Integrated Transportation Modes in Jakarta
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Owner Estimate for Urban Bus Services 2020
OWNER ESTIMATE FOR URBAN BUS SERVICES 2020 1 Owner Estimate for Urban Bus Services A guideline for service providers/operators 2020 Author Dr. Okto Risdianto Manullang, ST., MT. Contact Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1-5 65760 Eschborn Tel +49 (0) 6196 79-0 Fax +49 (0) 6196 79-11 15 www.giz.de Editors Ari Nova Firnanda Achmad Zacky Ambadar Maulana Ichsan Gituri Cover designer Nabila Fauzia Rahman DISCLAIMER The analysis, results, and recommendations in this paper represent the opinion of the author(s) and are not necessarily representative of the position of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH or BMUB. Partial or total reproduction of this document authorized for non-profit purposes provided the source is acknowledged. i EXECUTIVE SUMMARY The Government of Indonesia, through the Ministry of Transportation, has committed to provide support and assistance in the development of public transportation systems in all cities in Indonesia. It aims to provide incentives to local governments to immediately take the necessary actions to help accelerate public transport reform in their respective cities. To realize this, the calculation of vehicle operating costs (BOK) needed as an indicator of determining minimum tariffs or providing subsidies. The commonly used calculation methods in the calculation of vehicle operating costs refer to the Decree of Directorate General of Land Transportation and Transjakarta's calculation methods. Each of those calculation methods have advantages and disadvantages. The Decree of Directorate General of Land Transportation’s method has advantages in the right understanding of the calculation component. In contrast, Transjakarta’s method has advantages in practical worksheets and can provide comprehensive information. -
Initiating Bus Rapid Transit in Jakarta, Indonesia
Initiating Bus Rapid Transit in Jakarta, Indonesia John P. Ernst On February 1, 2004, a 12.9-km (8-mi) bus rapid transit (BRT) line began the more developed nations, the cities involved there frequently lack revenue operation in Jakarta, Indonesia. The BRT line has incorporated three critical characteristics more common to cities in developing most of the characteristics of BRT systems. The line was implemented in countries: only 9 months at a cost of less than US$1 million/km ($1.6 million/mi). Two additional lines are scheduled to begin operation in 2005 and triple 1. High population densities, the size of the BRT. While design shortcomings for the road surface and 2. Significant existing modal share of bus public transportation, terminals have impaired performance of the system, public reaction has and been positive. Travel time over the whole corridor has been reduced by 3. Financial constraints providing a strong political impetus to 59 min at peak hour. Average ridership is about 49,000/day at a flat fare reduce, eliminate, or prevent continuous subsidies for public transit of 30 cents. Furthermore, 20% of BRT riders have switched from private operation. motorized modes, and private bus operators have been supportive of expanding Jakarta’s BRT. Immediate improvements are needed in the These three characteristics combine to favor the development of areas of fiscal handling of revenues and reconfiguring of other bus routes. financially self-sustaining BRT systems that can operate without gov- The TransJakarta BRT is reducing transport emissions for Jakarta and ernment subsidy after initial government expenditures to reallocate providing an alternative to congested streets. -
Report of 37Th Conference of the ASEAN Federation of Engineering and 26Th Young Engineers of ASEAN Federation of Engineering Organisation Conference
