Warsaw Metro Line 2
Total Page:16
File Type:pdf, Size:1020Kb
— FACT SHEET - SYSTEM INTEGRATION AGP Metro Polska, Poland Reliable power supply to support Warsaw Metro Innovative traction power supply solution incorporating the world’s largest wayside energy storage system, which captures braking energy from decelerating metro cars and feeds it back to accelerating trains. — In 2015, the 6.1 kilometers central section of the Customer benefits 01 New Metro Line 2 in Warsaw, Poland second metro line, called M2, was commissioned • Enhanced energy efficiency of metro line through eight meters under the Vistula river and serves over reuse of braking energy 140,000 passengers a day on working days. It is • Continuous operation, high performance and pro- powered by seven underground substations sup- ductivity supported by reliable and high-quality plied by ABB that are working dependably. power supply • Improved ecological footprint and reduced ABB’s solution operating costs of new east-west connection • Turnkey supply of five combined traction and • Scalable systems using state-of-the-art and auxiliary substations rated at 15 kV / 825 V DC / proven technologies enabling future extensions 400 V AC and two auxiliary substations rated at • Optimal solutions based on long experience and 15 kV / 400 V AC in-depth knowledge of the demands of the grid as • A 40 MJ (megajoule) wayside energy storage sys- well as storage technologies tem (ESS) based on Envistore® super-capacitors to • Proficient turnkey implementation by experienced recuperate and reuse braking energy from metro system integrator cars. The ENVILINE™ DC wayside ESS is the largest of its kind in the world. • Turnkey project including system studies and specifications • Supply of complete range of substation equip- ment including AC and DC switchgear, transform- ers, rectifiers, substation automation, control and protection systems as well as supervisory control and data acquisition (SCADA) system — — 02 03 — ENVILINE™ ESS MicroSCADA 02 World’s largest DC wayside energy storage ENVILINE ESS is a wayside energy management sys- The MicroSCADA system is integrated in the central system recuperating tem that stores and recycles the surplus braking en- section of the M2 line and enables real-time remote and reusing braking energy from metro cars ergy, feeding it back to the power line to assist the control of power equipment in the substations. Im- — acceleration of trains, helping reduce the energy proving functionality and supervision for the opera- 03 Warsaw Metro control room consumption up to 30 percent. tor along the entire metro line. MicroSCADA is a part Whenever a metro car brakes, its kinetic energy is of the ABB Ability™ portfolio of more than 180 digi- converted into electricity and returned on the trac- tal solutions that help boost uptime, speed and tion power line. Most of the time, onboard loads and yield. The system has set new standards for Warsaw distant trains can only take a portion of this energy, metro’s operations, providing added value to the and the surplus is wasted into onboard or wayside operators at metro’s central control room. resistors. The ENVILINE ESS stores and recycles this surplus energy. ABB’s traction power supply offerings • Complete electrification for main line railways, AC and DC traction power supply systems metros and urban transport systems ABB is an experienced turnkey partner for AC and DC • AC and DC traction substations traction substations for all types of applications. • Reversible DC traction substations • DC traction substations with standard voltages of • Wayside energy storage systems 750 V DC, 1,500 V DC and 3,000 V DC • Static frequency converter stations - Complete substation packages including DC • Power quality systems switchgear, transformers, rectifiers, substation • Network management, substation automation, con- automation, control and protection systems trol, protection and telecommunications systems • AC traction substations for 16.7, 25, 50 or 60 Hz • System studies and traction power supply applications simulations - Comprising single- or two-phase feeder substa- • Turnkey project implementation from design to tions and switching posts, autotransformer sta- commissioning and maintenance tions, substation automation, control and pro- tection systems ABB is committed to sustainable mobility by pro- moting efficient public transport and has a track re- cord of urban rail projects and metros in major cities around the world ranging from Delhi to Sao Paolo and Dubai to London. — — ABB Switzerland Ltd. We reserve the right to make technical We reserve all rights in this document and Power Grids - Grid Integration changes or modify the contents of this in the subject matter and illustrations con- Bruggerstrasse 72 document without prior notice. With re- tained therein. Any reproduction, disclo- 5400 Baden, Switzerland gard to purchase orders, the agreed par- sure to third parties or utilization of its ticulars shall prevail. ABB AG does not ac- contents – in whole or in parts – is forbidden cept any responsibility whatsoever for without prior written consent of ABB AG. potential errors or possible lack of infor- Copyright© 2017 ABB mation in this document. All rights reserved abb.com/substations 9AKK106103A4887 REV E 19.12.2017.