03246 Steve Way Irwin 163 (Exit to Road Island Caboolture-Bribie – Upgrade Bruce over a15 Upgrade Program, aprogram delivering $12 . This project is beingdelivered under theBruce Highway ($132 by theAustralian ($530 (federal:state) basis with funding of $662 to Steve Irwin Way (Exit 163 The Upgrade –Caboolture- Road Steve Irwin Way (Exit 163). between Caboolture-Bribie Island Road and the Roads has (TMR) released thedesign for The Department of Transport and Main Final design released for highway upgrade Project benefits Project Jobs immunity Flood Capacity Safety 11-kilometre stretch of Bruce Highway . 5 million) governments. -year period. project Average of 664direct jobs for thelifetime of the 100-year flood upgraded highway designed to withstand a1 Significantly improved flood immunity with the greater capacity for commuter and freight traffic Increased lanes from four to six will deliver allowing traffic to continue toflow pull over incase of acrash oremergency while Wider shoulders will allow for vehicles to safely

million) and ) project is funded onan80/ . 5 million allocated 6 billion of works

20 -in-

• features design Key • • • • • • • • Steve Irwin Way (Exit 163 Caboolture-Bribie Island Road interchange and Two extra lanes (oneineach direction) between Pumicestone Road and Steve Irwin Way (Exit 163 Minor changes to existing interchanges at interchange into two consecutive exit ramps. Bribie Island Road and D'Aguilar Highway Northbound exit ramp separation for Caboolture- allow for ramp metering. modification to reduce southbound weaving and Caboolture-Bribie Island Road interchange to allow for current and future ramps. and thesouthbound bridgeat Beerburrum Creek New four-lane northbound bridgeat Lagoon Creek five creek crossings. flood for northbound and southbound lanes at all New three-lane bridges to withstand a1 and flatter batters orbarriers as required. 3 and 110km/h posted speedof D'Aguilar north Highway Provision for Smart Motorways. . 5 metre traffic lanes with 3 ) 100km/h posted speed to thesouth.

. 0 metre shoulders ). -year -in-100-year

).

N471 Pumicestone Road Interchange Road Pumicestone Inset C Contract 2–Pumicestone Road Interchange to Steve 163) Way Irwin (Exit Interchange N471 Upgrade Highway Bruce

Pumicestone Road Interchange Road Pumicestone Inset C Contract 2–Pumicestone Road Interchange to Steve 163) Way Irwin (Exit Interchange Bruce Highway Upgrade Highway Bruce Caboolture

Brisbane

P Caboolture u

Brisbane m

P

i Brisbane c u

e

m

s

t

o i

c n

e

e

s R

o t

a o

d

n

e

R

o Toorbul

a d Toorbul retained with ramps modified to suit six lane highway upgrade Interchange andbridge to be retained with ramps modified to Existing Pumicestone Road suit six lane highway upgrade Interchange andbridge to be Inset C Existing Pumicestone Road Inset C suit six lane highway upgrade N471 Entry/Exit ramps modified to suit six lane highway upgrade Entry/Exit ramps modified to Legend Pumicestone Road Interchange Road Pumicestone Inset C Contract 2–Pumicestone Road Interchange to Steve 163) Way Irwin (Exit Interchange Bruce Highway Upgrade Highway Bruce

Legend Caboolture

Brisbane

P Brisbane

u

m

i

c

New Bruce Highway andramps e

s

t

o

n

e

New Bruce Highway andramps R o

a d Toorbul -Caboolture-Bribie Island Road 163) to Steve Way (Exit Irwin

N471 -Caboolture-Bribie Island Road 163) to Steve Way (Exit Irwin Pumicestone Road Interchange Road Pumicestone Inset C Contract 2–Pumicestone Road Interchange to Steve 163) Way Irwin (Exit Interchange Bruce Highway Upgrade Highway Bruce

Sunshine Coast

Caboolture

Sunshine Coast

Brisbane

P Brisbane

u BruceHighway

m

i

c

e BruceHighway

Bruce Highway Upgrade Program aimed at improving safety, flood resilience and capacity from Brisbane to . s

This project forms part of theAustralian andQueensland governments $12.6 billion, 15 year (2013-14 to 2027-28) t

o

n

e

Bruce Highway Upgrade Program aimed at improving safety, flood resilience and capacity from Brisbane to Cairns. R This project forms part of theAustralian andQueensland governments $12.6 billion, 15 year (2013-14 to 2027-28) o a d

retained with ramps modified to Toorbul suit six lane highway upgrade Interchange andbridge to be Existing Pumicestone Road