Submission to the HKIE Executive HKIE-YMC Report of the 37th CAFEO & 26th YEAFEO Conference Dec 2019 Submission to the HKIE Executive Report of 37th Conference of the ASEAN Federation of Engineering and 26th Young Engineers of ASEAN Federation of Engineering Organisation Conference 10 - 13 September 2019 Jakarta The Hong Kong Institution of Engineers Young Members Committee Submission to HKIE Executive HKIE-YMC Report of the 37th CAFEO & 26th YEAFEO Conference Dec 2019 Contents 1. Introduction ................................................................................................................. 1 1.1 Background ............................................................................................................. 1 1.2 Objectives ................................................................................................................ 3 2. YEAFEO Meeting ........................................................................................................ 4 2.1 Country Report ..................................................................................................... 4 2.2 YEAFEO Governing Board Meeting ................................................................. 5 3. Sustainability Forum ................................................................................................. 6 3.1 Energy ...................................................................................................................... 6 3.2 LinkAja ................................................................................................................... -
Kualitas Pelayanan Badan Layanan Umum Transjakarta Pada Penumpang Penyandang Cacat Fisik (Difabel)
KUALITAS PELAYANAN BADAN LAYANAN UMUM TRANSJAKARTA PADA PENUMPANG PENYANDANG CACAT FISIK (DIFABEL) SKRIPSI diajukan untuk memenuhi salah satu syarat ujian sarjana strata-1 pada program studi administrasi negara Oleh: ZAHROTUL ADDAWIYAH ISKANDAR 072759 FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNIVERSITAS SULTAN AGENG TIRTAYASA SERANG 2011 ABSTRAK Zahrotul Addawiyah I, NIM 072759, Kualitas Pelayanan Badan Layanan Umum Transjakarta Pada Penumpang Penyandang Cacat Fisik (Difabel), program studi Ilmu Administrasi Negara, Fakultas Ilmu Sosial dan Ilmu Politik Universitas Sultan Ageng Tirtayasa, Serang 2011. Pembimbing I Maulana Yusuf, S, IP. Msi. Pembimbing II Kandung Sapto Nugroho, S.sos, M.si. Kata Kunci: Aksesibilitas, Penyandang Cacat Fisik, Transjakarta Fokus penelitian ini adalah kualitas pelayanan badan layanan umum transjakarta pada penumpang penyandang cacat fisik (difabel). Penelitian ini bertujuan untuk mengetahui bagaimana kualitas pelayanan badan layanan umum transjakarta pada penumpang penyandang cacat fisik (difabel). Berdasarkan tujuan penelitian tersebut, maka metode penelitian yang digunakan adalah metode penelitian deskriptif kualitatif dengan menggunakan teknik purposive sampling dan snow ball sampling. Hasil penelitian menyimpulkan bahwa kualitas pelayanan badan layanan umum transjakarta pada penumpang penyandang cacat fisik (difabel) adalah tidak optimal. Hal ini dapat dilihat dari banyaknya petugas yang tidak mengamalkan sistem 4S (sapa, sopan, sabar, senyum) terhadap pelanggan transjakarta, infrastruktur yang tidak memadai bagi penyandang cacat fisik (difabel) seperti trotoar, jembatan penyebrangan, halte, adanya gap platform, dan audiovisual yang bobrok, headway yang sangat lama, tidak adanya pelatihan khusus bagi pegawai transjakarta dalam melayani penyandang cacat fisik (difabel), banyak fasilitas yang tidak terawat, kurangnya pengawasan pegawai transjakarta dan sulitnya melakukan pengaduan layanan, kurangnya sosialisasi program pemberdayaan transjakarta seperti temu pelanggan, wisata busway, park and ride busway. -
Skripsi Yunda
CHAPTER 1 INTRODUCTION 1.1 General Overview of Research Object 1.1.1 Light Rail Transit Figure 1.1 LRT Source : www.kabar3.com The Palembang Light Rail Transit (Palembang LRT) is an operational light rail transit system in Palembang, Indonesia which connects Sultan Mahmud Badaruddin II International Airport and Jakabaring Sports City. Starting construction in 2015, the project was built to facilitate the 2018 Asian Games and was completed in mid-2018, just a few months before the event. Costing Rp 10.9 trillion for construction, the system is the first operational light rail transit system in Indonesia, and utilizes trains made by local manufacturer PT.INKA. The system's only line has a total of 13 stations (6 operational). As Palembang was to host the 2018 Asian Games, the project was pushed to be completed before the event began. Groundbreaking for the project occurred on 1 November 2015, with state-owned company Waskita Karya being appointed as the primary contractor following the issuance of Presidential Regulation 116 of 2015 on Acceleration of Railway Train Operation in South Sumatera Province. The contract, which was signed in February 2017, was initially valued at Rp 12.5 trillion. Construction was scheduled for completion in February 2018, with commercial service beginning in May 2018. However, the completion date was moved to June 2018 with operations beginning in July, only one month before the Asian Games. A test run was done on 22 May 2018 and was inaugurated by President Joko Widodo on 15 July 2018. Operations for the LRT started on 1 August, several days before the Jakarta LRT began running, making it the first operational LRT system in the country. -
