University of Southampton Research Repository Eprints Soton

Total Page:16

File Type:pdf, Size:1020Kb

University of Southampton Research Repository Eprints Soton University of Southampton Research Repository ePrints Soton Copyright © and Moral Rights for this thesis are retained by the author and/or other copyright owners. A copy can be downloaded for personal non-commercial research or study, without prior permission or charge. This thesis cannot be reproduced or quoted extensively from without first obtaining permission in writing from the copyright holder/s. The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the copyright holders. When referring to this work, full bibliographic details including the author, title, awarding institution and date of the thesis must be given e.g. AUTHOR (year of submission) "Full thesis title", University of Southampton, name of the University School or Department, PhD Thesis, pagination http://eprints.soton.ac.uk UNIVERSITY OF SOUTHAMPTON Faculty of Engineering and the Environment Aeronautics, Astronautics and Computational Engineering Aerodynamic Noise of High-speed Train Bogies by Jianyue Zhu Thesis for the degree of Doctor of Philosophy June 2015 UNIVERSITY OF SOUTHAMPTON ABSTRACT FACULTY OF ENGINEERING AND THE ENVIRONMENT Aeronautics, Astronautics and Computational Engineering Thesis for the degree of Doctor of Philosophy AERODYNAMIC NOISE OF HIGH-SPEED TRAIN BOGIES Jianyue Zhu For high-speed trains, aerodynamic noise becomes significant when their speeds exceed 300 km/h and can become predominant at higher speeds. Since the environmental requirements for railway operations will become tighter in the future, it is necessary to understand the aerodynamic noise generation and radiation mechanism from high- speed trains by studying the flow-induced noise characteristics to reduce such environmental impacts. The aim of this thesis is to investigate the flow behaviour and the corresponding aeroacoustic mechanisms from high-speed trains, especially around the bogie regions. Since the prediction of the flow-induced noise in an industrial context is difficult to achieve, this study focuses on scale models with increasing complexity. The aerodynamic and aeroacoustic behaviour of the flow past an isolated wheelset, two tandem wheelsets, a simplified bogie and the bogie inside the cavity with and without the fairing as well as considering the influence of the ground are investigated at a scale 1:10. A two-stage hybrid method is used consisting of computational fluid dynamics and acoustic analogy. The near-field unsteady flow is obtained by solving the Navier-Stokes equations numerically through the delayed detached-eddy simulation and the source data are applied to predict the far-field noise signals using the Ffowcs Williams-Hawkings acoustic analogy. All simulations were run with fully structured meshes generated according to the guidelines based on a grid independence study on a circular cylinder case. Far-field noise radiated from the scale models was measured in an open-jet anechoic wind tunnel. Good agreement is achieved between numerical simulations and experimental measurements for the dominant frequency of tonal noise and the shape of the spectra. Numerical results show that turbulent flow past the isolated wheelset is dominated by three-dimensional vortices. Vortex shedding around the axle is the main reason for the tonal noise generation with the dominant peak related to the vortex shedding frequency. The noise directivity shows a typical dipole pattern. Moreover, for both the tandem-wheelset and the simplified bogie cases, the unsteady flow developed around them is characterized by the turbulent eddies with various scales and orientations including the coherently alternating shedding vortices generated from the upstream axles. The vortices formed from the upstream geometries are convected downstream and impinge on the downstream bodies, generating a turbulent wake i behind the objects. Vortex shedding and flow separation as well as interaction around the bodies are the key factors for the aerodynamic noise generation. The radiated tonal noise corresponds to the dominant frequencies of the oscillating lift and drag forces from the geometries. The directivity exhibits a distinct dipole shape for the noise radiated from the upstream wheelset whereas the noise directivity pattern from the downstream wheelset is multi-directional. Compared to the wheelsets, the noise contribution from the bogie frame is relatively small. Furthermore, when the bogie is located inside the bogie cavity, the shear layer developed from the cavity leading edge has a strong interaction with the flow separated from the upstream bogie and cavity walls. Thus a highly irregular and unsteady flow is generated inside the bogie cavity due to the considerably strong flow impingement and interaction occurring there. Unlike the isolated bogie case, noise spectra from the bogie inside the cavity are broadband and a lateral dipole pattern of noise radiation is generated. The noise prediction based on the permeable surface source is formulated and programmed using the convective Ffowcs Williams-Hawkings method. Results show that the bogie fairing is effective in reducing the noise levels in most of the frequency range by mounting a fairing in the bogie area; and for the bogie inside the bogie cavity with the ground underneath, the far-field noise level is increased due to more flow interactions around the geometries and the ground reflection effect. ii Contents 1 Introduction ................................................................................................................ 1 1.1 Background ................................................................................................................. 1 1.2 Research Objectives ................................................................................................... 3 1.3 Structure of Thesis ..................................................................................................... 3 2 Literature Review ..................................................................................................... 