Grand Trunkway Estate

Total Page:16

File Type:pdf, Size:1020Kb

Grand Trunkway Estate ^^The release of industrial allotments in EXPRESSION OF Renewal SA’s Grand Trunkway Estate has INTEREST CLOSES FOR SALE been keenly awaited as it represents the first Friday 23 October 2015 at the BY EXPRESSION OF INTEREST recent release of master-planned industrial offices of Renewal SA at 4:00pm allotments in this emerging Key Industry Area. SALES AGENT ^^The area is identified in The 30-Year Plan for Grand Trunkway Greater Adelaide to be developed over time to support employment targets, particularly for Estate Northern and Western Adelaide. David Reid 0418 810 865 8110 3352 Serviced, filled and compacted [email protected] ^^Grand Trunkway Estate is located adjacent level allotments ready for Port Adelaide at the western edge of the Jon Nitschke industry 0407 904 660 Northern Economic Corridor and has strong 8110 3342 transport links to Outer Harbor, the Interstate [email protected] Main Rail Line and Adelaide’s upgraded www.cbre.com.au expressway system, including the recently Level 5, 151 Pirie Street, announced Northern Connector road Adelaide RLA 208125 accessed through the Port River Expressway. For further information on Grand Trunkway Estate ^^Renewal SA continues to hold significant and other Renewal SA projects visit: undeveloped land to the west of the www.renewalsa.sa.gov.au/grandtrunkwayestate current estate which could be developed to accommodate occupiers with large land requirements, or subsequent stages of development. Whilst best endeavours have been used to provide true and accurate information in this publication, the vendor and its agents accept no responsibility and disclaim all liability in respect to any errors or inaccuracies it may contain. Photographs in this publication are intended to be a visual aid only and do not necessarily depict the actual development of the project described. Prospective purchasers are invited to inspect the project described or make further enquiries through the appointed selling agent. The vendor and its agents accept no liability for any loss which may be suffered by any person who relies either wholly or in part upon any description, photograph or statement contained herein. Information contained herein is subject to change without notice. Potential buyers must rely on their own investigations and satisfy themselves in relation to all aspects of this development. ^^Allotments from 8,753sqm* to 2,83ha* ^^B double accessible Directly linked to Eastern Parade and Port River Expressway. ^^Superb location in Adelaide’s inner north Strategically positioned to service Industry, transport GAWLER logistics, storage distribution and manufacturing. ALE RD ANGLE V & PERTH & TO SYDNEY NORTHERN EXPRESSWAY TO DARWIN TO Y EXPRESSWA MAIN NORTH RD WOMMA RD INTERMODAL NORTHERNTERMINAL Grand Trunkway Estate ELIZABETH REGIONAL CENTRE EDINBURGH PARKS Serviced, filled and compacted level allotments ready for industry MAIN NORTH RD SALISBURY TOWN CENTRE OUTER HARBOR 3 2 TECHPORT LOT 2 LOT 11 LOT 20 AUSTRALIA 8,983 SQM* 1,476 HA* 9,422 SQM* GRAND 19 TRUNKWAY SALISBURY HWY 10 PORT WAKEFIELD RD MAWSON LAKES & 20 LOT 3 LOT 19 LOT 21 ESTATE TECHNOLOGY PARK 9,750 SQM* 8,753 SQM* 9,422 SQM* PORT RIVER EXPRESSWAY 21 11 PORT ADELAIDE LOT 10 GRAND JUNCTION RD GRAND JUNCTION RD SUBJECT TO SITE SURVEY 1,427 HA* * NORTH EAST RD APPROXIMATE ONLY SOUTH RD MAIN NORTH ROAD CBD ADELAIDE Y CROSS RD PORTRUSH RD ANZAC HW TO MELBOURN E SOUTH RD www.renewalsa.sa.gov.au/ grandtrunkwayestate.
Recommended publications
  • Conference Facilities
    Adelaide Manor Conference Facilities Ph: 08 8349 4999 Fax: 08 8349 4631 [email protected] www.adelaidemanor.com.au Conference Rooms Thank you for your enquiry regarding the conference facilities at the Adelaide Manor. The Adelaide Manor has been an integral part of the northern suburbs since its establishment in 1985 providing accommodation, function facilities, licensed restaurant and a bar on site, complimentary off street parking, outdoor swimming pool and spa and free WiFi. Centrally located in Adelaide’s northern suburbs approximately 10 minutes from the CBD, the property is easily accessible from any direction with entrances off both Main North Road and Port Wakefield Road. The property boasts a range of features designed to ensure your event is effortless, effective and enjoyable. Our dedicated and experienced hospitality staff can tailor a package to suit your specific conference requirements. The conference rooms include the Manor Room and the Board Room, which are located on the ground floor and have been completely refurbished allowing ample natural light to filter through the large windows with French doors opening poolside. Our head chef has created a selection of breakfast, lunch, dinner and light snack options to cater for every occasion. Should you require further information or have any queries, please do not hesitate to contact us. Kind Regards, Cherie Olsen Function Co-Ordinator Adelaide Manor T: (08) 8349 4999 F: (08) 8349 4631 E: [email protected] Adelaide Manor │ 574 Main North Rd │ Gepps Cross │ South Australia │ 5094 T: 08 8349 4999 F: 08 8349 4631 E: [email protected] ABN 33102 857 385 - 002 The Board Room is perfect for smaller gatherings, measuring 49m2 it provides a private space for intimate meetings.
