Vauxhall Bridge Lupus Street

Total Page:16

File Type:pdf, Size:1020Kb

Vauxhall Bridge Lupus Street SQ E VAUXHALL BRIDGE V U A A R SQU R E Barclays Cycle Superhighway Route 5 (CS5). E V G A ARE L R E G L B E SQ B E V U MILLBANK A ARE R G L E VAUXHALL BRIDGE B Barclays Cycle Superhighway Route 8. B L ELGRA BGROSVE Barclays Cycle Superhighway Route 5 (CS5). M P CE E GROSVE . CHESHA V LGRNORA PONT ST . B E PLA LA L E P RE GROSVE GARDEN LGRHEA SHAM A LUPUS STREET SHNATM ST P . C CE VE PLA NOR PONT ST. CHPEO V NOR GARDEN E PLA RE S RE CS5: Options LY A A CHESHAM ALL STREE N SQU VI G TO CE ECCLEST C AR A TO E CE RI DE S A LY S N CHESHAM N SQU T ALL STREET O E ON S D VI . S MILLBANK T A C CCLEST T S LY EAT Y STREET O CHESHAM TREET N RI SQU T ALL STREEUR Victoria A VICT STREET . Barclays Cycle Superhighway Route 8. TO S EC EB ON STREET A P T. RO AD ELIZABE E CLESV T ORI S A Y ECC U Segregated two-way cycle track T UR Victoria X . A HA replaces traffic lane T EB BRI LE P LL BR ST ELIZABEH STREET CE ST V ON STREET T D ON AU IDG AD Segregated two-way cycle track ALA ECCG X S H E Route 1 A E RO Segregated two-way cycle trackreplaces trafc lane TH STREET BRI LEST LL BRIDG T CE RO replaces bus lane AD Victoria . D GE ON ALA Route 1 Y STREETVictoria E RO Y Segregated two-way cycle track WA No left turn from URCoach Station ELIZABET K A ROreplaces bus lane V B IC D Bus stop A Vauxhall Bridge Road E RW ECCLEST U Y STREET WA X into Millbank Victoria AY moved H P STR No left turn from W R URCoach Station Route 2 K E A B IC V EG LVauxhall Bridge Road E RW C BRI A Bus stop L BR H A U E W XH E UCKINGHAM HAM P moved E into Millbank STREET NC B LA ALL BRIDG T D ON STR R IDGE Segregated two-way cycle track NG Route 2 E I A EG B GE V Y U K A BELGRA UXH E replaces bus lane to link R E RO Y UC Y E A E RO NC B ALL BRIDG T BRI W IP E L K AD Rampayne Street to CS5 B ST E AD Y S N U D VE RO I T A R G WARWICK . GEORGE’S D BELGRA E E YN N E Y AY TE RO W P A H P BRI P E O I THAMES AD E Pimlico J STR L MILLB K D S Victoria ST R E AD S N Y U VE RO AM P I T A A G T WARWIRouteCK 3 . GEORGE’S D E E No left turn from E HERLA Coach Station R ST YN AT N W A T H RE K RIVER PONDE G O IC RIVE E Pimlico J ST MILLB Bus stop Vauxhall Bridge Road S A UMM R W U ND STREET D DR AM P AR T Route 3 R ST TE HERLAND STREET HAM T A W RIVER into Millbank VAUXH A STREE ND G moved LL BRIDGE G O R R PUS THAMES Segregated two-way N IV LU UMM RIVER R EG E No leftD turn from cycle track replaces Barclays Cycle Superhigh T AD CS5 VA way Route 5 (CS5). CKI STREEDrummond Gate into RO V Vcontinues to bus lane Potential widening of TREET US VAAU A UXH PotentialE widening of SU UP UX T L Vauxhall Bridge Road UXX New Cross T NCY S HALL H N existingexisting northern northern LUPUS B No left turn from AD HA ALL ALLN BRIDGE ENOR E pedestrian/cycle subway MILL BANK TREET Drummond Gate into RO LL B B pedestrian/cycle subway S R BR NKM Vauxhall Bridge Road I R NKM