CBS News Manifest Current as of: 8/4/06

STS/ISS Manifest and Crews SpaceCalc

ISS Flight No Launch 2006 Shuttle Crew STS-121/ISS-ULF1.1 Elements/EVAs

ISS-13 Up: 1 Launch: STS-121 CDR Lindsey Return to flight test mission; 03/30/06 07/04/06 ULF 1.1 PLT M. Kelly TUS/MT repair; TPS tests Discovery MS1/EV2Fossum Reiter to ISS Vinogrado Land: MS2 Nowak J Williamsv 07/17/06 MS3 Wilson EVA-1/2/3: Sellers, Fossum Reiter MS4/EV1 Sellers (STS-121) MS5 Reiter, ESA (up)

STS-115/ISS-12A Elements/EVAs

2 Launch: STS-115 CDR Jett 2nd port truss segment (P3/P4); 2nd 08/27/06 12A PLT Ferguson set of arrays; 3 EVAs Atlantis MS1/EV1 Tanner

Page 1 CBS News Space Shuttle Manifest Current as of: 8/4/06

Land: MS2/EV3 Burbank EVA-1: Tanner, Piper 09/07/06 MS3/EV2 Piper EVA-2: Burbank, MacLean MS4/EV4 MacLean EVA-3: Tanner, Piper

ISS-14 Up: 09/14/06

Lopez A Tyurin Enomoto

ISS-13 Dn: 09/25/06

Vinogrado J Williamsv Enomoto

STS-116/ISS-12.1 Elements/EVAs

3 Launch: STS-116 CDR Polansky 3rd port truss segment (P5); 12/14/06 12A.1 PLT Oefelein Spacehab cargo module Discovery MS1 Patrick P6 port array retraction MS2/EV1 Curbeam Ms3/EV2 Fuglesang, ESA EVA-1: Curbeam, Fuglesang MS4 Higginbotham EVA-2: Curbeam, Fuglesang 116 Up: MS5/EV3 Williams (up) EVA-3: Curbeam, Williams S Williams MS5 Reiter (down)

116 Dn: Reiter

Page 2 CBS News Space Shuttle Manifest Current as of: 8/4/06

2007 STS-117/ISS-13A Elements/EVAs

4 Launch: STS-117 CDR Sturckow 2nd starboard truss element (S3/S4); 02/22/07 13A PLT Archambault PV radiator; 3rd set of solar arrays Atlantis MS1/EV3 Forrester P6 starboard array retraction MS2/EV4 Swanson MS3/EV2 Olivas EVA-1/3: Olivas/Reilly ISS-15 Up MS4/EV1 Reilly EVA-2: Forrester/Swanson 03/09/07

ISS-14 Dn: 03/19/06

Lopez A Tyurin TBD

Page 3 CBS News Space Shuttle Manifest Current as of: 8/4/06

STS-118/ISS-13A.1 Elements/EVAs

5 Launch: STS-118 CDR S. Kelly 3rd starboard truss element (S5); 06/11/07 13A.1 PLT Hobaugh External stowage platform 3 (ESP-3); Endeavour MS1 Caldwell power transfer system MS2/EV1 Mastracchio MS3/EV2 D. Williams EVA-1: Mastracchio, Williams MS4 Morgan EVA-2: Mastracchio, Williams MS5 TBD (up) EVA-3: Mastracchio, TBD MS5 Williams (down) EVA-4: Williams, TBD

STS-120/ISS-10A Elements/EVAs

6 launch: STS-120 CDR Melroy Node 2 multi-hatch connecting 08/09/07 10A PLT Zamka module; Sidewall PDGF Atlantis MS Parazynski P6 relocation MS Wheelock

Page 4 CBS News Space Shuttle Manifest Current as of: 8/4/06

MS Foreman MS Nespoli, ESA

ISS-16 Up: 09/02/07

ISS-15 Dn: 09/12/07

7 Launch: STS-122 CDR Frick Columbus European research 09/27/07 1E PLT Poindexter module; non-deployable MPESS Discovery MS Walheim MS Love MS Melvin MS Schlegel, ESA

Page 5 CBS News Space Shuttle Manifest Current as of: 8/4/06

8 Launch: STS-123 CDR TBD Kibo Japanese pressurized exper- 11/29/07 1J/A PLT TBD iment module; SLP-D1 with Endeavour MS Doi, JAXA (up/down) MS TBD MS TBD MS TBD

Page 6 CBS News Space Shuttle Manifest Current as of: 8/4/06

2008

9 Launch: STS-124 TBD Kibo research module; Japanese 02/07/08 1J remote manipulator system Atlantis

ISS-17 Up: March 08

ISS-16 Dn: March 08

10 Launch: STS-119 CDR TBD 4th starboard truss segment (S6);

Page 7 CBS News Space Shuttle Manifest Current as of: 8/4/06

06/19/08 15A PLT TBD 4th set of solar arrays and batteries Endeavour MS MS Gernhardt MS TBD MS TBD MS TBD

11 Launch: STS-125 TBD servicing TBD mission (if approved)

12 Launch: STS-126 TBD MPLM resupply; last flight of Atlantis 08/21/08 ULF 2 ISS-18 Up: Atlantis Sept. 08

ISS-17 Dn: 13 Launch: STS-127 TBD Kibo exposed experiment facility; Sept. 08 10/30/08 2J/A Japanese logistics module; SLP-D2

Page 8 CBS News Space Shuttle Manifest Current as of: 8/4/06

Discovery

2009

14 Launch: STS-128 TBD MPLM, 3 crew quarters, galley, 01/22/09 17A treadmill, crew health system; 6 Endeavour person capability established ISS-19 Up: March 09 15 Launch: STS-129 TBD EXPRESS logistics carriers (2); ISS-18 Dn: 04/30/09 ULF 3 Last flight of Discovery March 09 Discovery

NOTE: dates TBD with 6

Page 9 CBS News Space Shuttle Manifest Current as of: 8/4/06

person crew

16 Launch: STS-130 TBD MPLM, LMC Soyuz Up: 07/16/09 19A Sept. 09 Endeavour

Soyuz Dn: Sept. 09 17 Launch: STS-131 TBD EXPRESS logistics carrier (2) 10/22/09 ULF 4 (CONTINGENCY FLIGHT) Discovery

Page 10 CBS News Space Shuttle Manifest Current as of: 8/4/06

2010

18 Launch: STS-132 TBD Node 3, 01/21/10 20A Last flight of Endeavour Endeavour

Soyuz Up: March 10

Soyuz Dn: March 10

19 Launch: STS-133 TBD EXPRESS logistics carrier (2) 07/15/10 ULF 5 (CONTINGENCY FLIGHT) Endeavour

Page 11 CBS News Space Shuttle Manifest Current as of: 8/4/06

As of: 8/4/06 14:04 Compiled by William Harwood

Page 12