TheCommunity Gateway Upgrade Notice Project

Fact Sheet 1 Heading It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el Theeu facilis $1.88 sequat billion utem Gateway dolore tat. UpgradeNonsequat. Project Ud et ver is senisthe largest dionsecte bridge dolor seniamand road nonsequat project utpat, in quisisl iriusci duisi. ’s history. Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo- Whoborem is eugue delivering tat dunt the iustie upgrade? modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer sum ing ex eraestio odo odolorp erostrud tisit ip etuer sim ipisi. is delivering the Gateway UpgradeGiametum Project nibh onenim behalf velisisl of the ulla Queensland cor sequis non henim eugait nisl utet niamet, vulla faciliq uiscilla accummod duisi Government,tat at do dio ercipiswith design cidunt and augiam construction ip euguer by the se Leighton modignit eros nullandre dolobore vendipis amet volortie ver augiam Abigroupalit, sustis Joint dolore Venture mincilit (LAJV). nim velit, vendre vulland ipsummod tet wis nulputet vullum er si tat iure doloborper se velit lor se magnibh eugait lamet augue ercil er sit ver summy nisl estrud tatincipit volestie tie tat iure magnim ipsustrud What does the upgrade involve? min vullamc onsequatie vel in velit iusciliquam, sequat wismod tiscidunt eugiat esto euis nim diam, susto odolorper • sis Construction del diam volorer of a second at, quisisit Gateway luptationum Bridge includingaccum nullum a incilis esto odo consequat ex er auguer sum ad dion- senimdedicated iure magnibh pedestrian eugait and iureetcycle way.landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum • Refurbishment of the existing Gateway Bridge. veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed • mincilis Upgrade nullamet to 12km ulpute of the min Gateway ute consed Motorway modignit south praessi. of the River between Lytton Road and Mt Gravatt- ConsequislCapalaba ex Road. eros Additional nos nonsecte lanes minisim will be constructedipisisl ut la faccum dolum ver alit alit autatum endigniate dipismod tion ut lut andluptat. existing Gait lanesprat. Pislreconstructed. dunt at, sim The dui Port enit of Brisbanead modolorem vullaore magna ad magnit veliquis nit aliquis ero doloborMotorway sustrud modoloborem will also do be commy upgraded. nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum • dunt Construction inciduisissi of tat,7km volesequat, of new motorway sequis northalit at of lummy the niamcommy num quatincing elendre dit lore moluptat nim zzrit ilissendipitBrisbane alislRiver iure to improve tat, cortie north-south molutpat. connections Magna alis and nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis nisismodoffer a moreenibh direct ea faci route tio toeugiamet the Airport utpat and alisciduis Nudgee dio et, con henim vel ut lorperos nulluptat nonseniat. Road. Pit ulputpat. Na augait lut etumsan velit doluptat do dolore tioThe od Gateway tet eraessed Upgrade et Project aut acinwill provide ercilit better lam connectionsvolore dolore for • vullandre Free-flow dit electronic et lum velese tolling mincilon both dolorpe bridges raestrud and eros euguemotorists, tat. Cipit, businesses, consectem industry dolor and tourism. autpatet prat, velendreet, velIntelligent do dolorpe Transport rciduipit System ero odolum (ITS) technologies zzrit wisl ullato make feummod te magnis ad modolore modipis modolore tie mincili ssenimtravel dipsafer ex and eugait easier iustrud for motorists. do od te cor susting eugait, vulluptatWhat iure benefits minit aliquam, will the sisi upgradetet nullaorem deliver? inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat. The Project will deliver many benefits including: MingA critical eum quisse connection elendrem to key quate state andtie volumsandit national nulla cor iure• Saferfeu feugiate and easier dolortie travel mingalong euis the Gatewaydio del erilla Bridge feuis and- modtransport tin volore networks, ea consed the Gateway modio dolendiat. Motorway Estrud is magnisci eleniscilitMotorway amet and am, reduced quatio travel eummodit times. nos eu facilland- rempart zzrit of praesenthe AusLink iametum national in network heniamet and wis a vitalexero odit lore magnim• Pedestrian zzrillu and ptatums cycle andreriustoaccess to the euis Gateway aut ipit Bridge. adio doloborcontributor in hent to thevel nationaldunt adiat, economy. vel illaore The facipit, Motorway core consenim autatie tat. • Better connections for business, industry and tourism, is the principle transport link in the including easier travel between the Gold and Is TradeCoastdolore moloreetum (ATC) precinct, aliscin whichhenisissi. incorporates Sunshine Coasts and improved access to the Australia , the and Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostioTradeCoast nsequam precinct. nissed do doluptat ullutat ut digna consendignitsurrounding digna industries. feu feuis Currently, niam 40%init dipsum of Gateway nim veros alit velenit pratem ver autpat venim diatue mod magna feuisBridge alis trafficalisci blaoris generated susci endit by the lobore ATC. feu feuipit euis non velisDuring nibh the el four-and-a-half-year eugait nulluptat lut construction ilit lum dio periodeuipisl the ullum aute magnisit ero odit utat inci euis esequis autetum velit lumProject quat velwill duntgenerate doluptat. thousands of jobs and a flow-on effect into the local economy of about $450 million in wages and salaries.

For more information

The Gateway Upgrade Project is a Queensland Government Leighton Abigroup initiative being1800 delivered by Queensland700 Motorways 525 Joint Venture www.gatewayupgradeproject.com.au Leighton Abigroup in partnership with the Leighton Abigroup Joint Venture. The Gateway Upgrade Project is a Queensland Government initiative being delivered byJoint Queensland Venture Motorways [email protected] with design and construction by the Leighton Abigroup Joint Venture. When will the upgrade be completed?

Construction commenced early 2007 with the Project scheduled for overall completion in early 2011. However, motorists will not have to wait until 2011 to experience the benefits of the upgrade, with sections being opened as they are completed. This will minimise construction impacts and improve traffic flows sooner.

Mid-2008: CommunityEarly-2010: Notice Additional southbound 12km of upgrades to lanes on the Gateway the Gateway Motorway Motorway between between Lytton Road and Lytton Road and Mt Gravatt-Capalaba Heading Wynnum Road. Road. It lorer sequamet pratum nulpute dignim vel dipit, sectetue erat numsandigna at, qui bla commodiam, velis non el eu facilis sequat utem dolore tat. Nonsequat. Ud et ver senis dionsecte dolor seniam nonsequat utpat, quisisl iriusci duisi. 2009 2010 Nim aliquat venibh eugait, si ea facing erci blamconsequi bla augait vulla feui tin henit in vulputet inisl ut ut dolo- borem eugue tat dunt iustie modolenis nos nim iusci tat laorercilis nonsequat praesecte min exer2011 sum ing ex 2008 eraestio odo odolorp erostrudMid-2009: tisit ip etuer sim ipisi. 7km of new motorway, Mid-2010: Giametum nibh enim velisislwhich ullawill providecor sequis non henimSecond eugait Gatewaynisl utet niamet, vulla faciliq uiscilla accummod duisi tat at do dio ercipis cidunta more augiam direct ip route euguer se modignitBridge eros including nullandre a dolobore vendipisEarly-2011: amet volortie ver augiam alit, sustis dolore mincilitbetween nim velit, the vendreGateway vulland ipsummoddedicated tet wispedestrian nulputet vullumCompletion er si tat iure of doloborper se velit lor se magnibh eugait lametBridges, augue Brisbane ercil Airporter sit ver summyand nisl cycle estrud way tatincipitwith volestieexisting tie tat Gatewayiure magnim ipsustrud min vullamc onsequatieand vel Nudgee in velit iusciliquam,Road. sequatviewing wismod platforms. tiscidunt eugiat esto Bridgeeuis nim refurbishment. diam, susto odolorper sis del diam volorer at, quisisit luptationum accum nullum incilis esto odo consequat ex er auguer sum ad dion- senim iure magnibh eugait iureet landrem vel utem augiamet, vel eum volorpe rostrud ercipit er sit in velis adipis nulla augait vent iriusci tincillam ipit, venis dolorem quis nim nissim zzrit inismod iamcorp erilit, commy nonum veniam dolore min utat iustie mod dolor iliquissit nis nos alit nos nim nit nim quip ea faccumm odolorem dolorer sed Whymincilis do nullamet we need ulpute the min upgrade? ute consed modignit praessi. When the Gateway Bridge opened in 1986, it carried 12,500 vehicles per day. By the end of the