5 2.1 Aeroacoustic Research on High-speed Trains .......................................................... 5 2.1.1 Bogie ..................................................................................................................... 6 2.1.2 Pantograph ......................................................................................................... 10 2.1.3 Pantograph recess ............................................................................................. 11 2.1.4 Inter-coach spacing ........................................................................................... 12 2.1.5 Nose of power car .............................................................................................. 13 2.1.6 Rear power car ................................................................................................... 14 2.1.7 Coach wall surfaces ........................................................................................... 14 2.1.8 Ventilators, louvres and cooling fans............................................................... 15 2.1.9 Concluding remarks .......................................................................................... 16 2.2 Theory on Aerodynamic Noise Prediction using Acoustic Analogy ...................... 16 2.2.1 General sound sources ...................................................................................... 17 2.2.2 Lighthill’s theory: acoustic analogy .................................................................. 17 2.2.3 Curle’s theory: effect of solid boundaries ....................................................... 21 2.2.4 Ffowcs Williams-Hawkings method: effect of source motion ......................... 22 2.2.5 Theory of vortex sound ..................................................................................... 25 2.3 Numerical Methods for Aeroacoustics .................................................................... 25 2.3.1 Direct computation methods ............................................................................ 26 2.3.2 Integral methods based on acoustic analogy .................................................. 27 2.3.3 Empirical methods ............................................................................................. 30 2.4 Experimental Techniques for Aerodynamics and Aeroacoustics .......................... 31 2.4.1 Wind-tunnel measurements .............................................................................. 31 2.4.2 Field and on-board measurements ................................................................... 35 2.5 Summary ................................................................................................................... 36 3 Research Description ........................................................................................... 37 3.1 Research Outline ....................................................................................................... 37 3.2 Numerical Approach ................................................................................................. 38 3.2.1 Computational mesh generation ...................................................................... 39 iii 3.2.2 CFD solution process ........................................................................................ 40 3.2.3 Far-field noise prediction .................................................................................. 47 3.2.4 Post-processing of simulation
Recommended publications
  • HO Scale Price List 2019
    GAUGEMASTER HO Scale price list 2019 Prices correct at time of going to press and are subject to change at any time Post free option is available for orders above a value of £15 to mainland UK addresses*. Non-mainland UK orders are posted at cost. Orders to non-EC destinations are VAT free. *Except orders containing one or more items above a length of 600mm and below a total order value of £25. Order conforming to this exception will be charged carriage at cost (not to exceed £4.95) Gaugemaster Controls Ltd Gaugemaster House Ford Road Arundel West Sussex BN18 0BN Tel - (01903) 884321 Fax - (01903) 884377 [email protected] [email protected] [email protected] Printed: 06/09/2019 KEY TO PRICE LISTS The following legends appear at the front of the Product Name for certain entries: * : New Item not yet available # : Not in production, stock available #D# : Discontinued, few remaining #P# : New Item, limited availability www.gaugemaster.com Registered in England No: 2714470. Registered Office: Gaugemaster House, Ford Road, Arundel, West Sussex, BN18 0BN. Directors: R K Taylor, D J Taylor. Bankers: Royal Bank of Scotland PLC, South Street, Chichester, West Sussex, England. Sort Code: 16-16-20 Account No: 11318851 VAT reg: 587 8089 71 1 Contents Atlas 3 Magazines/Books 38 Atlas O 5 Marklin 38 Bachmann 5 Marklin Club 42 Busch 5 Mehano 43 Cararama 8 Merten 43 Dapol 9 Model Power 43 Dapol Kits 9 Modelcraft 43 DCC Concepts 9 MRC 44 Deluxe Materials 11 myWorld 44 DM Toys 11 Noch 44 Electrotren 11 Oxford Diecast 53 Faller 12
    [Show full text]
  • DOT/FRA/ORD-09/07 April 2009
    DRAFT DOT/FRA/ORD-09/07 April 2009 Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED April 2009 Final Report April 2009 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS The Aerodynamic Effects of Passing Trains to Surrounding Objects and People BB049/RR93 6. AUTHOR(S) Harvey Shui-Hong Lee 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER U.S. Department of Transportation Research and Special Programs Administration DOT-VNTSC-FRA-04-05 John A. Volpe National Transportation Systems Center Cambridge, MA 02142-1093 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORING AGENCY REPORT NUMBER U.S. Department of Transportation Federal Railroad Administration DOT/FRA/ORD/09-07 Office of Research and Development 1200 New Jersey Ave., SE Washington, D.C. 20590 11. SUPPLEMENTARY NOTES 12a. DISTRIBUTION/AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE This document is available to the public through the National Technical Information Service, Springfield, Virginia 22161.