N471 Inset C

Pumicestone Road Interchange Road Pumicestone Inset C Contract 2–Pumicestone Road Interchange to Steve 163) Way Irwin (Exit Interchange Bruce Highway Upgrade Highway Bruce Caboolture

Steve Irwin Way (Exit 163)Steve Way (Exit Irwin Interchange Inset D Brisbane

P Brisbane u

m 163)Steve Way (Exit Irwin Interchange Inset D

i

c

New Bridges e Two newbridges over Brisbane s

t

o

n

New Bridges e Two newbridges over Brisbane

suit six lane highway upgrade R o Entry/Exit ramps modified to a d Six Mile Creek

retained with ramps modified to Toorbul Six Mile Creek For information, further visit Legend suit six lane highway upgrade Interchange andbridge to be Existing Pumicestone Road

For information, further visit

Inset C

S

i

x

New Bruce Highway andramps M

S

i

i

l x

e

C

M r e

e

k

i

l

e

C r e e k -Caboolture-Bribie Island Road 163) to Steve Way (Exit Irwin

Existing Bruce Highway and ramps (not upgraded) suit six lane highway upgrade Entry/Exit ramps modified to Existing Bruce Highway and ramps (not upgraded) retained with ramps modified to suit six lane highway upgrade Legend Interchange andbridge to be Existing Pumicestone Road Sunshine Coast Inset C

Additional southbound lane to begin

BruceHighway www.tmr.qld.gov.au/cbir2siw

Additional southbound lane to begin New Bruce Highway andramps at Steve Irwin Way interchange Bruce Highway Upgrade Program aimed at improving safety, flood resilience and capacity from Brisbane to Cairns. www.tmr.qld.gov.au/cbir2siw This project forms part of theAustralian andQueensland governments $12.6 billion, 15 year (2013-14 to 2027-28) at Steve Irwin Way interchange southbound ramp entry southbound ramp entry -Caboolture-Bribie Island Road 163) to Steve Way (Exit Irwin Two newbridges over suit six lane highway upgrade Entry/Exit ramps modified to Two newbridges over Two newbridges over Unnamed Creek Beerburrum Creek

Two newbridges over

Contract Contract Contract Legend Caboolture Unnamed Creek Beerburrum Creek Brisbane Sunshine Coast Brisbane

Steve Irwin Way (Exit 163)Steve Way (Exit Irwin Interchange Inset D

BruceHighway

Inset A

Toorbul New Bridges Two newbridges over New Bruce Highway andramps Brisbane

Bruce Highway Upgrade Program aimedat improving safety, flood resilience and capacity from Brisbane to Cairns. This project forms partof the Australian andQueensland governments $12.6 billion, 15 year (2013-14 to 2027-28) 2 1 – Caboolture-Bribie Island Road to Pumicestone Road Pumicestone to Road Island Caboolture-Bribie – –Pumicestone Road interchange to 163 Steve Way (Exit Irwin Six Mile Creek

For information, further visit www.tmr.qld.gov.au/cbir2siw -Caboolture-Bribie Island Road 163) to Steve Way (Exit Irwin

Caboolture

Bribie Island Bribie

S

Unnamed Creek Unnamed

i

x

Sunshine Coast

M

Unnamed Creek Unnamed

i

l

Steve Irwin Way (Exit 163)Steve Way (Exit Irwin Interchange Inset D e

C r e e BruceHighway k Inset C

New Bridges Caboolture-Bribie Island Road Two newbridges over Brisbane Bruce Highway Upgrade Program aimedat improving safety, flood resilience and capacity from Brisbane to Cairns. overpass to beretained with This project forms partof the Australian andQueensland governments $12.6 billion, 15 year (2013-14 to 2027-28) suit six lane highway upgrade ramps modified to suit six Entry/Exit ramps modified to Existing Bruce Highway and ramps (not upgraded) lane highway upgrade Six Mile Creek suit six lane highway upgrade Entry/Exit ramps modified to Other roads For information, further visit www.tmr.qld.gov.au/cbir2siw Other roads

