LIST of ONLINE ARCHIVE DOCUMENTS from CUMBRIA CC

Total Page:16

File Type:pdf, Size:1020Kb

LIST of ONLINE ARCHIVE DOCUMENTS from CUMBRIA CC LIST of ARCHIVE DOCUMENTS from CUMBRIA CC Related to COWANS SHELDON CIVIL ENGINEERS of CARLISLE The particular Cumbria CC web site can be accessed using the link below: http://www.cumbria.gov.uk/archives/Online_catalogues/default.asp Then click on Catalogues in the left hand column. The Cowans Sheldon overall reference is DB40 for this archive, use this in the Advanced Search facility. Once in the Catalogues area, you can do a search for what you require, such as engine turntables, this will come back with a list of the first 10 items (documents/drawings), that constitutes a page, just above the list, it will tell you how many pages there are in the search list, you need to increment through the pages to try to find what is required. When logged on to the web site, to find the drawing details (not the drawing itself), you need to click on the blue item number in the left-hand column (not by the way, those in this document). You can search for more specific items such as 50’ engine turntables, but you may miss some of them as I found typing errors in the list, so be a little cautious in your search. This document has three (3) Tables in it, the first, Table 1, is a shortened version containing all turntables in the official on-line catalogued area. The second, Table 2. is the complete list of the official on-line catalogued documents, it does also contain the turntables mentioned in Table 1. The third, Table 3, is a complete list of all documents that have not yet been added to on-line catalogued. Tables 1 and 2 have the same format, they show the catalogued DB40 reference and drawing number of the item in the second column, a brief description of the item in the third column, and the date of the document in the last column. Table 3 shows the Cowans Sheldon order number in the first column, the drawing number in the second column, a brief description in the third column, and the date of the document in the fourth column. Table 3 in particular also in some cases, shows the location where the items were originally installed, an example is shown below: 6208 15938, 16014 70’ articulated engine turntable built for 15148 Southern Railway, Southampton 1937 Please be aware, there are typo’s in the text of the tables, but the numbers should be reasonably correct. TABLE 1. Cumbria CC Officially Catalogued List of Cowans Sheldon Turntables RefNo Title Date 1 DB40/D/3573 45' engine turntable 1953 2 DB40/D/5213 50 feet engine turntable 1902 3 DB40/D/5213/4678 60 feet engine turntable 1899 4 DB40/D/5213/4688 55 feet engine turntable 1899 5 DB40/D/5213/4691 foundation for 55 feet engine turntable not dated List of Archive Documents from Cumbria CC Related to Cownas Sheldon Data Page 1 of 209 RefNo Title Date 6 DB40/D/5213/4722 60 feet engine turntable not dated 7 DB40/D/5213/4741 30 feet engine turntable centre not dated 8 DB40/D/5213/4747 55 feet engine turntable 1900 9 DB40/D/5213/4750 30 feet engine turntable foundation not dated 10 DB40/D/5213/4758 50 feet engine turntable repair 1931 11 DB40/D/5213/4759 52 feet shallow pit engine turntable 1900 12 DB40/D/5213/4788 55 feet engine turntable 1900 13 DB40/D/5213/4808 52 feet shallow pit engine turntable 1900 14 DB40/D/5213/4811 50 feet engine turntable 1900 15 DB40/D/5213/4825 20 feet engine turntable not dated 16 DB40/D/5213/4851 50 feet engine turntable 1900 17 DB40/D/5213/4907 60 feet engine turntable centre 1912 18 DB40/D/5213/4979 45 feet engine turntable 1901 19 DB40/D/5213/5005 25 feet 6 inches engine turntable 1901 20 DB40/D/5213/5013 30 feet 6 inches engine turntable 1901 30 feet 6 inches