Baltic-Adriatic Corridor

Total Page:16

File Type:pdf, Size:1020Kb

Baltic-Adriatic Corridor CEF support to Baltic-Adriatic Corridor Innovation and Networks Executive Agency Baltic-Adriatic FEBRUARY 2018 1 Table of Contents 1. Introduction ......................................................................................................................................................................... 3 2. Action portfolio: State of play ................................................................................................................................. 4 2.1. Operational Implementation ....................................................................................................................... 4 2.1.1. Maritime .................................................................................................................................................................. 5 2.1.2. Multimodal ............................................................................................................................................................ 5 2.1.3. Rail ............................................................................................................................................................................... 6 2.1.4. Road ......................................................................................................................................................................... 10 2.1.5. Financial implementation ...................................................................................................................... 13 3. Evolution of the Action portfolio ...................................................................................................................... 14 3.1. Funding variations after the Grant Agreement signature ................................................. 14 3.2. Challenges affecting the implementation of Actions .............................................................. 14 4. Conclusion and Outlook ........................................................................................................................................... 16 5. Statistical Annex ............................................................................................................................................................. 18 6. List of Actions on the Baltic Adriatic Corridor ....................................................................................... 20 2 1. Introduction Since the 2014 CEF calls for proposals, this is the first INEA report aimed at presenting the contribution of CEF-Transport funded Actions to the development of the Baltic-Adriatic Core Network Corridor (BAC) and implementation of the BAC Work Plan prepared under the auspices of Mr Kurt Bodewig, the European Coordinator. It presents what has already been achieved thanks to CEF funding and what is still expected under the current programme. The Baltic-Adriatic Corridor is one of the most important trans-European railway and road axes. This 1800 km long corridor runs from North to South, i.e. from Poland through the Czech Republic, Slovakia, Austria to Italy and Slovenia, connecting core Baltic ports in Poland with core ports of the Adriatic Sea in Italy and Slovenia. It runs through the industrialised areas of Southern Poland, Vienna and Bratislava, the Eastern Alpine region and Northern Italy, linking major transport nodes through key rail, road, maritime and air transport connections. Except Austria and Italy, all member states located on the corridor are Cohesion countries. It includes around 4,600 km of rail network and 3,600 km of road network as well as 13 urban nodes and airports, 10 ports and 24 rail-road terminals. The corridor also crosses, or runs in parallel, with five other corridors: North-Sea Baltic in Poland, Orient-East Med and Rhine-Danube in the Czech Republic, Austria and Slovakia, Mediterranean in Italy and Slovenia, and Scandinavian-Mediterranean in Italy. As noted in the Work Plan, by implementing the Baltic-Adriatic Corridor, new traffic flows between Baltic and Adriatic ports and their hinterland are developed and the ports, as start and end points of the corridor are boosted. According to the Work Plan, in order to reach the full potential and develop a truly multi-modal and seamless corridor, the existing bottlenecks along the corridor, missing links in the rail network and last mile connections to ports need to be addressed. In response to these needs, the European Coordinator has set out a list of specific priorities for the Baltic-Adriatic Corridor, which focus on: developing rail and road cross-border connections, removing missing links at the Alpine crossings in Austria, improving infrastructure quality and standards with a focus on Cohesion countries, improving 'last mile' connections of the ports, and deployment of ERTMS. As it will be presented later in the report, the CEF programme makes a significant contribution to the implementation of the Work Plan along the aforementioned priorities. The Baltic-Adriatic Corridor has been very successful in securing CEF funds, especially considering the very high oversubscription in CEF calls for proposals. In the first three calls over €2 billion of CEF funding for a total investment of over €3 billion has been allocated to 68 Actions located on the corridor. The recent Blending Call 2017 has added another 12 Actions with CEF contribution of €320 million. CEF funding concentrates on railway Actions, with a contribution of €1.9 billion to date, representing 79% of total CEF funding allocated to the corridor. 