Gateway Motorway Roadworks
Total Page:16
File Type:pdf, Size:1020Kb
Gateway Motorway Roadworks TOWARDS A SAFER, MORE EFFICENT JOURNEY Overnight ramp closures at Mount Gravatt Capalaba Rd, Miles Platting Rd and Port of Brisbane Motorway Amended traffic alert: update to ramp closure locations and times The Gateway Motorway Pavement project – which involves replacing the top layer of road pavement between Nudgee and Eight Mile Plains – is motoring along. The next section of work is planned on the motorway at MacKenzie and Eight Mile Plains. To keep everyone safe while we work, we’re temporarily closing the motorway ramps at Mount Gravatt Capalaba Road, Miles Platting Road and Port of Brisbane overnight. We’ll try to minimise disruption to motorists so you can still get where you’re going – but change to your travel is going to be required during this work. Alternative routes for regular vehicles during the closures are detailed below. Heavy vehicle operators should review their travel plans and route options. Be assured, we are doing all we can to avoid disrupting your travel – and we’ll have the ramps back in action as quickly as we can each morning. We thank you for your understanding as we complete this necessary work. Closure times There will be closures of the Mount Gravatt Capalaba Road Southbound off-ramp from the Gateway Motorway during these times: • 8pm Monday 19 August until 5am Tuesday 20 August 2019 • 8pm Tuesday 20 August until 5am Wednesday 21 August 2019 • Detour via Miles Platting Road interchange. There will be closures of the Mount Gravatt Capalaba Road Southbound on-ramp to the Gateway Motorway during these times: • 8pm Tuesday 20 August until 5am Wednesday 21 August 2019 • 8pm Wednesday 21 August until 5am Thursday 22 August 2019 • Detour via Old Cleveland Road. There will be closures of the Port of Brisbane Southbound off-ramp from the Gateway Motorway during these times: • 8pm Friday 23 August until 5am Saturday 24 August 2019 • Detour via Kingsford Smith Drive For more information please contact: phone 07 3182 2316 email [email protected] website transurban.com twitter @LinktBrisbane All updates and planned activities are subject to weather, schedule changes and variables. Gateway Motorway Roadworks There will be closures of the Miles Platting Road Southbound off-ramp from the Gateway Motorway during these times: • 8pm Sunday 25 August until 5am Monday 26 August 2019 • Detour via Logan Road. If weather/construction conditions stop us from working, we will continue on the next available evening. Construction activity During the works you should expect: • overnight full closures of Mount Gravatt Capalaba Road and Miles Platting Road on-and-off ramps • reduced speed limits and other road safety measures • increased noise and lighting coming from the construction area • workers, vehicles and equipment moving in, out and around the construction area. Find out more Transurban Queensland manages the Linkt roads, including the Gateway Motorway. For more information about this project, contact our Community Relations Manager: Phone 3182 2316 Email [email protected] For Linkt traffic updates and work alerts, visit linkt.com.au or follow us on Twitter @LinktBrisbane. For more information please contact: phone 07 3182 2316 email [email protected] website transurban.com twitter @LinktBrisbane All updates and planned activities are subject to weather, schedule changes and variables. Traffic Alert─19 Dec 2017 For more information please contact: phone 07 3182 2316 email [email protected] website transurban.com twitter @LinktBrisbane All updates and planned activities are subject to weather, schedule changes and variables. .