The Water Agent
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
STRATEGIC ENVIRONMENTAL ASSESSMENT of the COOPERATION PROGRAMME SLOVENIA – CROATIA 2014-2020 APPENDIX 1: APPROPRIATE ASSESSMENT
Dvokut ECRO d.o.o. ZaVita, svetovanje, d.o.o. Integra Consulting s.r.o. Trnjanska 37 Tominškova 40 Pobrezni 18/16, 186 00 HR -10000 Zagreb, Hrvaška 1000 Ljubljana , Slovenija Pragu 8 , Republika Češka STRATEGIC ENVIRONMENTAL ASSESSMENT of the COOPERATION PROGRAMME SLOVENIA – CROATIA 2014-2020 APPENDIX 1: APPROPRIATE ASSESSMENT SEA REPORT Ljubljana, March 2015 This project is funded by the European Union Strategic Environmental Assessment of the Cooperation Programme INTERREG V-A Slovenia-Croatia 2014-2020 Appendix: Appropriate Assessment Strategic environmental assessment of the Cooperation Programme Slovenia – Croatia 2014-2020 Appendix 1: Appropriate Assessment SEA REPORT Contracting Authority : Republic of Slovenia Government Office for Development and European Cohesion Policy Kotnikova 5 SI-1000 Ljubljana, Slovenia Drafting of the PHIN Consulting & Training d.o.o. Cooperation Programme: Lanište 11c/1 HR-10000 Zagreb, Croatia K&Z, Development Consulting ltd. Kranjska cesta 4, 4240 Radovljica, Slovenia Drafting of the ZaVita, svetovanje, d.o.o. Environmental Report: Tominškova 40 SI-1000 Ljubljana, Slovenia Responsible person: Matjaž Harmel, Director Dvokut –ECRO d.o.o. Trnjanska 37 HR-10000 Zagreb, Croatia Responsible person: Marta Brkić, Director Integra C onsulting s.r.o. Pobrezni 18/16, 186 00 Pragu 8, Czech Republic Responsible person: Jiří Dusík, Director Project team leader: Matjaž Harmel, B. Sc. Forestry Project team deputy team leader: Klemen Strmšnik, B. Sc. Geography Project team members: Aleksandra Krajnc, B. Sc. Geography Marta Brkić, MA Landscape art and Architecture Jiří Dusík, M. Sc. Engeneering Jelena Fressl, B.Sc. Biology Ivana Šarić, B.Sc. Biology, Daniela Klaić Jančijev, B.Sc. Biology, Konrad Kiš, MSc Forestry Katarina Bulešić, Master of Geography Tomislav Hriberšek, B.Sc. -
LEGRAD, V2 0 0 0 0 5 5 1 1 3 3 1 1 5 5 LEGRAD - CROATIA Flood - 14/09/2014 N " 0 '
639000 640500 642000 643500 645000 646500 648000 649500 651000 16°48'0"E 16°49'0"E 16°50'0"E 16°51'0"E 16°52'0"E 16°53'0"E 16°54'0"E 16°55'0"E 16°56'0"E 16°57'0"E 16°58'0"E GLIDE number: N/A Activation ID: EMSR-101 Product N.: 03LEGRAD, v2 0 0 0 0 5 5 1 1 3 3 1 1 5 5 LEGRAD - CROATIA Flood - 14/09/2014 N " 0 ' 9 Delineation Map - Overview 1 ° 6 4 Production date: 18/09/2014 Austria Hungary N " 0 ' Slovenia 9 Serbia 1 Zagreb ° ^ 6 4 Bosnia Zala and Herzegovina Mur Nyugat-Dunantul Adriatic Sea Croatia Montenegro ! Medjimurska Italy 0 0 Somogy 0 0 0 0 zupanija 0 0 3 3 1 1 Drau 5 5 Legrad !( Del-Dunantul Koprivnicko-krizevacka zupanija N " 0 ' 8 Sjeverozapadna 1 ° 6 4 Hrvatska N " 0 ' 8 !( 1 ° Cartographic Information 6 4 1:20000 Full color ISO A1, low resolution (100 dpi) 0 ! 0 0 0 5 5 0 0,5 1 2 8 8 2 2 km 1 1 5 5 Grid: W GS 1984 UTM Zone 33N map coordinate system Tick marks: WGS 84 geographical coordinate system ± Legend Crisis Information Hydrology Flooded Area (18/09/2014) River General Information Stream Area of Interest N Canal " 0 ' 7 1 Settlements ! ° 6 Ditch 4 ! Populated Place Lake N " Residential 0 ' 7 0 0 River 1 0 0 ° 6 0 0 Agricultural 4 7 7 2 2 1 1 5 5 Cemetery Green Area Recreational Urbanized Multi-functional ! N " 0 0 0 ' 6 0 0 1 ° 5 5 6 5 5 4 2 2 Map Information 1 1 5 5 Due to severe raining in last days, extremely high water level is recorded on almost all rivers N in the northern part of Croatia. -
World Bank Document