A Bar LUPUS GROSV D I A B clays Cycle Superhighway Route 5. BELGRGE AD B IDG G M T Direction of CS5 Y E M New bus stop A Segregated two-way E RO . W ROSVENOR E T E Wider shared footway T E R Wider shared footway P G cycle track replaces R E I K ICK E B and crossing for ST B L E AD and crossing for L N New bus stop bus lane VE RO L A pedestrians and cyclistsS A WARW . GEORGE’S D A pedestrians and cyclists I T Bus stop removed YN E A T N P E H RE Segregated two-way . MILLB Bus stop removed . D E Pimlico O Segregated two-way A D SegregatedJ ST two-way cycle track replaces D R R cycle track replaces Footbridge FootbridgeFootbridge modified modified AM P cycle track replaces traffic lane TH R ST TEANE traffic lane THAMES to create space TH R AANE L DU traffic lane R L ON DU to create space R TON T London Underground station O ENNING THAMES for cycle track ENNINGNDK G R for cycle track P K O R R Vauxhall P HAM STR Bus station I Vauxhall HAM STR VE DSW RUMM SegregatedSegregated two-way two-way cycle track cycle track N Bus stationBus stationnot affected not affectedD H RIVER National Rail station RIVER HA ARLE replaces bus lane WA WANDSWOby theseby proposals theseT proposals RLEY replaces bus lane . Y V NE LANE P STREE D F London Underground station LA P A D F O EE A ELMS A R O EE NE NIELMSNE UPUSR RR R R RD R UXHALL BRIDGE Victoria Coach Station NI L R Y T Y TH D T Potential widening of ST ST TH R ET R R NoBE left turn from O T RE E EE BE O A AD ET T No right turn from A D K KE N existing northern National Rail station US ST AM No right turn from D EN NN E P AM DrummondL Gate into RO N IN Station with cycle parking LUP L HarleyfordHarleyford Road into Road into IN G GT TO pedestrian/cycle subway TH THVauxhall Kennington Bridge RoadLane ON N U U Kennington Lane O O NKM Victoria Coach Station SO SO ENOR V V KEN KEN A A A Bus station KenninKgenninton gton L L B Bus stopBus stop N N IN IN Oval M movedmoved ROSV G G Oval P Station with cycle parking G T TOCS5 continues Two-way cycle track replaces bus lane ON N T E R Wider shared footway to New Cross E O O B and crossing for Two-wTayw o-cywcleay track cycle replaces track r eplacestraffic lane bus lane V VA L Wider Widershared shared AL L A pedestrians and cyclists footwayfootway and crossing and crossing Bus stopBus stop Two-way cycle track replaces traffic lane movedmoved Footbridge modified CS5 contiCS5ton cuecreateontis nues space to Newto C Nrosews CrosP s P for cycleOval trackOval 6 THAMES 3 0 3 ANE L DU A TON KENNING RIVER Vauxhall P R HAM STR Segregated two-way cycle track HA replaces trafc and bus lane between RLEY here and John Islip Street in Pimlico LANE P D LMS A A F E E R O EE NIN R O R Y R ST D T R R E TH O ET E A B No right turn from D KE M NN A Harleyford Road into IN L G TO Kennington Lane N O V KEN A Bus stop Kennington L NI moved NG Oval TO N OV Wider shared AL footway and crossing Bus stop moved CS5 conti nues to N ew Cross Oval.