    [Show full text]
  • South Road Superway
    SOUTH ROAD SUPERWAY ON THE Way The $842M South Road Superway project will be one of Australia’s largest single investment developments and one of the most complex engineering road projects for any freeway. MAIN CONSTRUCTION COMPANIES : John Holland, Leed Engineering & Construction PROJECT END VALUE : $842 million COMPLETION : September 2013 ROAD LEGHTH : 4.8km The Australian and South Australian • The northern end of South Road is Governments are working together to being upgraded as it is a key freight improve transport in South Australia. The route for Adelaide’s major export $842 million South Road Superway project generating industries. is the biggest single investment in a South • South Road is the direct link for industrial Australian road project, and so far the state’s transport hubs: Adelaide Airport, most complex engineering road construction Islington Rail Terminal, Port Adelaide project. This project is under a joint venture and Outer Harbour. between John Holland and Leed Engineering & Construction and is the second stage A purpose built casting yard was of the north-south transport corridor implemented for the project and saved the upgrade which provides a 4.8 kilometre transportation of heavy segments by road. non-stop corridor and incorporates a 2.8 Being able to cast the segments as close kilometre elevated roadway. as possible to the piers ensures minimum interruption to traffic. Land was secured Supporting the local economy, the South Road and the Superway casting yard built for this Superway project has provided more than 2000 purpose at 628-638 South Road. jobs and has supported the growth of local businesses.
    [Show full text]
  • Adelaide Industrial Market
    RESEARCH Population Growth Aust: 1.6% SA: 0.8% Infrastructure—North to Lonsdale— an additional 3,000m² of As at December 2018 South Corridor advance manufacturing space which will increase the manufacturing capacity by Economic Growth The North to South Corridor is starting to 250% and create jobs for up to an Aust: 1.8% SA: 1.8% come together with the majority of additional 100 workers. projects completed. Current projects March 18 to March 19 underway are the Darlington Upgrade The unemployment rate in SA currently Unemployment Rate and Northern Connector, with expected stands at 5.9%, which is 0.7% higher completion in late 2019. The remaining than the national average as of June Aust: 5.2% SA: 5.9% sections that are yet to commence are 2019 (seasonally adjusted). This figure As at June 2019 the River Torrens to Anzac Highway and has improved from 7.3% in April 2017. “Anzac Highway to Darlington”. On Moving forward, this downward trend is Infrastructure Spending completion, the 78-kilometre North-South likely to continue as a number of major SA State Budget Corridor will reduce travel times by projects in the defence and providing a continuous non-stop manufacturing sectors come online. 2019/20: $11.9 billion carriageway from Gawler to Old Engineering Noarlunga. Furthermore, it will also Low cost of capital will Construction improve access to some of the key benefit the property market Aust: -13.5% SA: 7.8% industrial areas such as Edinburgh Parks in the Outer North. Evidence from sales transactions during March 18 to March 19 CY 2018 suggested that the low cost of Manufacturing is back capital and the abolition of stamp duty had a positive impact on the number of The closure of the 122.5ha General transactions for industrial properties Motors Holden (GMH) site in Elizabeth above $5 million.
    [Show full text]
  • Port River Expressway Cycle Path Detour ADVANCE NOTICE
    North-South Corridor Northern Connector Project Port River Expressway cycle path detour ADVANCE NOTICE As a part of the Northern Connector Project, The Department of Planning, Transport and Infrastructure (DPTI) advises that a new cycle path detour will be in place on the Port River Expressway for the eastbound and westbound routes, between Hanson Road and Globe Derby Drive from late August/early September 2017 to late 2019. This will replace the existing eastbound detour and will enable cyclists to continue to travel safely between these locations during the construction of the new bridge connecting the South Road Superway and the Northern Connector, as part of the Southern Interchange. Advanced notice and directional signage will be in place to direct cyclists along the detour. Please refer to the attached map to plan your journey. A further notification will be issued prior to the detour official opening. Thank you for your patience whilst these important works are undertaken. To assist with planning your cycle journey visit http://maps.sa.gov.au/cycleinstead/. # 11827676 Port River Expressway cycle detour For users eastbound and westbound from TBC 2017 to late 2019 LEGEND P O CYCLE DETOUR EASTBOUND ONLY R T (OPEN FROM TBC 2017 TO LATE 2019) W CYCLE DETOUR WESTBOUND ONLY A (OPEN FROM TBC 2017 TO LATE 2019) K E RAILWAY LINE F Ryans Rd I E L Trotters Dr D R N O Use Globe Derby Dr A existing D Dry Creek Linear Trail Use existing pedestrian access to cross Port Wakefield Rd. Dismount bicycle underneath Salisbury Hwy bridge. Use Pedestrian Start crossing eastbound cycle Vater St detour here.