work in progress for public discussion Public Disclosure Authorized Water Resources Management in South Eastern Public Disclosure Authorized Europe Volume II Country Water Notes and Public Disclosure Authorized Water Fact Sheets Environmentally and Socially Public Disclosure Authorized Sustainable Development Department Europe and Central Asia Region 2003 The International Bank for Reconstruction and Development / The World Bank 1818 H Street, N.W., Washington, DC 20433, USA Manufactured in the United States of America First Printing April 2003 This publication is in two volumes: (a) Volume 1—Water Resources Management in South Eastern Europe: Issues and Directions; and (b) the present Volume 2— Country Water Notes and Water Fact Sheets. The Environmentally and Socially Sustainable Development (ECSSD) Department is distributing this report to disseminate findings of work-in-progress and to encourage debate, feedback and exchange of ideas on important issues in the South Eastern Europe region. The report carries the names of the authors and should be used and cited accordingly. The findings, interpretations and conclusions are the authors’ own and should not be attributed to the World Bank, its Board of Directors, its management, or any member countries. For submission of comments and suggestions, and additional information, including copies of this report, please contact Ms. Rita Cestti at: 1818 H Street N.W. Washington, DC 20433, USA Email: [email protected] Tel: (1-202) 473-3473 Fax: (1-202) 614-0698 Printed on Recycled Paper Contents -
Session 4 SRB Assessment
Status of transboundary waters in South Eastern Europe Characterization Report on the Sava River Basin Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC General description of the basin • The Sava River Basin as a Danube sub-basin – Basin area: 95 720 km 2 (the second largest, after the Tisza basin) – Average flow (at the mouth): 1722 m 3/s (the largest tributary) – River length: 940 km (586 km of which were navigable before the war) Country Share of the Share of the basin (%) territory (%) Albania 0.1 0.5 Bosnia & Herzegovina 40 76 Croatia 26 45 Montenegro 7.5 52 Serbia 15.4 17 Slovenia 11 53 Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 2 Overview (location) of the SRB Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 3 Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 4 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 5 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 6 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 7 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 8 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 9 Values / uses / threats Int. Workshop on ITWRM in SEE, Sarajevo, 18-20 May 2009 10 Land cover/land use in the SRB Land class % Artificial surfaces 2,23 Agricultural areas 42,36 Forests and semi natural areas 54,71 Wetland 0,08 Inland water 0,63 Int. -
CMP and FMP and All Other Subsidiary Plans Needed 1.4.16./30.06.16
COOPERATION PROGRAMME INTERREG V-A, SLOVENIA-CROATIA 2014 -2020 COMMUNICATION MANANGEMENT PLAN FOR THE PROJECT “Cross-border harmonised Slovenia-Croatia flood risk reduction – Strategic project 1 – non-structural measures - project acronym FRISCO1 (Flood Risk Slovenia-Croatia Operations 1) JUNE 2016 - APRIL 2019 Zagreb, July 2016 CONTENTS 1. INTRODUCTION 2. COMMUNICATION AND PARTICIPATION OBJECTIVES 2.1. PROJECT LEVEL 2.2. PROGRAMME LEVEL 3. TARGET GROUPS 3.1. Target groups 3.2. Analysis of target groups 4. PROJECT IMPLEMENTATION 4.1. Communication Working Group 4.2. Awareness Raising and Capacity Building Working Group 5. METHODS OF COMMUNICATION WITH STAKEHOLDERS AND INTERESTED PUBLIC 5.1 Implementation of WP T8 Awareness raising and capacity building 5.1.1 Awareness rising for target groups 5.1.2 Institutional capacity building 5.1.3 Improvement of transboundary FRM 5.1.1. Visibility and project promotion measures 5.2.1 Publication(s) 5.2.2 Public Event(s) 5.2.3 Promotional material 5.2.4 Digital activities 6. BUDGET FOR THE ACTIVITY AWARENESS RAISING AND PROJECT VISIBILITY AND PROMOTION 7. IMPLEMENTATION PERIOD 8. ACTIVITY PLAN Action Plan for the activity: Awareness raising and project visibility and promotion 9. PROJECT OUTPUTS AND RESULTS 10. ANNEXES Annex 1 Table 2 BUDGET FOR THE ACTIVITY AWARENESS RAISING AND PROJECT VISIBILITY AND PROMOTION Annex 2 Table 3 ACTIVITY PLAN: AWARENESS RAISING AND PROJECT VISIBILTY AND PROMOTION 1. INTRODUCTION The Project The Cooperation Programme INTERREG V-A Slovenia – Croatia 2014 – 2020 (hereinafter: “Programme“) was adopted in October 2015. The cross-border cooperation aims to tackle common challenges identified in the border region and to exploit the growth potential in the border area, while enhancing the cooperation process for the purpose of the harmonious development of the European Union (EU). -