Recommended publications
  • Greater London Authority
    Consumer Expenditure and Comparison Goods Retail Floorspace Need in London March 2009 Consumer Expenditure and Comparison Goods Retail Floorspace Need in London A report by Experian for the Greater London Authority March 2009 copyright Greater London Authority March 2009 Published by Greater London Authority City Hall The Queen’s Walk London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 ISBN 978 1 84781 227 8 This publication is printed on recycled paper Experian - Business Strategies Cardinal Place 6th Floor 80 Victoria Street London SW1E 5JL T: +44 (0) 207 746 8255 F: +44 (0) 207 746 8277 This project was funded by the Greater London Authority and the London Development Agency. The views expressed in this report are those of Experian Business Strategies and do not necessarily represent those of the Greater London Authority or the London Development Agency. 1 EXECUTIVE SUMMARY.................................................................................................... 5 BACKGROUND ........................................................................................................................... 5 CONSUMER EXPENDITURE PROJECTIONS .................................................................................... 6 CURRENT COMPARISON FLOORSPACE PROVISION ....................................................................... 9 RETAIL CENTRE TURNOVER........................................................................................................ 9 COMPARISON GOODS FLOORSPACE REQUIREMENTS
    [Show full text]
  • FOR SALE 331 KENNINGTON LANE, VAUXHALL, SE11 5QY the Location
    COMMERCIAL PROPERTY CONSULTANT S 9 HOLYROOD STREET, LONDON, SE1 2EL T: 0207 939 9550 F: 0207 378 8773 [email protected] WWW.ALEXMARTIN.CO.UK PROPERTY PARTICULARS FOR SALE 331 KENNINGTON LANE, VAUXHALL, SE11 5QY The Location The property is situated in Kennington on the southern side of Kennington Lane (A3204) adjacent to the Lilian Baylis Technology School. The roperty is a short distance from Vauxhall Tube and British Rail Stations and also Vauxhall Bridge and the River Thames. The immediate environs are mixed use with educational, residential and retail. The open space of Spring Gardens, Vauxhall Farm, Vauxhall Park, Kennington Park and The Oval (Surrey County Cricket Club) are nearby. The property is located within the Vauxhall Conservation Area. FREEHOLD AVAILABLE (UNCONDITIONAL/ CONDITIONAL OFFERS INVITED) Description The property comprises a substantial mainly detached four storey and basement Victorian building last used for educational purposes by Five Bridges, a small independent school catering for 36 pupils. There are two parking spaces at the front, side pedestrian access and mainly paved rear yard with a substantial tree. The property is of typical construction for its age with solid built walls, pitched slate roofs, double hung single glazed sliding sash windows and timber suspended floors. The property benefits from central heating. COMMERCIAL PROPERTY CONSULTANT S 9 HOLYROOD STREET, LONDON, SE1 2EL T: 0207 939 9550 F: 0207 378 8773 [email protected] WWW.ALEXMARTIN.CO.UK PROPERTY PARTICULARS The accommodation comprises a net internal area of approximately: Floor Sq m Sq ft Basement 95 1,018 Ground 110 1,188 First 102 1,101 Second 100 1,074 Third 109 1,171 Total 516 5,552 The total gross internal area is 770 sq m (8,288 sq ft) The property is offered for sale freehold with vacant possession and offers are invited ‘Subject to Contract’ either on an ‘unconditional’ or ‘subject to planning’ basis General The property is located within Vauxhall Conservation Area (CA 32) and a flood zone as identified on the proposals map.
    [Show full text]
  • 192-198 Vauxhall Bridge Road , London Sw1v 1Dx
    192-198 VAUXHALL BRIDGE ROAD , LONDON SW1V 1DX OFFICE TO RENT | 2,725 SQ FT | £45 PER SQ FT. VICTORIA'S EXPERT PROPERTY ADVISORS TUCKERMAN TUCKERMAN.CO.UK 1 CASTLE LANE, VICTORIA, LONDON SW1E 6DR T (0) 20 7222 5511 192-198 VAUXHALL BRIDGE ROAD , LONDON SW1V 1DX REFURBISHED OFFICE TO RENT DESCRIPTION AMENITIES The premises are located on the east side of Vauxhall Bridge Road, Comfort cooling between its junctions with Rochester Row and Francis Street. Excellent natural light Secondary glazing The area is well served by transport facilities with Victoria Mainline Perimeter trunking and Underground Stations (Victoria, Circle and District lines) being approximately 400 yards to the north. Suspended ceilings Fibre provision up to 100Mbs download & upload including There are excellent retail and restaurant facilitates in the secondary fallover connection surrounding area, particularly within Nova, Cardinal Place on Capped off services for kitchenette Victoria Street and also within the neighbouring streets of Belgravia. Lift Car parking (by separate arrangement) The plug and play accommodation is arranged over the third floor and is offered in an open plan refurbished condition. TERMS *Refurbished 1st floor shown, 3rd floor due to be refurbished. RENT RATES S/C Please follow this link to see a virtual walk through; £45 per sq ft. £16.92 per sq ft. £6.34 per sq ft. https://my.matterport.com/show/?m=MZvVtMCSkkz Flexible terms available. AVAILABILITY EPC Available upon request. FLOOR SIZE (SQ FT) AVAILABILITY WEBSITE Third Floor 2,725 Available http://www.tuckerman.co.uk/properties/active/192-198-vauxhall- TOTAL 2,725 bridge-road/ GET IN TOUCH WILLIAM DICKSON HARRIET DE FREITAS Tuckerman Tuckerman 020 3328 5374 020 3328 5380 [email protected] [email protected] SUBJECT TO CONTRACT.