and 10 feet 6 inches combined 21 DB40/D/5213/5016 1901 engine turntable 22 DB40/D/5213/5040 25 feet engine turntable not dated 23 DB40/D/5213/5067 60 feet engine turntable not dated 24 DB40/D/5213/5106 50 feet engine turntable not dated 25 DB40/D/5213/5112 60 feet engine turntable 1901 TABLE 2. Cumbria CC On-Line Catalogued List of Cowans Sheldon Documents/Drawings RefNo Title Date 1 DB40 Cowans Sheldon civil engineers of Carlisle 1623-1966 2 DB40/D Engineering drawings - 3 DB40/D/1546 60 ton steam travelling crane 1884 4 DB40/D/2186 30 cwt hydraulic crane 1897 List of Archive Documents from Cumbria CC Related to Cownas Sheldon Data Page 2 of 209 RefNo Title Date 5 DB40/D/2338 10 ton steam travelling crane 1910 6 DB40/D/2500 50 ton steam Fairbairn crane not dated 7 DB40/D/2730 60 ton steam wharf crane 1919 8 DB40/D/2811 7 ton locomotive crane 1891 9 DB40/D/2964 10 ton steam capstan 1906 10 DB40/D/2988 30 ton steam derrick crane 1912 11 DB40/D/3033 25 ton steam wharf crane 1904 12 DB40/D/3302 15 ton steam travelling crane not dated 13 DB40/D/3365 15 ton hand accident crane 1908 14 DB40/D/3573 45’ engine turntable 1953 15 DB40/D/4078 25 ton hydraulic crane 1896 16 DB40/D/4183 30 cwt wall crane not dated 17 DB40/D/4260 30 ton electric overhead crane 1903 18 DB40/D/4328 33 ton block loading Titan crane 1897 19 DB40/D/4339 2 ton hydraulic wall crane 1900 20 DB40/D/4375 30 ton steam wharf crane 1898 21 DB40/D/4388 15 ton steam travelling crane 1898 22 DB40/D/4396 5 ton hydraulic crane 1898 23 DB40/D/4411 20 ton steam fixed crane 1898 24 DB40/D/4413 12 ton rope overhead travelling crane 1898 25 DB40/D/4445 15 ton steam wharf crane 1898 26 DB40/D/4450 20 ton station crane 1898 27 DB40/D/4463 10 ton steam travelling crane 1898 28 DB40/D/4490 10 ton steam forge crane 1899 29 DB40/D/4528 15 ton overhead travelling crane 1898 30 DB40/D/4551 25 ton floating crane 1926 31 DB40/D/4555 20 ton hand overhead crane 1899 32 DB40/D/4560 25 ton electric overhead crane 1899 33 DB40/D/4582 3 ton steam wharf crane 1899 List of Archive Documents from Cumbria CC Related to Cownas Sheldon Data Page 3 of 209 RefNo Title Date 34 DB40/D/4606 30 ton hand station crane 1899 35 DB40/D/4620 50 ton steam wharf crane not dated 36 DB40/D/4620/3434 40 ton steam wharf crane 1894-1902 37 DB40/D/4620/3523 35 ton steam coaling crane not dated 38 DB40/D/4620/4222 25 ton steam wharf crane 1896-1905 39 DB40/D/4622 30 ton overhead crane 1899 40 DB40/D/4622/2751 30 ton rope overhead crane 1917 41 DB40/D/4622/3452 30 ton rope overhead crane 1900 42 DB40/D/4623 50 ton steam fixed crane 1899 43 DB40/D/4655 60 ton steam derrick crane 1899 44 DB40/D/4706 3 ton hand overhead travelling crane 1900 45 DB40/D/4717 15 ton steam breakdown crane 1910 46 DB40/D/4723 40 ton electric overhead crane 1900 47 DB40/D/4726 20 ton electric travelling crane 1900 48 DB40/D/4727 15 ton electric overhead crane 1900 49 DB40/D/4797 50 ton steam Fairbairn crane 1900 50 DB40/D/4810 10 ton hand breakdown crane 1900 51 DB40/D/4832 10 ton hand overhead travelling crane 1900 52 DB40/D/4847 15 ton steam station crane 1900 53 DB40/D/4855 20/25 ton container handling crane 1968 54 DB40/D/4855/4807 20/25 ton container handling transporter crane 1967 55 DB40/D/4863 10 ton hand accident crane 1901 56 DB40/D/4874 15 ton steam accident crane 1901 57 DB40/D/4886 5 ton hand accident crane 1901 58 DB40/D/4952 1 ton portable electric capstan 1901 59 DB40/D/4952/4065 16 ton hydraulic capstan not dated 60 DB40/D/4952/4587 1 ton electric capstan not dated 61 DB40/D/4952/4624 10 ton steam capstan 1899 62 DB40/D/4952/4826 4 ton hydraulic capstan 1900 List of Archive Documents from Cumbria CC Related to Cownas Sheldon Data Page 4 of 209 RefNo Title Date 63 