Expressway Northern

Total Page:16

File Type:pdf, Size:1020Kb

Expressway Northern northernintroducing the expressway expresswaynorthern info What is the Northern Expressway? and regional communities. People who commute between Gawler and the Port of Adelaide, and the western and southern The Northern Expressway will be a new road initially joining the suburbs of Adelaide will also benefi t. Sturt Highway to Port Wakefi eld Road – and then linking to the Port River Expressway. It will involve: The route will reduce truck movements along Main North Road and Salisbury Highway. The expressway will improve access the construction of a new, two-way expressway standard to Adelaide for freight transport travelling via the Sturt Highway. road between Gawler and Port Wakefi eld Road (approximately This includes freight coming from key areas such as the 23 kilometres), and Barossa Valley and the Riverland. Once linked with the an upgrade of Port Wakefi eld Road from north of Taylor Road Port River Expressway, there will be predicted travel time savings to the Salisbury Highway (10 kilometres) to cater for future of up to 20 minutes between the Sturt Highway at Gawler and traffi c volumes. the Port of Adelaide – South Australia’s main shipping port. The Northern Expressway project is a joint initiative by the The Northern Expressway contributes to AusLink’s key Australian and South Australian Governments under the AusLink objective of assisting national economic and social program. It will be the largest road construction project in the development aimed at improving the effi ciency, safety and state since the 1960s. reliability of the national transport network. This includes improving freight effi ciency and reducing travel time between Why do we need the expressway? Gawler and Outer Harbor. The aim of the Northern Expressway is to: It will also contribute towards the following targets in South Australia’s Strategic Plan: improve the northern regional economy, and improve safety and reduce the environmental impact of promoting economic growth freight transport and commuter traffi c on suburban areas expanding export potential for the State and regional communities. providing strategic infrastructure The Northern Expressway will reduce driving time and providing infrastructure to support communities increase safety for travellers from the Mid-North, Riverland in regions. Upgrade to Port Wakefi eld Road section What are the key features? (Taylor Road to Salisbury Highway): additional traffi c lanes on Port Wakefi eld Road in some sections Gawler to Port Wakefi eld Road section: improvements to some junctions four lane, two-way expressway with divided roadway install new and upgrade existing traffi c lights to speed limit of 110km/hr increase capacity improvements to the Salisbury Highway/ full speed connection at Gawler, linking with the Port Wakefi eld Road bridge Gawler by-pass improve safety by removing some right turn access entry to the expressway via interchanges points by: closing some median openings, providing overpasses across the expressway left in/left out arrangements for connecting roads, changes to the road network and adjusting U-turn facilities. Northern Expressway Planning Study Process Investigation of possible routes and preliminary environmental, social and economic investigations 2003 TO 2005 Route selection workshops held with key stakeholders, industry representatives and government agencies What are the benefi ts? 2003 TO 2005 The Northern Expressway will: provide signifi cant economic benefi ts to the state improve traffi c conditions for local residents in Angle Vale Preliminary concept design of proposed route and the northern suburbs near Main North Road make roads safer by reducing freight, in particular Angle Vale 2004 TO 2005 and Heaslip Roads provide a quicker and safer connection with suburban destinations such as Adelaide Airport, shopping centres, Environmental, social and economic sports stadiums, beaches, residences and businesses investigations. Ongoing consideration of community feedback connect to the new Port River Expressway, allowing drivers SEPT 2006 TO MARCH/APRIL 2007 to use on-off connections at South Road and Hanson Road WE ARE as well as Port Adelaide HERE allow travellers, and particularly freight traffi c, to avoid any traffi c congestion along the existing Main North Road Community engagement period seeking feedback on proposed route help to reduce vehicle pollution emissions due to smoother traffi c fl ow along the Northern Expressway and Main North Road. NOV 2006 TO MARCH/APRIL 2007 Where will the expressway go? The proposed route for the Northern Expressway is shown on Public consultation on environmental report the inside of this brochure. The proposed route was developed as MARCH/APRIL 2007 a result of a planning study which has been ongoing