    [Show full text]
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • Buckland Park – Traffic Impact Assessment
    Buckland Park Traffic Impact Assessment 1 April 2009 Walker Corporation Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 16 1 King William Street 101 Pirie Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected] 08-0875-04-2112592A NCSI Certified Quality System ISO 9001, ISO 14001, AS/NZS4801 ©Parsons Brinckerhoff Australia Pty Limited (PB) [2009]. Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. Author: Gordon Benham, Sharon Billinger, Daniel Keller ......................... Signed: ..................................................................................................... Reviewer: S Lewis ......................................................................................... Signed: ..................................................................................................... Approved by: G Benham .................................................................................... Signed: ....................................................................................................
    [Show full text]
  • Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
    northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide.
    [Show full text]
  • 224F Bus Time Schedule & Line Route
    224F bus time schedule & line map 224F City View In Website Mode The 224F bus line (City) has 2 routes. For regular weekdays, their operation hours are: (1) City: 6:41 AM - 9:02 AM (2) Elizabeth: 2:47 PM - 5:27 PM Use the Moovit App to ƒnd the closest 224F bus station near you and ƒnd out when is the next 224F bus arriving. Direction: City 224F bus Time Schedule 86 stops City Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:41 AM - 9:02 AM Zone C Elizabeth Interchange Bus Access, Elizabeth Tuesday 6:41 AM - 9:02 AM Zone D Elizabeth City Centre - North West side Wednesday 6:41 AM - 9:02 AM Oxenham Drive, Elizabeth Thursday 6:41 AM - 9:02 AM Stop 63 Philip Hwy - East side Friday 6:41 AM - 9:02 AM 7 Philip Highway, Elizabeth Saturday Not Operational Stop 62 Philip Hwy - South East side 29 Philip Highway, Elizabeth Stop 61 Philip Hwy - South East side 224F bus Info Stop 60 Philip Hwy - South East side Direction: City 1 Deverill Street, Elizabeth Stops: 86 Trip Duration: 92 min Stop 59 Philip Hwy - South East side Line Summary: Zone C Elizabeth Interchange, Zone Phillip Highway, Elizabeth D Elizabeth City Centre - North West side, Stop 63 Philip Hwy - East side, Stop 62 Philip Hwy - South Stop 58 Philip Hwy - South East side East side, Stop 61 Philip Hwy - South East side, Stop 149 Philip Highway, Elizabeth 60 Philip Hwy - South East side, Stop 59 Philip Hwy - South East side, Stop 58 Philip Hwy - South East side, Stop 57 Hogarth Rd - North side Stop 57 Hogarth Rd - North side, Stop 56A Hogarth 109 Hogarth Road, Elizabeth
    [Show full text]
  • 13 Transport
    Northern Expressway Environmental Report 13 Transport 13.1 Introduction The existing transport network operates at an acceptable to poor level along most arterial roads in the study area. The predicted increase in traffic volumes on the current network will significantly increase delays and congestion, particularly along Main North Road and Heaslip Road. The construction of the Northern Expressway will provide an important link to the South Australian freight network. In general, consultation comments to date have been supportive of the Expressway, recognising the benefits of freight being diverted from local roads in the study area, improved travel times and improved access to other regions. Comments have also highlighted concerns from local people about access to their properties, to the Expressway, east–west access across the Expressway, and the effects on Port Wakefield Road. 13.2 Existing transport network 13.2.1 Arterial road network The fold-out plan at the back of this Environmental Report shows the road network within the study area. It is characterised by three major north–south roads: Port Wakefield Road, Heaslip–Angle Vale Road and Main North Road (and the Gawler Bypass). Main North Road and Port Wakefield Road form part of the existing National Network; Heaslip–Angle Vale Road is considered a significant freight route and connects the two National Network links. Main North Road and Heaslip Road form the main connections to the Mid North (e.g. Clare) and to the Riverland areas of South Australia as well as to northern Victoria and New South Wales via the Sturt Highway. The remaining arterial roads (generally east–west such as Womma Road, Penfield Road, Angle Vale Road and Two Wells Road) perform linking functions within the road network to the AusLink National Network and surrounding communities.