DB40/D/4952/4936 2 ton electric capstan 1901 64 DB40/D/4971 20 ton steam Fairbairn crane 1901 65 DB40/D/4978 4 ton hand overhead travelling crane 1901 66 DB40/D/4978/4903 4 ton hand overhead crane 1901 67 DB40/D/4982 2 ton hand overhead travelling crane 1901 68 DB40/D/4983 2 ton travelling crane 1901 69 DB40/D/4983/853 2 ton hand travelling crane 1902 70 DB40/D/4983/4423 3 ton hand travelling crane 1898 71 DB40/D/4983/4437 1 ton hand travelling crane 1898 72 DB40/D/4983/4448 2 ton travelling crane 1898 73 DB40/D/4983/4654 2 ton travelling crane 1899 74 DB40/D/4989 3 ton overhead travelling crane 1901 75 DB40/D/4995 15 ton overhead electric travelling crane 1901 76 DB40/D/4996 10 ton electric overhead travelling crane 1901 77 DB40/D/4996/4622 30 ton overhead travelling crane 1905 78 DB40/D/4996/4728 40 ton electric overhead travelling crane 1900 79 DB40/D/4996/4989 3 ton electric overhead travelling crane 1901 80 DB40/D/4996/4995 15 ton electric overhead travelling crane 1901 81 DB40/D/5088 15 ton steam wharf crane 1901 82 DB40/D/5094 30 cwt electric travelling crane 1902 83 DB40/D/5116 25 ton steam station crane 1902 84 DB40/D/5143 20 ton Titan crane 1902 85 DB40/D/5152 75 ton electric overhead travelling crane 1902, 1937 86 DB40/D/5156 2.5 ton hydraulic wharf crane 1902 87 DB40/D/5159 2.5 ton hydraulic wharf crane 1902 88 DB40/D/5169 10 ton steam travelling crane 1902 89 DB40/D/5213 50 feet engine turntable 1902 90 DB40/D/5213/4678 60 feet engine turntable 1899 91 DB40/D/5213/4688 55 feet engine turntable 1899 List of Archive Documents from Cumbria CC Related to Cownas Sheldon Data Page 5 of 209 RefNo Title Date 92 DB40/D/5213/4691 foundation for 55 feet engine turntable not dated 93 DB40/D/5213/4722 60 feet engine turntable not dated 94 DB40/D/5213/4741 30 feet engine turntable centre not dated 95 DB40/D/5213/4747 55 feet engine turntable 1900 96 DB40/D/5213/4750 30 feet engine turntable foundation not dated 97 DB40/D/5213/4758 50 feet engine turntable repair 1931 98 DB40/D/5213/4759 52 feet shallow pit engine turntable 1900 99 DB40/D/5213/4788 55 feet engine turntable 1900 100 DB40/D/5213/4808 52 feet shallow pit engine turntable 1900 101 DB40/D/5213/4811 50 feet engine turntable 1900 102 DB40/D/5213/4825 20 feet engine turntable
Recommended publications
  • Coal Power Station
    Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Coal Power Station ( Fly Ash , Bottom Ash & Flue Gas Desulfurization ) BY Tarek Ismail Kakhia 1 Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Contents No Item Page 1 Fossil - fuel power station 3 2 Chimney 11 3 Fly Ash -1 21 4 Fly Ash -2 44 5 Electrostatic precipitator 44 4 Bottom Ash 52 7 Flue - Gas Desulfurization ( FGD ) 53 8 Flue-gas emissions from fossil-fuel combustion 44 1 Flue - gas stack 47 10 Calcium Sulfite 72 11 Calcium bi sulfite 73 12 Calcium sulfate 74 2 Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Fossil - fuel power station Contents 1 Basic concepts o 1.1 Heat into mechanical energy 2 Fuel transport and delivery 3 Fuel processing 4 Steam - electric 5 Gas turbine plants 6 Reciprocating engines 7 Environmental impacts o 7.1 Carbon dioxide o 7.2 Particulate matter o 7.3 Radioactive trace elements o 7.4 Water and air contamination by coal ash . 7.4.1 Range of mercury contamination in fish 8 Greening of fossil fuel power plants o 8.1 Low NOx Burners o 8.2 Clean coal 9 Combined heat and power 10 Alternatives to fossil fuel power plants o 10.1 Relative cost by generation source - Introduction : A fossil - fuel power station is a power station that burns fossil fuels such as coal, natural gas or petroleum (oil) to produce electricity. Central station fossil - fuel power plants are designed on a large scale for continuous operation. In many countries, such plants provide most of the electrical energy used.
