CASTRO STATION ACCESSIBILITY IMPROVEMENTS CIVIC DESIGN REVIEW PHASE 1 MARCH 2018

CONTENTS

PROJECT OVERVIEW

PROPOSED IMPROVEMENTS

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 1 CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SFMTA’S GOALS/OBJECTIVES

SFMTA’s goal and standard are to provide uninterrupted elevator access at all underground stations. This standard has been adopted by The Project. SFMTA is working to incorporate the standard in existing stations by upgrading and to create elevator redundancy. ELEVATOR UPGRADES existing adding new elevators This is a list of projects: E L E V A T O R S SFMTA SUBWAY SAFETY AND RELIABILITY UPGRADE PROJECT at the following stations:

• Van Ness CASTRO • Church • Castro • Forest Hill • Powell • Central subway project E S C A L A T O R S ESCALATOR MODERNIZATION PROJECT PHASE II Replacement of 17 escalators in the subway system.

P R O J E C T S C O P E OF W O R K Add on the south-side of the Castro Station only: new elevator accessible path

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 2 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROJECT TIMELINE & OUTREACH ACTIVITIES

CASTRO STATION ACCESSIBILITY IMPROVEMENTS TIMELINE 2016 2017 2018 2019 2020 2021

pre-design/outreach competition advisory pre-design/outreach/CDR CD’s /permit/bid construction outreach outreach Project Web Site Castro Merchants Friends of Plaza Eureka Valley Neighborhood Assoc. SFMTA’s: * Multimodal Accessibility Advisory Committee (MAAC) Castro CBD Project on hold * Paratransit Coordinating Council PCC) Castro neighborhood Open Houses Pop-up tabling at Castro Station (planned) AIA COMPETITION

HARVEY MILK PLAZA IMPROVEMENTS PROJECT TIMELINE

Harvey Milk plaza pre-design/outreach fundraising/CEQA/CDR/CD’s /permit/bid/construction re-design project

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 3 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROJECT SITE

Rainbow Flag Building beyond station Commons Building

SITE

Market Street - South side

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 4 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 QUALIFICATIONS FOR ELEVATOR LOCATION Existing Elevator

St CASTRO Adjacent to station’s: main entrance concourse level station agent fare gates

platform trains MARKET St. 2 southwest corner of Market and Castro streets, which connects to additional transit lines and merchant corridor

Provides optimal access to all levels of the station 17th St 1 17th St

MARKET St. OTHER ELEVATOR LOCATIONS CONSIDERED BUT NOT CHOSEN CASTRO St CASTRO SITE

1 2 F line stop - 17th St & Castro St Station entry, Market St. - North side Outline of Castro Muni Station below . NOT TO SCALE Station Agent

Concourse Level

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 5 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 WĂůŵƚƌĞĞƐůŝŶĞďĂĐŬĞŶƚƌĂŶĐĞƚŽƉůĂnjĂ ^ƵŶŬĞŶůĂŶĚƐĐĂƉŝŶŐĨĞŶĐĞĚƚŽƉƵďůŝĐ ƵƐƐƚŽƉŽŶŶĂƌƌŽǁƐŝĚĞǁĂůŬ hŶĚĞƌƟůŝnjĞĚƵƉƉĞƌǁĂůŬǁĂLJ

SITE | STREET LEVEL 4 1 FLAG 2 SITE 6 7 3 5

Street level plan - Not to scale WĂůŵƚƌĞĞƐůŝŶĞďĂĐŬĞŶƚƌĂŶĐĞƚŽƉůĂnjĂ ^ƵŶŬĞŶůĂŶĚƐĐĂƉŝŶŐĨĞŶĐĞĚƚŽƉƵďůŝĐ ƵƐƐƚŽƉŽŶŶĂƌƌŽǁƐŝĚĞǁĂůŬ1 Market Street - Bus stop hŶĚĞƌƟůŝnjĞĚƵƉƉĞƌǁĂůŬǁĂLJ2 Upper walkway

&ĞŶĐĞĚŽīŐƌĞĞŶƐƉĂĐĞ3 Fenced off green space DĂƚƵƌĞƚƌĞĞƐŝŶƐƵŶŬĞŶĨĞŶĐĞĚƉůĂnjĂ4 Trees in sunken plaza ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ /ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ OVERVIEW & BACKGROUND 4