Additional southbound lane to begin

S

i

x

at Steve Irwin Way interchange M

i

Steve Irwin Way (Exit 163)Steve Way (Exit Irwin Interchange Inset D l

e

C r e e southbound ramp entry k New Bridges Two newbridges over

Brisbane

Two newbridges over Existing Bruce Highway andramps (not upgraded) Two newbridges over Six Mile Creek Unnamed Creek Beerburrum Creek Inset D For information, further visit www.tmr.qld.gov.au/cbir2siw Waterways Inset D

roads to beretained Existing connection Waterways

Bruce Highway

Additional southbound lane to begin

S

i

x

at Steve Irwin Way interchange M

i

l

e

u

r b r r

u

e

m

C

e r e

e

k

B

C

southbound ramp entry r

e

u

r b

r r e u

e

m

e k

B

S C r

e

t e e k

S Two newbridges over Existing Bruce Highway andramps (not upgraded) bridges to beretained v Way Interchange and t

e Two newbridges over ExistingIrwin Steve e

Unnamed Creek

bridges to beretained v I Beerburrum Creek Way Interchange and

e r ExistingIrwin Steve w Creek Unnamed I r i w n W Two newbridges over i n a Additional southbound lane to begin W y Six Mile Creek

a interchange )

at Steve Irwin Way interchange y Final Design April 2020 April Design Final suit six lane highway upgrade Entry/Exit ramps modified to Final Design April 2020 April Design Final southbound ramp entry Other roads www.tmr.qld.gov.au |www.qld.gov.au

Two newbridges over

www.tmr.qld.gov.au |www.qld.gov.au

Two newbridges over

S

i Unnamed Creek

x

Beerburrum Creek

M

i

l

e

Unnamed Creek Unnamed C

r e

e k

13 QGov (13 74 68) Coast Sunshine

S suit six lane highway upgrade Coast Sunshine

t Entry/Exit ramps modified to

e L

a

v g Sunshine Coast Sunshine

13 QGov (13 74 68) o o e n

C

r

e I e Sunshine Coast Sunshine S rw k tev in W Other roads e Irw ay Inset D in W Waterways a y Beerwah

Beerwah Unnamed Creek Unnamed

u r b r r u

e

m

e

B C

r

e

e S k t

e suit six lane highway upgrade Entry/Exit ramps modified to

bridges to beretained v Way Interchange and e ExistingIrwin Steve

I

Other roads r w Inset D i n Waterways W a y

Final Design April 2020 April Design Final

u r b r r u

e

m

e

B C

r

e

e S k www.tmr.qld.gov.au |www.qld.gov.au t

e

bridges to beretained v Way Interchange and e ExistingIrwin Steve

I r w Inset D i Waterways n

W a

y

Sunshine Coast Sunshine 2020 April Design Final 13 QGov (13 74 68)

Sunshine Coast Sunshine u

r b

r r u

S e m

t e e B

v C e r

Ir e w e in k S Wa

www.tmr.qld.gov.au | www.qld.gov.au t y e

bridges to beretained v Way Interchange and e ExistingIrwin Steve Beerwah I r w i n W a y

Final Design April 2020 April Design Final 13 QGov (1374 68) Coast Sunshine

Ste Coast Sunshine ve I rwin Wa www.tmr.qld.gov.au | www.qld.gov.au y

Beerwah 13 QGov (1374 68) Coast Sunshine

Stev Coast Sunshine e Irw in W ay

Beerwah Contract 1 – Caboolture-Bribie Island Road to Pumicestone Road

Caboolture

Two new bridges Inset B over Lagoon Creek Two new bridges over King John Creek

Bruce Highway Sunshine Coast

K

i L n

a g

g

J

o o

o h

n n

C C

r r e

e Toorbul e e

k k

B

e

e

r b

u

r

r u

m

Unnamed Creek Unnamed C r e e k Beerwah

Inset D Two new bridges over Beerburrum Creek Sunshine Coast

Two new bridges over Unnamed Creek Inset A Caboolture-Bribie Island Road and D’Aguilar Highway

L New D’Aguilar o D’Aguilar Highway Highway D’Aguilar w Highway exit ramp e interchange ramps and r K bridge to be retained i n g S t Entry ramp modified r e e to suit six lane t highway upgrade