    [Show full text]
  • 369 Kennington Lane, Vauxhall, SE11 5QY OFFICE to LET | HEART of VAUXHALL | READY for OCCUPATION to LET Area: 831 FT² (77M²) | Initial Rent: £38,000 PA |
    369 Kennington Lane, Vauxhall, SE11 5QY OFFICE TO LET | HEART OF VAUXHALL | READY FOR OCCUPATION TO LET Area: 831 FT² (77M²) | Initial Rent: £38,000 PA | Location Tube Parking Availability Vauxhall Vauxhall 2 spaces available Immediate LOCATION: Situated just south of Central London, 369 Kennington Lane is a highly prominent office building positioned at the junction of Kennington Lane and Harleyford Road. Excellent transport connections via Vauxhall Station (Mainline and Victoria Line) providing easy and direct links into Central London. The area is similarly well connected to local bus routes. The A3 Kennington Park Road is easily accessed to the South East and to the West, Vauxhall Bridge provides access north of the River Thames, through to Victoria and to the West End. The popular residential and commercial area offers a wide range of cafés, bars and restaurants including; Pret A Manger, Starbucks Coffee, Dirty Burger along with a number of local independent retailers. Cont’d MISREPRESENTATION ACT, 1967. Houston Lawrence for themselves and for the Lessors, Vendors or Assignors of this property whose agents they are, give notice that: These particulars do not form any part of any offer or contract: the statements contained therein are issued without responsibility on the part of the firm or their clients and therefore are not to be relied upon as statements or representations of fact: any intending tenant or purchaser must satisfy himself as to the correctness of each of the statements made herein: and the vendor, lessor or assignor does not make or give, and neither the firm or any of their employees have any authority to make or give, any representation or warranty whatever in relation to this property.
    [Show full text]
  • Thames Path Walk Section 2 North Bank Albert Bridge to Tower Bridge
    Thames Path Walk With the Thames on the right, set off along the Chelsea Embankment past Section 2 north bank the plaque to Victorian engineer Sir Joseph Bazalgette, who also created the Victoria and Albert Embankments. His plan reclaimed land from the Albert Bridge to Tower Bridge river to accommodate a new road with sewers beneath - until then, sewage had drained straight into the Thames and disease was rife in the city. Carry on past the junction with Royal Hospital Road, to peek into the walled garden of the Chelsea Physic Garden. Version 1 : March 2011 The Chelsea Physic Garden was founded by the Worshipful Society of Start: Albert Bridge (TQ274776) Apothecaries in 1673 to promote the study of botany in relation to medicine, Station: Clippers from Cadogan Pier or bus known at the time as the "psychic" or healing arts. As the second-oldest stops along Chelsea Embankment botanic garden in England, it still fulfils its traditional function of scientific research and plant conservation and undertakes ‘to educate and inform’. Finish: Tower Bridge (TQ336801) Station: Clippers (St Katharine’s Pier), many bus stops, or Tower Hill or Tower Gateway tube Carry on along the embankment passed gracious riverside dwellings that line the route to reach Sir Christopher Wren’s magnificent Royal Hospital Distance: 6 miles (9.5 km) Chelsea with its famous Chelsea Pensioners in their red uniforms. Introduction: Discover central London’s most famous sights along this stretch of the River Thames. The Houses of Parliament, St Paul’s The Royal Hospital Chelsea was founded in 1682 by King Charles II for the Cathedral, Tate Modern and the Tower of London, the Thames Path links 'succour and relief of veterans broken by age and war'.
