Minsk Region Preliminary Approximate No Land Plot Location Possible Ways of Use Infrastructure Cadastral Value, Area, Ha Thsd
Total Page:16
File Type:pdf, Size:1020Kb
Minsk Region Preliminary Approximate No Land plot location Possible ways of use Infrastructure cadastral value, area, ha thsd. USD Berezino district 1 Berezino town, 0,9 construction of a Motor road М-4 Minsk-Mogilev 53,46 Promyshlennyj lane manufacturing facility (650 m). Motor road R-67 – 290 m. Electricity supply – over 1000 V. Heating, drinking water, wells, gas supply – 100 m. 2 Berezino district, 1,18 construction of a roadside 2,597 motor road M-4 Minsk- service facility Mogilyov (km 99 left) Borsov district 3 Hugly village 1.8 construction of infrastructure – 200 m 24.3 manufacturing facilities 4 Borisov town, 0.5 hotel facilities infrastructure available 215.3 Gagrin str. (in the complex with an underconstruction football statium) 5 near agro-town 12 construction of a possibility of connection to 39,6 Velyatichi сommercial dairy farm medium pressure gasmain and (1050 heads of milking power transmission line fo 10 kV herd) Vilejka district 6 Vilejka town, "Severnyj 1 allocation of auto service electricity supply – 250 m, water 68.5 2" building estate entities - garage supply – 500 m, gas supply – 1000 m, draining – 400 m, no driveways 7 Vilejka town, "Severnyj 6.8 allocation of a logistic railway, gas supply – 1000 m, 669.12 2" building estate center water supply – 450 m, electricity supply – 700 m 8 Vilejka town, "Severnyj 0.5 allocation of auto service gas supply – 900 m, water supply 34.25 2" building estate entities - garage – 400 m, electricity supply – 450 m, draining – 200 m, driveways – 400 m Volozhin district 9 Volozhin town, 0.35 construction of an electricity supply – 300 m 30.35 Y.Kolasa str. manufacturing facility Kletsk district 10 Kletsk town, Lenin str. 9.9 construction of a railway, asphalt driveway, gas 496.98 productive entity supply, electricity supply, water supply – up to 100 m 11 Kletsk town, 2 construction of a asphalt driveway, gas supply, 115.6 Victory str. productive entity electricity supply, water supply, (furplant district) sewerage up to 100 m 12 Kletsk town, 1.6 construction of a asphalt driveway, gas supply, 106.24 Victory str. productive entity electricity supply, water supply, sewerage up to100 m 13 Kletsk town, 0.5 construction of a asphalt driveway, gas supply, 28.9 Lermontov str. productive entity electricity supply, water supply, sewerage up to 100 m 14 Kletsk town, Kirov str. 0.6 construction of a asphalt driveway, electricity 39.84 productive entity supply, water supply up to 100 m Kopyl district 15 Kopyl, Tymkovichskaya 10 industrial facilities location 100 km away from Minsk; 335 str. distance to railway - 7 km, other utilities are available 16 Копыльский район 1,5 production facilities, agro- 189 km away from Misnk 3,45 Internatsyonal village, tourism г.Минска; distance to railway - 7 Buchatinsky village km council Krupki district 17 Krupskij settlement (61 5 construction of road – 50 m, water supply, 36.5 km (left) motor road manufacturing facilities electricity supply R-19 Tolochin – Krupki) 18 Bobr settlement 4.5 construction of road, water supply, electricity 22.5 manufacturing facilities supply 19 Uhvala agro-town (98 4 construction of road, water supply, electricity 11.2 km (right) motor road manufacturing facilities supply R-62 Chashniki – Bobrujsk) 20 Yanovshchina village 2.5 construction of road, water supply, electricity 5.5 manufacturing facilities supply 21 Zamki agro-town, 0.5 construction of road, water supply, electricity 2.4 Molodezhnaya str. commenrce facilities supply 22 Velikaya Sloboda village 1 construction of motor road road, water supply, electricity 14.3 (motor road service and commerce supply – 30 m N-8645 Krupki – facilities Gapanovichi) 23 Yanovshсhina village 0.25 construction of motor road road, water supply, electricity 0.7 (motor road N-3802 service and commerce supply Chereya – Kholopenichi) facilities 24 close to the bridge over 0.15 construction of motor road road – 10 m, electricity supply 0.36 Bobr river (motor road R- service and commerce 1948 (right) Tolochin – facilities Krupki) 25 Krupki town, 7, 0.48 construction of road, water supply, electricity 31.78 Kommunal'naya str. manufacturing facilities supply – 10 m 26 Krupki town, 0.5 construction of a trade road, water and electricity supply 50.65 "Severny" building facility estate, Vasnetsova str. 27 г. Крупки 0,43 construction of a water paved access road, electricity, 19,56 power station water supply Lyuban' district 28 Lyuban' town, Borovika 