New elevator New elevator New elevator

&ĞŶĐĞĚŽīŐƌĞĞŶƐƉĂĐĞ DĂƚƵƌĞƚƌĞĞƐŝŶƐƵŶŬĞŶĨĞŶĐĞĚƉůĂnjĂ ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ /ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ5 Upper walkway 6 Rainbow flag 7 Upper walkway OVERVIEW & BACKGROUND 4 CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 6 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SITE | CONCOURSE LEVEL

1 Exterior stairs 2 Concourse entrance 3 Concourse entrance

New elevator 5

3 SITE 4 Sunken Plaza 4 2 1

Concourse level plan - Not to scale

Exterior elevator 5 View of platform level New window panel New opening for elevator

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 7 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SITE | PLATFORM LEVEL New opening for elevator exit

1, 2 & 4 View of platform

3 2 4 1

Platform level plan - Not to scale SITE 4 Existing elevator

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 8 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROPOSED IMPROVEMENTS

1. STREET LEVEL - REGRADE SIDEWALK AND PLAZA GRADING

Re-grade sidewalk and Plaza to provide ADA compliant Market Street paths of travel

Castro Street

2. STREET LEVEL - WIDEN SIDEWALK AT MARKET STREET BUS STOP

Widen a segment of Market Street sidewalk to

Market Street create a safer path to walk

Castro Street

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 9 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROPOSED IMPROVEMENTS

3. STREET LEVEL - REPLACE PLAZA LIGHT FIXTURES

Replace existing pedestrian light fixtures along guardrails Market Street

Castro Street

4. MEZZANINE LEVEL - IMPROVE SECURITY FENCING

Improve security fencing to integrate with elevator and to create a safer station Market Street

Castro Street

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 10 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 LIGHTING AND SECURITY FENCING | REFERENCES LIGHTING UPGRADE OPTIONS 1 2 3

EXISTING FIXTURES SPOTLIGHTS VERTICAL FRAME VERTICAL TORCH SECURITY FENCING OPTIONS 1 2

LOCATION IMAGE STATION STANDARD EXTENDED ELEVATOR SKIN

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 11 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROPOSED IMPROVEMENTS DEPARTMENT OFDEPARTMENT PUBLIC WORKS OFDEPARTMENT PUBLIC WORKS OF PUBLIC WORKS 5. ALL LEVELS - ADD ADA ACCESSIBLE ELEVATOR CITY AND COUNTYCITY OF AND SAN COUNTY FRANCISCOCITY OFAND SAN COUNTY FRANCISCO OF Edgar Lopez - City ArchitectEdgar Lopez - CityEdgar Architect Lopez - City Architect BUILDING DESIGNBUILDING AND BUILDINGDESIGN AND DESIGN AND MARKET MARKETST MARKET ST ST CONSTRUCTIONCONSTRUCTION DIVISIONCONSTRUCTION DIVISION DIVISION

STREET LEVEL

S S T T S NEW ELEVATOR T NEW NEW NEW ELEVATOR ELEVATOR ELEVATOR T T T NEW PLATFORM NEW PLATFORMNEW PLATFORM S S ENTRY S

S S

T T S

T TRASH TRASH O O

TRASH O

S S

W W

S

E E

W N N

E

N S

S Julia Laue - PrincipalJulia Architect Laue - Principal / Division Architect Manager / Division Manager

4’-6”

W

W R R

S Julia Laue - Principal Architect / Division Manager E

E Julia Laue - Principal Architect / Division Manager

W R N N

E

N S S

W W

S

E E

W N N

E

N S S

W W

S

E E

W

N N E 30 Van Ness Avenue30 Van Ness Avenue Suite 4100 Suite 4100

N 30 Van Ness Avenue Suite 4100 ST ST ST San Francisco, CA San Francisco, CAFaxSan (415)557-4701 Francisco, CA Fax (415)557-4701 Fax (415)557-4701 A A A 94102-6028 94102-6028 94102-6028(415)557-4700 (415)557-4700 (415)557-4700 C C C HPF HPF S S HPF S Project Project Project

PGE PGE PGE

S S S T T

T CASTRO STATIONCASTRO STATION

TPB TPB CASTRO STATION TPB S PGE S PGE S PGE T T T S S S U U U B B New B ELEVATORELEVATOR STUDY STUDY TRASH TRASH ELEVATOR STUDY TRASH elevator OPTION 2A.3OPTION - TOP OPTION2A.3Street LANDING - TOP level2A.3 LANDING (STREET) plan- TOP - NotLANDING (STREET) to scale (STREET) 1 1/16" = 1'-0"1 1/16" = 1'-0"1 1/16" = 1'-0" Enter address hereEnter address hereEnter address here

