Castro Station Accessibility Improvements Civic Design Review Phase 1 March 2018

Castro Station Accessibility Improvements Civic Design Review Phase 1 March 2018

CASTRO STATION ACCESSIBILITY IMPROVEMENTS CIVIC DESIGN REVIEW PHASE 1 MARCH 2018 CONTENTS PROJECT OVERVIEW PROPOSED IMPROVEMENTS CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 1 CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SFMTA’S GOALS/OBJECTIVES SFMTA’s goal and standard are to provide uninterrupted elevator access at all underground stations. This standard has been adopted by The Central Subway Project. SFMTA is working to incorporate the standard in existing stations by upgrading and to create elevator redundancy. ELEVATOR UPGRADES existing adding new elevators This is a list of projects: E L E V A T O R S SFMTA SUBWAY SAFETY AND RELIABILITY UPGRADE PROJECT at the following stations: • Van Ness CASTRO • Church • Castro • Forest Hill • Powell • Central subway project E S C A L A T O R S ESCALATOR MODERNIZATION PROJECT PHASE II Replacement of 17 escalators in the subway system. P R O J E C T S C O P E OF W O R K Add on the south-side of the Castro Station only: new elevator accessible path CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 2 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROJECT TIMELINE & OUTREACH ACTIVITIES CASTRO STATION ACCESSIBILITY IMPROVEMENTS TIMELINE 2016 2017 2018 2019 2020 2021 pre-design/outreach competition advisory pre-design/outreach/CDR CD’s /permit/bid construction outreach outreach Project Web Site Castro Merchants Friends of Harvey Milk Plaza Eureka Valley Neighborhood Assoc. SFMTA’s: * Multimodal Accessibility Advisory Committee (MAAC) Castro CBD Project on hold * Paratransit Coordinating Council PCC) Castro neighborhood Open Houses Pop-up tabling at Castro Station (planned) AIA COMPETITION HARVEY MILK PLAZA IMPROVEMENTS PROJECT TIMELINE Harvey Milk plaza pre-design/outreach fundraising/CEQA/CDR/CD’s /permit/bid/construction re-design project CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 3 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROJECT SITE Rainbow Flag Castro Theatre Building beyond station Commons Building SITE Market Street - South side CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 4 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 QUALIFICATIONS FOR ELEVATOR LOCATION Existing Elevator CASTRO St Adjacent to station’s: main entrance concourse level station agent fare gates platform trains MARKET St. 2 southwest corner of Market and Castro streets, which connects to additional transit lines and merchant corridor Provides optimal access to all levels of the station 17th St 1 17th St MARKET St. OTHER ELEVATOR LOCATIONS CONSIDERED BUT NOT CHOSEN CASTRO St SITE 1 2 F line stop - 17th St & Castro St Station entry, Market St. - North side Outline of Castro Muni Station below . NOT TO SCALE Station Agent Concourse Level CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 5 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 WĂůŵƚƌĞĞƐůŝŶĞďĂĐŬĞŶƚƌĂŶĐĞƚŽƉůĂnjĂ ^ƵŶŬĞŶůĂŶĚƐĐĂƉŝŶŐĨĞŶĐĞĚƚŽƉƵďůŝĐ ƵƐƐƚŽƉŽŶŶĂƌƌŽǁƐŝĚĞǁĂůŬ hŶĚĞƌƟůŝnjĞĚƵƉƉĞƌǁĂůŬǁĂLJ SITE | STREET LEVEL 4 1 FLAG 2 SITE 6 7 3 5 Street level plan - Not to scale WĂůŵƚƌĞĞƐůŝŶĞďĂĐŬĞŶƚƌĂŶĐĞƚŽƉůĂnjĂ ^ƵŶŬĞŶůĂŶĚƐĐĂƉŝŶŐĨĞŶĐĞĚƚŽƉƵďůŝĐ ƵƐƐƚŽƉŽŶŶĂƌƌŽǁƐŝĚĞǁĂůŬ1 Market Street - Bus stop hŶĚĞƌƟůŝnjĞĚƵƉƉĞƌǁĂůŬǁĂLJ2 Upper walkway &ĞŶĐĞĚŽīŐƌĞĞŶƐƉĂĐĞ3 Fenced off green space DĂƚƵƌĞƚƌĞĞƐŝŶƐƵŶŬĞŶĨĞŶĐĞĚƉůĂnjĂ4 Trees in sunken plaza ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ /ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ OVERVIEW & BACKGROUND 4 New elevator New elevator New elevator &ĞŶĐĞĚŽīŐƌĞĞŶƐƉĂĐĞ DĂƚƵƌĞƚƌĞĞƐŝŶƐƵŶŬĞŶĨĞŶĐĞĚƉůĂnjĂ ŽŵŵĞŵŽƌĂƟǀĞƉůĂƋƵĞƐ /ŶƐƵĸĐŝĞŶƚƉůĂnjĂƐƉĂĐĞĨŽƌĂĐƟǀĂƟŽŶ5 Upper walkway 6 Rainbow flag 7 Upper walkway OVERVIEW & BACKGROUND 4 CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 6 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SITE | CONCOURSE LEVEL 1 Exterior stairs 2 Concourse entrance 3 Concourse entrance New elevator 5 3 SITE 4 Sunken Plaza 4 2 1 Concourse level plan - Not to scale Exterior elevator 5 View of platform level New window panel New opening for elevator CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 7 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 SITE | PLATFORM LEVEL New opening for elevator exit 1, 2 & 4 View of platform 3 2 4 1 Platform level plan - Not to scale SITE 4 Existing elevator CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 8 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROPOSED IMPROVEMENTS 1. STREET LEVEL - REGRADE SIDEWALK AND PLAZA GRADING Re-grade sidewalk and Plaza to provide ADA compliant Market Street paths of travel Castro Street 2. STREET LEVEL - WIDEN SIDEWALK AT MARKET STREET BUS STOP Widen a segment of Market Street sidewalk to Market Street create a safer path to walk Castro Street CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 9 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 PROPOSED IMPROVEMENTS 3. STREET LEVEL - REPLACE PLAZA LIGHT FIXTURES Replace existing pedestrian light fixtures along guardrails Market Street Castro Street 4. MEZZANINE LEVEL - IMPROVE SECURITY FENCING Improve security fencing to integrate with elevator and to create a safer station Market Street Castro Street CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 10 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 LIGHTING AND SECURITY FENCING | REFERENCES LIGHTING UPGRADE OPTIONS 1 2 3 EXISTING FIXTURES SPOTLIGHTS VERTICAL FRAME VERTICAL TORCH SECURITY FENCING OPTIONS 1 2 LOCATION IMAGE STATION STANDARD EXTENDED ELEVATOR SKIN CASTRO STATION ACCESSIBILITY IMPROVEMENTS | Castro St & Market St 11 Building Design & Construction CIVIC DESIGN REVIEW PHASE 1 | MARCH 2018 ENTRY ADD ADA ACCESSIBLE ELEVATOR FARE GATES STATION AGENT EXISTING ELEVATOR 5. ALL LEVELS - Street level plan - Not to scale 62’ TO AGENT STREET LEVEL EXISTING ELEVATOR DEPARTMENT OFDEPARTMENT PUBLIC WORKS OFDEPARTMENT PUBLIC WORKS OF PUBLIC WORKS New CITY AND COUNTYCITY OF AND SAN COUNTY FRANCISCOCITY OFAND SAN COUNTY FRANCISCO OF SAN FRANCISCO elevator Edgar Lopez - City ArchitectEdgar Lopez - CityEdgar Architect