KPMG KIDS Report V4.0

Total Page:16

File Type:pdf, Size:1020Kb

KPMG KIDS Report V4.0 GlobeLink Scoping Study Report Business Case – Stages 1 and 2 South Australia Department of Planning, Transport & Infrastructure December 2019 Prepared by KPMG on behalf of — KPMG.com.au Prepared by KPMG on behalf of the Department of Transport, Planning and Infrastructure, with technical support from AECOM the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. The KPMG name and logo are registered d by a scheme approved under Professional Standards Legislation. Disclaimer Important Notice If you are a party other than DPTI, KPMG: • owes you no duty (whether in contract or in tort or under statute or otherwise) with respect to or in connection with the attached report or any part thereof; and • will have no liability to you for any loss or damage suffered or costs incurred by you or any other person arising out of or in connection with the provision to you of the attached report or any part thereof, however the loss or damage is caused, including, but not limited to, as a result of negligence. If you are a party other than DPTI and you choose to rely upon the attached report or any part thereof, you do so entirely at your own risk. Limitations The responsibility for determining the adequacy or otherwise of our terms of reference is that of DPTI. The services provided under our engagement contract (‘Services’) have not been undertaken in accordance with any auditing, review or assurance standards. Any reference to ‘audit’ and ‘review’, throughout this report, is not intended to convey that the Services have been conducted in accordance with any auditing, review or assurance standards. Further, as our scope of work does not constitute an audit or review in accordance with any auditing, review or assurance standards, our work will not necessarily disclose all matters that may be of interest to DPTI or reveal errors and irregularities, if any, in the underlying information. In preparing this report, we have had access to information provided by DPTI, the supply chain study, stakeholder inputs and publicly available information. We have relied upon the truth, accuracy and completeness of any information provided or made available to us in connection with the Services without independently verifying it. Any findings or recommendations contained within this report are based upon our reasonable professional judgement based on the information that is available from the sources indicated. Should the project elements, external factors and assumptions change then the findings and recommendations contained in this report may no longer be appropriate. Accordingly, we do not confirm, underwrite or guarantee that the outcomes referred to in this report will be achieved. We do not make any statement as to whether any forecasts or projections will be achieved, or whether the assumptions and data underlying any such prospective financial information are accurate, complete or reasonable. We will not warrant or guarantee the achievement of any such forecasts or projections. There will usually be differences between forecast or projected and actual results, because events and circumstances frequently do not occur as expected or predicted, and those differences may be material. Electronic Distribution of Reports This Scoping Study was produced solely for the use and benefit of DPTI and cannot be relied on or distributed, in whole or in part, in any format by any other party. This version of the Scoping Study is dated 20 December 2019 and KPMG accepts no liability for and has not undertaken work in respect of any event subsequent to that date which may affect the plan. Any redistribution of this Scoping Study requires the prior written approval of KPMG and in any event, is to be a complete and unaltered version of the Scoping Study and accompanied only by such other materials as KPMG may agree. Responsibility for the security of any electronic distribution of this Scoping Study remains the responsibility of DPTI and KPMG accepts no liability if the Scoping Study is or has been altered in any way by any person. the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. The KPMG name and logo are registered d by a scheme approved under Professional Standards Legislation. GlobeLink Scoping Study, December 2019 Executive Summary The SA Government’s GlobeLink policy commits to a disciplined process to understand and quantify South Australia’s supply chain challenges and constraints; to identify and test the spectrum of possible solutions; and to identify solutions that support increased trade and investment and drive sustainable economic growth and employment. GlobeLink Scoping Study, December 2019 About GlobeLink South Australia has always been an export economy, built on natural advantages from extractive and productive industries, twinned with the historic comparative advantage of highly skilled manufacturing workforce; which produced value added products including vehicles, fuel refining, and food and beverage. The past few decades have seen South Australia impacted by a range of domestic and global factors that have eroded the standing of the South Australian economy and seen South Australia’s trade surplus narrow; with economic and social impacts accruing through reduced economic productivity and prosperity. GlobeLink