NEW ACCESS FARE GATES 23’ PLATFORM WITH STREET LEVELSTREET AXONSTREET LEVEL AXON LEVEL AXON (E) PLATFORM BELOW(E) PLATFORM BELOW(E) PLATFORM BELOW STATION AGENT 1B 1B 1B GLASS FLOOR & EXISTING ELEVATOR Consultant Consultant Consultant GLASS RAILING

NEW ELEVATORNEW ELEVATOR

601 41 1 2 601 41 1 2 40TO1 08P_. 570 40TO1 08P_. 570 EDGCOE/ EDGCOE/ NEW ELEVATOR NC NC

601 41 1 2 TO401 08P_. 570 EDGCOE/ NC

601 4112 601 41 1 2 TO401 1P_. 0 571 TO401 1P_. 0 571 _STEP _STEP EDG /CO E EDG /CO E CN CN

601 41 1 2 TO401 P_1. 0 571 STEP_ EDG /CO E CN

TO E421 60 06 . 41 1 2 TO E421 60 06 . 41 1 2 044 044

TO E421 60 06 . 41 1 2 044 38’ ENTRY

TR E_ TR E_ AME I NDT 4 _I AME I NDT 4 _I ER" ER"

TR E_ AME I NDT 4 _I ER"

TR EE5 TR EE5 I N D N I D N I AI T ME AI T ME E" R E" R 62’ TO AGENT

TR EE5 I N D N I AI T ME E" R

401 60 10. 4121 401 60 2 10. 41 1 TO P/ 605 TO P/ 605 601 41 1 2 STEP 601 4112 STEP TO 40P/1 1. 606 TO 40P/1 1. 606 P E T S _BA P E T S _BA CK CK

60 1 1412 60 1 41 1 2 40ED1 09GE/. 573 39601 7641 . 1 2 40ED1 09GE/. 573 39601 7641 . 1 2 NCOC_ FL_ NCO 574 NCOC_ FL_ NCO 574 601 2 41 1 601 2 41 1 DR N AI C DR N AI C TR EE6 42TO1 03 . E 043 TR EE6 42TO1 03 . E 043 I N D N I D N I

AI T ME AI T ME 401 60 1. 41 02 E" R E" R TO P/ 605 601 41 1 2 STEP TO P/401 1. 606 _BA P E T S CK

60 1 41 1 2 ED401 GE/09. 573 391 60 76. 41 1 2 NCOC_ FL_ NCO 574 601 2 41 1 DR N AI C TR EE6 42TO1 03 . E 043 I N D N I AI T ME E" R 42’-6”

TR 3 EE TR 3 EE I N N DI N DI IA T ME IA T ME ER" ER"

TR 3 EE I N N DI IA T ME ER"

4260 TO1 141 E.12 4260 TO1 141 E.12 042 042

4260 TO1 141 E.12 STREET LEVEL 042

PL 1 4360 84 . AN91411 PL 1 4360 84 . AN91411 FTT_1_65 FTT_1_65 DI A DI A

PL 1 4360 84 . AN91411 FTT_1_65 DI A

TR E6 TR E6 I N D N I D N I AI T ME AI T ME ER" ER"

TR E6 I N D N I AI T ME ER"

52 B1 60 1 D4LG.1 2 41 1 52 B1 60 1 D4LG.1 2 41 1 M T _B 092 M T _B 092 -CO C N -CO C N HAM HAM PH ER PH ER EC EC

52 B1 60 1 D4LG.1 2 41 1 M T _B 092 -CO C N HAM PH ER New EC

B LDG52601 47 2 41 . 1 B LDG52601 47 2 41 . 1 M T _B 089 M T _B 089 -CO NC -CO NC C C HA HMP HA HMP ER ER B @ ER B @ IC RI WA K C RI WA K LL LL

B LDG52601 47 2 41 . 1 521 60 44 . 41 1 2 521 60 44 . 41 1 2 M T _B 089 B _B D L G 090 B _B D L G 090 -CO NC M-CO C T N M-CO C T N C C H A MPH C H A MPH HA HMP ER ER ER ER ER B @ BC BC IC RI WA K LL