since 2003. The study considered a variety of routes and looked at how to: improve safety for all road users Environmental report improve freight effi ciencies supplementary document reduce effects on local and regional traffi c networks MAY/JUNE 2007 consider the needs of landowners and local residents reduce effects on land productivity reduce effects on indigenous and non-indigenous heritage sites South Australian and Federal government approval of proposed route avoid splitting up communities reduce environmental effects such as changes to noise, JUNE 2007 air and water quality. Contributors to the planning process included State and Australian government departments, local councils, industry and local Land acquisition business organisation representatives. Community consultation on JUNE 2007 TO 2008 the proposed route is an important next step. The proposed route will now undergo an environmental assessment. Following this assessment, a fi nal decision on the proposed route Construction will be made. The proposed project is subject to the fi nalisation of agreed funding between the State and Australian governments. 2008 TO 2011 expresswaynorthern proposed Typical road reserve width 70m Northbound Carriageway Southbound Carriageway Vegetated Median Drainage TYPICAL CROSS SECTION OF THE NORTHERN EXPRESSWAY Two lanes each way LEGEND Northern Expressway U Gawler River Railway Upgrade of existing intersection New traffi c signals Arterial roads B Arterial road closure New traffi c signals at Ryans Road N GAWLER PORT WAKEFIELD ROAD GLOBE DERBY PARK D A O R H T R O N N I A M Modify Salisbury Highway bridge Y A SALISBURY W H IG H Y R U B IS L A S ORT P SALISBURY H RIVER IGHWAY EXPRESSWAY ADELAIDE route New traffi c 1 signals ROAD TAYLOR Y A Expressway AILW Upgrade to traffi c R bridge over railway IN signals at Waterloo W & Taylor Road AR P E Corner Road N E – D F I E L D ELAID R AD O A D WATERLOO CORNER DIREK D A O BURTON R D EDINBURGH L IE F E K A W T W R O A P T Upgrade traffi c signals E R L O at Bolivar Road O C O R N E R R O A D OLIVAR AD 1 2 A RO OMM ED W LIGN REA TA YLOR ROAD E IN L Y A D WO W A MM IL O A R A O R R AD IP L S A E H VIRGINIA + TWO WELLS ANGLE Access to/exit from VALE Northern Expressway from Heaslip & Womma Road overpass PENFIELD ROAD HEASLIP 2 W O M M MACDONALD A 4 R PARK O A D A N G L E VA 3 L E R O A Overpass at D Angle Vale Road C U R T I MUNNO PARA S R O DOWNS South-bound access A D onto & north-bound exit off Expressway ANDREWS FARM KU DAVOREN PARK SMITHFIELD PLAINS AD RO HY AC PE 3 4 CURTIS ROAD ANGLE VALE ROAD MALLALA N M T A W L L O A W L A E L R L O S A R D O A D 5 WARD BELT Northern Expressway Overpass at connects at Two Wells Road Gawler bypass BUCHFELDE Two-way access to Northern Expressway 6 from Gawler bypass via interchange WILLASTON UDLA GAWLER WEST EVANSTON TH ROAD MAIN NOR GAWLER 5 6 AY EXPRESSW GAWLER BYBASS TWO WELLS ROAD ROAD expresswaynorthern info How will environmental effects It will be available for public comment in the fi rst half of 2007. Comments received from the community will be considered? be considered and inform any revision of the concept An environmental assessment has commenced and will design. A supplementary report document will also continue during the community engagement process. be prepared. It will identify and quantify the environmental, social and economic effects of the Northern Expressway proposal. What happens if the proposed route The investigations will relate to technical areas such as: goes through my property? noise water quality Some properties will need to be purchased by the Department air quality and hydrology for Transport, Energy and Infrastructure (DTEI) so that the socio-economic impact cultural heritage Northern Expressway can be constructed. The Department fl ora and fauna land use and planning is authorised under the Highways Act 1926 to acquire land visual effect traffi c and transport required for road development purposes. and landscaping infrastructure Approved guidelines will be followed when contact is made Project team members working in the area will be clearly with potentially affected property owners or occupiers. identifi ed. Their presence will not mean that any particular Staff of DTEI will individually contact these people. property is to be affected by the project. Information about property owner rights will be provided. The environmental report will describe the Northern If you believe that your property might be acquired, Expressway, summarise its effects and describe the and you have not yet been contacted directly, then please proposed ways to avoid or minimise any adverse effects. contact the Northern Expressway team on 1300 658 621. How can you have a say? Community engagement during the environmental assessment and response process will occur from November 2006 until mid-2007.