    [Show full text]
  • 2 Designation 3 Conservation Area Boundary 4 Brief
    1.9 In line with the guidance given by both the 2 DESIGNATION Government and English Heritage, therefore, this conservation area profile will aim to define the 2.1 The Sands End Conservation Area was character of the conservation area on the basis of designated in 1991. The conservation area was an analysis of all or some of the following designated because of the importance of criteria:- protecting the riverside from unsympathetic development and to encourage the preservation the origins and development of the street and enhancement of the riverside itself, ensuring patterns, the lie of the land; that new development is of a good and archaeological significance and potential of appropriate design. the area, including any scheduled monuments; the architectural and historic quality, 3 CONSERVATION AREA character and coherence of the buildings, both BOUNDARY listed and unlisted, and the contribution which they make to the special interest of the area; 3.1 The area is in the southernmost part of the the character and hierarchy of spaces, and borough, fronting and incorporating the River townscape quality; Thames between the Chelsea Railway Bridge and the Hurlingham Conservation Area. prevalent and traditional building materials for buildings, walls and surfaces; 3.2 To the north and west, the conservation area the contribution made to the character of boundary extends from the railway bridge at the area by greens or green spaces, trees, hedges Battersea Reach along Townmead Road and and other natural or cultivated elements; Carnwath Road to Broomhouse Lane. This includes the slipway to the river at Broomhouse the prevailing (or former) uses within the Dock.
    [Show full text]
  • Bankside Power Station: Planning, Politics and Pollution
    BANKSIDE POWER STATION: PLANNING, POLITICS AND POLLUTION Thesis submitted for the degree of Doctor of Philosophy at the University of Leicester by Stephen Andrew Murray Centre for Urban History University of Leicester 2014 Bankside Power Station ii Bankside Power Station: Planning, Politics and Pollution Stephen Andrew Murray Abstract Electricity has been a feature of the British urban landscape since the 1890s. Yet there are few accounts of urban electricity undertakings or their generating stations. This history of Bankside power station uses government and company records to analyse the supply, development and use of electricity in the City of London, and the political, economic and social contexts in which the power station was planned, designed and operated. The close-focus adopted reveals issues that are not identified in, or are qualifying or counter-examples to, the existing macro-scale accounts of the wider electricity industry. Contrary to the perceived backwardness of the industry in the inter-war period this study demonstrates that Bankside was part of an efficient and profitable private company which was increasingly subject to bureaucratic centralised control. Significant decision-making processes are examined including post-war urban planning by local and central government and technological decision-making in the electricity industry. The study contributes to the history of technology and the environment through an analysis of the technologies that were proposed or deployed at the post-war power station, including those intended to mitigate its impact, together with an examination of their long-term effectiveness. Bankside made a valuable contribution to electricity supplies in London until the 1973 Middle East oil crisis compromised its economic viability.