421 60 25 . 41 1 2 421 60 25 . 41 1 2 FA CEC 046 FA CEC 046 LU OL MN U OL MN

521 60 44 . 41 1 2 B _B D L G 090 M-CO C T N C H A MPH ER ER BC

421 60 25 . 41 1 2 FA CEC 046 LU OL MN UP UP

42601 43 2 41 . 1 42601 43 2 41 . 1 FA C E 045 FA C E 045 LU MNOL U MNOL UP

42601 43 2 41 . 1 FA C E 045 LU MNOL

601 2 41 1 601 2 41 1 43FA1 C .15C E 047 43FA1 C .15C E 047 L OMNU L OMNU

601 2 41 1 43FA1 C .15C E 047 elevator L OMNU ENTRY No. Date No. DateRevisions Revisions

52B1 60 24 _B D . L G 41 1 2 52B1 60 24 _B D . L G 41 1 2 M-CO C T 053N M-CO C T 053N C H A MPH C H A MPH E R E R BC BC No. Date Revisions

52B1 60 24 _B D . L G 41 1 2 M-CO C T 053N C H A MPH E R BC

B _B D L G 521 60 31 . 41 1 2 B _B D L G 521 60 31 . 41 1 2 M-CO T 054 60 1 41 1 0 M-CO T 054 60 1 41 1 0 CN HCA GR41 1 _D.7 954 CN HCA GR41 1 _D.7 954 M A L N_P I 2 M A L N_P I 2 HP E OCRP NET R HP E OCRP NET R R41 G1 60 .741 D_1 0 R41 G1 60 .741 D_1 0 _LA N_PL 9951 I A N_PL 9951 I NTE R NTE R

60 1 41 1 0 60 1 41 1 0 W41 1 LA.9-TO 958 W41 1 LA.9-TO 958 P7 P7

B _B D L G 521 60 31 . 41 1 2 M-CO T 054 60 1 41 1 0 CN HCA GR41 1 _D.7 954 M A L N_P I 2 HP E OCRP NET R R41 G1 60 .741 D_1 0 _LA N_PL 9951 I NTE R

60 1 41 1 0 W41 1 LA.9-TO 958 P7

41 GR1 60 0 41 _.D81 41 GR1 60 0 41 _.D81 60 1 41 1 2 A L N_P 9I 953 60 1 41 1 2 A L N_P 9I 953 52 1 B 31 D. LG 055 TNE R 52 1 B 31 D. LG 055 TNE R M _T B M _T B -CO NC C -CO NC C HAM HAM 60 1 41 1 0 60 1 41 1 0 HP E R HP E R R41 G1 _.9D 952 R41 G1 _.9D 952 EC EC _ A L N_P I 2 A L N_P I 2 NTER NTER

41 GR1 60 0 41 D_7.1 41 GR1 60 0 41 D_7.1 _ A L N_P 8I 955 A L N_P 8I 955 TNE R TNE R

41 GR1 60 0 41 _.D81 60 1 41 1 2 A L N_P 9I 953 4260 G1 A 19.1411TE_ 4260 G1 A 19.1411TE_ 52 1 B 31 D. LG 055 TNE R GN 38_@BG N 38_@BG M _T B _ WA _ WA -CO NC C L L HAM 60 1 41 1 0 HP E R R41 G1 _.9D 952 41 1 60 .61 41 1 0 41 1 60 .61 41 1 0 EC _ A L N_P I 2 RG D_ 8 956 RG D_ 8 956 NTER A L N_P I A L N_P I NTER NTER TR EEC TR EEC IN S--L 2I N S--L 2I 2 IN 2 IN -2 -2 41 GR1 60 0 41 D_7.1 IN " IN " _ A L N_P 8I 955 TNE R

4260 G1 A 19.1411TE_ GN 38_@BG TR EEC TR EEC _ WA IN S--L 5I N S--L 5I L IN 4I -3 N 4I -3 IN_ IN_ 41 1 60 .61 41 1 0 TR EEC TR EEC IN1 " IN1 " RG D_ 8 956 N S--L 5I N S--L 5I 41 GR1 60 0 41 D_6.1 41 GR1 60 0 41 D_6.1 _ A L N_P I N 4I -3 N 4I -3 N _P A8I L 957 N _P A8I L 957 NTER IN_ IN_ TNE R TNE R TR EEC N 3I _ N 3I _ IN S--L 2I N_ 2I N 2I _ N_ 2I N 2I _ 2 IN 50 49 041 60 63 2 . 1 41 N" I 1 50 49 041 60 63 2 . 1 41 N" I 1 -2 CHK 781 CHK 781 IN "

TR EEC IN S--L 5I IN 4I -3 IN_ TR EEC IN1 " IN S--L 5I 41 GR1 60 0 41 D_6.1 IN 4I -3 N _P A8I L 957 IN_ TNE R IN 3I _ IN_ 2I N 2I _