    [Show full text]
  • Central London Tfl -20Mph Overview
    Central London TfL Roads 20mph Speed Limit Proposal C AM E O H N M NEW OXFORD STREET I IG A LE H L L E ST P COMMERCIAL RD Y HA R EC E T ST GILES HIGH ST HI C W CHARING CROSS ROAD KINGSWAY N BISHOPSGATE A H LET FARRINGDON STREET FARRINGDON C EED DN LEMAN STREET FLEET STREET REA TH LEA MANSELL STREET T DENHALL S CORNHILL ALDGATE HIGH ST T S STRAND E G H CH D C Y I W R D R L U B A H C W E E ET QUEEN VICTORIA STREET C F E N EN TR PRESCOT STREET A CHURCH S CANNON STREET R G GOODMAN'S YD SHAFTESBURY AV MINORIES STRAND U T LANCASTER PLE PPE S VICTORIA EMBANKMENT R TH AME L S S L T E S N L A HIL M LOWER THAMES STREET TOWER T E STRAND N AS E T M WATERLOO BRIDGE SM D K RIVER THAMES IT HFIEL N BLACKFRIARS BRIDGE A MILLENNIUM BRIDGE B M SOUTHWARK BRIDGE E IA R O RIVER THAMES T TOWER BRIDGE RD C I V LONDON BRIDGE PALL MALL HUNGERFORD BRIDGE & GOLDEN JUBILEE BRIDGES DU KE S S TRE OU ET STAMFORD STREET THW H ARK ILL WHITEHALL ST REET THE MALL TOWER BRIDGE BLACKFRIARS ROAD BLACKFRIARS T T O E ST O E T LE Qu Y R een's H H ead Yard S T O TR S M EE A T .m H S S Boat House G T I RE H Boat House E T M H .m A G C WATERLOO ROAD R U RU S C O IF DRUID ST VICTORIA EMBANKMENT YORK ROAD H IX LN R E A G L O BERMONDSEY STREET S B D E I A R BERMONDSEY B K ADDINGTON ST R A PARLIAMENT ST W H WESTMINSTER BRIDGE ROAD BLACKFRIARS T LONG LANE U JA O M S A IC A R O AD BOROUGH ROAD GREAT DOVER STREET TOWER BRIDGE ROAD a VICTORIA STREET D WESTMINSTER BRIDGE RDD A R O TH R BE CE M A LA LONDON ROAD AL P H T E NEWINGTON CAUSEWAY B GRANGE ROAD M A L MILLBANK ST GEORGE'S ROAD RIVER THAMES LAMBETH ROAD HORSEFERRY ROAD LAMBETH BRIDGE NEW KENT ROAD OLD KENT ROAD WALWORTH ROAD ESTERBROOKE STREET NEWINGTON BUTTS ALBERT EMBANKMENT E N A MILLBANK L N VAUXHALL BRIDGE RD TO KENNINGTON ROAD G NIN EN RAMPAYNE STREET K Map Key: .m Currently 20mph VAUXHALL BRIDGE KENNINGTON PARK ROAD Proposed 20mph as part of this project Cockburn House GROSVENOR ROAD Eagle House KENNINGTON LANE Proposed 20mph as part of another TfL project (not a part of this consultation).
    [Show full text]
  • Port of London Authority Thames Byelaws 2012 Namely
    Port of London - River Thames NOTICE TO MARINERS M74 of 2019 VAUXHALL REACH VAUXHALL BRIDGE ARCH CLOSURES Contractors working on behalf of Transport for London will be conducting inspection and non-destructive testing at Vauxhall Bridge from Friday 27th December 2019 until Tuesday 31st December 2019. In order to accommodate these works, arches at Vauxhall Bridge will be closed to navigation as follows: Works Start Works End Navigational Arch Date Time Date Time Information Friday 27th December Friday 27th December 2 0800 1600 Closed to Navigation 2019 2019 Saturday 28th Saturday 28th 2 0800 1600 Closed to Navigation December 2019 December 2019 Closed to Navigation Sunday 29th December Sunday 29th December 3 0800 1630 Local Traffic Control over 2019 2019 LW Period Monday 30th December Monday 30th December 4 0800 1600 Closed to Navigation 2019 2019 Tuesday 31st December Tuesday 31st December 4 0800 1600 Closed to Navigation 2019 2019 Works will be conducted by a rope access team, with marine equipment brought to and removed from the site by marine contractors MST. Whilst transfer operations are taking place London VTS will broadcast requests for vessels to “proceed with caution” or “proceed at slow speed”, as described in Permanent Notices to Mariners 4 of 2014 as required by the works. International Code Flags “Romeo Yankee” will be displayed when this is in effect. Local Traffic Control Local Traffic Control will be undertaken from a PLA Harbour Service Launch in the vicinity of Vauxhall Bridge, during the Low Water period on 29th December 2019 from approximately 0800 to 1300. All vessels wishing intending to navigate between Millbank Pier and Westminster Boating Base are to call ‘VAUXHALL CONTROL’ on VHF Channel 14 as follows: to pass through the bridge should call ’VAUXHALL CONTROL’ for permission.
