Koralm Railway Line (Graz - Klagenfurt): Package of Implementation Measures for 2014-2020 2014-AT-TM-0003-W Baltic-Adriatic Multi-Annual Call Funding Objective 1

Total Page:16

File Type:pdf, Size:1020Kb

Koralm Railway Line (Graz - Klagenfurt): Package of Implementation Measures for 2014-2020 2014-AT-TM-0003-W Baltic-Adriatic Multi-Annual Call Funding Objective 1 Koralm railway line (Graz - Klagenfurt): package of implementation measures for 2014-2020 2014-AT-TM-0003-W Baltic-Adriatic Multi-Annual Call Funding Objective 1 Member State(s) involved: Austria C:\Temp\fichemaps\20150630AfterCorrs\2014-AT-TM-000 (Coordinating) Applicant: Bundesministerium fur Verkehr, Innovation und Technologie Implementation schedule: Image found and displayed. Start date: January 2014 End date: December 2020 Requested funding: Total eligible costs: €1 480 892 000 Requested funding: €444 267 600 Requested EU support: 30.00% The proposed Action comprises a package of implementation measures for parts Recommended funding: of the construction work of the Koralm Railway line, a new 127 km long continuously electrified line connecting Graz - Klagenfurt. The existing railway line Recommended total eligible that crosses the Alps is dominated by tight radiuses and steep gradients. The €191 930 423 costs: works foresee the excavation of the 32.9 km long Koralm Tunnel, as the centre Recommended funding: €57 579 127 piece of this new line, as well as shorter tunnels to consistently establish a physical rail infrastructure in the Alpine crossings that meets modern European Recommended EU support: 30.00% standards and is intended primarily to enable the operation of high-performance rail services. Evaluation Remarks The proposed Action in its reduced scope is very relevant. It has a high European added-value as it aims to remove an existing bottleneck on a pre-identified section of a Core Network Corridor. The Action is highly mature. All activities submitted in the application have received necessary approvals, including the Environmental Impact Assessment. The Action will have a very good impact; it is indispensable for fast, frequent, high quality services connecting several Member States. The quality is very good..
Recommended publications
  • ÖBB-PORR Slab Track System for the Koralm Railway — World of PORR
    World of PORR 168/2016 PORR Updates ÖBB-PORR slab track system for the Koralm railway Success with our own technology The Austrian Federal Railways (ÖBB) continue to rely on the railway construction expertise of PORR Bau GmbH. Under its leadership, 3276m of railway line will be installed using the “ÖBB-PORR elastically supported slab system”. Construction work on the slab tracks of line 1 in the Hengsberg Tunnel and the Weitendorf FW12 underpass, Different types of ÖBB-PORR track support slabs Oberbau 66.03 section has started on 5 February 2016. Line Image: PORR AG 2 was built also under the leadership of PORR Bau GmbH in 2010 as a slab track and has been operational since December 2010. The following concrete and surface works will be carried out for ÖBB: Line 1 slab tracks Track cover with load bearing sound-absorbing slabs Switch in slab tracks Light mass-spring system in the Weitendorf FW12 underpass Load distribution slabs Pre-ballasting on the connecting line The main construction work on the slab tracks will be carried out over a 7 week period from 11 July to 26 August 2016 during which time the tracks will be closed. The work will mainly be carried out on rails in shifts. This construction work is a part of the new Koralm Railway Line project between Graz and Klagenfurt. Construction of the Koralm Railway Line began in 1999. The new 130km-long line will be completed in 2023. The rail journey from Graz to ÖBB-Porr slab tracks with load bearing sound-absorbing slabs Klagenfurt will then only take 45 minutes, with trains reaching Image: PORR AG speeds of up to 230km/h.