    [Show full text]
  • Prediction of High-Speed Train Noise on Swedish Tracks
    Prediction of high-speed train noise on Swedish tracks Xuetao Zhang SP Technical Research Institute of Sweden Research SP Technical Energy Technology SP Report 2010:75 2 Prediction of high-speed train noise on Swedish tracks Xuetao Zhang Abstract Aiming at applying the Nord2000 propagation model to predict high speed train noise in Sweden, the noise emission data of X2 trains has been studied. By using the Imagine source model for rolling noise (i.e. the roughness-transfer-function method), it becomes possible to empirically estimate the aerodynamic noise based on the collected inclusive noise emission data. The sound power level per meter train has been determined for each noise type/component (i.e. the rail/track and wheel radiation and the aerodynamic noise) and for the speed range of interest (150-300 km/h). The calculation method is described and the horizontal directivity for each noise type/component is provided. Key words: X2 train noise, high speed train noise, aerodynamic noise, pantograph noise, aero-noise around bogie area, sound power level, horizontal directivity, roughness and transfer function SP Sveriges Tekniska Forskningsinstitut SP Technical Research Institute of Sweden SP Report 2010:75 ISBN 978-91-86622-18-3 ISSN 0284-5172 Borås 2010 4 Contents Abstract 3 Contents 4 Preface 5 Summary 6 1 Introduction 7 2 X2 train noise and the model prediction 8 3 Method to determine input data 16 3.1 Rolling noise 16 3.2 Aerodynamic noise 16 4 Input data for prediction of X2 train noise 18 4.1 Estimation of X2 train pantograph noise
    [Show full text]
  • Technical and Safety Analysis Report
    HIGH SPEED RAIL ASSESSMENT, PHASE II Norwegian National Rail Administration Technical and Safety Analysis Report JBV 900017 February 2011 HSR Assessment Norway, Phase II Technical and Safety Analysis Page 1 of (270) Preparation- and review documentation: Review documentation: Rev. Prepared by Checked by Approved by Status 1.0 DEF/18.02.2011 RFL, KJ GI Final List of versions: Revision Rev. Description revision Author chapters Nr. Date Version 1 18.02.2011 1.0 Delivery final version DEF, RFL 2 3 4 HSR Assessment Norway, Phase II Technical and Safety Analysis Page 2 of (270) Table of contents List of tables ..................................................................................................................8 List of figures...............................................................................................................11 List of abbreviations ...................................................................................................16 1 Subject – Technical solutions..............................................................................18 1.0 Introduction ...........................................................................................................18 1.0.1 Brief description of scenarios....................................................................................19 1.0.2 World high speed rail (HSR) overview......................................................................20 1.0.2.1 Infrastructure...........................................................................................................
    [Show full text]
  • Rapport Relatif À L'état Actionnaire
    RÉPUBLIQUE FRANÇAISE ANNEXE AU PROJET DE LOI DE FINANCES POUR 2016 RAPPORT RELATIF À L’ÉTAT ACTIONNAIRE Les faits marquants intervenus depuis la publication du rapport de l’État actionnaire en juillet 2015 7 octobre 2015 Renault : arrivée à échéance des premières options souscrites par l'État dans le cadre de sa montée au capital Depuis sa montée au capital de Renault annoncée le 8 avril 2015, l’État détient des options de vente à prix fixe sur 14 millions de titres Renault et a cédé des options d’achat à prix fixe sur 14 millions de titres Renault. Les échéances de celles-ci sont échelonnées linéairement entre le 7 octobre et le 28 décembre 2015. Les modalités de dénouement à échéance de ces options, en titres ou en numéraire, sont déterminées par l’État. Celui-ci a décidé de procéder à un dénouement des premières échéances de ces options en numéraire. L’ État confirme son intention de revenir à terme au niveau de participation antérieur à son acquisition de 4,73 % du capital de Renault en avril 2015. 5 et 6 octobre 2015 Organisation du troisième State holding dialogue à Paris L’Agence des participations de l’État a organisé une rencontre internationale de professionnels de l’actionnariat public : les dirigeants de plus de dix organisations de gestion de participations publiques, européennes, ont échangé autour de leurs expériences nationales et des bonnes pratiques en termes de gouvernance et de dialogue stratégique avec les entreprises. 16 septembre 2015 Clôture de l’opération de cession de titres ENGIE Conformément à l’arrêté en date du 12 juin 2015 fixant le prix et les modalités de cession d’actions de la société GDF Suez (ENGIE), l’État, via l’Agence des participations de l’État, a engagé le 16 juin 2015 une cession au fil de l’eau de titres GDF Suez (Engie).