    [Show full text]
  • London and Its Main Drainage, 1847-1865: a Study of One Aspect of the Public Health Movement in Victorian England
    University of Nebraska at Omaha DigitalCommons@UNO Student Work 6-1-1971 London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England Lester J. Palmquist University of Nebraska at Omaha Follow this and additional works at: https://digitalcommons.unomaha.edu/studentwork Recommended Citation Palmquist, Lester J., "London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England" (1971). Student Work. 395. https://digitalcommons.unomaha.edu/studentwork/395 This Thesis is brought to you for free and open access by DigitalCommons@UNO. It has been accepted for inclusion in Student Work by an authorized administrator of DigitalCommons@UNO. For more information, please contact [email protected]. LONDON .ML' ITS MAIN DRAINAGE, 1847-1865: A STUDY OF ONE ASPECT OP TEE PUBLIC HEALTH MOVEMENT IN VICTORIAN ENGLAND A Thesis Presented to the Department of History and the Faculty of the Graduate College University of Nebraska at Omaha In Partial Fulfillment of the Requirements for the Degree Master of Arts by Lester J. Palmquist June 1971 UMI Number: EP73033 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. Dissertation Publishing UMI EP73033 Published by ProQuest LLC (2015). Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC.
    [Show full text]
  • Initial Document Template
    Item No. 1 CITY OF WESTMINSTER PLANNING Date Classification APPLICATIONS SUB For General Release COMMITTEE 31 March 2020 Report of Ward(s) involved Director of Place Shaping and Town Planning Vincent Square Subject of Report Development Site At 268-282, Vauxhall Bridge Road, London, , Proposal Demolition of existing buildings and erection of a new building comprising basement, ground and 7 upper levels plus rooftop plant to provide a hotel with associated ancillary facilities including restaurant/bar and gym (Class C1), 1 x 2 and 1 x 3 bedroom apartments (Class C3), plant, cycle parking and other associated works. Agent ROK Planning On behalf of 4C Hotels Group Registered Number 19/05099/FULL Date amended/ completed 1 July 2019 Date Application 1 July 2019 Received Historic Building Grade Unlisted Conservation Area Site is not located within a conservation area. Westminster Cathedral Conservation Area is located to the rear. 1. RECOMMENDATION 1. Grant conditional permission, subject to the completion of a Section 106 agreement to secure: i. Financial contribution of £95,467 to support the Westminster Inclusive Economy and Employment Service (index linked and payable on commencement of development) ii. Carbon off-setting payment of £2,100 (index linked and payable on commencement of development) iii. Monitoring costs (£500 per head of term). 2. If the S106 legal agreement has not been completed within 6 weeks, then: a. The Director of Place Shaping and Town Planning shall consider whether it would be possible and appropriate to issue the permission with additional conditions attached to secure the benefits listed above. If so, the Director of Place Shaping and Town Planning is authorised to determine and issue the decision under Delegated Powers; however, if not; Item No.
    [Show full text]
  • Vauxhall Bridge
    ADDRESS: Application 1: Vauxhall Bridge Case Officer: Rozina Vrlic Application Number:18/01995/EIAFUL Vauxhall Bridge (Application 1) - Master Copy Lambeth Bridge (Application 2) 18/01993/EIAFUL Westminster Bridge (Application 3) 18/01991/EIAFUL Golden Jubilee Bridge (Application 4) 18/01990/EIAFUL Waterloo Bridge (Application 5) 18/01988/EIAFUL Ward: Oval (Vauxhall Bridge) Date Received: 08/05/2018 Proposal: The architectural illumination, as part of the Illuminated River proposal, of Vauxhall Bridge including the installation of fixtures, fittings and ancillary equipment and associated works. The application is an Environmental Impact Assessment (EIA) development and is accompanied by an Environmental Statement (ES). Drawing numbers: Vauxhall Bridge (18/01995/EIAFUL) 1028_04_VA SK0457; 1028_04_VA SK0458; 1028_04_VA SK0459; 1028_04_VA P016; 1028_04_VA P1001; 1028_04_VA P2001; 1028_04_VA P2002; 1028_04_VA