    [Show full text]
  • Koralm Tunnel
    KORALM TUNNEL – DEVELOPMENT OF TUNNEL SYSTEM DESIGN AND SAFETY CONCEPT Christof Neumann, Florian Diernhofer, ILF Consulting Engineers, Austria Gerhard Harer, Josef Koinig, OEBB Infrastruktur Bau AG 1 ABSTRACT The 32.8-km-long Koralm tunnel requires additional measures to guarantee a sufficient safety level. The methodology applied to define safety measures for this very long tunnel is on the one hand based on a set of guidelines and on the other hand based on the specific boundary conditions of this tunnel. These tunnel-specific conditions are considered by establishing customized safety targets. As a result of an investigation into the construction and operating phase, the tunnel system was determined to consist of two single-tube tunnels, an emergency station, no crossover and cross- passages every 500 m. The emergency station in the centre of the tunnel, which incorporates various considerations, was designed to accommodate staggered platforms and a refuge room with a length of 800 m. With a view to the incident management strategy to be adopted, characteristic operating scenarios were analysed to realistically reflect the sequence of events in case of an emergency. 2 THE KORALM TUNNEL PROJECT The Koralm tunnel is one of the key elements of the Koralm high-capacity railway line, which connects the cities of Graz and Klagenfurt in the south of Austria. The Koralm railway line is part of the Baltic-Adriatic Axis, which represents the easternmost crossing of the Alps and links several Eastern European countries Koralm line with Koralm tunnel and Vienna with southern Austria and northern Italy. The Koralm line is a 130- km-long high-capacity railway line engineered for a design speed of 200 km/h.
    [Show full text]
  • Grr318 Online.Indb
    IN THIS ISSUE Digitalisation: Infrabel’s commitment to delivering a smarter and safer railway UK rail expert debate: Embracing change and solving challenges 9,$5DLO&DQDGDDžVǪHHWUHQHZDO programme and modernisation strategy ISSUE JUN 03 2018 EXPERTISE | OPINION | INTELLIGENCE globalrailwayreview.com Level crossing safety Discover how the rail sector is deploying innovative technology and concentrating on several campaigns and educational programmes to reduce the number of level crossing accidents and save lives Developing solu- tions for strong railway operations. Increase the capacity of your rail network. Swiss precision in WUDȢFPDQDJHPHQW 5DLO&RQWURO6\VWHP 5&6 Discover more at sbb.ch/rcs Swiss Federal Railways SBB, Infrastructure Sales, Hilfikerstrasse 3, 3000 Bern 65, Switzerland, + 41 51 222 88 88, [email protected], www.sbb.ch WELCOME Why is the message still not clear? Recent headlines and statistics suggest that many pedestrians and motorists do not understand the dangers of level crossings. Is the rail sector doing enough to help educate the public? EVERYONE should know that level crossings are dangerous, yet so many people continue to cause accidents at these road/rail junctions that result in serious injury and, too often, fatalities. It’s surely simple: Be sensible and adhere to GLOBAL RAILWAY REVIEW warnings at level crossings. VOL 24 | ISSUE 03 | JUN 2018 According to Operational Lifesaver Inc. few people are aware of the worrying statistic that in America, a person or Founder: IAN RUSSELL Managing Director: JOSH RUSSELL vehicle is hit by a train roughly every three hours. And it’s Editor: CRAIG WATERS Junior Editor: TARA NOLAN not only happening in the ‘States; in 2015, according Editorial Assistants: MANDY PARRETT / SARAH WILLS Commerical Director: SAM PIRANI to the European Union Agency for Railways, there were Sales Manager: JESSICA RUSSELL Sales Executive: TONI LAMB 469 collisions at level crossings in the EU, resulting in Product Marketing Exec: ALEX COOLEY Head of Marketing: JON RAESIDE 288 fatalities and 239 serious injuries.
    [Show full text]
  • Issue #30, March 2021