is a SA Government policy, committing to an evidence-based examination of the freight challenges impacting South Australia’s trade – identifying the best mix of options to increase the reach of South Australia’s exports – and to reduce the cost of moving goods. The initial policy identified four reference projects, which are: • A non-stop freight road to connect from the South Eastern Freeway to Adelaide’s motorway network; • An intermodal export park to the south east; • A freight railway to replace the legacy Adelaide Hills segment of the ARTC track; and • A dedicated freight airport, to Adelaide’s south-east. These initial project options formed inputs to the GlobeLink Scoping Study, but were assessed against a broad range of alternative capital and non-capital options to identify options best placed to grow export trade and create economic opportunities. KPMG | v © 2019 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. The KPMG name and logo are registered trademarks or trademarks of KPMG International. Liability limited by a scheme approved under Professional Standards Legislation. Document Classification: KPMG Public GlobeLink Scoping Study, December 2019 Defining GlobeLink The GlobeLink Scoping Study commenced with a spatial definition of the GlobeLink Study Area. This saw the identification of GlobeLink’s freight catchment; as well as the identification of an infrastructure corridor for option identification. The initial infrastructure corridor reflected the GlobeLink reference projects; but was expanded during the study to allow a wider consideration of potential project options. Figure 1 below shows the GlobeLink freight catchment extending across the Victorian border, the initial infrastructure corridor and the expanded corridor, which encompasses all of Greater Adelaide. Figure 1: The GlobeLink defined areas Source: AECOM, National Key Freight Routes (DIRD) KPMG | vi © 2019 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. The KPMG name and logo are registered trademarks or trademarks of KPMG International. Liability limited by a scheme approved under Professional Standards Legislation. Document Classification: KPMG Public GlobeLink Scoping Study, December 2019 GlobeLink objectives KPMG developed a range of project objectives, which were tested with SA Government and freight industry stakeholders. These objectives were aligned with SA Government’s policy and industry priorities – and provided a basis to filter a longlist of potential options to a manageable shortlist for detailed inquiry. These objectives are: Boost state and national productivity to capitalise on market opportunity over the long term through improved freight system 29% 01 efficiency, connectivity and capacity Increase and attract new employment and investment 02 within the region and for South Australia 25% Improve safety and amenity, and achieve social benefits 03 that are considerate of 16% community views Attract industry and Government partnerships to 15% 04 create affordable outcomes Optimise the use of existing South Australian 15% 05 Infrastructure 0% 10% 20% 30% Stakeholder prioritisation of GlobeLinkobjectives KPMG | vii © 2019 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. The KPMG name and logo are registered trademarks or trademarks of KPMG International. Liability limited by a scheme approved under Professional Standards Legislation. Document Classification: KPMG Public GlobeLink Scoping Study, December 2019 SA’s primary freight networks Figure 2 below shows South Australia’s key freight road and rail freight corridors and their destinations, as well as key freight nodes. Figure 2: Map
Recommended publications
  • South Road Superway
    SOUTH ROAD SUPERWAY ON THE Way The $842M South Road Superway project will be one of Australia’s largest single investment developments and one of the most complex engineering road projects for any freeway. MAIN CONSTRUCTION COMPANIES : John Holland, Leed Engineering & Construction PROJECT END VALUE : $842 million COMPLETION : September 2013 ROAD LEGHTH : 4.8km The Australian and South Australian • The northern end of South Road is Governments are working together to being upgraded as it is a key freight improve transport in South Australia. The route for Adelaide’s major export $842 million South Road Superway project generating industries. is the biggest single investment in a South • South Road is the direct link for industrial Australian road project, and so far the state’s transport hubs: Adelaide Airport, most complex engineering road construction Islington Rail Terminal, Port Adelaide project. This project is under a joint venture and Outer Harbour. between John Holland and Leed Engineering & Construction and is the second stage A purpose built casting yard was of the north-south transport corridor implemented for the project and saved the upgrade which provides a 4.8 kilometre transportation of heavy segments by road. non-stop corridor and incorporates a 2.8 Being able to cast the segments as close kilometre elevated roadway. as possible to the piers ensures minimum interruption to traffic. Land was secured Supporting the local economy, the South Road and the Superway casting yard built for this Superway project has provided more than 2000 purpose at 628-638 South Road. jobs and has supported the growth of local businesses.