    [Show full text]
  • New York State Technical & Economic Maglev Evaluation
    4 NEW YORK STATE TECHNICAL & ECONOMIC MAGLEV EVALUATION New York State Energy Research and Development Authority The New York State Energy Research and Development Authority (Energy Authority) is responsible for the development and use of safe, dependable, renewable and economic energy sources and conservation technologies. It sponsors energy research, development and demonstration (RD&D) projects and financing programs designed to help utilities and other private companies fund certain energy-related projects. The Energy Authority is a public benefit corporation which was created in 1975 by the New York State Legislature. In working toward these goals, the Energy Authority sponsors research, development and demonstration projects in two major program areas: Energy Efficiency and Economic Development, and Energy Resources and Environmental Research. Under its financing program, the Energy Authority is authorized to issue tax-exempt bonds to finance certain electric or gas facilities and special energy projects for private companies. The Energy Authority also has res~nsibility for constructing and then operating facilities for the disposal of low-level radioactive wastes produced in New YoA State. The generators of these wastes ultimately will bear the costs of the instruction of these facilities. A 13-member board of directors governs the Energy Authority, with William D. Cotter, Commissioner of the State Energy Office, serving as Chairman of the Board and Chief Executive Officer. Irvin L. White, President of the Energy Authority, manages its programs, staff and facilities. The Energy Authority derives its basic RD&D revenues from an assessment levied on the intrastate sales of New York State’s investor-owned electric and gas utilities.
    [Show full text]
  • World High Speed Rolling Stock 15Th January 2020
    World High Speed Rolling Stock 15th January 2020 Seats Number Number Number total total number Tractive Max. Max.Op. Weight of the Power weight Max.Axle Trainset Trainset Country Owner or Trainset Number of cars to add Number Year in Power Acceleratio Number of Signaling Photograph Suppliers Class Features of number of cars Effort Speed Speed Voltage trainset ratio Load length width Observations /Region Operator Formula of presence in a over expected Service [kW] n[m/s2] over 250 kph systems trainsets of cars (over200kph) [kN] [km/h] [km/h] [t] [kW/t] [t] [m] [mm] 1st class 2nd class Total trainset 200 kph Succeeded company is shown in case of M: Motor Car, C: Concentrated Trainsets Current Loaded T: Trailer Car, powered, For original company currently Maximum Maximum (planned) (Calculated For 3 classes, 1st and 2nd classes are disappeared. L: Locomotive, A: Articulated, Unloaded Loaded Passenger used and acceleration speed operation from the data included in '1st class' Some subsidary MB: Motor Bogie, T: Tilting, car comapanies are TB: Trailer Bogie D: Double Decker planned speed on this table) neglected. "Railjet" 3kV(partially) 16+76, 316, 408, Siemens Taurus LZB/PZB,ZUB,ET Austria TI ÖBB Siemens 1L7T C 60 60 8 60 480 480 60 2008- 6400 300 230 230 0 15kV16.7Hz 446 #VALUE! 22.5 206 2825 partially partially partially Locomotive: Class 1116, partially 1216 (OBB 1216) + CS 25kV50Hz 6+42 394 442 Siemens Viaggio Austria TI WestBahn Stadler 4010 2M4T 7 7 6 42 7 2011- 6000 200 200 0 15kV16.7Hz 296 17.9 150 2800 60 441 501 LZB/PZB,ZUB No.301-405 1.5kV France NY SNCF Alstom TGV Atlantique 2L10T C, A 28 54 12 54 648 648 28 1989- 8800 300 300 54 435 18.6 17 237 2904 116 364 480 TVM/KVB Renovated to Lacroix 455 places(105+350) 25kV50Hz TVM430 is installed from No 386 to No 405 France, 1.5kV TVM/KVB, No.