    High-Speed Intercity Passenger SPEEDLINESMarch 2021 ISSUE #30 Moynihan is a spectacular APTA’S CONFERENCE SCHEDULE » p. 8 train hall for Amtrak, providing additional access to Long Island Railroad platforms. Occupying the GLOBAL RAIL PROJECTS » p. 12 entirety of the superblock between Eighth and Ninth Avenues and 31st » p. 26 and 33rd Streets. FRICTIONLESS, HIGH-SPEED TRANSPORTATION » p. 5 APTA’S PHASE 2 ROI STUDY » p. 39 CONTENTS 2 SPEEDLINES MAGAZINE 3 CHAIRMAN’S LETTER On the front cover: Greetings from our Chair, Joe Giulietti INVESTING IN ENVIRONMENTALLY FRIENDLY AND ENERGY-EFFICIENT HIGH-SPEED RAIL PROJECTS WILL CREATE HIGHLY SKILLED JOBS IN THE TRANS- PORTATION INDUSTRY, REVITALIZE DOMESTIC 4 APTA’S CONFERENCE INDUSTRIES SUPPLYING TRANSPORTATION PROD- UCTS AND SERVICES, REDUCE THE NATION’S DEPEN- DENCY ON FOREIGN OIL, MITIGATE CONGESTION, FEATURE ARTICLE: AND PROVIDE TRAVEL CHOICES. 5 MOYNIHAN TRAIN HALL 8 2021 CONFERENCE SCHEDULE 9 SHARED USE - IS IT THE ANSWER? 12 GLOBAL RAIL PROJECTS 24 SNIPPETS - IN THE NEWS... ABOVE: For decades, Penn Station has been the visible symbol of official disdain for public transit and 26 FRICTIONLESS HIGH-SPEED TRANS intercity rail travel, and the people who depend on them. The blight that is Penn Station, the new Moynihan Train Hall helps knit together Midtown South with the 31 THAILAND’S FIRST PHASE OF HSR business district expanding out from Hudson Yards. 32 AMTRAK’S BIKE PROGRAM CHAIR: JOE GIULIETTI VICE CHAIR: CHRIS BRADY SECRETARY: MELANIE K. JOHNSON OFFICER AT LARGE: MICHAEL MCLAUGHLIN 33
    [Show full text]
  • Key Aspects of Long Railroad Tunnels
    Key Aspects of Long Railroad Tunnels (e.g. Semmering Base Tunnel alignment selection process) Johannes Kleberger May 28th 2012 Ankara Key Aspects of Long Railroad Tunnels Appropriate Alignment selection process Geological investigation and ground modelling Definition of maximum longitidinal gradient Definition of minimum horizontal radius Design speed selection/aerodynamic design Tunnel system selection (passenger trains only or mixed traffic, maintenance concept for railroad line) Tunnel Safety lnfrastructure according to Internat. Standards Tunnel construction method(s) selection Construction contract selection/ fair risk share Construction budget availability Realistic construction time scenario © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 2 OVERVIEW SEMMERING BASE TUNNEL KORALM TUNNEL © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 3 GHEGA-LINE © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 4 GHEGA-LINE (UNESCO WORLD HERITAGE) built from 1848 - 1854 by Carl Ritter von Ghega 41.8 km length from Gloggnitz to Mürzzuschlag (linear distance: 21 km) more than 20.000 workers 15 tunnels (total length 5.420 m) and 16 viaducts max. gradient 28 ‰ (25 km >20 ‰) original speed 6 km/h, today max. speed 70 km/h 2 lokomotives for heavy cargo trains © iC group. For copies, please contact +43 1 521 69-0 or [email protected]. 5 DESIGN PARAMETER FOR BASE TUNNEL new maximum gradient 0,85 % minimum horizontal radius 3.000 m design speed 230 km/h 2 parallel single-track tubes emergency stop in the middle of the tunnel minimum inner clearance of 41 m2 cross passages every 500 m „short construction time“ and „high flexibility in construction“ intermediate construction accesses, use of TBM © iC group.
    [Show full text]
  • Koralm, Railway Line, Wettmannstätten
    SUBSOIL EXPLORATION•• GEOMECHANICS GEOHYDROLOGY Prof. DI Dr. techn. Peter Waibel, State Certified Civil Engineer KORALM,GRAZ - KLAGENFURT RAILWAY LINE, WETTMANNSTÄTTEN - ST. ANDRÄ SECTION Client: ÖBB-Infrastruktur Bau AG (Austrian Railways Infrastructure Construction AG) Development Period: since 1996 THE PROJECT OUR FUNCTION With the new Koralm Railway Line BGG was commissioned with the hydro- Paierdorf exploration shaft: between Graz and Klagenfurt, an geological and geotechnical workman- For this 120 m deep shaft, that has essential section of the european railway ship of the tertiary tunnel sections and already been completed, a particularly system will be implemented. open areas. During the planning phases intensive geological and hydrogeological Within the 43.8 km long Wettmann- (route selection, environmental impact supervision was essential during the stätten - St. Andrä section (the core of assessment, and the tender for the design and execution phases. This was the line) the Koralm Tunnel, with a length exploration structures), the following necessary due to the predominant of 32.8 km, is situated. tasks were carried out: subsoil and groundwater situation: The double-tube tunnel cuts through q Hydrogeological field mapping Granular soil, with varying grain sizes, polymetamorphic crystalline rock of the q Planning and handling of several and several groundwater storeys exist all Koralpe and has an overburden of up to subsoil exploration campaigns the way to the bottom of the shaft. 1,200 m. Near the tunnel entrances, q Interpretation of aerial photographs Already during the planning stage of the tertiary sediments of different grain sizes and geophysical investigations tender, BGG established a detailed and rock with minor strength exists.