28 railway Actions supported by CEF are implemented in all countries on the corridor, focusing on the improvement of existing infrastructure and ERTMS deployment, particularly in Cohesion countries. Other modes of transport are also supported by CEF, namely road, maritime and multimodal. Amongst them, 4 road Actions address cross-border sections, 21 innovation Actions are involved in deploying alternative fuels, 6 Actions deploy ITS, 11 Actions improve port infrastructure and connections and 4 Actions develop multimodal logistic platforms. This report will present the current state of play of implementation of CEF Actions, which are vital for the achievement of the above goals. It will also tackle the main challenges and opportunities going forward. 3 2. Action portfolio: State of play1 CEF Transport has so far allocated grants worth €22.3 billion with a total investment in the European economy of €46 billion. The current portfolio of Actions in the Baltic-Adriatic Corridor comprises 80 grant agreements2 allocating €2.4 billion of actual CEF Transport Funding (corresponding to 12% of total number of CEF Transport Actions and 11% of total actual CEF Transport funding). Except for one termination and one closure of these grant agreements, all Actions are ongoing. 2.1. Operational Implementation For the Baltic-Adriatic Corridor, the Core Network Corridor priority (under Funding Objective 1)3 represents 85% of actual CEF Transport funding. Other priorities, such as Innovation (under Funding Objective 2)4 and Multimodality (under Funding Objective 3)5 also contribute to the development of the Corridor. Due to its location, most of the funding for the Baltic-Adriatic portfolio is coming from the Cohesion envelope (80%). The portfolio is dominated by national Actions, which absorb around 97% of the grants allocated to this corridor. 89% of the actual CEF Transport funding is linked with works Actions. The highest number of Actions is under the rail transport mode, which also receives most of the actual funding (79%). 43 bottlenecks are expected to be addressed by Actions on this corridor, mainly regarding national rail sections, some with cross-border impact. Figure 1: Statistics by transport mode Funding (€ million) Number of Actions Number of bottlenecks Air 0.0 0 0 Inland Waterways 0.0 0 0 Maritime 204.1 11 3 Multimodal 50.0 10 1 Rail 1,876.1 28 37 Road 246.5 31 2 1 As of February 2018. 2 Of which 68 have been signed following the 2014-2016 calls, and 12 are under preparation following the 2017 Blending call. 3 Removing bottlenecks and bridging missing links, enhancing rail interoperability, and, in particular, improving cross-border sections 4 Ensuring sustainable and efficient transport in the long run 5 Optimising the integration and interconnection of transport modes and enhancing interoperability, safety and security of transport 4 2.1.1. Maritime There are ten core ports in operation along the Baltic-Adriatic Corridor: five maritime and inland waterway ports (Szczecin and Świnoujście, Trieste, Venezia and Ravenna), three maritime ports (Gdynia, Gdańsk and Koper) and two inland waterway ports (Wien and Bratislava). All ports are connected to the road and railway network in line with TEN-T standards. In order to develop the full potential of the seaports one of the priorities of the Work Plan relates to the improvement of last mile connections outside and inside the ports and development of hinterland connections of ports, focusing on rail last mile connections. Indeed, ports access is addressed by many CEF Actions, as described below. In total the maritime portfolio of the Baltic-Adriatic Corridor is composed of 11 Actions, 10 of which include construction works, receiving in total €204.1 million of CEF Transport funding. The funding is concentrated in 6 core ports located on the corridor, namely: Gdańsk, Koper, Ravenna, Świnoujście, Trieste and Venice. These Actions focus on maritime and land accessibility of the port (Koper, Trieste and Venice), expansion
Recommended publications
  • ÖBB-PORR Slab Track System for the Koralm Railway — World of PORR
    World of PORR 168/2016 PORR Updates ÖBB-PORR slab track system for the Koralm railway Success with our own technology The Austrian Federal Railways (ÖBB) continue to rely on the railway construction expertise of PORR Bau GmbH. Under its leadership, 3276m of railway line will be installed using the “ÖBB-PORR elastically supported slab system”. Construction work on the slab tracks of line 1 in the Hengsberg Tunnel and the Weitendorf FW12 underpass, Different types of ÖBB-PORR track support slabs Oberbau 66.03 section has started on 5 February 2016. Line Image: PORR AG 2 was built also under the leadership of PORR Bau GmbH in 2010 as a slab track and has been operational since December 2010. The following concrete and surface works will be carried out for ÖBB: Line 1 slab tracks Track cover with load bearing sound-absorbing slabs Switch in slab tracks Light mass-spring system in the Weitendorf FW12 underpass Load distribution slabs Pre-ballasting on the connecting line The main construction work on the slab tracks will be carried out over a 7 week period from 11 July to 26 August 2016 during which time the tracks will be closed. The work will mainly be carried out on rails in shifts. This construction work is a part of the new Koralm Railway Line project between Graz and Klagenfurt. Construction of the Koralm Railway Line began in 1999. The new 130km-long line will be completed in 2023. The rail journey from Graz to ÖBB-Porr slab tracks with load bearing sound-absorbing slabs Klagenfurt will then only take 45 minutes, with trains reaching Image: PORR AG speeds of up to 230km/h.