    [Show full text]
  • Sands End Revisited a Local History Guide
    SANDS END REvisitED A Local HISToRy GuIDE We found useful information at the Archive and Local History centre in Hammersmith. There were people that came into school and helped us with our research because they had been residents in Sands End or pupils at Langford many years ago. We also went to Elizabeth Barnes Court Old People’s home to hear more stories and memories of people who knew Sands End in the past. Some of the places in Sands End are named after people that lived here, for example Bagley’s Lane, is named after the Bagley family, locally well known for market gardening and were called the ‘Kings of Fulham’. Elaysha This local history guide about the Sands End area, has been compiled by Y6 from Langford Primary school. Working in partnership with Hammersmith and Fulham Urban Studies Centre, LBHF’s Archives and Local History Centre, and local interest group Sands End Revisited, Oak class became ‘History Detectives’ and were taken back in time to discover the stories of Sands End and the changes that have taken place over the years. By visiting local landmarks, such as the Community Centre on Broughton Road - which was once the old Sunlight laundry - examining old photos at the Archives, and sharing the memories of former local residents and pupils of Langford School, the children discovered a wealth of information, learnt about the changes that have taken place over the years and tried to uncover any secrets about the local area. The stories presented here are a mixture of fact, personal experience, and maybe a little bit of urban myth thrown in to really get you thinking! Thanks to Heritage Lottery Fund for the grant to produce the project.
    [Show full text]
  • Connecting Existing Buildings to District Heating Networks Technical Report
    Connecting Existing Buildings to District Heating Networks Technical Report 035317 14 DeCember 2016 Revision 00 Copyright © 1976 - 2016 BuroHappold Engineering. All Rights Reserved. Revision Description Issued by Date Checked 00 TeChniCal Report – Approved by GLA MD 14-DeC-2016 AY, SW This report has been prepared for the sole benefit, use and information of Greater London Authority for the purposes set out in the report or instruCtions Commissioning it. The liability of Buro Happold Limited in respeCt of the information Contained in the report will not extend to any third party. author Dr Mark Dowson date 14 Dec 2016 approved Alasdair Young signature date 14 Dec 2016 ConneCting Existing Buildings to DistriCt Heating Networks Copyright © 1976 - 2016 BuroHappold Engineering. All Rights Reserved. Page 3 Contents Executive Summary 9 1 Introduction 13 1.1 Context 13 1.2 BaCkground 13 1.3 ObjeCtives and outComes 14 1.4 University partners 15 2 Methodology 16 2.1 Deliverables 16 2.2 Work PaCkages 16 2.3 Report struCture 17 3 Building Typology Assessment (WP1A) 19 3.1 Overview 19 3.2 DomestiC building typology assessment 19 3.3 Non-domestiC building typology assessment 26 3.4 Summary 32 4 Building Typology Spatial Mapping (WP1B) 33 4.1 Overview 33 4.2 DomestiC building typology spatial mapping 33 4.3 Non-domestiC spatial mapping 36 5 Building Typology Retrofit Technical Requirements (WP2A) 41 5.1 Overview 41 5.2 Building stock review 41 5.3 Baseline typology CharaCteristiCs 44 5.4 Load modelling 47 5.5 DistriCt heating conneCtion strategies 49 5.6 DomestiC retrofit strategy 50 5.7 Non-domestiC retrofit strategy 54 5.8 Summary 55 6 Building Typology Retrofit Cost Modelling (WP2B) 56 6.1 Overview 56 6.2 Pipework design 56 6.3 Cost references 60 6.4 Cost summary 63 6.5 Observations 64 6.6 Centralised DHW storage 65 6.7 Summary 65 7 Cost Effectiveness & Retrofit Spatial Mapping (WP3A) 66 ConneCting Existing Buildings to DistriCt Heating Networks Copyright © 1976 - 2016 BuroHappold Engineering.