2 Sutla.Indd
ZdravkaHRVATSKI Žiger, Andrija GEOGRAFSKI Bognar – Geomorfolo GLASNIKška obilje 69/1,žja gornjeg 25 – 39toka (2007.) rijeke Sutle UDK 551.435(282.249 Sutla) Original Scientific Paper 551.311.2(282.249 Sutla) Izvorni znanstveni članak Geomorfološka obilježja gornjeg toka rijeke Sutle Zdravka Žiger, Andrija Bognar Dolina rijeke Sutle oblikovana je na području SZ Hrvatske u sklopu Panonskog bazena. Geomorfološkom analizom i sintezom te metodom geomorfološkog kartiranja istražena je dolina gornjeg toka rijeke Sutle od izvora do Kumrovečke zavale. Kompozitno obilježje doline je reljefni izraz njenog složenog geomorfološkog razvoja. U njenom oblikovanju odlučujući su utjecaj imali fluvio – denudacijski, fluvijalni procesi i tektonika. Ključne riječi: geomorfološka analiza, geomorfološko kartiranje, fluvijalni procesi, tektonika, Sutla Geomorphological Characteristic of Upper Flow River Sutla River Sutla valley was developed as a part of Panonian basin in NW part of Croatia. The research of upper flow river Sutla from well till plain of Kumrovec has been made using analysis, synthesis and the methods of geomorphological mapping. Character of valley is complex. Valley is poligenetic origin, which means that in it` s modeling fluvial and denudation processes and tectonic had the major influence. Keywords: geomorphologic analysis, geomorphologic mapping, fluvial processes, tectonics, Sutla UVOD Dolina rijeke Sutle dio je makrogeomorfološke regije gorsko-zavalskog prostora SZ Hrvatske i SI Slovenije. Gornji tok rijeke između njenog izvorišnog dijela u pobrđu Maceljske gore pa do Zagorskih Sela dio je mezogeomorfološke cjeline gorskih nizova i pobrđe Hrvatskog zagorja, koja je pak u širem smislu dio megageomorfološke regije Panonskog bazena. (Bognar 1999.) Područje istraživanja ovog rada, od izvora do Kumrovečke zavale, dosad je proučavano kao dio većih cjelina. -
Chapter 5 Drainage Basin of the Black Sea
165 CHAPTER 5 DRAINAGE BASIN OF THE BLACK SEA This chapter deals with the assessment of transboundary rivers, lakes and groundwa- ters, as well as selected Ramsar Sites and other wetlands of transboundary importance, which are located in the basin of the Black Sea. Assessed transboundary waters in the drainage basin of the Black Sea Transboundary groundwaters Ramsar Sites/wetlands of Basin/sub-basin(s) Recipient Riparian countries Lakes in the basin within the basin transboundary importance Rezovska/Multudere Black Sea BG, TR Danube Black Sea AT, BA, BG, Reservoirs Silurian-Cretaceous (MD, RO, Lower Danube Green Corridor and HR, CZ, DE, Iron Gate I and UA), Q,N1-2,Pg2-3,Cr2 (RO, UA), Delta Wetlands (BG, MD, RO, UA) HU, MD, ME, Iron Gate II, Dobrudja/Dobrogea Neogene- RO, RS, SI, Lake Neusiedl Sarmatian (BG-RO), Dobrudja/ CH, UA Dobrogea Upper Jurassic-Lower Cretaceous (BG-RO), South Western Backa/Dunav aquifer (RS, HR), Northeast Backa/ Danube -Tisza Interfluve or Backa/Danube-Tisza Interfluve aquifer (RS, HU), Podunajska Basin, Zitny Ostrov/Szigetköz, Hanság-Rábca (HU), Komarnanska Vysoka Kryha/Dunántúli – középhegység északi rész (HU) - Lech Danube AT, DE - Inn Danube AT, DE, IT, CH - Morava Danube AT, CZ, SK Floodplains of the Morava- Dyje-Danube Confluence --Dyje Morava AT, CZ - Raab/Rába Danube AT, HU Rába shallow aquifer, Rába porous cold and thermal aquifer, Rába Kőszeg mountain fractured aquifer, Günser Gebirge Umland, Günstal, Hügelland Raab Ost, Hügelland Raab West, Hügelland Rabnitz, Lafnitztal, Pinkatal 1, Pinkatal 2, Raabtal, -
Rhodeus Amarus)