    [Show full text]
  • Complex Segment Monitoring at Koralm Tunnel
    TJ_0513_OUTSIDE_FNT_COVER_PLUS_SPINE_001.qxd:cover 22/4/13 20:22 Page 1 www.tunnellingjournal.com April/May 2013 TTheunne international journal for the tunnelling industry llingjournal SEE PAGE 18 SEE PAGE 34 SEE PAGE 40 SEGMENTAL PROJECT JUBILEE INNOVATION POLITICS REPAIRS TJ LOOKS AT NEW THE COMPLEX A FASCINATING TECHNOLOGIES WORLD OF INSIGHT INTO AVAILABLE TO THE PROJECT POLITICS AN INTRIGUING SEGMENTAL LINING EXAMINED GROUTING SECTOR PROBLEM TUNNELLING JOURNAL SEGMENTAL LININGS IN FOCUS APRIL/MAY 2013 APRIL/MAY THE KORALM’S SEGMENT TRACKING SYSTEM TJ_0513_KORALM_010_016.qxd:Feature 22/4/13 20:33 Page 10 SEGMENTAL LINING The Koralm Project at a glance Austria's new Koralm tunnel is one of the the west and the harder gneiss of the largest infrastructure projects in Europe outside mountains. Strabag did that work in 2005-07, of the three great Alpine pass crossings at making a small 45m2 cross-section bore. Brenner, the Swiss Gotthard and France's Fréjus. “It was thought this might be a difficult area At just under 33km long and with a maximum but in the end it was more straightforward than cover of nearly 1200m it is at least approaching thought,” says Lehner. the same kind of scale. The interface fixes two different types of The twin bores for high-speed rail trains will tunnelling for the project which uses form a critical link through Klagenfort in conventional excavation in hard clays to the southern Austria and on to the north east via west and switches to TBM for the longer hard Graz and Vienna. Another major tunnel, the rock.
    [Show full text]
  • Koralm Tunnel
    KORALM TUNNEL – DEVELOPMENT OF TUNNEL SYSTEM DESIGN AND SAFETY CONCEPT Christof Neumann, Florian Diernhofer, ILF Consulting Engineers, Austria Gerhard Harer, Josef Koinig, OEBB Infrastruktur Bau AG 1 ABSTRACT The 32.8-km-long Koralm tunnel requires additional measures to guarantee a sufficient safety level. The methodology applied to define safety measures for this very long tunnel is on the one hand based on a set of guidelines and on the other hand based on the specific boundary conditions of this tunnel. These tunnel-specific conditions are considered by establishing customized safety targets. As a result of an investigation into the construction and operating phase, the tunnel system was determined to consist of two single-tube tunnels, an emergency station, no crossover and cross- passages every 500 m. The emergency station in the centre of the tunnel, which incorporates various considerations, was designed to accommodate staggered platforms and a refuge room with a length of 800 m. With a view to the incident management strategy to be adopted, characteristic operating scenarios were analysed to realistically reflect the sequence of events in case of an emergency. 2 THE KORALM TUNNEL PROJECT The Koralm tunnel is one of the key elements of the Koralm high-capacity railway line, which connects the cities of Graz and Klagenfurt in the south of Austria. The Koralm railway line is part of the Baltic-Adriatic Axis, which represents the easternmost crossing of the Alps and links several Eastern European countries Koralm line with Koralm tunnel and Vienna with southern Austria and northern Italy. The Koralm line is a 130- km-long high-capacity railway line engineered for a design speed of 200 km/h.