Lopez - City Architect BUILDING DESIGNBUILDING AND BUILDINGDESIGN AND DESIGN AND MARKET MARKETST MARKET ST ST 12 CONSTRUCTIONCONSTRUCTION DIVISIONCONSTRUCTION DIVISION DIVISION S S T T S Mezzanine/Concourse level plan - Not to scale T NEW ELEVATOR ENTRY NEW NEW NEW TRAINS ELEVATOR ELEVATOR ELEVATOR EXISTING ELEVATOR T T T NEW PLATFORM NEW PLATFORMNEW PLATFORM S S PROPOSED IMPROVEMENTS ENTRY S S S T T S T TRASH TRASH O O TRASH O S New S W W S E E W N N E N S S Julia Laue - PrincipalJulia Architect Laue - Principal / Division Architect Manager / Division Manager W W R R S Julia Laue - Principal Architect / Division Manager E E Julia Laue - Principal Architect / Division Manager W R N N E N S S W W S E E W N N E N S S W W S E E W N elevator N E 30 Van Ness Avenue30 Van Ness Avenue Suite 4100 Suite 4100 N 30 Van Ness Avenue Suite 4100 ST ST ST San Francisco, CA San Francisco, CAFaxSan (415)557-4701 Francisco, CA Fax (415)557-4701 Fax (415)557-4701 A A A 94102-6028 94102-6028 94102-6028(415)557-4700 (415)557-4700 (415)557-4700 C C C HPF HPF S S HPF S Project Project Project PGE PGE NEW ACCESS PGE S S S T T T CASTRO STATIONCASTRO STATION TPB TPB CASTRO STATION TPB S PGE S PGE S PGE T T T S S PLATFORM WITH S U U U B B B ELEVATORELEVATOR STUDY STUDY TRASH TRASH ELEVATOR STUDY GLASS FLOOR & TRASH 4’-6” CONCOURSE LEVEL GLASS RAILING OPTION 2A.3OPTION - TOP OPTION2A.3 LANDING - TOP 2A.3 LANDING (STREET) - TOP LANDING (STREET) (STREET) 1 1/16" = 1'-0"1 1/16" = 1'-0"1 1/16" = 1'-0" Enter address hereEnter address hereEnter address here Platform level plan - Not to scale STREET LEVELSTREET AXONSTREET LEVEL AXON LEVEL AXON (E) PLATFORM BELOW(E) PLATFORM BELOW(E) PLATFORM BELOW 1B 1B 1B Consultant Consultant Consultant 14’-1” 23’ NEW ELEVATORNEW ELEVATOR 601 41 21 601 41 21 40TO1 08P_. 570 40TO1 08P_. 570 EDGCOE/ EDGCOE/ NEW ELEVATOR NC NC 601 41 21 401 TO 08P_. 570 EDGCOE/ NC 601 4121 601 41 21 401 TO 10P_. 571 401 TO 10P_. 571 STEP _ STEP _ EDG /CO E EDG /CO E CN CN 601 41 21 401 TO 10. P_ 571 STEP_ EDG /CO E CN TO 60421 E 06 41 21 . TO 60421 E 06 41 21 . 044 044 TO 60421 E 06 41 21 . 044 TR _E TR _E AME I DT N4 _I AME I DT N4 _I ER" ER" TR _E AME N I DT 4 _I ER" TR 5EE TR 5EE ND I ND I AI T ME AI T ME E" R E" R TR 5EE ND I AI T ME E" R 60401 412101. 60401 2 41 101 . TO P/ 605 TO P/ 605 601 41 21 STEP 601 4121 STEP TO 40P/1 1. 606 TO 40P/1 1. 606 P E T S _BA P E T S _BA CK CK 60 1 1412 60 1 41 1 2 40ED1 09GE/. 573 39601 7641 2. 1 40ED1 09GE/. 573 39601 7641 2. 1 NC_CO FL_ NCO 574 NC_CO FL_ NCO 574 601 41 2 1 601 41 2 1 DR N AI C DR N AI C TR 6EE 42TO1 03 . E 043 TR 6EE 42TO1 03 . E 043 I N D N I D N I AI T ME AI T ME 60401 41 210. E" R E" R TO P/ 605 601 41 21 STEP TO 401 P/ 1. 606 _BA P E T S CK 60 1 41 1 2 401 ED 09. GE/ 573 60391 41 2761 . NC_CO FL_ NCO 574 601 41 2 1 DR N AI C TR 6EE 42TO1 03 . E 043 I N D N I AI T ME E" R TR EE 3 TR EE 3 N DI N DI IA T ME IA T ME ER" ER" TR EE 3 N DI IA T ME ER" 4260 TO1 141 2E.1 4260 TO1 141 2E.1 042 042 4260 TO1 141 2E.1 042 38’ STREET LEVEL 1 6043PL 84 91411.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us