C Bruce Highway a

b o

Brisbane o

l

t

u

r

e -

B Sunshine Coast

r

i

b

i

e

I

s

l

a

n

d

R d

Southbound exit ramp to D’Aguilar Highway New southbound exit ramp to Additional northbound lane to begin at modified to suit six lane highway upgrade Caboolture-Bribie Island Road Caboolture-Bribie Island Road exit ramp

Inset B Inset C Pumicestone Road interchange Pumicestone Road interchange

P u m P Existing Pumicestone Road Existing Pumicestone Road ic u e m interchange and bridge to be interchange and bridge to be s ic to e n s retained with ramps modified to retained with ramps modified to e t o R n suit six lane highway upgrade suit six lane highway upgrade o e a d R o

a

d

Sunshine Coast Bruce Highway Sunshine Coast Brisbane Bruce Highway Brisbane

Entry and Exit ramps modified to suit six lane highway upgrade

Old Toorbul Point Road to be retained

Inset D Steve Irwin Way (Exit 163) interchange

y a

Entry and Exit ramps modified to W

n suit six lane highway upgrade i w y r a I Two new bridges over W in e Irw v Beerburrum Creek e e tev t S S

Existing Steve Irwin Way interchange and bridges to be retained

Brisbane Bruce Highway Sunshine Coast

Additional southbound lane to begin at Steve Irwin Way interchange southbound entry ramp What are Smart Motorways?

Smart Motorways technologies including ramp signals, variable speed limit and message signs, vehicle detection systems and CCTV cameras will be delivered as part of this project. These technologies help to improve safety, reduce stop-start travel, and provide more predictable travel times for motorists.

As part of the Bruce Highway Smart Motorways Stage 2 project, Smart Motorways technologies will be delivered along the 60-kilometre link of the Bruce Highway Project delivery between and Road. TMR plans to deliver the major construction works as two separate packages. The first package, Contract 1, between Caboolture-Bribie Island Road and Pumicestone Road is Project milestones scheduled to start in late 2020. The second package, Contract 2, between Pumicestone Road and Steve Irwin Way (Exit 163) is scheduled to start in mid-2021. April 2019 Commence Detailed Design Quick facts Commence February 2020 Procurement for Road traffic noise Major Contracts We understand that road traffic noise is of interest for many people who live next to or near the highway. The project team Commence Early has carried out noise monitoring at various locations within April 2020 the project area to develop a noise model, which predicts Works future noise levels.

Our Transport Noise Management Code of Practice sets out standard processes for dealing with the effects of road traffic May 2020 Finalise Detailed Design noise on properties adjacent to state-controlled roads. If predicted noise levels at adjacent properties exceed the criterion in the code of practice, the department will discuss requirements under the code of practice with property owners. Late 2020 Start Construction Contract 1

Mid-2021 Start Construction Contract 2 Environmental management

Environmental management and conservation is one of TMR’s highest priorities. The department has been liaising with key stakeholders and the Australian and Queensland governments to discuss environmental issues, share information and ensure legislative requirements are met and, where possible, exceeded.

Through this consultation, many aspects of environmental management have been considered in the design layout and will be included in construction methods for the project. We will continue to listen to and work with local environmental stakeholders to ensure best practice is achieved as part of all environmental initiatives.

Traffic management

Minimising disruption to the flow of traffic while widening the Bruce Highway to six lanes will be one of the key challenges for the project. During construction, TMR will work with the contractors on strategies to keep the highway fully operational. It is important to note that reduced speed limits will be in place during construction.

For real time information on road closures, traffic conditions and traffic times on the Bruce Highway, call 13 19 40, visit www.QLDTraffic.qld.gov.au or check the QLDTraffic App (download for free from the App Store or Google Play).

Sustainability Want more information?

Our community, reducing waste and thinking long term are Your ideas and feedback are important to us. key sustainability focus areas for the department during design and construction. Call Talk to our community engagement team by calling 1800 430 800* The ’s objective is to embed sustainability into infrastructure planning, design, Email Send an email to construction and operation to deliver environmental, social [email protected] and economic benefits to the community.

To achieve sustainability outcomes the project will Web Find out more online and register incorporate innovation where possible and strive for an for project updates at Infrastructure Sustainability Council of Australia ‘excellent’ www.tmr.qld.gov.au/C2SIW rating in the use of construction materials and methods, pollution control, environmental management and delivery * Free call from anywhere in Australia, call charges of community benefits. apply for mobile phones and payphones. Check with your service provider for call costs.