    [Show full text]
  • Grr318 Online.Indb
    IN THIS ISSUE Digitalisation: Infrabel’s commitment to delivering a smarter and safer railway UK rail expert debate: Embracing change and solving challenges 9,$5DLO&DQDGDDžVǪHHWUHQHZDO programme and modernisation strategy ISSUE JUN 03 2018 EXPERTISE | OPINION | INTELLIGENCE globalrailwayreview.com Level crossing safety Discover how the rail sector is deploying innovative technology and concentrating on several campaigns and educational programmes to reduce the number of level crossing accidents and save lives Developing solu- tions for strong railway operations. Increase the capacity of your rail network. Swiss precision in WUDȢFPDQDJHPHQW 5DLO&RQWURO6\VWHP 5&6 Discover more at sbb.ch/rcs Swiss Federal Railways SBB, Infrastructure Sales, Hilfikerstrasse 3, 3000 Bern 65, Switzerland, + 41 51 222 88 88, [email protected], www.sbb.ch WELCOME Why is the message still not clear? Recent headlines and statistics suggest that many pedestrians and motorists do not understand the dangers of level crossings. Is the rail sector doing enough to help educate the public? EVERYONE should know that level crossings are dangerous, yet so many people continue to cause accidents at these road/rail junctions that result in serious injury and, too often, fatalities. It’s surely simple: Be sensible and adhere to GLOBAL RAILWAY REVIEW warnings at level crossings. VOL 24 | ISSUE 03 | JUN 2018 According to Operational Lifesaver Inc. few people are aware of the worrying statistic that in America, a person or Founder: IAN RUSSELL Managing Director: JOSH RUSSELL vehicle is hit by a train roughly every three hours. And it’s Editor: CRAIG WATERS Junior Editor: TARA NOLAN not only happening in the ‘States; in 2015, according Editorial Assistants: MANDY PARRETT / SARAH WILLS Commerical Director: SAM PIRANI to the European Union Agency for Railways, there were Sales Manager: JESSICA RUSSELL Sales Executive: TONI LAMB 469 collisions at level crossings in the EU, resulting in Product Marketing Exec: ALEX COOLEY Head of Marketing: JON RAESIDE 288 fatalities and 239 serious injuries.
    [Show full text]
  • Issue #30, March 2021
    High-Speed Intercity Passenger SPEEDLINESMarch 2021 ISSUE #30 Moynihan is a spectacular APTA’S CONFERENCE SCHEDULE » p. 8 train hall for Amtrak, providing additional access to Long Island Railroad platforms. Occupying the GLOBAL RAIL PROJECTS » p. 12 entirety of the superblock between Eighth and Ninth Avenues and 31st » p. 26 and 33rd Streets. FRICTIONLESS, HIGH-SPEED TRANSPORTATION » p. 5 APTA’S PHASE 2 ROI STUDY » p. 39 CONTENTS 2 SPEEDLINES MAGAZINE 3 CHAIRMAN’S LETTER On the front cover: Greetings from our Chair, Joe Giulietti INVESTING IN ENVIRONMENTALLY FRIENDLY AND ENERGY-EFFICIENT HIGH-SPEED RAIL PROJECTS WILL CREATE HIGHLY SKILLED JOBS IN THE TRANS- PORTATION INDUSTRY, REVITALIZE DOMESTIC 4 APTA’S CONFERENCE INDUSTRIES SUPPLYING TRANSPORTATION PROD- UCTS AND SERVICES, REDUCE THE NATION’S DEPEN- DENCY ON FOREIGN OIL, MITIGATE CONGESTION, FEATURE ARTICLE: AND PROVIDE TRAVEL CHOICES. 5 MOYNIHAN TRAIN HALL 8 2021 CONFERENCE SCHEDULE 9 SHARED USE - IS IT THE ANSWER? 12 GLOBAL RAIL PROJECTS 24 SNIPPETS - IN THE NEWS... ABOVE: For decades, Penn Station has been the visible symbol of official disdain for public transit and 26 FRICTIONLESS HIGH-SPEED TRANS intercity rail travel, and the people who depend on them. The blight that is Penn Station, the new Moynihan Train Hall helps knit together Midtown South with the 31 THAILAND’S FIRST PHASE OF HSR business district expanding out from Hudson Yards. 32 AMTRAK’S BIKE PROGRAM CHAIR: JOE GIULIETTI VICE CHAIR: CHRIS BRADY SECRETARY: MELANIE K. JOHNSON OFFICER AT LARGE: MICHAEL MCLAUGHLIN 33