    [Show full text]
  • Anticiper Et Profiter Des Ruptures
    Cycle MOISSON-DESROCHES Promotion 2015 Anticiper et profiter des ruptures Emmanuel BOIS, Alstom Jimmy BRUN, Ministère de l'Ecologie, du Développement durable et de l'Energie Didier CARAMELLO, SNCF Gares&Connnexions Frédéric CYR, UTP (Transdev) Table des matières I. Entretiens avec des sachants du ferroviaire et du monde économique : le diagnostic des membres du groupe est-il partagé ? ..................................................................................................... 6 A. Aucune rupture technologique forte n’est à attendre du ferroviaire ......................................... 8 B. Le ferroviaire doit savoir s’adapter aux nouveaux besoins des usagers ................................... 8 C. Une rupture de pratique du ferroviaire à rechercher : l’inscription d’une offre globale de mobilité connectée .......................................................................................................................... 10 D. La nécessaire réduction des coûts de production du service ferroviaire ................................. 12 E. Le besoin de structurer une filière forte, innovante et tournée vers l’extérieur ...................... 14 II. Principaux enseignements tirés du questionnaire envoyé à la filière ......................................... 16 A. Les principales innovations passées dans le domaine de la mobilité et celles porteuses d’avenir (questions n°3 et n°4) ....................................................................................................... 17 B. Les faiblesses du ferroviaire français
    [Show full text]
  • Kraftförsörjningsanläggningar
    Verksamhetssystemet Gäller för Version Standard BV koncern 2.0 BVS 543.19300 Giltigt från Giltigt till Antal bilagor 2010-02-05 Tills vidare 1 Diarienummer Ansvarig enhet Fastställd av F 09-16151/EL30 Leveransdivisionen/Anläggning Leif Lindmark, LAKf Handläggare Ersätter Hongbo Jiang, XTBE Nils Rohlsson, LAKfÖf Kraftförsörjningsanläggningar Elektriska krav på fordon med avseende på kompatibilitet med infrastrukturen och andra fordon 1 (6) Verksamhetssystemet – BVMall 1000.3 Dokumentmall, version 3.0 Verksamhetssystemet Innehållsförteckning 1 Syfte.............................................................................................................................3 2 Omfattning ...................................................................................................................3 3 Definitioner och förkortningar ......................................................................................3 3.1 Definitioner.....................................................................................................................3 3.2 Förkortningar ..................................................................................................................3 4 Ansvar ..........................................................................................................................4 5 Elektriska krav på fordon med avseende på kompatibilitet med infrastrukturen och andra fordon .................................................................................5 6 Hjälpmedel och referenser ...........................................................................................6
    [Show full text]
  • 144000410.Pdf
    MINISTÈRE DES FINANCES ET DES COMPTES PUBLICS MINISTÈRE DE L'ÉCONOMIE, DU REDRESSEMENT PRODUCTIF ET DU NUMÉRIQUE BanQUe pUBliQUe D’inVeStiSSeMent S SerViceS 2014 TRANSport aUtreS inDUStrieS el ÉNERGIE U ann L’ÉtAT apport r ACTIONNAIRE inFRAStrUCTUreS De TRANSport SerViceS FINANCIERS iMMoBilier l’État actionnairel’État • aÉRONAUtiQUe-DÉFenSe MÉDiaS APE AGENCE DES PARTICIPATIONS DE L’ÉTAT L’ÉtAT ACTIONNAIRE RAPPORT ANNUEL 2014 APE AGENCE DES PARTICIPATIONS DE L’ÉTAT PRÉFACE © A. Salesse - SG - SG Ricard © P. Michel Sapin Arnaud Montebourg ministre des Finances ministre de l’Économie, et des Comptes publics du Redressement productif et du Numérique oté d’un large portefeuille de participations, notre pays dispose d’un patrimoine sur lequel nous avons le devoir de veiller tout en mettant en œuvre une stratégie économique, financière, industrielle et sociale exemplaire qui contribue D au développement de la France et au renforcement de ses positions stratégiques. Fort de cette conviction, le Gouvernement a souhaité clarifier la stratégie de l’État actionnaire et lui fixer un cap. Adoptées en Conseil des ministres le 15 janvier dernier, des lignes directrices permettent désormais de donner un cadre aux opérations sur capital décidées par l’État et mises en œuvre par l’Agence des participations de l’État (APE), 10 ans après la création de cette Agence. Les opérations récentes de l’Etat, comme la recomposition du capital d’Airbus Group, l’ajustement des niveaux de participations dans Safran, d’Aéroports de Paris et de GDF Suez, s’inscrivent pleinement dans cette stratégie. Ces cessions se sont traduites par des recettes de 4,8 Md€ mobilisées pour réaliser de nouveaux investissements et désendetter l’État.