Recommended publications
  • Conference Facilities
    Adelaide Manor Conference Facilities Ph: 08 8349 4999 Fax: 08 8349 4631 [email protected] www.adelaidemanor.com.au Conference Rooms Thank you for your enquiry regarding the conference facilities at the Adelaide Manor. The Adelaide Manor has been an integral part of the northern suburbs since its establishment in 1985 providing accommodation, function facilities, licensed restaurant and a bar on site, complimentary off street parking, outdoor swimming pool and spa and free WiFi. Centrally located in Adelaide’s northern suburbs approximately 10 minutes from the CBD, the property is easily accessible from any direction with entrances off both Main North Road and Port Wakefield Road. The property boasts a range of features designed to ensure your event is effortless, effective and enjoyable. Our dedicated and experienced hospitality staff can tailor a package to suit your specific conference requirements. The conference rooms include the Manor Room and the Board Room, which are located on the ground floor and have been completely refurbished allowing ample natural light to filter through the large windows with French doors opening poolside. Our head chef has created a selection of breakfast, lunch, dinner and light snack options to cater for every occasion. Should you require further information or have any queries, please do not hesitate to contact us. Kind Regards, Cherie Olsen Function Co-Ordinator Adelaide Manor T: (08) 8349 4999 F: (08) 8349 4631 E: [email protected] Adelaide Manor │ 574 Main North Rd │ Gepps Cross │ South Australia │ 5094 T: 08 8349 4999 F: 08 8349 4631 E: [email protected] ABN 33102 857 385 - 002 The Board Room is perfect for smaller gatherings, measuring 49m2 it provides a private space for intimate meetings.
    [Show full text]
  • Whose Place Is It? Examining the Socio-Spatial Geography of Obesity in Young Adults for an Australian Context
    Whose place is it? Examining the socio-spatial geography of obesity in young adults for an Australian context Natasha J. Howard Bachelor of Health Sciences (Honours Public Health) Discipline of Geographical and Environmental Studies Faculty of Humanities and Social Sciences The University of Adelaide Submitted for the degree of Doctor of Philosophy February 2011 TABLE OF CONTENTS TABLE OF CONTENTS................................................................................................................ ii LIST OF TABLES ........................................................................................................................ vi LIST OF FIGURES ....................................................................................................................... ix ABSTRACT .................................................................................................................................. xi DECLARATION .......................................................................................................................... xii ACKNOWLEDGEMENTS .......................................................................................................... xiii THE NOBLE STUDY ................................................................................................................. xiv ABBREVIATIONS ....................................................................................................................... xv PUBLICATIONS AND PRESENTATIONS ..............................................................................