    [Show full text]
  • Key Aspects of Long Railroad Tunnels
    Key Aspects of Long Railroad Tunnels (e.g. Semmering Base Tunnel alignment selection process) Johannes Kleberger May 28th 2012 Ankara Key Aspects of Long Railroad Tunnels Appropriate Alignment selection process Geological investigation and ground modelling Definition of maximum longitidinal gradient Definition of minimum horizontal radius Design speed selection/aerodynamic design Tunnel system selection (passenger trains only or mixed traffic, maintenance concept for railroad line) Tunnel Safety lnfrastructure according to Internat. Standards Tunnel construction method(s) selection Construction contract selection/ fair risk share Construction budget availability Realistic construction time scenario © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 2 OVERVIEW SEMMERING BASE TUNNEL KORALM TUNNEL © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 3 GHEGA-LINE © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 4 GHEGA-LINE (UNESCO WORLD HERITAGE) built from 1848 - 1854 by Carl Ritter von Ghega 41.8 km length from Gloggnitz to Mürzzuschlag (linear distance: 21 km) more than 20.000 workers 15 tunnels (total length 5.420 m) and 16 viaducts max. gradient 28 ‰ (25 km >20 ‰) original speed 6 km/h, today max. speed 70 km/h 2 lokomotives for heavy cargo trains © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 5 DESIGN PARAMETER FOR BASE TUNNEL new maximum gradient 0,85 % minimum horizontal radius 3.000 m design speed 230 km/h 2 parallel single-track tubes emergency stop in the middle of the tunnel minimum inner clearance of 41 m2 cross passages every 500 m „short construction time“ and „high flexibility in construction“ intermediate construction accesses, use of TBM © iC group.
    [Show full text]
  • Koralm, Railway Line, Wettmannstätten
    SUBSOIL EXPLORATION•• GEOMECHANICS GEOHYDROLOGY Prof. DI Dr. techn. Peter Waibel, State Certified Civil Engineer KORALM,GRAZ - KLAGENFURT RAILWAY LINE, WETTMANNSTÄTTEN - ST. ANDRÄ SECTION Client: ÖBB-Infrastruktur Bau AG (Austrian Railways Infrastructure Construction AG) Development Period: since 1996 THE PROJECT OUR FUNCTION With the new Koralm Railway Line BGG was commissioned with the hydro- Paierdorf exploration shaft: between Graz and Klagenfurt, an geological and geotechnical workman- For this 120 m deep shaft, that has essential section of the european railway ship of the tertiary tunnel sections and already been completed, a particularly system will be implemented. open areas. During the planning phases intensive geological and hydrogeological Within the 43.8 km long Wettmann- (route selection, environmental impact supervision was essential during the stätten - St. Andrä section (the core of assessment, and the tender for the design and execution phases. This was the line) the Koralm Tunnel, with a length exploration structures), the following necessary due to the predominant of 32.8 km, is situated. tasks were carried out: subsoil and groundwater situation: The double-tube tunnel cuts through q Hydrogeological field mapping Granular soil, with varying grain sizes, polymetamorphic crystalline rock of the q Planning and handling of several and several groundwater storeys exist all Koralpe and has an overburden of up to subsoil exploration campaigns the way to the bottom of the shaft. 1,200 m. Near the tunnel entrances, q Interpretation of aerial photographs Already during the planning stage of the tertiary sediments of different grain sizes and geophysical investigations tender, BGG established a detailed and rock with minor strength exists.
