Environmental Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
South Road Superway
SOUTH ROAD SUPERWAY ON THE Way The $842M South Road Superway project will be one of Australia’s largest single investment developments and one of the most complex engineering road projects for any freeway. MAIN CONSTRUCTION COMPANIES : John Holland, Leed Engineering & Construction PROJECT END VALUE : $842 million COMPLETION : September 2013 ROAD LEGHTH : 4.8km The Australian and South Australian • The northern end of South Road is Governments are working together to being upgraded as it is a key freight improve transport in South Australia. The route for Adelaide’s major export $842 million South Road Superway project generating industries. is the biggest single investment in a South • South Road is the direct link for industrial Australian road project, and so far the state’s transport hubs: Adelaide Airport, most complex engineering road construction Islington Rail Terminal, Port Adelaide project. This project is under a joint venture and Outer Harbour. between John Holland and Leed Engineering & Construction and is the second stage A purpose built casting yard was of the north-south transport corridor implemented for the project and saved the upgrade which provides a 4.8 kilometre transportation of heavy segments by road. non-stop corridor and incorporates a 2.8 Being able to cast the segments as close kilometre elevated roadway. as possible to the piers ensures minimum interruption to traffic. Land was secured Supporting the local economy, the South Road and the Superway casting yard built for this Superway project has provided more than 2000 purpose at 628-638 South Road. jobs and has supported the growth of local businesses. -
Adelaide Industrial Market
RESEARCH Population Growth Aust: 1.6% SA: 0.8% Infrastructure—North to Lonsdale— an additional 3,000m² of As at December 2018 South Corridor advance manufacturing space which will increase the manufacturing capacity by Economic Growth The North to South Corridor is starting to 250% and create jobs for up to an Aust: 1.8% SA: 1.8% come together with the majority of additional 100 workers. projects completed. Current projects March 18 to March 19 underway are the Darlington Upgrade The unemployment rate in SA currently Unemployment Rate and Northern Connector, with expected stands at 5.9%, which is 0.7% higher completion in late 2019. The remaining than the national average as of June Aust: 5.2% SA: 5.9% sections that are yet to commence are 2019 (seasonally adjusted). This figure As at June 2019 the River Torrens to Anzac Highway and has improved from 7.3% in April 2017. “Anzac Highway to Darlington”. On Moving forward, this downward trend is Infrastructure Spending completion, the 78-kilometre North-South likely to continue as a number of major SA State Budget Corridor will reduce travel times by projects in the defence and providing a continuous non-stop manufacturing sectors come online. 2019/20: $11.9 billion carriageway from Gawler to Old Engineering Noarlunga. Furthermore, it will also Low cost of capital will Construction improve access to some of the key benefit the property market Aust: -13.5% SA: 7.8% industrial areas such as Edinburgh Parks in the Outer North. Evidence from sales transactions during March 18 to March 19 CY 2018 suggested that the low cost of Manufacturing is back capital and the abolition of stamp duty had a positive impact on the number of The closure of the 122.5ha General transactions for industrial properties Motors Holden (GMH) site in Elizabeth above $5 million. -
Port River Expressway Cycle Path Detour ADVANCE NOTICE
North-South Corridor Northern Connector Project Port River Expressway cycle path detour ADVANCE NOTICE As a part of the Northern Connector Project, The Department of Planning, Transport and Infrastructure (DPTI) advises that a new cycle path detour will be in place on the Port River Expressway for the eastbound and westbound routes, between Hanson Road and Globe Derby Drive from late August/early September 2017 to late 2019. This will replace the existing eastbound detour and will enable cyclists to continue to travel safely between these locations during the construction of the new bridge connecting the South Road Superway and the Northern Connector, as part of the Southern Interchange. Advanced notice and directional signage will be in place to direct cyclists along the detour. Please refer to the attached map to plan your journey. A further notification will be issued prior to the detour official opening. Thank you for your patience whilst these important works are undertaken. To assist with planning your cycle journey visit http://maps.sa.gov.au/cycleinstead/. # 11827676 Port River Expressway cycle detour For users eastbound and westbound from TBC 2017 to late 2019 LEGEND P O CYCLE DETOUR EASTBOUND ONLY R T (OPEN FROM TBC 2017 TO LATE 2019) W CYCLE DETOUR WESTBOUND ONLY A (OPEN FROM TBC 2017 TO LATE 2019) K E RAILWAY LINE F Ryans Rd I E L Trotters Dr D R N O Use Globe Derby Dr A existing D Dry Creek Linear Trail Use existing pedestrian access to cross Port Wakefield Rd. Dismount bicycle underneath Salisbury Hwy bridge. Use Pedestrian Start crossing eastbound cycle Vater St detour here. -
Traffic Impact Assessment
APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81 -
Buckland Park – Traffic Impact Assessment
Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: .................................................................................................... -
Northern Connector FACT SHEET July 2008
northern connector FACT SHEET July 2008 Involved at this early stage are a wide range The planning study will include an economic Have your of government agencies, local businesses and analysis and identify relevant environmental community bodies that need to understand issues and outline an approach for design and and comment on the proposal and to raise construction. It will also provide the framework say about a any issues about it. for an environmental impact assessment to be developed throughout this year. Since the announcement in March 2008 a major project range of activities have occurred, including: The project route is expected to be confirmed > feedback on design based on traffic needs by the end of 2009. Five months ago the Minister for Transport, and engineering Patrick Conlon announced a study into a > desktop research on similar projects Where is the project? new road and rail transport corridor in the > drop-in forums held at Globe Derby Park The planning study area will investigate area west of Port Wakefield Road – the and St Kilda a 17 km corridor from north of the Brown Northern Connector. > shopping centre displays at Hollywood Road/Port Wakefield Road intersection through to the connection of the Port River This fact sheet sets out additional Plaza and Virginia Expressway and South Road. information about the project and identifies > meeting and planning with emergency the opportunities for the community to services experts This includes a section of approximately be involved in the planning process that > field surveys that look at geography, 1 km width on the western side of is underway. -
Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide. -
Cycling Guide Gawler and Surrounds ©Copyright 2021
Cycling Guide Gawler and surrounds ©Copyright 2021 Gawler Environment and Heritage Association (GEHA) 42 Finniss Street, Gawler and Australian Educational Publications and Training (AEPaT) 30 Phillips Avenue, Gawler East Phone 08 8523 2859 [email protected] All rights reserved. Apart from any fair dealing permitted under the Copyright Act 1968, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of GEHA and AEPaT. Disclaimer – while every effort is made to ensure the information contained in this publication is current and correct at the time of publishing, future changes may render the information incorrect. The publishers and author expressly disclaim liability or responsibility to any person using the information or advice contained herein. Author: Paul Koch Title: Cycling Guide, Gawler and Surrounds Subjects: Cycling in Gawler Cycling around Gawler Graphic design: Imogen Pip Design Photography: Paul Koch Mapping: Base map Carto Graphics Contents 1. Rides 2. Preface 3. Introduction 4. Cycling in general 6. Gawler as a cycling hub 7. Gawler and surrounds 8. Amenities in Gawler 9. Cycling groups and clubs 10. Using this guide 11. Riding surfaces 11. Challenges 12. Choosing a ride 13. Maps and Descriptions 1 Rides Navigating around Gawler •Gawler Rivers Paths -Tapa Pariara..................................................... 14 •Gawler VIC to Start of Stuart O’Grady Bikeway................................ 15 •VIC to Thiele Highway...................................................................... 16 •VIC to Kentish Road and Alexander Ave............................................ 17 •Redbanks Road to Gawler VIC.......................................................... 18 •Thiele Highway to VIC...................................................................... 19 •VIC to Wheatsheaf Inn via local roads............................................. -
Old Port Wakefield Road, Two Wells Master Plan
Old Port Wakefield Road, Two Wells May 2020 Master Plan Prepared for Adelaide Plains Council Contents Summary 3 Introduction 5 Existing conditions 7 Vision 9 Principles 10 Context 11 Master plan 15 Wayfinding + Branding 19 Village Green Concept Design 21 Tool kit 25 Implementation 29 4th May 2020 Produced by Jensen Plus Level 1, 21 Roper Street Adelaide 5000 South Australia 08 8338 5511 [email protected] www.jensenplus.com.au Old Port Wakefield Road, Two Wells Master Plan 1. Summary In late 2019, funding through the Jensen PLUS has worked with Adelaide The Drought Communities Programme along The main projects identified to be completed Australian Government’s Drought Plains Council since 2018 on master planning with the strategic direction fro Two Wells by the end of 2020 include: strategies for the main street of Two Wells. formulated the Vision for the master plan; _ Revitalised Public Space next to the Library Communities Programme provided From these works, a series of principles for the - Two Wells Village Green with nature an opportunity for the Adelaide Plains main street refresh were identified and used “By Christmas 2020 revitalise the town of playspace and new public toilet to ensure the identified projects aligned with Two Wells by innovatively implementing Council to accelerate a program to the strategic direction for Two Wells. These urban design projects along the main street.” _ Greening of the main street with new street refresh the main street of Two Wells. principles include: tree planting and opportunities for raised Working closely with Council, Jensen planters _ New street furniture PLUS used the funding as a framework _ Renewing the public Realm _ Better pedestrian crossings to identify short and long term projects _ Defining safe and accessible movement along Old Port Wakefield Road. -