0.5 construction of possibility of connection to gas 1.21 str. (in the area of a manufacturing facilities pipeline, power transmission line, former garment factory) sewerage 29 Lyuban' town, Borovika 1 construction of possibility of connection to gas 10.4 str. (in the area of the manufacturing facilities pipeline, power transmission line, "Fishplant") sewerage 30 town settlement Urech'e, 7 construction of possibility of connection to power 140.7 Kommunal'naya str., manufacturing facilities transmission line, sewerage, in the area "Byvshaya railway – 500 m smolokurnya" Myadel' district 31 0.3 km to the south-west 17 alloction of alternative power supply, asphalt driveways 90.1 of Rudoshany energy facilities 32 Myadel' town, 1 manufacturing facility electricity 70,9 Internationalnaya str. 33 urban-type settlement 0,5 manufacturing facility electricity 3,8 Svir', Krasnoarmeiskaya str. 34 0.1 km to north of 6 allocation of renewable electricity 21 Stoudenitsa village energy facilities Nesvizh district 35 Gorodeya rural 5 construction of 556 settlement "Gorodeya" up to 178.5 committee (in the area of manufacturing facilities 1 mW (installation of a power Komarova str. and the transformation station) – 0.4 km; territory of OJSC water pipeline, sewerage, gas "Volozhinskij linenplant") supply on the territory of OJSC "Volozhinskij linenplant" - 0.1 km; gravel road is near by; road М–1 Е30 – 9.5 km; road Р-11 – 2 km, railway – 1.3 km Puhovichi district 36 Shackoe motorway, 4 construction of water supply up to 120 m, 5.6 adjoining to Mar'ina manufacturing facilities draining up to 500 m, electricity Gorka town supply up to 200 m, gas supply up to 100 m Sloutsk district 37 Sloutsk town, Lenina 1.5 construction of motor road R-43 – 0 km, power 232.2 str., along the motor manufacturing facilities transmission line 10 (k)V – 0.6 road R-43 the border of km, water pipeline – 20 m, gas Russian Federation- pipeline – 160 m, railway – 0 km Krichev-Bobrujsk- Ivacevichi (355 km to the left) 38 Sloutsk town, 1 construction of motor road R-43 – 0,7 km, power 322.6 Gagarina str. manufacturing facilities transmission line 10 (k)V – 0.2 km, water pipeline – 0 m, gas pipeline – 320 m, heat distribution system – 250 m 39 Sloutsk town, 2.4 construction of motor road R-43 – 5,5 km, power 311.52 M.Bogdanovicha str., 95 manufacturing and storage transmission line 10 (k)V – 0,2 km (former fuel storage) base km, water pipeline – 180 m, railway – 0 km 40 Sloutsk town, 5 construction of power transmission line 10 (k)V – 717.5 M.Bogdanovicha str., 95 manufacturing facilities 0 km, heat supply system – 0 m, km (close to the regional railway – 0 km consumer's association base) 41 Sloutsk town, 7 construction of power transmission line 10 (k)V – 1 004.5 M.Bogdanovicha str., 95 manufacturing facilities 0 km, heat supply system – 0 m, km (to the east of railway – 0 km petrolbase) 42 Sloutsk town, 11.5 construction of power transmission line 10 (k)V – 1 650.25 M.Bogdanovicha str., 95 manufacturing facilities 0 km, passage of vehicles and km (to the north of possibility of connection to the miitary service) operating utilities Starye dorogi district 43 Noviny village 15 manufacturing facilities infrastructure available 150 44 Starye Dorogi town, 0.32 manufacturing facilities infrastructure available 19.2 Zvezdnaya str. 45 Starye Dorogi town, 3 manufacturing facilities infrastructure available 180 Kirova str. 46 Starije Dorogi, 40, 0.31 manufacturing facilities infrastructure available 488.95 Moskovskay str. Smolevichy district 47 Berezovitsa village of 9,7219 manufacturing facilities motor road Р-53 –1 km 70,97 Smolevichy district (OJSC "Smolevichi Broyler") Stolbtsy district 48 Stolbtsy town, 17ogo 3.2 renewable energy infrastructure available 209.28 Sentjabrja str. production 49 Stolbtsy town, 5 logistics infrastructure available 656.5 Mashinostroitelej str. Uzda district 50 Uzda town, 4 manufactuing and storage possibility of connection to gas 268.4 Jengel'sa str. facilities pipeline, water pipeline, sewerage – 0.2 km; note: the base remains 51 near Telyakovo village 4 manufactuing and storage possibility of connection to gas 10.4 facilities pipeline, water pipeline – 150 m, local sewerage; note: remains of the stock farm buildings and constructions Cherven district 52 Doubovruch'e village of 1,7 construction of a water supply - 30 m, power 4,76 Cherven district (OJSC manufacturing facility transmission line "Rovanichi") 53 Vinogradovka village of 3 construction of a water supply - 30 m, power 8,4 Cherven district (OJSC manufacturing facility transmission line - 30 m "Rovanichi").