road Interchange to Legacy Way at Brisbane

Toowong and linking to North-South Link (Inner Western Bypass) at Everton Park 5 East-West Link Toowong (Legacy Way) to South East Freeway Brisbane

Tunnel

Table 4-5: Proposed Prioritised Delivery Schedule - All Projects

Key: Road / Public & Active Transport

Base Scenario Advanced Scenario

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 No Project Description Base or Cost Committed Transport Advanced ($bn) works ($bn) Type Brisbane Metro Metro 1 Eight Mile Plains to Roma Base 2.70 0.93 Street, Metro 2 UQ to RBWH, Mass

Transit Extension Buranda to Chandler, 1 Mass Transit Extension RBH to Chermside, Mass Transit Extension Eight Mile Plains to Springwood Centenary Motorway Moggill Road to Sumners Road Base 1.10 0.074

2 Upgrade Projects Interchange 6 lanes; Logan Motorway to Springfield and Springfield to Yamanto (4 lane upgrade) Cross River Rail Project Dutton Park to Mayne Rail Yards Base 5.40 5.40 3

4 Ipswich Motorway Darra to Rocklea (Centenary Motorway Base 1.90 0.4

Upgrade Projects to Sherwood Road) 5 Mt Lindesay Highway Chambers Flat Rd to Woodhill; Browns Base 0.28 0.076

Upgrade Project Plains Road to Compton Road North Coast Rail Line Urban Passenger Rail Line Duplication for Base 0.78 0.55 6 Duplication (Beerburrum the Beerburrum to Landsborough to Nambour Project) Section (B2N) Pacific Motorway Gateway Motorway (Eight Mile Plains) to Base 2.80 2.185

Upgrade Projects Tugun; 8 lanes Gateway Motorway to 7 Logan Motorway; 6 lanes Varsity Lakes to Stewart Road at Tugun; Interchanges upgrades at Yatala, Ormeau and Pimpama 8 Gateway Motorway Stage 2 - Old Gateway Motorway to Base 0.30

Upgrade Project Bruce Highway (six lanes)

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 No Project Description Base or Cost Committed Transport Advanced ($bn) works ($bn) Type Multi-Modal Transport Kawana Town Centre (Main Drive) to Base 0.18

9 Corridor (MMTC) Mooloolah River Interchange (MRI); Bells Creek Connection from Aura to the Bruce Highway New Rail Stabling New Rail Stabling at Robina and Banyo Base 0.10 10 Facilities

Bruce Highway Upgrade 6 lane upgrade Bribie Island Road to Base 0.82 11 Projects Caloundra Road and interchange upgrade at Deception Bay Road Inter-Regional Transport 4 lanes Coomera to Nerang-Broadbeach Base 1.10 12 Corridor (IRTC)(Coomera Rd (Arundell) Connector) Norman Street Bridge Base 0.25 13

Sunshine Motorway Upgrade to 4 lanes from Kawana Way to Base 0.75

14 Upgrade Projects the MRI and an Upgrade to 6 lanes from the Mooloolaba Road interchange to the MRI Warrego Highway Ipswich (Dinmore) to Toowoomba - 6 Base 1.88

Upgrade Projects lanes Dinmore to Brisbane Valley 15 Highway and 4 lane upgrades (safety, realignment) and interchanges to Toowoomba Gold Coast Urban Rail Tallebudgera to Coolangatta Airport Base 0.50 16 Line Extension Project

17 North South Urban Pine River Crossing to Boundary Road Base 0.80

Arterial (NSUA) (remaining sections) Open Level Crossing Beams Road (Aspley); Cavendish Road Base 0.60 18 (OLC) Removal Projects (Coorparoo); Wacol Station Road (Wacol); Boundary Road (Coopers Plains); South Pine Road (Alderley)

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 No Project Description Base or Cost Committed Transport Advanced ($bn) works ($bn) Type Gold Coast Light Rail Broadbeach to Coolangatta Airport Base 1.68 19 Extension

Ipswich to Springfield Urban passenger rail Springfield to Ripley Base 0.50 20 Rail Line (Springfield to section Ripley section) Salisbury to Beaudesert Urban passenger rail Salisbury to Base 0.55 21 Rail Line (Salisbury to Undullah section, to Beaudesert subject Undullah section) to further studies Sunshine Coast Light Rail Kawana to the Maroochydore CBD via Base 1.10 22 Mooloolaba