Analysis of Tariff Integration Between MRT and Transjakarta*
Advances in Engineering Research, volume 193 2nd International Symposium on Transportation Studies in Developing Countries (ISTSDC 2019) Analysis of Tariff Integration Between MRT and TransJakarta* Kevin Ginevra Arota Hulu Andyka Kusuma Civil Engineering Department Civil Engineering Department University of Indonesia University of Indonesia Depok, Indonesia Depok, Indonesia [email protected] [email protected] Abstract—The Tariff Integration System is a tariff payment residents to reduce transportation cost. Tariff integration system where users of public transportation make payments allows passengers to use several transportation modalities only once but can use two or more modes of public by only buying one ticket, which can be used for a short transportation. For this study, the modes of transportation period or can also have seasonal validity [4]. Therefore, this reviewed are TransJakarta and MRT. The purpose of this study tries to find out what the people of Jakarta perceive study is to find out the preferences that affect the community regarding tariff integration, to know the factors that can about the tariff integration system. influence people's behaviour towards tariff integration, as well as the preference for integration rates for the community. The II. TARIFF INTEGRATION SYSTEM data collection method for this study is the Stated Preference Method. The survey conducted in two places, namely in the The Integration Tariff system allows passengers to use downtown and in the suburbs. The survey in the downtown is several transportation modalities (for example, intercity and held at the Bendungan Hilir Shelter (TransJakarta Corridor 1) city buses, subways, local trains, and ferries). -
Social Impact of Railway Project A
SOCIAL IMPACT OF RAILWAY PROJECT A CASE STUDY OF MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA DAMPAK SOSIAL PROYEK KERETA API STUDI KASUS MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA Listifadah Research and Development Land Transportation-Ministry of Transportation Jl. Medan Merdeka Timur No. 5 Jakarta Pusat 10110 email: [email protected] Diterima: 11 November 2014, Revisi 1: 1 Desember 2014, Revisi 2: 10 Desember 2014, Disetujui: 19 Desember 2014 ABSTRACT Jakarta MRT system had been planned since the 1980’s. Many constraints such as political, finan- cial, as well as bureaucratic make the project delayed for a long time. When the plan scheduled to be implemented in a couple years ago, some protests arise. Communities and some interest group against. The fears of income decline and loss of livelihood become their main concerns which in- duce protests before the project really started. Based on this experience, this paper tries to reveal social impacts of transport development in case MRT Jakarta. Now the project construction is being carried out. Social impact as well as the project construction continues. This study investigate how social impact of railway project was happened. Literatures and documents analysis was used to analyze this study. The result of the study were the MRT Jakarta project inevitably have negative and positive impacts both for society and environment. But with the start of the project after a long delay, it gives hope to the community for better transportation. It is a positive impact before the project was completed. Community engagement in a meeting or discusssion should more be em- phasized in the process in order to minimize the conflicts of interest. -
Sustainable Urban Transport Development in Indonesia
Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA Ikhwan Hakim Director of Transportation Ministry of National Development Planning Indonesia Presented at Transport and Climate Change Week Berlin, 18-20 September 2017 Sustainability Issues in Urban Development (1/2) REPUBLIK INDONESIA High UrbanisaFon Rate 76% Environmental Impacts 100% 59% 64% 68% 72% 41% 36% • 50% 32% 28% 24% The transport sector accounts for 27% of CO2 emissions. In developing countries, CO2 0% emissions from transportaon will increase 2015 2020 2025 2030 2035 by two 7mes in the period 1980 - 2030. Urban Populaon Rural Populaon • In DKI Jakarta (2008-2013) indicators of In 2015: Indonesia (2.69%), India (2.38%), China (2.3%) urban air quality such as PM10 increased by 20%, CO increased 70%, and NO2 increased Rapid MotorizaFon by 350%. 100,000,000 92,976,240 50,000,000 12,599,138 - Massive Urban Land Conversion 1954 1964 1974 1984 1994 2004 2014 • Rapid changes of low density areas into Private Car Bus Truck Motorcycle high densi7es. Agricultural land and green areas turned into residen7al areas. High Traffic Fatality • In Jakarta Metropolitan Area, within • Traffic fatality in 2016 1985-2002, the residen7al land use was almost 26.000. increased from 11% to 22% (2 7mes) and • In 2016, 72% of traffic industrial land use increased from 4.75% accidents involve to 7.5%. While, agricultural land use motorcycles. decreased from 45% to 24%. Sustainability Issues in Urban Development (2/2) REPUBLIK INDONESIA Deterioraon of Urban Public Transport (current share is around 20%) URBAN GRIDLOCK V/C Rao 2020: > 1.2 DKI Jakarta (2010) 2% 19% 62% 23% Hong Kong (2011) 25% 63% 11% Tokyo (2009) 48% 3% 12% 37% Singapore (2011) (2011) 19% 29% 29% 23% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Rail Non-Rail Public Transport Private Transport Others Severe Traffic Congeson • Economic losses due to traffic conges7on in Jakarta reach USD 3 billion in 2016. -
Japan-ASEAN Connectivity Initiative(PDF)
November. 2020 Japan-ASEAN Connectivity Initiative MOFA Japan has supported ASEAN's efforts to strengthen connectivity in order to narrow the gaps in the ASEAN region and further facilitate the integration of ASEAN community based on the Master Plan on ASEAN Connectivity (MPAC) 2025 and Ayeyawady-Chao Phraya-Mekong Economic Cooperation Strategy (ACMECS) Masterplan. Japan will continue to provide support in this field. Japan has announced its decision to support strengthening ASEAN connectivity both in hard and soft ware with focus on the ongoing 2 trillion yen worth of land, sea, and air corridor connectivity infrastructure projects as below, together with capacity building projects for 1,000 individuals over the next three years. “Land Corridor” East-West Corridor *The following connectivity projects include projects (Thailand) The road connecting Da Nang, Viet Nam under consideration. (Cambodia) ・Mass Transit System Project and Mawlamyaing, Myanmar ・National Road No. 5 Improvement Project “Sea and Air corridor” in Bangkok (RED LINE) Southern Corridor ( ) (Myanmar) The road connecting Ho Chi Minh, Viet Nam Cambodia ・ ・Bago River Bridge Construction Project and Dawei, Myanmar Sihanoukville Port New Container Terminal Development Project ・East-West Economic Corridor Improvement Project Mandalay Hanoi ・ ・East-West Economic Corridor Highway Development The Project for Port EDI for Port Myanmar Modernization Project (Phase 2)(New Bago-Kyaikto Highway Section) Naypyidaw Laos (Myanmar) ・Infrastructure Development Project in Thilawa Area Phase -
Annual-Report-MRT-Jakarta-2017.Pdf
Laporan Tahunan Annual Report 2017 ACHIEVING THE MILESTONES PT MRT Jakarta Wisma Nusantara 21st Floor Jl. MH. Thamrin 59 ReportAnnual Laporan Tahunan Jakarta, 10350 - Indonesia Tlp: (+62-21) 3906456 Fax: (+62-21) 3155846 2017 (+62-21) 3142273 www.jakartamrt.co.id ACHIEVING THE MILESTONES Laporan Tahunan Annual Report 2017 SANGGAHAN DAN TANGGUNG JAWAB Disclaimer Laporan Tahunan ini memuat berbagai pernyataan This Annual Report contains various statements terkait kondisi keuangan, operasi, kebijakan, regarding financial and operational conditions, proyeksi, rencana, strategi, serta tujuan Perseroan, policies, projection, plans, strategies, as well as yang digolongkan sebagai pernyataan ke depan the Company’s objectives, which are classified as dalam pelaksanaan perundang-undangan yang forward-looking statements in the implementation berlaku. Pernyataan-pernyataan tersebut memiliki of the applicable laws. Such forward-looking prospek risiko, serta ketidakpastian, hingga statements have known and unknown risks kemungkinan perbedaan dengan perkembangan (prospective) and uncertainties, which could cause aktual. Berbagai pernyataan prospektif dalam the actual results to differ from the expected Laporan Tahunan ini disusun berdasarkan asumsi- results. Prospective statements in this Annual Report asumsi mengenai kondisi terkini, serta proyeksi are prepared based on numerous assumptions atas situasi mendatang, terkait lingkungan bisnis concerning current conditions as well as projection Perseroan. Perseroan tidak menjamin bahwa of the coming future -
