DIVISION OF MATERIEL SOLICITATION MANAGEMENT UNIT
SSE ID#: 0000244934 TITLE: A-37150A Design and Construction of Accessibility Upgrades at Sixth Avenue Station on the Canarsie Line (BMT) in the Borough of Manhattan PROPOSAL DUE DATE: 1/10/2019, 12PM
DOCUMENT AVAILABILITY: 11/27/2018
Proposals will only be accepted from those firms pre-qualified by NYC Transit under Step 1, which are listed below in alphabetical order: Citnalta-TAP, Joint Venture ECCO III Enterprises, Inc. Halmar International, LLC John P. Picone, Inc. Skanska USA Civil Northeast Inc. Tully Construction Co., Inc.
Interested subcontractors are encouraged to contact the pre-qualified firms for subcontracting opportunities. A Project Site Tour and Pre-Proposal Conference will be held as follows:
Project Site Tour: DATE: Thursday, December 6, 2018 START TIME: 10:00 AM MEETING PLACE: Control area H003 in the upper mezzanine level above L-train platform. Access from street stairs on 14th Street, east of 6th Avenue. Shown in A- 112 drawing in contract documents
Pre-Proposal Conference: DATE: Friday, December 7, 2018 START TIME: 2:00 PM VENUE: 2 Broadway, 6th Floor, Conference Room A6.03, New York, NY, 10004
Prospective subcontractors are limited to 2 attendees per event. Those who wish to attend the Project Site Tour and/or Pre-Proposal Conference are required to notify the Procurement Representative ([email protected]) not later than midday, three (3) business days prior to the scheduled date of the relevant event.
For applicable contractor contact information, return to the previous page and select the link for the Project’s Plan Holder List. To obtain bid documents, please return to the previous page and click on the ORDER NOW button.