    [Show full text]
  • A VIEW INSIDE ÖBB´S ASSET MANAGEMENT SYSTEM
    A VIEW INSIDE ÖBB´s ASSET MANAGEMENT SYSTEM Christian Holzer ÖBB Infrastruktur AG (Austrian Federal Railways) Are you familiar with the following situation? 2 Todays real-life scenario: The asset owner comes with a request… Difficult question… Luckily we have a lot of experience! What if … ? Asset Owner Asset Manager Employees 3 Todays real-life scenario: …the asset manager forwards the request to it’s employees ? ? ? A What if … ? Asset Manager Employees 4 Todays real-life scenario: … many answers worked out by all the experts You can…, provided that… Don’t know… It is like … In my opinion.. ? My answer is… I think the One could say… answer is … Asset Manager Employees 5 Todays real-life scenario: … the asset manager responds with a brief summary Well, the answer to your question is… Asset Owner Asset Manager Employees 6 …the scenario we where confronted with in 2014… 7 Who we are Semmering base tunnel Speed up to 230 km/h 27 km long Status: under construction Start of Service: 2026 4.846 km of track 13.760 switches 6.327 bridges 246 tunnels 3.398 level crossings 1.095 stations Brenner base tunnel Koralm railway Joint project with Italy 130 km new railway lines 64 km long railway tunnel 33 km long Koralm tunnel 8 terminals Status: under construction 12 new Stations Start of Service: 2026 Status: under construction Investments of € 2 billion per year Start of Service: 2024 8 WHY? HOW? BENEFIT? 9 two questions: „what if…?“ and „what will happen then…?“ 10 Asset Management - what is it and why do we need it? Managing costs performance
    [Show full text]
  • Baltic-Adriatic Corridor
    CEF support to Baltic-Adriatic Corridor Innovation and Networks Executive Agency Baltic-Adriatic FEBRUARY 2018 1 Table of Contents 1. Introduction ......................................................................................................................................................................... 3 2. Action portfolio: State of play ................................................................................................................................. 4 2.1. Operational Implementation ....................................................................................................................... 4 2.1.1. Maritime .................................................................................................................................................................. 5 2.1.2. Multimodal ............................................................................................................................................................ 5 2.1.3. Rail ............................................................................................................................................................................... 6 2.1.4. Road ......................................................................................................................................................................... 10 2.1.5. Financial implementation ...................................................................................................................... 13 3. Evolution of the Action portfolio
    [Show full text]
  • Annual Report 2020 ÖBB-Holding AG Gaining Momentum Together
    Annual Report 2020 ÖBB-Holding AG Gaining Momentum Together TODAY. FOR TOMORROW. FOR US. 16/01 Double decker in Cityjet design Around 100 DOSTO trains in local transport – as well as many TALENT1 and DESIRO Classic trains – will be upgraded to Cityjet stan- dard. The conversion includes not only an interior and exterior design in the Cityjet look, but also many technical improvements such as WLAN or a multi-purpose area with space for bicycles, luggage and children’s pushchairs and prams. 23/01 RCG strengthens Hamburg trans- 19/01 ports Nightjet connection to Brussels The Rail Cargo Group (RCG) in launching the TransFER Since mid-January 2020, Brussels has been newly included in ÖBB’s Enns – Hamburg, introduces a international night train network. Twice a week there are overnight twice-weekly non-stop inter- services from Vienna via Linz and from Innsbruck via Munich to the modal connection between the EU capital. ÖBB is Europe’s largest provider of night trains, offering a Enns container terminal and the total of 27 lines in Europe together with its partners. “Our new direct North Sea port of Hamburg. This connection to Brussels sends out a clear signal: it must be possible enables a direct connection to to travel to the EU capital in a climate-friendly way,” says Andreas intercontinental flows of goods. Matthä, CEO of ÖBB-Holding AG. 30/01 Increase in ROLA capacities The extension of the sectoral driving ban in Tyrol has been in force since the turn of the year. The transit trucks affected by the driving ban therefore only have the rail option available on the route via the Brenner Pass.