    [Show full text]
  • Falls Prevention Service Directory
    Falls Prevention Service Directory Central Adelaide Local Health Network June 2012 Welcome to the fifth edition for the Central Adelaide Local Health Network. The Falls Prevention Service Directory has become a must-have resource for health professionals working with older adults who are at risk of falls. Linking individuals to the right services is easier with maps, common referral forms, clear criteria for referral, a decision making tool and alphabetic listings. Central Adelaide Local Health Network primary health services The Central Adelaide Local Health Network (CALHN) provides care for around 420,000 people living in the central metropolitan area of Adelaide as well as providing a number of state-wide services, and services to those in regional areas. More than 3,000 skilled staff provide high quality client care, education, research and health promoting services. The Central Adelaide Local Health Network (CALHN) provides a range of acute and sub acute health services for people of all ages and covers 19 Statistical Local Areas and 10 Local Government Areas and includes the following: > Royal Adelaide Hospital > The Queen Elizabeth Hospital > Hampstead Rehabilitation Centre > St Margaret’s Rehabilitation Hospital > Ambulatory and Primary Health Care (including Super Clinics) > Sub-Acute > Mental Health Services (under the governance of the Adelaide Metro Mental Health Directorate) We are working hard to build a healthy future for South Australia by striving towards our three strategic goals of better health, better care and better services. What is ‘falls prevention’? Falls represent a common and significant problem, especially in our elderly population. Approximately 30% of community-dwelling older persons fall in Australia each year, resulting in significant mortality and morbidity, as well as increased fear of falling and restriction in physical activity.
    [Show full text]
  • South Road Superway
    SOUTH ROAD SUPERWAY ON THE Way The $842M South Road Superway project will be one of Australia’s largest single investment developments and one of the most complex engineering road projects for any freeway. MAIN CONSTRUCTION COMPANIES : John Holland, Leed Engineering & Construction PROJECT END VALUE : $842 million COMPLETION : September 2013 ROAD LEGHTH : 4.8km The Australian and South Australian • The northern end of South Road is Governments are working together to being upgraded as it is a key freight improve transport in South Australia. The route for Adelaide’s major export $842 million South Road Superway project generating industries. is the biggest single investment in a South • South Road is the direct link for industrial Australian road project, and so far the state’s transport hubs: Adelaide Airport, most complex engineering road construction Islington Rail Terminal, Port Adelaide project. This project is under a joint venture and Outer Harbour. between John Holland and Leed Engineering & Construction and is the second stage A purpose built casting yard was of the north-south transport corridor implemented for the project and saved the upgrade which provides a 4.8 kilometre transportation of heavy segments by road. non-stop corridor and incorporates a 2.8 Being able to cast the segments as close kilometre elevated roadway. as possible to the piers ensures minimum interruption to traffic. Land was secured Supporting the local economy, the South Road and the Superway casting yard built for this Superway project has provided more than 2000 purpose at 628-638 South Road. jobs and has supported the growth of local businesses.
    [Show full text]
  • Adelaide Industrial Market
    RESEARCH Population Growth Aust: 1.6% SA: 0.8% Infrastructure—North to Lonsdale— an additional 3,000m² of As at December 2018 South Corridor advance manufacturing space which will increase the manufacturing capacity by Economic Growth The North to South Corridor is starting to 250% and create jobs for up to an Aust: 1.8% SA: 1.8% come together with the majority of additional 100 workers. projects completed. Current projects March 18 to March 19 underway are the Darlington Upgrade The unemployment rate in SA currently Unemployment Rate and Northern Connector, with expected stands at 5.9%, which is 0.7% higher completion in late 2019. The remaining than the national average as of June Aust: 5.2% SA: 5.9% sections that are yet to commence are 2019 (seasonally adjusted). This figure As at June 2019 the River Torrens to Anzac Highway and has improved from 7.3% in April 2017. “Anzac Highway to Darlington”. On Moving forward, this downward trend is Infrastructure Spending completion, the 78-kilometre North-South likely to continue as a number of major SA State Budget Corridor will reduce travel times by projects in the defence and providing a continuous non-stop manufacturing sectors come online. 2019/20: $11.9 billion carriageway from Gawler to Old Engineering Noarlunga. Furthermore, it will also Low cost of capital will Construction improve access to some of the key benefit the property market Aust: -13.5% SA: 7.8% industrial areas such as Edinburgh Parks in the Outer North. Evidence from sales transactions during March 18 to March 19 CY 2018 suggested that the low cost of Manufacturing is back capital and the abolition of stamp duty had a positive impact on the number of The closure of the 122.5ha General transactions for industrial properties Motors Holden (GMH) site in Elizabeth above $5 million.