    [Show full text]
  • Consolidated Table of Limited Access Locations for SA
    Information Bulletin August 2020 Heavy Vehicles Limited Access Locations in SA Areas or routes of Operation Outlined below is a list of Limited Access Locations within South Australia. Despite the dimension limits specified, access may be permitted for some vehicle combinations that operate under a Class 1 notice published by the National Heavy Vehicle Regulator (NHVR) that provides access for combinations to travel on all routes and areas in South Australia or a route specific permit issued by the NHVR. Note: Regions are defined as per Primary Industries and Regions SA (PIRSA), published at http://www.pir.sa.gov.au/regions. Adelaide Metropolitan Area Dimension Limit Condition of access for (metres) vehicles which exceed a Location / Road dimension limit which Width Height Length applies to a limited access location Adelaide CBD, bounded by West Terrace, South 2.5 4.3 19 Specific permit Terrace, East Terrace and North Terrace Specific permit for width or Pedestrian bridge over South Terrace, Adelaide 2.5 4.5 19 length Park Terrace, Salisbury, between the intersections of Commercial Road/Park Terrace and Salisbury 2.5 4.3 19 Access not permitted Hwy/Waterloo Corner Road/Park Terrace Pedestrian bridge over Main North Road and Malinya Drive when turning from Main North Road 3.5 4.5 19 onto Malinya Drive, Salisbury Park Railway bridge over Rosetta St, West Croydon 2.5 3.0 19 Access under notice for Railway bridge over Chief St, Brompton 2.5 3.2 19 vehicles that exceed the length Road bridge over St Andrews Terrace, Willunga 3.5 4.5 19 dimension
    [Show full text]
  • South Road Upgrade (Torrens Road to River Torrens) Project Report
    South Road Upgrade (Torrens Road to River Torrens) Project Report Introduction What is this report? This document has been prepared to provide an overview of the findings of the South Road Planning Study to upgrade the section from Torrens Road to the River Torrens. The planning study has investigated a broad range of possible options. It has developed and assessed a concept design for the preferred option for this project as the next step in delivering Adelaide’s non‐stop north‐south corridor. This document is intended to inform residents, property owners and businesses, along with the general public, of the State Government’s plans for this significant piece of transport infrastructure. If you have further questions after reading this document, please contact the South Road Planning Study Team via the contact details provided on the last page of this booklet. Why does Adelaide need a North‐South Corridor? Through its Seven Strategic Priorities the South Australian Government has detailed its economic, social and environmental goals. They include creating a vibrant city, safe communities and healthy neighbourhoods, affordable places to live and growing advanced manufacturing. The transport system plays a critical role in achieving these goals. Adelaide’s transport system is, however, facing major challenges over the next 30 years, the most critical of these being the provision of safe and efficient transport options for Adelaide’s residents and businesses. Due to the projected growth of South Australia’s North‐South Corridor economy and population, additional demands will be placed on infrastructure, especially transport infrastructure. South Road is part of the National Land Transport Network through urban Adelaide and is the major north‐south traffic and freight route through Adelaide’s west.
    [Show full text]
  • Town of Gawler Council Meeting Agenda 22 September 2015
    Town of Gawler Council Meeting Agenda 22 September 2015 ATTACHMENTS UNDER SEPARATE COVER Item 8.1 – Gawler East Link Road Update ATTACHMENT 1 SA Power Network Correspondence ATTACHMENT 2 Gawler East Link Road Community Information Forum PowerPoint Presentation ATTACHMENT 3 Community Submissions TOWN OF GAWLER Page 1 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER $77$&+0(17 TOWN OF GAWLER Page 2 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER TOWN OF GAWLER Page 3 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER $77$&+0(17 Gawler East Link Road Community Forum Wednesday 9 September, 2015 TOWN OF GAWLER Page 4 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER GAWLER EAST LINK ROAD Welcome to the Gawler East Link Road Community Forum Facilitator: Angela Hazebroek - URPS TOWN OF GAWLER Page 5 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER GAWLER EAST LINK ROAD Overview of the evening: • Setting the scene & guidelines for a successful meeting • Introduction – Mayor Karen Redman • Presentation – Town of Gawler CEO, Mr Henry Inat • Responses to Questions on Notice – addressing the Top 10 issues • Questions from the floor • Summary & next steps TOWN OF GAWLER Page 6 of 132 COUNCIL MEETING 22 SEPTEMBER 2015 ATTACHMENTS UNDER SEPARATE COVER GAWLER EAST LINK ROAD Setting the scene & guidelines for a successful meeting: • The purpose of tonight’s forum is to increase community awareness regarding the process involved in delivering the Gawler East Link Road. • Please respect the rights of others to their views and to have those views heard.
    [Show full text]