    [Show full text]
  • DRAFT Report on Procurement Update and OJEU
    ‘NORTH LONDON WASTE AUTHORITY REPORT TITLE: CONSULTATIONS AND POLICY UPDATE REPORT OF: HEAD OF OPERATIONS FOR SUBMISSION TO: DATE: AUTHORITY MEETING 28 September 2017 SUMMARY OF REPORT: This report provides the regular update on consultations and policy issues which have the potential to impact on Authority operations or activities. The report is principally focussed on one issue for this meeting, namely the consultation draft London Environment Strategy of the London Mayor. The report sets out key aspects of the consultation draft document for Member consideration and recommends authority is delegated to submit a formal response. The Deputy Mayor for Environment and Energy will give a presentation to the meeting. The report also notes a response to the GLA’s Environment Committee and planning matters that may affect the Authority’s principal place of business in Tottenham Hale. RECOMMENDATION: The Authority is recommended to delegate authority to the Head of Operations, in consultation with the Chair and Vice Chairs to submit a response on behalf of the Authority to the draft London Environment Strategy. SIGNED: ________________________________ Head of Operations DATE: 18 September 2017 1. PURPOSE AND STRUCTURE OF REPORT 1.1 The Consultations and Policy Update report is a regular report which provides an update for Members on consultations and policy issues that are relevant to the Authority such that the proposals have the potential to affect the Authority’s operations and/or costs. The report additionally seeks approval for responses where appropriate. 1.2 This report is principally concerned with the Mayor of London’s consultation draft Environment Strategy. It also notes planning matters that may affect the Authority’s principal place of business in Tottenham Hale.
    [Show full text]
  • Tales of the Thames Path from Hammersmith to Chelsea
    Tales of the Thames Path from Hammersmith to Chelsea A Guide by Local Children Black Lion Pub Ghost 1 Story In the early 1800s the Black Lion pub in Hammersmith was rumoured to be haunted by a ghost! The terrifying ghost roamed the streets and lanes around a nearby graveyard. Did you know that a lady was scared by the ‘ghost’ and never recovered from the shock and died soon after? 2 Kelmscott House/William Morris Local men decided to hunt the Kelmscott House is a Georgian mansion Ghost but accidentally shot an at 26 Upper Mall. William Morris lived here innocent man in the process. and made beautiful carpets and designed Come along to the Thames Path to wallpapers which were very popular in discover more yourself! England. He was a revolutionary force in Victorian Britain: his work as an artist, There are birds that always fly designer, craftsman, writer and socialist High, high up in the sky dramatically changed the fashions and thinking of the era. He lived at Kelmscott But in times more polluted House from 1878 to 1896. In 1891 he founded Like the Industrial factories with the Kelmscott Press to publish limited- their chimneys sooted edition illustrated books. Factories sending water to the east And the quality is not the best All the herons in the sky And in the winter saying bye bye Lots of people in the boats All of them wearing fluffy coats Nikoden - St Peters CE School The basement and coach house serve as headquarters for the William Morris Society. Kelmscott House Museum is open to the public Thursdays and Saturday from 2–5 p.m.
    [Show full text]
  • Cinematic Urban Geographies
    Screening Spaces Series Editor Pamela Robertson Wojcik Dept. of Film, Television, and Theatre University of Notre Dame Notre Dame, Indiana, USA Screening Spaces is a series dedicated to showcasing interdisciplinary books that explore the multiple and various intersections of space, place, and screen cultures. More information about this series at http://www.springer.com/series/14491 François Penz • Richard Koeck Editors Cinematic Urban Geographies Editors François Penz Richard Koeck Department of Architecture School of Architecture University of Cambridge University of Liverpool Cambridge, United Kingdom Liverpool, United Kingdom Screening Spaces ISBN 978-1-137-46830-7 ISBN 978-1-137-46084-4 (eBook) DOI 10.1057/978-1-137-46084-4 Library of Congress Control Number: 2017940414 © The Editor(s) (if applicable) and The Author(s) 2017 This work is subject to copyright. All rights are solely and exclusively licensed by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication.