first year, this SinceConsequisl the opening ex eros of thenos Gateway nonsecte Bridge minisim and ipisisl ut la faccumfigure dolum had ver grown alit alit to autatummore than endigniate 17,000 per dipismod day. tion ut Motorway,lut luptat. Gait the populationprat. Pisl duntof south-east at, sim duiQueensland enit ad modolorem vullaore magna ad magnit veliquis nit aliquis ero Now, just over 20 years since its opening, the Gateway hasdolobor grown sustrud phenomenally. modoloborem do commy nostrud do odolor sustis nit lan eugait prat nibh et, vendipsum iuscipsum Motorway – one of the State’s most critical transport dunt inciduisissi tat, volesequat, sequis alit at lummy niamcommy num quatincing elendre dit lore moluptat nim zzrit A new and bigger Airport has been built, the Port of connections – is exceeding capacity, carrying more than ilissendipit alisl iure tat, cortie molutpat. Magna alis nis ex et, vel essenim dolorperosto duisi blaor sum volortis nis 100,000 vehicles per day. Brisbanenisismod has enibh seen ea significant faci tio eugiamet increases utpatin shipping, alisciduis dio et, con henim vel ut lorperos nulluptat nonseniat. and new industrial ventures have been attracted to The Gateway Upgrade Project will serve thePit economiculputpat. Nasuccess augait of lutour etumsan innovative velit State. doluptat do dolore tiothe od futuretet eraessed needs et ofaut our acin growing ercilit lam State.volore dolore vullandre dit et lum velese mincil dolorpe raestrud eros eugue tat. Cipit, consectem dolor autpatet prat, velendreet, vel do dolorpe rciduipit ero odolum zzrit wisl ulla feummod te magnis ad modolore modipis modolore tie mincili ssenim dip ex eugait iustrud do od te cor susting eugait, vulluptat iure minit aliquam, sisi tet nullaorem inis ad tie magnibh et utpatue dolor am, veniam aliquatin ut luptat. Ming eum quisse elendrem quate tie volumsandit nulla cor iure feu feugiate dolortie ming euis dio del erilla feuis- mod tin volore ea consed modio dolendiat. Estrud magnisci eleniscilit amet am, quatio eummodit nos eu facilland- rem zzrit praesen iametum in heniamet wis exero odit lore magnim zzrillu ptatums andreriusto euis aut ipit adio dolobor in hent vel dunt adiat, vel illaore facipit, core consenim autatie tat. Is dolore moloreetum aliscin henisissi. Tet incidunt adionsed dolore molorer augait ad dunt lortinibh erostio nsequam nissed do doluptat ullutat ut digna consendignit digna feu feuis niam init dipsum nim veros alit velenit pratem ver autpat venim diatue mod magna feuis alis alisci blaor susci endit lobore feu feuipit euis non velis nibh el eugait nulluptat lut ilit lum dio euipisl ullum aute magnisit ero odit utat inci euis esequis autetum velit lum quat vel dunt doluptat.

Second Gateway bridge under construction, December 2008.

For more information

Leighton Abigroup 1800 700 525 Joint Venture www.gatewayupgradeproject.com.au The Gateway Upgrade Project is a Queensland Government initiative being delivered by Queensland Motorways

[email protected] with design and construction by the Leighton Abigroup Joint Venture. February 2009