MONITORING PROGRAMME FOR BITTERLING (RHODEUS AMARUS) by Jan Dušek with participation from Marko Ćaleta and Zoran Marčić using parts of the text and list of references prepared by Doru Bănăduc Range The range of Rhodeus amarus includes Eurasia with a disjunctive distribution. In Europe, R. amarus inhabits waters from the East of France, from the Alps and Dinarics mountains to the Ural and Caucasus mountains, including the Balkans area. Distribution in Croatia R. amarus is considered to be well distributed, common and present in high abundances in the suitable habitats in the continental biogeographical region (Drava, Sava, Ilova, Kupa, Sutla and Una and their alluvium and tributaries watersheds) (Figures 1 and 2). It often disappears or is not found in samples in some areas and reappears in nearby areas. In other biogeographic regions, it is an introduced invasive species. Consequently, it was considered that a monitoring program was needed for the Continental Biogeographical Region only. Nationally, there has been no permanent or long-term specific monitoring on distribution or population status of R. amarus. In spite of the fact that no exhaustive data about this fish species distribution in Croatian national territory is available, (a relatively common situation in some other European countries also) the present known data (Figure 2) represent reliable data for the proposal of a short medium-term monitoring elements proposal for Croatia. Nevertheless, the knowledge regarding R. Amarus in Croatia is considered to be sufficient when taking the status of the species into consideration. Figure 1: R. amarus presence identified in the last years Figure 2: Distribution of R. -
Preliminary Flood Risk Assessment in the Sava River Basin
PRELIMINARY FLOOD RISK ASSESSMENT IN THE SAVA RIVER BASIN July, 2014 Date Document Revision History Document Author/Reviser 23 September 2013 Initial draft – sent to PEG FP for comments Secretariat/ PEG FP 17 December 2013 Draft 2 – sent to PEG FP for comments Secretariat/ V. Tusić, M. Babić Mladenović 30 January 2014 Draft 2.1 – reviewed at 23rd PEG FP meeting Secretariat/ PEG FP 20 March 2014 Draft 3 – sent to PEG FP for comments Secretariat/ V. Tusić, A. Bezdrob 14 April 2014 Draft 3.1 – sent as doc. for 24th PEG FP meeting Secretariat/ PEG FP 02 June 2014 Draft 4 – sent to PEG FP for comments Secretariat/ V. Tusić 10 June 2014 Draft 4.1 – sent to PEG FP for approval Secretariat/ PEG FP (no comments) 18 June 2014 Draft 5 – sent to ISRBC Secretariat/ ISRBC 01 July 2014 ISRBC accepted and approved publishing on web ISRBC International Sava River Basin Commission Kneza Branimira 29 10 000 Zagreb, Croatia T: + 385 1 488 69 60 F: + 385 1 488 69 86 [email protected] www.savacommission.org TABLE OF CONTENTS 1 INTRODUCTION ........................................................................................................................................... 1 2 GENERAL INFORMATION ON THE SAVA RIVER BASIN .................................................................. 3 3 OVERALL APPROACH AND METHODOLOGY ..................................................................................... 4 3.1 SLOVENIA ........................................................................................................................................................................... -
Surface Water Bodies in the Sava River Basin
Sava River Basin Management Plan Background paper No.1 Surface water bodies in the Sava River Basin March 2013 This document has been produced with the financial assistance of the European Union. The contents of this document are the sole responsibility of the beneficiaries and can under no circumstances be regarded as reflecting the position of the European Union. Sava River Basin Management Plan Table of Contents 1. Introduction ......................................................................................................... 5 2. Description of the Sava River and its main tributaries ......................... 5 2.1 Sectioning of the River Sava.................................................................................................. 8 3 Delineation of surface water bodies ............................................................ 10 4 Surface water monitoring network in the Sava River Basin ............... 18 4.1 Introduction .................................................................................................................................... 18 4.2 Assessment of the existing national and Danube basin wide monitoring networks .................................................................................................................................... 19 4.3 Danube Transnational Monitoring Network ...................................................................... 21 4.4 Comparability of monitoring results ....................................................................... 23 4.5 Monitoring -