Faster Rail (Brisbane to Brisbane to the Sunshine Coast via Advanced 4.57 23 the Sunshine Coast) Moreton Bay Regional Council

Cleveland Rail Line Manly to Cleveland Rail Line Duplication Base 0.18 24 Duplication

North-West Transport Urban passenger rail and 4 lane urban Base 6.35 25 Corridor (NWTC) motorway from Bald Hills to Stafford Road (road) and Alderley Station (rail)

Bus Rapid Transit (BRT) Base 0.10 26 Toowoomba to Ipswich

Logan Motorway Ipswich Motorway to Mt Lindesay Advanced 1.20 27 Upgrade Project Highway and Wembley Road to the Pacific Motorway Faster Rail (Brisbane to Brisbane to the Gold Coast (at Southport Advanced 3.40 28 the Gold Coast) Gold Coast University Hospital)

Caboolture to CAMCOS Urban Passenger Rail (Beerwah Base 1.20 29 Maroochydore Corridor to Kawana) (CAMCOS) Urban Passenger Rail 30 North-South Link (Inner Tunnel corridor linking from Toowong Base 1.80

Western Bypass) (Centenary Motorway and Legacy Way)

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 No Project Description Base or Cost Committed Transport Advanced ($bn) works ($bn) Type to the North-West Transport Corridor at Everton Park Park Ridge Connector Logan Motorway / Gateway Motorway Base 0.25 31 Stage 1 Extension to Park Ridge to Granger Road (Park Ridge). 4 lane motorway Faster Rail (Brisbane to Brisbane to Ipswich Central Advanced 1.70 32 Ipswich)

Caboolture to CAMCOS Urban Passenger Rail (Kawana Base 0.60 33 Maroochydore Corridor to Maroochydore) (CAMCOS) Urban Passenger Rail Brisbane River Crossing Consideration for public and active Base 0.70 34 and Green Bridges transport links

Mass Transit Corridor Mass Transit Extension Springwood to Base 1.95 35 Extensions the Logan Hyperdome, Mass Transit Extension UQ to Indooroopilly, Mass Transit Extension Chandler to Capalaba Sunshine Coast Light Rail Kawana to Caloundra via Caloundra CBD Base 0.90 36

Bus Rapid Transit (BRT) High quality bus corridor (on-road and Base 0.55 37 Nerang to Broadbeach off-road)

Open Level Crossing Pumicestone Road (Caboolture); Base 0.60 (OLC) Removal Projects Beenleigh Road (Kuraby); Caloundra

38 Street (Landsborough); Dawson Parade (Keperra); McKean Street (Caboolture); Nathan Road (Runcorn) 39 East-West Link Toowong (Legacy Way) to South East Advanced 1.80

Freeway Tunnel Gold Coast Light Rail Miami to Robina Light Rail Extension Advanced 0.50 40 Extension (Miami to

Robina)

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 No Project Description Base or Cost Committed Transport Advanced ($bn) works ($bn) Type Western Ipswich Bypass Connecting the Warrego Highway and Base 0.70

and Cunningham Cunningham Highways and Upgrades to 41 Highway Upgrades the Cunningham Highway from Yamanto to Amberley (including the Amberley Interchange) Mt Lindesay Highway Woodhill to Bromelton Advanced 0.20

42 Deviation (Bromelton North-South Arterial Road) Ipswich to Springfield Urban passenger rail Ripley to Ipswich Base 0.90 43 Rail Line (Ripley to via Yamanto section Ipswich section) 44 Park Ridge Connector Granger Road (Park Ridge) to Camp Base 0.25

Stage 2 Cable Road (McLean) 4 lane motorway Faster Rail (Ipswich to Advanced 3.40 45 Toowoomba)

Centenary Motorway Sumners Road Interchange to Legacy Advanced 3.00

46 Bypass Way at Toowong and linking to North- South Link (Inner Western Bypass) at Everton Park Bus Rapid Transit (BRT) High quality bus corridor (on-road and Base 0.85 47 Nambour to off-road)

Maroochydore