    [Show full text]
  • Land Supply Report for Greater Adelaide Greenfield Land Supply Contents Reenfield
    GROWTH MANAGEMENT PROGRAM LAND SUPPLY REPORT FOR GREATER ADELAIDE Part 1: Greenfield Published June 2021 Disclaimer While every reasonable effort has been made to ensure that this document is correct at the time of publication, the Minister for Planning and Local Government, the State Planning Commission, the State of South Australia, its agencies, instrumentalities, employees and contractors disclaim any and all liability to any person in respect to anything or the consequence of anything done or omitted to be done in reliance upon the whole or any part of this document. Issued by the Attorney General’s Department on 2 June 2021 Version 1: Published on 2 June 2021 © Government of South Australia. All rights reserved. LAND SUPPLY REPORT FOR GREATER ADELAIDE GREENFIELD LAND SUPPLY CONTENTS REENFIELD TABLE OF CONTENTS G 1. GREENFIELD LAND SUPPLY OVERVIEW ............................................................................................... 1 1.1 Greenfield land supply .......................................................................................................................... 1 1.2 Greenfield land demand ....................................................................................................................... 5 1.3 Greenfield supply and demand balance ............................................................................................... 5 1.4 Region analysis .................................................................................................................................... 6 2.
    [Show full text]
  • Port River Expressway Cycle Path Detour ADVANCE NOTICE
    North-South Corridor Northern Connector Project Port River Expressway cycle path detour ADVANCE NOTICE As a part of the Northern Connector Project, The Department of Planning, Transport and Infrastructure (DPTI) advises that a new cycle path detour will be in place on the Port River Expressway for the eastbound and westbound routes, between Hanson Road and Globe Derby Drive from late August/early September 2017 to late 2019. This will replace the existing eastbound detour and will enable cyclists to continue to travel safely between these locations during the construction of the new bridge connecting the South Road Superway and the Northern Connector, as part of the Southern Interchange. Advanced notice and directional signage will be in place to direct cyclists along the detour. Please refer to the attached map to plan your journey. A further notification will be issued prior to the detour official opening. Thank you for your patience whilst these important works are undertaken. To assist with planning your cycle journey visit http://maps.sa.gov.au/cycleinstead/. # 11827676 Port River Expressway cycle detour For users eastbound and westbound from TBC 2017 to late 2019 LEGEND P O CYCLE DETOUR EASTBOUND ONLY R T (OPEN FROM TBC 2017 TO LATE 2019) W CYCLE DETOUR WESTBOUND ONLY A (OPEN FROM TBC 2017 TO LATE 2019) K E RAILWAY LINE F Ryans Rd I E L Trotters Dr D R N O Use Globe Derby Dr A existing D Dry Creek Linear Trail Use existing pedestrian access to cross Port Wakefield Rd. Dismount bicycle underneath Salisbury Hwy bridge. Use Pedestrian Start crossing eastbound cycle Vater St detour here.