    [Show full text]
  • New Emission Data for Ventilation Design for Road Tunnels
    - 1 - DUST LOADS IN RAILWAY TUNNELS – RESULTS FROM IN-SITU MEASUREMENTS AND CONSEQUENCES FOR TUNNEL FACILITIES AND RAILWAY OPERATION 1Helmut Steiner, 2Peter Sturm, 2Daniel Fruhwirt, 1ÖBB Infrastruktur AG, A; 2Graz University of Technology, A ABSTRACT Several long railway tunnels are currently under construction in Austria (e.g. the Koralm Tunnel / KAT; Semmering Base Tunnel / SBT; Brenner Base Tunnel / BBT). The project KAT is now at the beginning stage of implementation with respect to technical railway equipment. In order to complete the detailed planning several very specific topics have to be examined in detail. The ÖBB (Austrian railway corporation) has thus begun detailed research in the relevant areas in order to grapple with problems at their root, and to allow for findings to be incorporated into ongoing projects. For example, it is known from cases in Switzerland, where several long railway tunnels have been in operation for years (Lötschberg Base Tunnel / LBT; Gotthard Base Tunnel / GBT), that technical equipment needs a lot of maintenance when it is exposed to high dust loads. The quantity and composition of the dust also play a key role here. To assess the nature of the problem, in-situ measurements were thus carried out in an ÖBB railway tunnel under full operation in Upper Styria. The knowledge gained from these measurements is to be integrated into current and future rail tunnel projects. Specific attempts were made to derive characteristic emission factors in relation to different train types. It should then prove possible to estimate total dust emissions in current and future projects, depending on the specific operating programs, timetables, train mix etc.
    [Show full text]
  • Öbb-Infrastruktur Aktiengesellschaft
    Supplement No. 2 dated 14 June 2013 to the Debt Issuance Programme Prospectus dated 27 June 2012 ÖBB-INFRASTRUKTUR AKTIENGESELLSCHAFT Euro 20,000,000,000 Debt Issuance Programme Guaranteed by the Republic of Austria (the "Programme") This supplement no. 2 to the Euro 20,000,000,000 Debt Issuance Programme Prospectus of ÖBB-Infrastruktur Aktiengesellschaft ("ÖBB-Infrastruktur AG" or the “Issuer”) dated 27 June 2012 (the "Supplement No. 2") is prepared in connection with the Programme for the issue of notes issued under this Programme (the "Notes") of ÖBB-Infrastruktur AG and is supplemental to, and should be read in conjunction with, the Debt Issuance Programme Prospectus dated 27 June 2012 (the "Original Prospectus") and the supplement no. 1 to the Original Prospectus dated 29 April 2013 (the "Supplement No. 1") in respect of the Programme. This Supplement No. 2 is a supplement in the meaning of article 13.1 of the Luxembourg Act on Securities Prospectuses (loi relative aux prospectus pour valeurs mobilières) which implements article 16 of the Prospectus Directive. Unless otherwise stated or the context otherwise requires, terms defined in the Original Prospectus have the same meaning when used in this Supplement No. 2. As used herein "Prospectus" means the Original Prospectus as supplemented by the Supplement No. 1 and this Supplement No. 2. The Supplement No. 2 is related to (i) recent changes relating to the description of the Issuer and (ii) the publication of the annual financial report for the business year 2012 containing the consolidated financial statements of the Issuer as of 31.12.2012.
    [Show full text]
  • Koralm Railway, Construction Stage KAT3 — World of PORR
    World of PORR 168/2016 PORR Projects Koralm railway, construction stage KAT3 Andreas Karlbauer Der zyklische Vortrieb in der Südröhre setzt sich aus folgenden Teilvortrieben zusammen: The Koralm railway line (Graz – Klagenfurt section) Together with the new Semmering base tunnel and the Aufweitung Neogen VT-SÜ (581 m) Vienna main train station, the Koralm railway line forms part of Aufweitung Neogen MI-SÜ (4.075 m) a key project along the Baltic-Adriatic Corridor. The objective Aufweitung Kristallin MI-SÜ (2.513 m) of the corridor is to connect the individual regions and Vollausbruch Kristallin MI-SÜ (2.728 m) emerging economies between the Baltic and Adriatic regions Demontagekaverne (40 m) together. Koralm tunnel overview Bench cutting south tube Image: ÖBB/Die Presse/HR Image: PORR AG The Koralm tunnel Dismantling cavern south tube The Koralm tunnel is 32.9km long and crosses the Koralpe The size of the dismantling cavern for the TBM from the KAT2 mountain massif at depths of up to 1,200m and connects construction stage was optimised together with the client Deutschlandsberg in Styria with Lavanttal in Carinthia. Two during construction. By using two hanging rails with hoists tunnel tubes run parallel to each other at a distance of about mounted in the transom, as an alternative to a gantry crane, 25 to 50m apart and are connected to each other every 500m the cross-section could be reduced from 354m² to 170m². with cross passages. Completion is expected in 2023. Trains will then be able to travel under the Koralpe at a top speed of Exploratory boreholes 250km/h.
    [Show full text]