Youth Perception on Features and Accessibility of Bus Rapid Transit Mebidang in Bridging Interconnected Areas in North Sumatera
International Journal of Research and Review www.ijrrjournal.com E-ISSN: 2349-9788; P-ISSN: 2454-2237 Research Paper Youth Perception on Features and Accessibility of Bus Rapid Transit Mebidang in Bridging Interconnected Areas in North Sumatera Yusuf Aulia Lubis, Sirojuzilam, Suwardi Lubis Regional Planning Department, School of Post-Graduate, University of Sumatera Utara, Medan, Indonesia Corresponding Author: Yusuf Aulia Lubis ABSTRACT One of Indonesian problems in infrastructure development is how to nationally avail Bus Rapid Transit having transit rail system in its development system. In the macroeconomic perspective, the availability of urban transport infrastructure services can affect the marginal productivity of private capital, while in the microeconomic perspective; such services can also decrease production costs. Moreover, the contribution of urban transport infrastructure to improving quality of life is indicated by the increase in welfare, productivity and access to employment, as well as macroeconomic stability. This research is descriptive trying to gain youth’s perception on Bus Rapid Transit in Medan. In this study, the primary and secondary data sources are used and the populations include all users of Trans Mebidang. The samples are taken from those using the routes of Tanjug Anom to Down Town (or Pusat Kota), Jamin Ginting to Down Town, and Simpang Pos to Down Town and the samples chosen are only 15% of population. Sampling technique is purposive and accidental. It can be concluded that partially the Feature Perception (X1) gives impacts on the uutilization of Trans Mebidang and partially the Accessibility Perception also brings effect to the utilization of Trans Mebidang. Keywords: perception, features, accessibility, bus rapid transit, Medan INTRODUCTION Mamminasata). -
Country Report
10th Regional EST Forum in Asia, 14-16 March 2017, Vientiane, Lao PDR Intergovernmental Tenth Regional Environmentally Sustainable Transport (EST) Forum in Asia 2030 Road Map for Sustainable Transport ~Aligning with Sustainable Transport Development Goals (SDGs)~ Country Report (Draft) <Indonesia> ------------------------------------- This country report was prepared by the Government of Indonesia as an input for the Tenth Regional EST Forum in Asia. The views expressed herein do not necessarily reflect the views of the United Nations. 10th Regional EST Forum in Asia, 14-16 March 2017, Vientiane, Lao-PDR Country EST Report (covering from Nepal EST Forum a) Name of the Country : INDONESIA 2015 to Lao EST Forum 2017) b) Name, Designation and Line Ministry/Agency Respondent: Muiz Thohir, Deputy Director of Programme Evaluation, Greater Jakarta Transport Authority, Ministry of Transportation c) List other Line Ministries/Agencies contributing to preparation of the Country Report: Ministry of Foresty and Environmental d) Reporting period: 2015-2017 With the objective of demonstrating the renewed interest and commitment of Asian countries towards realizing a promising decade (2010-2020) of sustainable actions and measures for achieving safe, secure, affordable, efficient, and people and environment-friendly transport in rapidly urbanizing Asia, the participating countries of the Fifth Regional EST Forum in Asia discussed and agreed on a goodwill and voluntary declaration - “Bangkok Declaration for 2020 – Sustainable Transport Goals for 2010-2020.” At the Seventh Regional EST Forum held in Bali in 2013, the participating countries adopted the “Bali Declaration on Vision Three Zeros- Zero Congestion, Zero Pollution and Zero Accidents towards Next Generation Transport Systems in Asia” reinforcing the implementation of Bangkok 2020 Declaration (2010-2020) with emphasis to zero tolerance towards congestion, pollution and road accidents in the transport policy, planning and development.