    [Show full text]
  • Laurence, Scott & Electromotors Ltd
    PBnni irTIOKI DAD^TFR aVn-S’ variable speed A. C. motor, 1450/480 rl\U U U U I IW IN D U U JI Cl\ POUTECHi 'R'P-M- driyinZ Shards Horizontal Borer. It is a fact that in numerous instances the application of an ‘ N.S. ’ variable speed A.C. motor, by enabling the speed to be adjusted instantly and exactly to the best value, has greatly improved the performance of machines of many kinds, as discerning designers and users are quick to appreciate. LAURENCE, SCOTT & ELECTROMOTORS LTD. Electrical Engineers since 1883 NORWICH & MANCHESTER E l e c t r ic a l R e v ie w January 26, 1945 The reliability of the generating plant is the same as that of its dis­ tributive cable. And the reliability of the cable is that of its insulation! That is why leading cable manufacturers use Tullis R u s s e ll Rothmill Cable Insulating Papers. Rothmill is renowned for its uniformly highquality.and isguaranteed free from metals and grit. R o t h iiiill A complete range is manu­ CABLE INSULATING PAPERfactured. W rite for details. T u llii ‘i& vn ell rC o Jix d The Pioneers of Twin-wire Papers for Printers AUCHMUTY & ROTHES PAPER MILLS, MARKINCH, SCOTLAND LONDON MANCHESTER BIRMINGHAM I Tudor Street, E.C.4 372 Corn Exchange Bldgs., 116 Colmore Row Corporation Street ____________ ________________________ January 26, 1945 E l e c t r ic a l R e v ie w I T h is new “ Sieray ” fluorescent lamp is identical with the standard Siemens “ Sieray ” D aylight fluorescent lamp, except that it gives a white, warmer, and more pleasing light» co mparable to Sunlight, and possesses the same qualities cf High Efficiency and Coolness in operation.
    [Show full text]
  • Implementation of Waste to Energy Systems in Metropolitan America
    IMPLEMENTATION OF WASTE TO ENERGY SYSTEMS IN METROPOLITAN AMERICA Prepared for: Jon Ratner, Forest City Enterprises I May 2012 Author : Brinda Sen Gupta Tulane School of Architecture I Candidate, Master of Sustainable Real Estate Development IMPLEMENTATION OF WASTE TO ENERGY SYSTEMS IN METROPOLITAN AMERICA I BRINDA SEN GUPTA I 2 TABLE OF CONTENTS EXECUTIVE SUMMARY 3 INTRODUCTION BROAD DEFINITION 4 SIGNIFICANCE 5 TYPES 6 Incineration 6 Gasification 7 Anaerobic Digestion 8 INNOVATION AND OUTPUTS 10 Heating and Electricity 10 Compressed Biogas 10 Bioethanol 11 PERCEPTION 13 Health Risks 13 Aesthetic Factors 14 Economic Impact 14 Social Perceptions 15 CASE STUDIES CLEVELAND 15 LONDON 18 LINKOPING 20 LUBECK 22 RISKS AND MITIGANTS MARKET TIMING 24 FINANCIAL RISKS 26 MARKET ANALYSIS CURRENT STATE OF AFFAIRS 27 DEMAND 28 COMPETITIVE SUPPLY 29 SITING THE PROJECT 31 DEVELOPMENT PROGRAM 32 LAND USE PLANNING: CLOSED LOOP SYSTEM 34 CONCLUSION 35 IMPLEMENTATION OF WASTE TO ENERGY SYSTEMS IN METROPOLITAN AMERICA I BRINDA SEN GUPTA I 3 EXECUTIVE SUMMARY Forest City Enterprises currently spends approximately $150 million in energy costs per annum. This proposal seeks to offset this expense by analyzing the viability of Waste-to-Energy as a potential solution. The driving components of this proposal are: analysis of types of WTE systems, case studies of urban WTE implementations, and the feasibility of this system in an urban area within the United States: Waste-to-Energy Systems create energy using incineration, gasification or anaerobic digestion of waste products. This system is particularly efficient because its advantage is many-fold: By using Waste-to-Energy, the cost and environmental hazards of land-filling is significantly mitigated; as recycling is a large part of the pretreatment of waste collected, there is a greater level of reuse of existing materials; and the embodied energy of waste can be harnessed for use by the people who contribute to its levels.