Study of Freshwater Ecosystem Services in Croatia
Study of Freshwater Ecosystem Services in Croatia April, 2014 Carried out by: Dr. Sc. David Pithart MSc Ivana Petrov Rančić Petra Kutleša Aljoša Duplić IMPLEMENTATION FRAMEWORK The project National Biodiversity Planning to Support the Implementation of the CBD 2011-2020 Strategic Plan in Croatia is being implemented over a period of two years (from 1 July 2012 to 31 December 2014). The Ministry of Environmental and Nature Protection, Nature Protection Directorate (MENP) is the government institution responsible for the implementation of the project and will act as the Executing Agency. The main implementing partner of the Ministry is the State Institute for Nature Protection (SINP), which is the central institution carrying out expert tasks of nature protection in Croatia. UNDP is involved as the GEF Agency for the project, and it is accountable to the GEF for the use of funds. The project is nationally implemented (NIM). The project National Biodiversity Planning to Support the Implementation of the CBD 2011-2020 Strategic Plan in Croatia builds on the current status and achievements of Croatia with respect to its obligations vis-à-vis the Convention on Biological Diversity (CBD), in particular the country’s biodiversity planning and Convention reporting processes, and its commitment to implement, at the national level, the CBD’s Strategic Plan for the period 2011-2020. The concept of ecosystem services that is directly connected to the Aichi Targets 14 and 15 of CBD, as well as the EU 2020 Biodiversity Strategy, are still quite new for Croatia. Since 2013, three projects in Croatia were dealing with the economic valuation of biodiversity, where ecosystem services were used as a tool for sustainable management of nature protected areas (in Nature Park Vransko jezero and Nature Park Velebit), or for sustainable rural development. -
Flood Protection in Emergency Situations
FLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN STAKEHOLDER FORUM WORKSHOP 15 November 2018 CATALOGUE OF MEASURES CATALOGUE OF MEASURES SUMMARY OF MEASURES FLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN (SAVA FRMP) . 42 nonstructural measures divided into 11 groups of measures: 15 prevention measures: 3 M23 and 12 M24, 11 protective measures: 5 M31 and 6 M35, 16 preparedness measures: 9 M41, 3 M43, 3 M44 and 1 M53; . 37 national structural measures in areas of mutual interest: 4 protective measures M32 (watercourse regulation), 33 measures M33 (channel, riverbank and flood area works). SUMMARY OF MEASURES . Available technical and other information on projects; . Impacts of areas (retentions) with natural and regulated retention of flood water; . Crossborder impacts; . Environmental objectives of the WFD and information from Sava RBMP; . Potential environmental influences; . Impact on climate change adaptation capacities. SUMMARY OF NONSTRUCTURAL MEASURES SUMMARY OF NONSTRUCTURAL MEASURES NONSTRUCTURAL MEASURES Measures of high indicative priority include: . Measures that are of mutual interest for the countries and the ISRBC, pertaining to the provision of data and components for the preparation of the next Flood Risk Management Plan in the Sava River Basin; . Measures that support improvements of the realtime data collection systems and provide basis hydrological forecasting. STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST The following documents were used for proposing structural measures: . national flood risk management plans for Slovenia and Croatia; . draft flood risk management plan for Serbia; . water management strategies; . projects from the ISRBC Metacatalogue; . countries' proposals. STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST STRUCTURAL MEASURES IN AREAS OF MUTUAL INTEREST SPATIAL DISTRIBUTION OF MEASURES MEASURES RELATING TO WATER RETENTION CROSS-BORDER IMPACT OF MEASURES .