    [Show full text]
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • Submission Form Planning and Design Code for South Australia This Submission Form Is Being Used to Collect Feedback About the New Planning and Design Code
    Consultation Submission Form Planning and Design Code for South Australia This submission form is being used to collect feedback about the new Planning and Design Code. Your input will help build the new planning rules for our State. * Which part of the Planning and Design Code would you like to make a submission about? (Please click the circle to select which part of the Code you wish to comment on. Youcan also see which council areas are included in the rural and urban code via the links below.) My submission relates to Rural code. (click here for council areas) My submission relates to Urban code. (click here for council areas) Statewide code My submission relates to This consultation process is powered by pernix Consultation Submission Form Planning and Design Code for South Australia Personal Details * Please provide your contact details below (Name, Postcode & Email are mandatory) Please be advised that your submission will be made publicly available on the SA Planning Portal. Name Sam Green Company City of Playford Address , Davoren Park Your Council Area City of Playford State SA Postcode 5113 Country Australia Email address Consultation Submission Form Planning and Design Code for South Australia * Which sector do you associate yourself with? Local Government State or Federal Government Development Industry Business General Public Community Group Consultation Submission Form Planning and Design Code for South Australia * Would you like to make comment on Specific Topics for example : - Rules of Interpretation - Zones and Sub-zones - Overlays - General Provision - Mapping Land Use Definitions - Administrative Definitions - Referrals -Table of Amendments General comments All of the above Consultation Submission Form Planning and Design Code for South Australia The Planning and Design Code consists of Rules of Interpretation, Referrals, Mapping, TableofAmendments, Overlays, Zones, Subzones, General Policy, Land Use Definition and Admin Definitions.
    [Show full text]
  • Buckland Park – Traffic Impact Assessment
    Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: ....................................................................................................
    [Show full text]
  • G1v1 Sic 17/0 MINUTES Forming ENCLOSURE to Cpsa2002l00005 PLN/01'/0495
    c; G1v1 Sic 17/0 MINUTES forming ENCLOSURE to CPSA2002l00005 PLN/01'/0495 To: THE PREMIER FOR CABINET SUB COMMITTEE Re: CITY OF PLAYFORD HERITAGE PLAN AMENDMENT REPORT 1. PROPOSAL 1.1 In the interest of orderly and proper development, it is recommended that Cabinet endorse the City of Playford Heritage Plan Amendment Report to come into operation on an interim basis pursuant to section 28(1) of the Development Act 1993. 1.2 The Plan Amendment Report be referred to the Governor for declaration by notice published in the Gazette that the Plan Amendment Report has come into operation, pursuant to section 28 of the Development Act 1993. 1.3 That the file subsequently be referred to the office of the Minister for Urban Development and Planning so that a report can be laid before both Houses of Parliament for notification under section 28(3) of the Development Act 1993. 2. BACKGROUND The City of Playford has submitted the Heritage Plan Amendment Report (PAR) requesting that it be approved for public consultation, and brought into operation on an interim basis in accordance with section 28(1) of the Development Act 1993. The former City of Elizabeth and City of Munno Para, prior to amalgamation, each commissioned heritage surveys that were completed in 1996 and 1997, respectively. The aims of the surveys were to: . make recommendations for the entry of places in the State Heritage Register and for the declaration of State Heritage Areas . identify areas which could be declared Historic Conservation Zones or Policy Areas for inclusion in the Development Plan .
    [Show full text]
  • Northern Connector FACT SHEET July 2008
    northern connector FACT SHEET July 2008 Involved at this early stage are a wide range The planning study will include an economic Have your of government agencies, local businesses and analysis and identify relevant environmental community bodies that need to understand issues and outline an approach for design and and comment on the proposal and to raise construction. It will also provide the framework say about a any issues about it. for an environmental impact assessment to be developed throughout this year. Since the announcement in March 2008 a major project range of activities have occurred, including: The project route is expected to be confirmed > feedback on design based on traffic needs by the end of 2009. Five months ago the Minister for Transport, and engineering Patrick Conlon announced a study into a > desktop research on similar projects Where is the project? new road and rail transport corridor in the > drop-in forums held at Globe Derby Park The planning study area will investigate area west of Port Wakefield Road – the and St Kilda a 17 km corridor from north of the Brown Northern Connector. > shopping centre displays at Hollywood Road/Port Wakefield Road intersection through to the connection of the Port River This fact sheet sets out additional Plaza and Virginia Expressway and South Road. information about the project and identifies > meeting and planning with emergency the opportunities for the community to services experts This includes a section of approximately be involved in the planning process that > field surveys that look at geography, 1 km width on the western side of is underway.
    [Show full text]