    [Show full text]
  • Southern Line Experience More
    SOUTHERN EXPERIENCE LINE MORE 80 km NEW TUNNELS AND UNDERPASSES 3,500,000 18 PEOPLE LIVING IN THE SOUTHERN NEWLY BUILT RAILWAY STATIONS, TRAIN LINE’S COMMUTER BELT STOPS, AND FREIGHT TRAFFIC FACILITIES 33 km KORALM TUNNEL, ONE OF THE LONGEST RAILWAY TUNNELS IN THE WORLD 1 h 20 min 250 km/h SHORTER TRAVEL TIME POSSIBLE MAXIMUM VIENNA – KLAGENFURT LINE SPEED WL 15,000 JOBS IN THE OPERATING STAGE AFTER 2026 50 min 2026 SHORTER TRAVEL NEW, MODERNISED TIME GRAZ - VIENNA FACILITIES PUT INTO OPERATION Experience more. > 5,000 EMPLOYED WORKERS When we say "experience more", we mean all the 200 km 14,000,000 many dimensions of human travel: arriving, living EXTENDED, MODERNISED TONS OF EXCAVATED AND RAILWAY LINE EXTRACTED MATERIAL and learning. 150 NEW BRIDGES AND In 2026, trains will speed from Vienna to Klagen- UNDERPASSES furt in just 2 hours and 40 minutes and from Graz to 170 km 210,000 NEW CONSTRUCTION ROUTE NEW SEGMENTS ARE BEING Klagenfurt in 45 minutes. Covering a total of 470 km, BUILT IN THE TUNNEL they will pass through numerous new railway stations ~90 and through the Semmering and the Koralpe moun- MODERNISED RAILWAY STATIONS AND TRAIN STOPS tains at the highest of speeds. And when it comes to more "experiences" - just wait until Austria’s new Southern Line opens! 4 The Benefits The Benefits 5 The future of traveling and transport SHORTER TRAVEL TIMES The Southern Line is one of the largest and most VIENNA – GRAZ 2017: from 2 h 35 min 2026: 1 h 50 min VIENNA – KLAGENFURT 2017: from 3 h 55 min 2026: 2 h 40 min spectacular infrastructure projects of the coming decade.
    [Show full text]
  • A VIEW INSIDE ÖBB´S ASSET MANAGEMENT SYSTEM
    A VIEW INSIDE ÖBB´s ASSET MANAGEMENT SYSTEM Christian Holzer ÖBB Infrastruktur AG (Austrian Federal Railways) Are you familiar with the following situation? 2 Todays real-life scenario: The asset owner comes with a request… Difficult question… Luckily we have a lot of experience! What if … ? Asset Owner Asset Manager Employees 3 Todays real-life scenario: …the asset manager forwards the request to it’s employees ? ? ? A What if … ? Asset Manager Employees 4 Todays real-life scenario: … many answers worked out by all the experts You can…, provided that… Don’t know… It is like … In my opinion.. ? My answer is… I think the One could say… answer is … Asset Manager Employees 5 Todays real-life scenario: … the asset manager responds with a brief summary Well, the answer to your question is… Asset Owner Asset Manager Employees 6 …the scenario we where confronted with in 2014… 7 Who we are Semmering base tunnel Speed up to 230 km/h 27 km long Status: under construction Start of Service: 2026 4.846 km of track 13.760 switches 6.327 bridges 246 tunnels 3.398 level crossings 1.095 stations Brenner base tunnel Koralm railway Joint project with Italy 130 km new railway lines 64 km long railway tunnel 33 km long Koralm tunnel 8 terminals Status: under construction 12 new Stations Start of Service: 2026 Status: under construction Investments of € 2 billion per year Start of Service: 2024 8 WHY? HOW? BENEFIT? 9 two questions: „what if…?“ and „what will happen then…?“ 10 Asset Management - what is it and why do we need it? Managing costs performance
    [Show full text]
  • Eastern Alps)
    1661-8726/09/010031-11 Swiss J. Geosci. 102 (2009) 31–41 DOI 10.1007/s00015-009-1305-5 Birkhäuser Verlag, Basel, 2009 Stream profile analysis of the Koralm Range (Eastern Alps) GERD RANTITSCH 1, *, GERALD PISCHINGER 2 & WALTER KURZ 3 Key words: Eastern Alps, geomorphology, fluvial erosion, stream profiles, exhumation ABSTRACT The Koralm Range at the eastern margin of the Eastern Alps shows an asym- tilting of the Koralm Range as a consequence of a Miocene block rotation, metric topography. Steep slopes and short stream channels characterize the slope-area data from stream channels suggest a spatial differential uplift south-western segment, whereas gentle slopes and elongated catchments pattern. A north-to-south-increase of the steepness values might indicate incise the mountain range towards the east. The fluvial landscape dissecting faster uplift rates in the central Koralm Range. This trend is traced by Pa- this mountain range is characterized by stream long profiles and by ana- leogene low-temperature geochronological data and by the Late Cretaceous lyzing the power-law scaling between stream slope and drainage area. The metamorphic field gradient. Thus, it may be explained by a long-term spatial concave-up form of the stream long profiles suggests an equilibrium state pattern of exhumation and subsequent uplift which remained stable since of the fluvial landscape. In accordance with a tectonic model describing the the Late Cretaceous. Introduction morphometric analysis of a digital elevation model (Frisch et al. 2000b; Székely 2001), by a sediment budget of the Alps The interaction of climate, endogenous and exogenous pro- (Kuhlemann et al.