    [Show full text]
  • Anexo 1. Material Rodante De Alta Velocidad En El Mundo
    El transporte aéreo como fuente de inspiración para el ferrocarril ANEXO 1. MATERIAL RODANTE DE ALTA VELOCIDAD EN EL MUNDO Fuente: Union Internationale des Chemins de fer – UIC World High Speed Rolling Stock 1st November 2013 Number Tractive Max.Tr. Max.Op. Weight of the Power weight Max.Axle Train Train Seats Owners or Year in Power Acceleratio Signaling Country Class Train set Formula Features of train Effort Speed Speed Voltage train ratio Load length width Suppliers Observations Operators Service [kW] n[m/s2] systems sets [kN] [km/h] [km/h] [t] [kW/t] [t] [m] [mm] 1st class 2nd class Total M: Motor Coach, C: Concentrated Train Succeeded company is Current Loaded T: Trailer Coach, powered, sets Maximum For shown in case of original Maximum (planned) (Calculated For 3 classes train, 1st and 2nd classes L: Locomotive, A: Articulated, currentl acceleratio Unloaded Loaded Passenger company disappeared. train speed operation from the data are included in '1st class' MB: Motor Bogie, T: Tilting, y used n car Some subsidary comapanies speed on this table) TB: Trailer Bogie D: Double Decker and are neglected. planned 3kV 51 Austria TI ÖBB "Railjet" 1L7T C 2008- 6400 300 250 200 15kV16.7Hz 479 12,5 21,5 205,4 2825 16+76 316 408 LZB/PZB,ZUB Siemens Locomotive: Class 1216 (+18) 25kV50Hz 3kV Czech NY CD 680 4M3T T 7 2003- 3920 200 230 200 15KV16.7Hz 385 9,5 184.4 2800 105 228 333 LS, LZB/PZB Alstom 25kV50Hz Finland TI VR 4M2T T 18 1995- 4000 163 0,5 220 220 25kV50Hz 328 11,5 14.3 159 3200 47 238(+2) 285(+2) EBICAB900 Alstom Broad gauge (1524)
    [Show full text]
  • Market Strategies for International High-Speed Passenger Train Operators
    Faculteit Toegepaste Economische Wetenschappen Strategieën voor internationale hogesnelheidsspoorvervoerders in de Europese reizigersvervoersmarkt Proefschrift voorgelegd voor het behalen van de graad van doctor in de toegepaste economische wetenschappen aan de universiteit Antwerpen te verdedigen door: Jacobus Everdina Maria Jozef Doomernik Openbare verdediging: Maandag 3 juli 2017, 17.00u Hof van Liere, Universiteit Antwerpen Doctoraatscommissie Prof. dr. Ann Verhetsel (president), Universiteit Antwerpen Prof. dr. Eddy van de Voorde (supervisor), Universiteit Antwerpen Prof. dr. Thierry Vanelslander (supervisor), Universiteit Antwerpen Prof. dr. Koen Vandenbempt, Universiteit Antwerpen Prof. ing. Pierluigi Coppola, Università di Roma “Tor Vergata” Dr. Florent Laroche, Université Lumière de Lyon 2 Prof. dr. Matthias Finger, Ecole Polytechnique Fédérale Lausanne Copyright 2017, J.E.M.J. Doomernik All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, mechanically, by photocopying, by recording, or otherwise, without prior permission of the author. Samenvatting High-speed rail systemen zijn momenteel een geaccepteerde manier van reizen in verschillende landen in de wereld. In de afgelopen decennia hebben high-speed railsystemen zich gestaag ontwikkeld, voornamelijk in Azië en Europa, maar er zijn ook initiatieven te vinden in de Verenigde Staten, Zuid-Amerika, het Midden-Oosten en Afrika. Eén van de beleidsdoelstellingen van de Europese Commissie om een duurzame toekomst op te bouwen was om de spoorwegsector te revitaliseren. De liberalisering van de spoorwegsector heeft geleid tot een splitsing tussen nationale infrastructuurbeheerders en spoorwegondernemingen. Een nieuw Europees wettelijk kader is ingevoerd om de nationale netwerken open te stellen voor andere operatoren en om de opbouw van een pan-Europese high-speed railnetwerk op basis van de reeds door de nationale regeringen genomen initiatieven te ondersteunen.
    [Show full text]