    [Show full text]
  • Port River Expressway Cycle Path Detour ADVANCE NOTICE
    North-South Corridor Northern Connector Project Port River Expressway cycle path detour ADVANCE NOTICE As a part of the Northern Connector Project, The Department of Planning, Transport and Infrastructure (DPTI) advises that a new cycle path detour will be in place on the Port River Expressway for the eastbound and westbound routes, between Hanson Road and Globe Derby Drive from late August/early September 2017 to late 2019. This will replace the existing eastbound detour and will enable cyclists to continue to travel safely between these locations during the construction of the new bridge connecting the South Road Superway and the Northern Connector, as part of the Southern Interchange. Advanced notice and directional signage will be in place to direct cyclists along the detour. Please refer to the attached map to plan your journey. A further notification will be issued prior to the detour official opening. Thank you for your patience whilst these important works are undertaken. To assist with planning your cycle journey visit http://maps.sa.gov.au/cycleinstead/. # 11827676 Port River Expressway cycle detour For users eastbound and westbound from TBC 2017 to late 2019 LEGEND P O CYCLE DETOUR EASTBOUND ONLY R T (OPEN FROM TBC 2017 TO LATE 2019) W CYCLE DETOUR WESTBOUND ONLY A (OPEN FROM TBC 2017 TO LATE 2019) K E RAILWAY LINE F Ryans Rd I E L Trotters Dr D R N O Use Globe Derby Dr A existing D Dry Creek Linear Trail Use existing pedestrian access to cross Port Wakefield Rd. Dismount bicycle underneath Salisbury Hwy bridge. Use Pedestrian Start crossing eastbound cycle Vater St detour here.
    [Show full text]
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • Buckland Park – Traffic Impact Assessment
    Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: ....................................................................................................
    [Show full text]
  • Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
    northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide.
    [Show full text]
  • Consolidated Table of Limited Access Locations for SA
    Information Bulletin August 2020 Heavy Vehicles Limited Access Locations in SA Areas or routes of Operation Outlined below is a list of Limited Access Locations within South Australia. Despite the dimension limits specified, access may be permitted for some vehicle combinations that operate under a Class 1 notice published by the National Heavy Vehicle Regulator (NHVR) that provides access for combinations to travel on all routes and areas in South Australia or a route specific permit issued by the NHVR. Note: Regions are defined as per Primary Industries and Regions SA (PIRSA), published at http://www.pir.sa.gov.au/regions. Adelaide Metropolitan Area Dimension Limit Condition of access for (metres) vehicles which exceed a Location / Road dimension limit which Width Height Length applies to a limited access location Adelaide CBD, bounded by West Terrace, South 2.5 4.3 19 Specific permit Terrace, East Terrace and North Terrace Specific permit for width or Pedestrian bridge over South Terrace, Adelaide 2.5 4.5 19 length Park Terrace, Salisbury, between the intersections of Commercial Road/Park Terrace and Salisbury 2.5 4.3 19 Access not permitted Hwy/Waterloo Corner Road/Park Terrace Pedestrian bridge over Main North Road and Malinya Drive when turning from Main North Road 3.5 4.5 19 onto Malinya Drive, Salisbury Park Railway bridge over Rosetta St, West Croydon 2.5 3.0 19 Access under notice for Railway bridge over Chief St, Brompton 2.5 3.2 19 vehicles that exceed the length Road bridge over St Andrews Terrace, Willunga 3.5 4.5 19 dimension
    [Show full text]
  • South Road Superway North-South Corridor • Regency Road to Port River Expressway
    DELIVERING OUR TRANSPORT FUTURE NOW South Road Superway north-south corridor • Regency Road to Port River Expressway Project Impact Report • Executive Summary Environment • Social • Economic South Road Superway Executive Summary The South Australian The proposed South Road Superway will The Superway will extend over the major deliver a non-stop corridor approximately intersections of South Terrace, Wingfield Government has a 4.8 kilometres in length largely consisting rail line, Cormack Road, Grand Junction strategic vision to of an elevated roadway, with multiple Road and Days Road and bypass traffic deliver to the Adelaide lanes in each direction above the existing signals. The Superway will minimise the alignment, between Regency Road and need for property and businesses to be metropolitan area a Port River Expressway. acquired and will enable regional and non-stop north–south local east–west links across South Road The project has been developed as to be maintained and enhanced. corridor for freight and part of the solution to address a lack passenger vehicles of efficiency of the South Road transport This project has been carefully designed between the Port River corridor and increasing urban to minimise adverse social and congestion. This congestion, if allowed environmental effects on the business Expressway and the to worsen, would result in more traffic and broader community. It will support Southern Expressway. delays, higher crash rates, reduced the strategically important northwest South Road is the only amenity as well as reduced business industrial precincts of Outer Harbor, and community access. Port Adelaide, Wingfield and Regency continuous transport link Park as well as the rapidly expanding between these areas An elevated roadway, is considered the industrial and employment hubs within optimum design solution, and when and is crucial for the metropolitan Adelaide and across constructed will be the first in South South Australia.