50 49 041 60 63 2 . 1 41 N" I 1 CHK 781 14’-1” CONCOURSE LEVEL MEZZANINEMEZZANINE AXONMEZZANINE AXON AXON 2B 2B 2B OPTION 2A.3OPTION - MIDDLE OPTION2A.3 -LANDINGMezzanine/Concourse MIDDLE 2A.3 - MIDDLELANDING ( MEZZANINE) LANDING ( MEZZANINE) level ( plan MEZZANINE) - Not to scale 2 1/16" = 1'-0"2 1/16" = 1'-0"2 1/16" = 1'-0" Mark Dorian - ArchitectureMark Dorian Services - Architecture ManagerMark Dorian Services - Architecture Manager Services Manager

CONCOURSE LEVEL EXISTING ELEVATOR Section Head Section Head Section Head N N N Proj. Mgr. Proj. Mgr. Proj. Mgr. O O O

Proj. Arch. Proj. Arch. Proj. Arch. 11’-6” Drawn Drawn Drawn Author NOT FORAuthor NOTAuthor FOR NOT FOR Date Date Date 06/28/16 06/28/16 06/28/16 Phase Phase Phase TRAINS CONCEPTUAL CONSTRUCTICONCEPTUAL CONSTRUCTICONCEPTUAL CONSTRUCTI Drawing Title Drawing Title Drawing Title PLATFORM LEVEL ENTRY

(E) ELEVATOR ROOM(E) ELEVATOR ROOM(E) ELEVATOR ROOM OPTION 2A.3OPTION - PLANS 2A.3OPTION & - PLANS 2A.3 & - PLANS & AXONOMETRICSAXONOMETRICSAXONOMETRICS NEW GLASS FLOOR ABOVE ELEVATOR EXISTING ELEVATOR TUNNEL NEW ELEVATOR NEW ELEVATORNEW ELEVATOR Sheet No. Sheet No. Sheet No. PLATFORMPLATFORM AXONPLATFORM AXON AXON 3B 3B 3B C2A.3.01C2A.3.01C2A.3.01 NEW ELEVATOR PLATFORM LEVEL

OPENING 1/16" = 1'-0" 1/16" = 1'-0" OPTION 2A.3OPTION - BOTTOM OPTION2A.3 - BOTTOMLANDING 2A.3 - BOTTOM LANDING (PLATFORM) LANDING (PLATFORM) (PLATFORM) Scale: 1/16" = Scale:1'-0" Scale: Platform level plan - Not to scale Job No. Job No. Job No. 3 1/16" = 1'-0"3 1/16" = 1'-0"3 1/16" = 1'-0" 7982A 7982A 7982A

Original Sheet Size:Original 22"x34" Sheet Size:Original 22"x34" Sheet Size: 22"x34"

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 12 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 ELEVATOR | LONGITUDINAL SECTION

EXISTING RAINBOW FLAG 77’ NEW ELEVATOR MARKET STREET BEYOND

NEW ACCESS PLATFORM WITH 11’-6” MARKET STREET WALL 15’-10” GLASS FLOOR MARKET STREET BEYOND EXISTING PLANTERS

CASTRO STREET 38’ 42’-6”

STREET LEVEL

NEW GLASS WALL STATION AGENT BEYOND

EXISTING RETAINING WALLS 14’-1” NEW FENCE CONCOURSE LEVEL

NEW GLASS FLOOR ABOVE ELEVATOR TUNNEL NEW PAVING 11’-6” NEW ELEVATOR TUNNEL PLATFORM LEVEL

NEW ELEVATOR PIT

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 13 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 ELEVATOR SKIN STUDIES | RENDERINGS & REFERENCES

STRUCTURAL GLASS POINT SUPPORT SYSTEM STOREFRONT SYSTEM CURTAIN WALL SYSTEM

1 2 3

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 14 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 DEPARTMENT OF PUBLIC WORKS CITY AND COUNTY OF SAN FRANCISCO Edgar Lopez - City Architect MARKET ST BUILDING DESIGN AND CONSTRUCTION DIVISION

NEW PAVING

S T

Julia Laue - Principal Architect / Division Manager 30 Van Ness Avenue Suite 4100 San Francisco, CA Fax (415)557-4701 94102-6028 (415)557-4700