    [Show full text]
  • Annual Report 2020 ÖBB-Holding AG Gaining Momentum Together
    Annual Report 2020 ÖBB-Holding AG Gaining Momentum Together TODAY. FOR TOMORROW. FOR US. 16/01 Double decker in Cityjet design Around 100 DOSTO trains in local transport – as well as many TALENT1 and DESIRO Classic trains – will be upgraded to Cityjet stan- dard. The conversion includes not only an interior and exterior design in the Cityjet look, but also many technical improvements such as WLAN or a multi-purpose area with space for bicycles, luggage and children’s pushchairs and prams. 23/01 RCG strengthens Hamburg trans- 19/01 ports Nightjet connection to Brussels The Rail Cargo Group (RCG) in launching the TransFER Since mid-January 2020, Brussels has been newly included in ÖBB’s Enns – Hamburg, introduces a international night train network. Twice a week there are overnight twice-weekly non-stop inter- services from Vienna via Linz and from Innsbruck via Munich to the modal connection between the EU capital. ÖBB is Europe’s largest provider of night trains, offering a Enns container terminal and the total of 27 lines in Europe together with its partners. “Our new direct North Sea port of Hamburg. This connection to Brussels sends out a clear signal: it must be possible enables a direct connection to to travel to the EU capital in a climate-friendly way,” says Andreas intercontinental flows of goods. Matthä, CEO of ÖBB-Holding AG. 30/01 Increase in ROLA capacities The extension of the sectoral driving ban in Tyrol has been in force since the turn of the year. The transit trucks affected by the driving ban therefore only have the rail option available on the route via the Brenner Pass.
    [Show full text]
  • New Emission Data for Ventilation Design for Road Tunnels
    - 1 - DUST LOADS IN RAILWAY TUNNELS – RESULTS FROM IN-SITU MEASUREMENTS AND CONSEQUENCES FOR TUNNEL FACILITIES AND RAILWAY OPERATION 1Helmut Steiner, 2Peter Sturm, 2Daniel Fruhwirt, 1ÖBB Infrastruktur AG, A; 2Graz University of Technology, A ABSTRACT Several long railway tunnels are currently under construction in Austria (e.g. the Koralm Tunnel / KAT; Semmering Base Tunnel / SBT; Brenner Base Tunnel / BBT). The project KAT is now at the beginning stage of implementation with respect to technical railway equipment. In order to complete the detailed planning several very specific topics have to be examined in detail. The ÖBB (Austrian railway corporation) has thus begun detailed research in the relevant areas in order to grapple with problems at their root, and to allow for findings to be incorporated into ongoing projects. For example, it is known from cases in Switzerland, where several long railway tunnels have been in operation for years (Lötschberg Base Tunnel / LBT; Gotthard Base Tunnel / GBT), that technical equipment needs a lot of maintenance when it is exposed to high dust loads. The quantity and composition of the dust also play a key role here. To assess the nature of the problem, in-situ measurements were thus carried out in an ÖBB railway tunnel under full operation in Upper Styria. The knowledge gained from these measurements is to be integrated into current and future rail tunnel projects. Specific attempts were made to derive characteristic emission factors in relation to different train types. It should then prove possible to estimate total dust emissions in current and future projects, depending on the specific operating programs, timetables, train mix etc.
    [Show full text]