13 Transport
Northern Expressway Environmental Report 13 Transport 13.1 Introduction The existing transport network operates at an acceptable to poor level along most arterial roads in the study area. The predicted increase in traffic volumes on the current network will significantly increase delays and congestion, particularly along Main North Road and Heaslip Road. The construction of the Northern Expressway will provide an important link to the South Australian freight network. In general, consultation comments to date have been supportive of the Expressway, recognising the benefits of freight being diverted from local roads in the study area, improved travel times and improved access to other regions. Comments have also highlighted concerns from local people about access to their properties, to the Expressway, east–west access across the Expressway, and the effects on Port Wakefield Road. 13.2 Existing transport network 13.2.1 Arterial road network The fold-out plan at the back of this Environmental Report shows the road network within the study area. It is characterised by three major north–south roads: Port Wakefield Road, Heaslip–Angle Vale Road and Main North Road (and the Gawler Bypass). Main North Road and Port Wakefield Road form part of the existing National Network; Heaslip–Angle Vale Road is considered a significant freight route and connects the two National Network links. Main North Road and Heaslip Road form the main connections to the Mid North (e.g. Clare) and to the Riverland areas of South Australia as well as to northern Victoria and New South Wales via the Sturt Highway. The remaining arterial roads (generally east–west such as Womma Road, Penfield Road, Angle Vale Road and Two Wells Road) perform linking functions within the road network to the AusLink National Network and surrounding communities. -
Consolidated Table of Limited Access Locations for SA
Information Bulletin August 2020 Heavy Vehicles Limited Access Locations in SA Areas or routes of Operation Outlined below is a list of Limited Access Locations within South Australia. Despite the dimension limits specified, access may be permitted for some vehicle combinations that operate under a Class 1 notice published by the National Heavy Vehicle Regulator (NHVR) that provides access for combinations to travel on all routes and areas in South Australia or a route specific permit issued by the NHVR. Note: Regions are defined as per Primary Industries and Regions SA (PIRSA), published at http://www.pir.sa.gov.au/regions. Adelaide Metropolitan Area Dimension Limit Condition of access for (metres) vehicles which exceed a Location / Road dimension limit which Width Height Length applies to a limited access location Adelaide CBD, bounded by West Terrace, South 2.5 4.3 19 Specific permit Terrace, East Terrace and North Terrace Specific permit for width or Pedestrian bridge over South Terrace, Adelaide 2.5 4.5 19 length Park Terrace, Salisbury, between the intersections of Commercial Road/Park Terrace and Salisbury 2.5 4.3 19 Access not permitted Hwy/Waterloo Corner Road/Park Terrace Pedestrian bridge over Main North Road and Malinya Drive when turning from Main North Road 3.5 4.5 19 onto Malinya Drive, Salisbury Park Railway bridge over Rosetta St, West Croydon 2.5 3.0 19 Access under notice for Railway bridge over Chief St, Brompton 2.5 3.2 19 vehicles that exceed the length Road bridge over St Andrews Terrace, Willunga 3.5 4.5 19 dimension -
Ridesprogramme ISSUE 64
Bicycle SA SEPTEMBER-NOVEMBER 2017 RidesPROGRAMME ISSUE 64 FREE RIDES EVERY WEEK FOR EVERYONE! www.bikesa.asn.au RidesPROGRAMME September-November 2017 Information Ride Group Coordinators The rides are free of charge (unless indicated otherwise) and available 30/30 Beach Streak Mishmash to the general public. For a punctual start, please arrive 15 minutes prior Daniel 0433 391 674 Michele 0438 010 220 to the scheduled starting time. Riders are encouraged to join Bicycle All Women’s Bike Rides Night Espresso SA after three rides. Only Bicycle SA members are eligible to lead and Lanie 0406 452 117 Rob 8299 0230 coordinate rides. The ride leaders can be contacted for additional rides Better Harts Northside Cycling Group information. Each ride has been coded for your convenience and it is Sharon 8723 0805 Gary 8255 1979 [email protected] suggested that you choose the ride to suit your ability. Children under 16 Pedalling Parents Border BUG Warwick 8344 8996 shall be accompanied by a responsible adult. The Rides Programme is Marcus 0407 978 763 subject to change without notice. Peninsula Pedallers Cobwebs Raelene 8682 3196 [email protected] On Road Ride Codes Poseurs d’Adelaide ‘Cycle Salisbury’ Peter 0407 182 376 1 Up to 15km/h A Flat Nigel 0431 838 735 2 15 to 18km/h B A few hills Ride with Keith GAD-BUG Rebecca 8232 7277 3 18 to 20km/h C Hilly and steep (Goolwa and District Bicycle User Group) Riverland Riders 4 20 to 23km/h D Challenging Gavin 0468 909 397 Ruth 0427 752 815 5 23 to 26km/h Peter 0418 820 921 Anne 0431 829 973 Saturday Express 6 26+km/h Patsy 8379 6477 Gallery Glides Saturday Sojourn Mountain Bike Ride Codes Warwick 8344 8996 Chris 0414 802 919 Class 1 (MTB Beginner) Limited off road experience.