S

T Project T

TRASH

S

W

E

N

S

W

E

N

S

W CASTRO STATION E

N

S

W E N TRO S ELEVATOR STUDY

AS C Enter address here

HP PROPOSED ELEVATOR | STREET LEVEL FS

PGE

S T Consultant

TPB S PGE TOP LANDING (STREET) - OPTION 1 - ENLARGED PLAN T 1 1" = 10'-0" BUS TRASH

NO I D

(N ) POINT SUPPORT GLASS TOWER

NEW PAVING MARKET ST. MARKET ST. STOP

NEW GLASS RAILING TS No. Date Revisions

4"

-

'

4

(E) RAINBOW FLAG

Mark Dorian - Architecture Services Manager

Section Head Proj. Mgr. (E) PLANTER Proj. Arch. FOR Drawn Author NOT NEW TRANSLUCENT BRIDGE Date 09/23/16 Phase CONCEPTUAL CONSTRUCTION NEW PLATFORM OPEN TO Drawing Title BELOW NEW GLASS RAILING OPTION 1 - TOP LANDING (STREET) PLAN

Sheet No. O1.02

StreetTOP level LANDING plan (STREET) - Not to - OPTIONscale 1 - ENLARGED PLAN DIMENSIONS Scale: As indicated Job No. 2 1/4" = 1'-0" 7982A Original Sheet Size: 22"x34"

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 15 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 DEPARTMENT OF PUBLIC WORKS CITY AND COUNTY OF SAN FRANCISCO

1 60 1 40 1412 C .64 722 L_6 IN W ID 1 60 E _ 1 401412 TUR C .60 683 N L_6 S TY IN LE W ID E _ TUR N S TY LE Edgar Lopez - City Architect

40 C .63 L_6 IN W ID 1 60 E _ 1 1412 TUR 723 N S TY LE

1 60 1 40 1412 .59 682 C L_6 IN

W ID E _ TUR N S TY LE BUILDING DESIGN AND

1 60 1 40 1412 .63 724 C L_6 IN W ID E _

1 60 TUR 1 40 1412 N 1 60 M .62 725 S TY 1 4014 (E) PLATFORM BELOW UNI_ LE C .58126 B O L_6 81 O IN TH_ W C OR ID E _ TUR N S TY LE

1 60 1 40 1412 .55 680 M UNI_ B O O TH_ CONSTRUCTION DIVISION C OR

1 60 1 401 601412 C 1 40.811412357 C HK.80 407 PT1HK6 PT106 140 0 19140 191 601 60 1 401 140601414 P 1T 401.81.8240.8114118114114 P PT TP T1601.81.81118119132919 1 160160160116014 019 114178 1 4014124400194 019 P T .81 19780 1601 X 02 40 3/ 19 0 17 X 02 5/ 0 17

1 60 1 40 1412 M .54 679 UNI_ B O O TH_ C OR

1 60 1 401412 T O .08 570 P_ EDG E/

1 60 C O 1 NC

1 40 412 T O .20 639 P_ EDG E/ CO NC_ PO C

1 60 1 40 14 .55 126 E LE 71 VAT OR _ E NT R Y_

CO R

1 60

1 1 4460 1412 F 1 IR44 .751412 235 F IRE_A.01 234 E_ALAR AR L M_P M_P U LL U LL _ BO _ BO X_C X_C OR OR

1 16060 1 14748141412 F IR F IR.68.13122 240 E_AE_A 41 LAR LAR

M_S M_S T ROT RO B E_B E_

LIGH LIGH T_ T_ COR COR

_ _

FA FA CE CE FA

1 60 1 44 1412 F IR .39 236 E_A LAR

M_P U LL _ BO

X_F 1 60 A CE 1 471412 F IR .90 244 E_A LAR

M_S T RO B E _ LI GH T _ FAC E

1 60 1 47481412 F IR .68.13 242423 F IR E_A 1 601 60 E_ALAR 1 441 1412441412 LAR F IR F .01IR .75233232 M_S E_AE_A M_TS RO LAR LAR T ROB E_ B E_ M_P M_P LIGH U LL U LL LIGH T_ _ BO_ BO T_ COR CO_R X_C X_C _ FA OR OR FA CE CE