P2003; 1028_04_VA P2008; 1028_04_VA P2009; 1028_04_VA X0101 rev A; 1028_04_VA 0102; X0161 rev A Documents: Vauxhall Bridge (18/01995/EIAFUL) Planning Statement – Vauxhall Bridge, dated May 2018; Project Overview Design Statement, ref: 1028doc114, dated May 2018; 04_Vauxhall Bridge Design Statement, ref: 1028doc114, dated May 2018; Statement of Community Engagement, dated May 2018. Environmental Statement – Volume 1: Non-Technical Summary, dated May 2018; Environmental Statement – Volume 2: Main Text, dated May 2018; Environmental Statement – Volume 3: Heritage, Townscape and Visual Impact Assessment, dated May 2018, prepared by Montagu
    [Show full text]
  • Piccadilly Circus Green Park Victoria Pimlico Vauxhall Waterloo
    Westbound services Northbound services 35 min towards Westfield towards Kings Cross, White City St Pancras, Euston, Coach parking Moorgate Piccadilly Circus Piccadilly PICCADILLY BAKERLOO 30 min JUBILEE Buses Eastbound services from Waterloo towards Green Park London Bridge, O2 Coach Parking and VICTORIA LINE Here East Stratford Coach Parking JUBILEE PICCADILLY Buses Waterloo Piccadilly 30 min Green Park Trains BAKERLOO Buses JUBILEE Coaches NORTHERN York Rd Palace of Westminster Buckingham Gate St Thomas’s Hospital Processions End Point Abingdon St NB Please use Cardinal Place 30 min Victoria St Artillery Entrance Row Meeting Point Victoria Millbank area in front Lambeth of Victoria Palace GreycoatPl Tower Horseferry Road Gardens Lambeth Palace Rd Trains VICTORIA LINE Buses DISTRICT Lambeth Br CIRCLE Vauxhall Bridge Rd Millbank Pier Millbank Thames Clipper Eastbound 20 min Key Walking routes Vauxhall Br Average walking time from Pimlico dispersal point Abingdon St VICTORIA LINE 35 min SW1P 3JY to transport 30 min connections Processions End Point Abingdon St SW1P 3JY Vauxhall Processions Meeting Point area in front of Victoria Tower Trains VICTORIA LINE Gardens Buses Coaches Southwest services Road closed for Processions towards Clapham Jct Accessible stations VICTORIA LINE DISTRICT CIRCLE London JUBILEE Underground routes BAKERLOO Please Note: NORTHERN • On your way home please ensure you stay on the pavement, and do not walk in the roads. • As the bus network will be disrupted and re-routed during the road closures, please ensure you research local bus services before you travel by visiting tfl.gov.uk/modes/buses • There are planned part closures on the Circle, Hammersmith & City, and Overground lines.
    [Show full text]
  • Elegant Living at a Prestigious Address
    ELEGANT LIVING AT A PRESTIGIOUS ADDRESS Standing proudly on the banks of the River Thames in the beating heart of historic Westminster, 9 Millbank is a new residential address encapsulating all of British luxury and style. The second release, Millbank Residences is a restoration of the iconic 9 Millbank address, maintaining all of the historic listed features. The building celebrates timeless luxury and style, with the heritage of the Westminster past. Proud to be a member of the Berkeley Group of companies THE DEVELOPER St Edward Homes Ltd Westminster Victoria Tower Lambeth City of Westminster Abbey Gardens South Bridge London The Shard (a joint venture company owned by Bridge 10 Downing Waterloo Lambeth Borough the Prudential Assurance Company Street Big Ben London Eye South Bank OXO Tower Station Palace Market and The Berkeley Group) LOCATION Westminster, London LOCAL AUTHORITY Westminster TENURE 999 year lease INTERIOR DESIGNERS Goddard Littlefair BUILDING WARRANTY Premier Guarantee – 10 year build warranty ESTIMATED COMPLETION Q1/Q2 2022 THE LOCATION TRANSPORT LINKS WALK PARKING 9 Millbank is at the epicentre of 9 Millbank is a 10-minute walk from Tate Britain – 8 minutes Westminster, home to many of the Westminster Underground station, Chelsea Art College – 8 minutes A General Right to Park is available world’s most well-known landmarks connecting you to Bond Street in 4 minutes, to purchase for £100,000. and the very heart of London, both South Kensington in 9 minutes, and Houses of Parliament – 9 minutes Penthouses will have allocated tandem historically and politically. 9 Millbank Heathrow Airport in only 40 minutes.
    [Show full text]