    [Show full text]
  • Environmental Report
    northernexpressway environmental report A Part A. Introduction and Background 1. What is the Northern Expressway Project? 1-1 2. The environmental assessment process 2-1 3. Community and stakeholder engagement 3-1 Northern Expressway Environmental Report 1 What is the Northern Expressway Project? 1.1 Overview The proposed Northern Expressway Project consists of two components: the Northern Expressway (between Gawler and Port Wakefield Road) and the Port Wakefield Road Upgrade. The project will provide an improved highway and freight connection through metropolitan Adelaide between the Sturt Highway at Gawler and the Port River Expressway. This project will improve freight access from the northern areas of the State and from the main highways, and link key centres in the north, east and west of Australia with the Port of Adelaide, South Australia’s main shipping port. The location plan in Figure 1.1 places this road infrastructure in context. The Northern Expressway component – 23 km of new four-lane expressway with restricted access and a speed limit of 110 km/h – will link to Port Wakefield Road with a new intersection to the north of Taylors Road, approximately 3 km north of the Waterloo Corner intersection. Port Wakefield Road will be upgraded at key locations between the new intersection and the existing intersection with the Salisbury Highway; some local roads will be diverted to service road access for improved safety. The Expressway will replace the section of Main North Road between Gawler and Gepps Cross as the designated AusLink National Network road link. The proposed Northern Expressway and Port Wakefield Road Upgrade is South Australia’s largest and highest priority project under the current AusLink Investment Program and, as such, has the commitment of the South Australian Government.
    [Show full text]
  • 2008 013.Pdf
    No. 13 783 THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE www.governmentgazette.sa.gov.au PUBLISHED BY AUTHORITY ALL PUBLIC ACTS appearing in this GAZETTE are to be considered official, and obeyed as such ADELAIDE, THURSDAY, 6 MARCH 2008 CONTENTS Page Page Act Assented To ........................................................................784 Local Government Act 1999—Notice....................................... 802 Appointments, Resignations, Etc...............................................784 Mining Act 1971—Notices ....................................................... 802 Associations Incorporation Act 1985—Notice ..........................785 National Electricity Law—Notice ............................................. 803 Controlled Substances Act 1984—Notices................................785 National Parks and Wildlife Act 1972—Notice ........................ 803 Corporations and District Councils—Notices............................864 Occupational Therapy Board of S.A.—Guidelines on Crown Lands Act 1929— Registration............................................................................ 806 Government Land Sale .......................................................... 796 Petroleum Act 2000—Notices................................................... 847 Development Act 1993—Notices..............................................785 Public Trustee Office—Administration of Estates .................... 865 Fisheries Management Act 2007—Notices ...............................792 Roads (Opening and Closing) Act 1991—Notices...................