1 60 1 451412 K .51 237 EY_ PA N

E L _C O R _ F AC E

1 60 1 60451412 1 44 .511412238 K K .88 239 EY_EY_ PAPA NENE L _CL _C O RO R _ _F F ACAC E E

1 60 1 40 1412 E LE .55 670 VAT OR _ E NT R Y_ CO R

1 60 1 42 1412 T O .12 004 P F AC E W ALL 1FT W I DE @ B R IC K WA LL

1 60 1 41 14 TC .2 121 6 06

1 60 1 40 14 .96 121 F L 15

1 60 0 1 60 1TC41 1412 .91 1 4 1412 .14 114 C 796 L- 6IN _ W- FLU SH_ T RA CK_ C O V ER_ E ND

1 601 60 1 60 1 60 1 441 141246 1412 1412227 F A .89 .46225 224 14 F1 A46 F CEA 125 1 60 CE_F.45 CE_FIR 1 40 7 1 60 1 441412 IR E_A _FIRE_ .10 1 391412 F A .87 226 LA AE_LA T O 1 T O .56 607 CE RM_A A LARM P_ P/ _FIR NNUN RM_ A STE STEP E_ CIATOR _ ANN P_ A LA _C NN EDG RM O R UN E/ UN _ A 1 60 C IA C O C IA NN 1 60 1412 T OR NC T OR UN 1 46 1 141245 229 1 60 _ 1 60 _ C IA U U .96 .93228 1 451 601412 C O 1 401412 C O T OR NKNNKN U 1 46.9414 230 R T O .11 572 R _ O OWNWN NKN.95122 C O P/ U O WN 31 R STEP _B_BO O NNK _ X_X_ O WN _BO B A FAFAC C X_ CK E_E_ _BO FAC C C X_ E_ OROR FAC C E_ OR C OR

1 60 1 40 1412 .18 659 H AN DRA IL_ E ND Julia Laue - Principal Architect / Division

1 60 1 40 1412 C .93 797 1 60 L- 1 40 1412 6IN .92 798 _ E D W- GE_ FLU 6 IN SH_ _ T W - RA F LUS CK_ H_ C O T V R AC ER_ K_ E ND C OV E R_ E N D Manager

1 60 1 4014 F L 9.9 121 18

1 60 1 4114 TC .14121 1 60 17 1 40 14 F L .99 121 16

1 60 1 40 1412 30 Van Ness Avenue Suite 4100 H .10 658 AN DRA IL_ E ND

B LDG _BTM - CO NC CHA MPH EREND @ BL DG_B TM-C O NC C HAMP1 60 SL O PE HER1412 T OP1 097 51.6 5 San Francisco, CA Fax (415)557-4701 94102-6028 (415)557-4700

1 60

1T 40O .101412 P/ 605 STEP

1 60 1 40 1412 .11 606 T O P/ STEP _ B A CK

1 60 1 401412 E D .09 573 1 60 GE/ 1 39 1412 C F L_.76 574 ON C C _ ONC DR AIN

1 60 1412 1 40 657 H .19 AN DRA IL_ NEW PAVING E ND

1 60 1 40 1412 E D .91 799 GE_ 6I N _W - FLUS H _ TR AC K _ C O V ER_ B C

1 60 1 41 14 TC .10 121 20 1 60 14 1 40 121 F L .97 19 Project

1 60 1 51 1412 B .6 096 LDG6 _BT M - C O NC C H A M P H ER EC

1 60 1 60 1 41 1412 1 41 14 F L .0 030 TC .16 120 2 31

1 60 1 40 1412 E D .93 800 GE_ 6I N _W - FLUS H _ TR A C K_ C OV

ER_ POC

1 6040 E D 14.91128 GE_ 01 6I N _W _ - C O FLUS V H _ _ TRER EC AC K

1 60 1 401412 C .92 802 L_6 IN _ W- FLU SH_ 1 60 T 1 40 1412 RAC .81 803 K _ C O C V L_6 ER_ IN E C _ W- FLU H S_ T RAC K _ C O V ER