    [Show full text]
  • CONSUMER SAMPLING Ii Electrical Review April 2 8 , 1 9 4 4 PRIDE & PREJUDICE
    ELECTRICAL REVIEW, APRIL 28TH, 19 4-1 { • CONSUMER SAMPLING ii Electrical Review April 2 8 , 1 9 4 4 PRIDE & PREJUDICE It is with feelings of pride that we look back upon our pioneering efforts in the introduction of Fusion Weldecj boiler drums and pressure vessels, as it is yet another successful surmounting of the prejudice of ill-informed criticism . This construction was accepted by Lloyd’s Register of Shipping on the 24th May, 1935, and subsequently by all recognised engineering Insurance Companies, the Board of Trade, the Admiralty and the British Standards Institution (B.S.I 113 : 1943). This is no small testimonial to the willingness of legislative bodies to alter their Regulations permitting legitimate progress based on sound engineering principles. April 28, 1944 E l e c t r ic a l R e v ie w 1 . c f Hen? Only the expert yachtsman knows how to take every advan­ tage of a varying w in d . It is no job for amateurs. The same applies to the design of Water-heaters having to operate in various kinds of “ W aters.” All a matter of experience in knowing how to go on the right “ T a c k .” LEADERS IN Ch\ EAT * ELECTRIC “ WATER HEATING HEATRAE LTD., NORWICH • PHONE : NORWICH 25131 • GRAMS : HEATRAE, NORWICH W E M A K E TAG ELECTRIC WELDING MACHINES SPOT, SEAM AND BUTT FOR WIRELES8 WELDERS AND 8IM ILAR A WIDE RANGE OF 35 y a rn ’ axparlenca CONNECTIONS SIZE8 IN 8TOCK Automatic or Non- ROSSCOURTNEY & Co.Ltd. Automatic ASHBROOK ROAD, LONDON, N.I9 With or without Electric Control Tho quickest and most economical method ot Welding Oil Drums, Bars, SIT SCREWS Tyres, Wheel Rims, 11 k V A S p o t W e ld er Tubes and Angles.
    [Show full text]
  • PDU Case Report XXXX/YY Date
    GLA/4509/WR 20 May 2019 Riverside Energy Park, Belvedere In the London Borough of Bexley Planning Inspectorate reference: EN010093 National Infrastructure Project Development Consent Order application - Written representation Development Consent Order, Section 90 of Planning Act 2008 Proposed development Cory Environmental Holdings propose to develop ‘an integrated multi-technology Riverside energy generation park (REP) including an Energy Recovery Facility (ERF incinerator), Anaerobic Digestion Facility, Solar Panels, Battery Storage and electrical connection route’. As the Riverside Energy Park would have an electricity generating capacity over 50MWe, it is classified as a Nationally Significant Infrastructure Project under section 14(1)(a) and section 15(2) of the Planning Act 2008. Strategic impacts and summary • Heat demand: there is insufficient heat demand in the local area for the proposed ERF to operate as an effective CHP plant. The applicant overstates the CHP opportunities. The applicant’s existing energy from waste plant, adjacent to the proposed site, could meet all identified local need with only 70% of its heat supply capacity. • Renewable Energy: Feedstock is expected to be less than 50% renewable. • Carbon: Inadequate evidence provided to demonstrate that the ERF will meet the Carbon Intensity Floor Mayoral policy. The proposed ERF operating in power-only mode would be a net carbon producer, and not a carbon reducer. • Waste: Modelling indicates that if the Mayor achieves his recycling and reduction targets, London will have surplus energy from waste capacity by 2030, when considering all existing and permitted incinerators. Permitting further EfW capacity will undermine achievement of the Mayor’s recycling and reduction targets.
    [Show full text]