    [Show full text]
  • North-South Corridor Regency Road to Pym Street
    North-South Corridor Regency Road to Pym Street Graphical representation: North-South Corridor (Regency Road to Pym Street) looking south along the non-stop motorway above Regency Road. Project Report Road to Pym Street). What is a project report? The Project Report explains the need for the project and summarises the environmental, social, economic and engineering assessments undertaken during design for the Regency Road to Pym Street Project, part of Adelaide’s North-South Corridor. The report outlines the measures proposed to avoid or minimise the effects of the project identified during design. The Project Report is the next stage of the North–South Corridor (Regency Road to Pym Street) project’s 2 Project Report North-South Corridor The North–South Corridor is one of Adelaide’s most important transport corridors (Figure 1). It is the major route for north and south bound traffic including freight vehicles running between Gawler and Old Noarlunga, a distance of 78 kilometres, and currently comprises seven road links: • Northern Expressway, from Gawler to Port Wakefield Road (opened in 2010); • Northern Connector, from Northern Expressway to Port River Expressway (opening late 2019); • South Road Superway (completed 2014); • Torrens Road to River Torrens (completed 2019); • Torrens River to Darlington; • Darlington Upgrade Project (due for completion 2020); • Southern Expressway, from Darlington to Old Noarlunga (completed 2014). By late 2019, approximately 63 kilometres of the 78 kilometre North–South Corridor will be constructed. With completion of the Darlington Upgrade Project in 2020 this extent will increase by about 3 kilometres to approximately 66 kilometres. The Australian Government continued its decision to support the upgrade the North–South Corridor over the next decade and together with the South Australian Government has committed $354 million to construct the 1.8 kilometre section between Regency Road to Pym Street.
    [Show full text]
  • Expressway Northern
    northernintroducing the expressway expresswaynorthern info What is the Northern Expressway? and regional communities. People who commute between Gawler and the Port of Adelaide, and the western and southern The Northern Expressway will be a new road initially joining the suburbs of Adelaide will also benefi t. Sturt Highway to Port Wakefi eld Road – and then linking to the Port River Expressway. It will involve: The route will reduce truck movements along Main North Road and Salisbury Highway. The expressway will improve access the construction of a new, two-way expressway standard to Adelaide for freight transport travelling via the Sturt Highway. road between Gawler and Port Wakefi eld Road (approximately This includes freight coming from key areas such as the 23 kilometres), and Barossa Valley and the Riverland. Once linked with the an upgrade of Port Wakefi eld Road from north of Taylor Road Port River Expressway, there will be predicted travel time savings to the Salisbury Highway (10 kilometres) to cater for future of up to 20 minutes between the Sturt Highway at Gawler and traffi c volumes. the Port of Adelaide – South Australia’s main shipping port. The Northern Expressway project is a joint initiative by the The Northern Expressway contributes to AusLink’s key Australian and South Australian Governments under the AusLink objective of assisting national economic and social program. It will be the largest road construction project in the development aimed at improving the effi ciency, safety and state since the 1960s. reliability of the national transport network. This includes improving freight effi ciency and reducing travel time between Why do we need the expressway? Gawler and Outer Harbor.
    [Show full text]
  • New Connections Issue 2 (October 2008)
    15673 OMP CONNECTIONS FINAL:Layout 1 9/10/08 4:38 PM Page 1 ISSUE 2 OCTOBER 2008 Breakthrough! > Project Director, Paul Gelston watching the South Road underpass taking shape and INSET: one of the 60 tonne bridge beams is lowered into place. Workers on site at the South Road Underpass “When you see figures such as 47,000 cubic metres “We are aware that when people drive past, they don’t recently saw light emerge at the southern end of excavated materials or the 35,000 tonnes of asphalt necessarily gain a sense of the rapid progress made of the tunnel – with the massive excavation effort that will be used to create this underpass, it really towards delivering the underpass for all to use,” breaking through to the other side. gives a sense of scale to the works,” he said. said Mr Gelston. “Now that we can see all the way through what This defining moment for the underpass project will soon be the underpass, it really shows that this “I can assure the community heralded its transformation from a muddy worksite project has been undertaken with a great sense to a defined underpass that will transport millions of purpose, which is a credit to the project team that even though there is some of vehicles non-stop under ANZAC Highway. and our contractors. inconvenience now, just like the Above the deep pit the last of the massive 60 tonne “And the engineering of the site has generated beams that support the bridge deck were recently considerable interest with more than 200 people multi-award winning Bakewell installed.
    [Show full text]