1 60 1 401412 C .65 804 L_6 IN _ W- FLU SH_ T RAC K _ C O V ER_ E ND

1 60 1 4 1412 1 028 TC .2 1 1 60 1 41 1412 F L .0 029 5

1 60 1 40 14 E X .99 121 TER 24 IO R_

2IN_ GA TE_ B G N _@ _ BR

IC K _ W ALL

1 60 1 40 14 E XR .87 121 TEIO R_ 25

2IN_ GA TE_ B G N _@ _ BR

IC K _ W ALL CASTRO STATION

1 60 1 41 14 C .0 119 ONC8 55 _ C O LUMN _ PO C_ @ _ 1 60 G RD 1 41 14 C .0 119 ONC3 58 _ C O LUMN _ PO C_ @ _ G RD

1 60 1 41 14 C .0 119 ONC3 57 _ C O LUMN _ PO C_ @ _ G RD

1 60 1 41 14 C .0 119 ONC7 56 _ C O LUMN _ PO C_ @ _ G RD ELEVATOR STUDY

1

60 1 60 1 41 14 1 41 14 TC .2 119 F L .0 119 6 36 8 37

1 60 1 511412 .6 050 B 2 LDG _BTM

- CO NC C HA M PHER BC

1 60 B 1 511412 LDG 5 .3 049 _BT M - CO NC 1 60 C 1 53 14 HA S Q .13 119 M UA 62 PHE RE R E B DG R AC E K @ ET

1 16060 W AL 1 1525214121412 L J JU U .35.72078077 FOR NCC N S TI ON 1 60 P 1 51 1412 BOX EA B .16 048 C K ER LDG O R_ _BT M 1 60 PRO - C 1 52 1412 J U .69 JCT O NC 076 NC T C 1 60 TI ON O F HA 1 52 1412 AC M J U .32 079 BOX E W PH NC C ALL ER TI ON O R_ CO R BOX PRO C JCT O R_ T O F PRO AC JCT E W T ALL O F AC E W ALL

1 60 1 5114 B .6 120 LDG 9 51 _BT M - C O NC C 1S 152Q 60 HA .85UARE1411963 M BRAC PH K

ER ET @ POC W ALL FOR SP EA KER

1 60 1 51 1412 B .7 052 LDG2 _BT M - C O NC C H A M P H ER EC Enter address here

1 60 1 41 14 F L .14 119 34 1 60 1 41 14 TC .3 119 1 35

1 60 1 52 1412 B .47 089 LDG _BT M - C O NC C H A M PH ER @ B R IC K W A LL

1 60 1 52 1412 B .44 090 LDG _BTM

- CO NC C HA M PHER BC

1 60 1 4214 B .35119 ENC 21 H -R

OCK /ST ON E

1 60 1 42 14 .36 119 B 22 ENC H -R

OCK /ST ON E

1 60 1 41 14 B .0 119 ENC1 31 H _ M ETA L_ COR

1 60 1 40 14 T R .76 119 AS 25 1 60 HCAN 1 4014 .74119 _CO T R 26 R AS HCAN

_CO 1 60 R 1 40 14 B .92 119 ENC 28 ETA H _ L_ M COR Consultant

1 60 1 4214 B .36119 ENC 24 H -R

OCK /ST 1 60 ON 1 4014 E .99119 B 30 ENC H _ M ETA

L_ COR

1 60 1 60 1 4114 1 4114 .3 119 F L .17119 TC 3 32 33

1 60 1 421410 1 60 .10 950 1 40 14 W B .92 119 ALL- ENC 29 T O H _ P M ETA L_ COR

2 B .36 ENC H -R 1 60 1 4 14 1 60 OCK 119 1410 /ST 23 1 42 960 ON W .09 E ALL- T O P

1 60 1 42 1410 W .01 959 ALL- T O

P

1 60 1 404 1 T R .76119 AS 27 HCAN

_CO R

1 60 1 411410 W .9 958 ALL-7 T O PROPOSED ELEVATOR | CONCOURSE LEVEL P

R EECLS- 2I N- 2 IN -2 IN "

T

T R EECLS- 5IN- 4 IN - 3 IN _ 1IN "

T R EECLS- 5IN- 4 IN -3IN _ 3IN _ 2IN_2 IN_1IN"

CLS- 5IN- 4 T R IN - EE 3 IN _ 1IN "

NEW PAVING

MIDDLE LANDING ( MEZZANINE) - OPTION 1 - ENLARGED PLAN 1 1" = 10'-0"

No. Date Revisions

NEW GLASS WINDOW 12' - 4" NEW TRANSLUCENT Mark Dorian - Architecture Services Manager 10' - 4" GLASS PAVERS Section Head Proj. Mgr. Proj. Arch. FOR Drawn Author NOT Date 09/23/16 8' - 4" Phase CONCEPTUAL NEW ELEVATOR CONSTRUCTION

Drawing Title 13' - 4" 11' - 4" 9' - 4" - 9' OPTION 1 - MIDDLE LANDING (MEZZANINE) PLAN

Sheet No. O1.03 Mezzanine/ConcourseMIDDLE LANDING ( MEZZANINE) level plan- OPTION - Not 1 - DIMENSIONSto scale 2 1/4" = 1'-0" Scale: As indicated Job No. 7982A Original Sheet Size: 22"x34"

CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 16 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018