Atlantis Returns Home After Successful Mission 20 February 2008

Total Page:16

File Type:pdf, Size:1020Kb

Atlantis Returns Home After Successful Mission 20 February 2008 Atlantis Returns Home After Successful Mission 20 February 2008 Leland Melvin, Rex Walheim, Stanley Love and European Space Agency astronauts Hans Schlegel from Germany and Leopold Eyharts from France. Eyharts remained aboard the space station, replacing Expedition 16 Flight Engineer Dan Tani, who returned to Earth on Atlantis after nearly four months on the station. Eyharts will return on shuttle Endeavour's STS-123 mission, currently targeted for launch on March 11, 2008. The mission included three spacewalks to outfit Columbus with power, data and cooling cables, installation of two science experiments on the lab's Space shuttle Atlantis lands at Kennedy Space Center, exterior, replacement of an expended nitrogen tank Fla. Photo credit: NASA/Bill Ingalls on the space station's cooling system, and retrieval of a failed space station control moment gyroscope -- a device that helps control the orientation of the station -- for its return to Earth. Space shuttle Atlantis and its crew landed at 9:07 a.m. EST Wednesday at NASA's Kennedy Space Several inspections in orbit revealed no damage to Center, Fla., after completing a 13-day journey of Atlantis, and the shuttle's thermal protection system nearly 5.3 million miles in space. The STS-122 was declared safe for re-entry on Tuesday. mission expanded the size and research Workers immediately will begin processing the capabilities of the International Space Station with Atlantis for its next flight to service the Hubble the delivery of the European Space Agency's Space Telescope, targeted for Aug. 28. Columbus laboratory. STS-122 was the 121st space shuttle flight, the Associate Administrator for Space Operations Bill 29th flight for shuttle Atlantis and the 24th flight to Gerstenmaier described STS-122 as one of the the station. program's most successful space station construction missions. With Atlantis and its crew safely home, the stage is set for the next phase of station assembly. The "These missions are extremely challenging, and a STS-123 mission will deliver the Japan Aerospace great deal of preparation and teamwork are Exploration Agency's Kibo logistics module and required to get these vehicles ready to fly," Canada's new robotics system, Dextre, the Special Gerstenmaier said. "We're focused on completing Purpose Dexterous Manipulator, to the station. assembly and moving into the full utilization phase of the station. This mission opens the door for Source: NASA another one of our international partners to join in the important work and science on the space station." Steve Frick commanded the flight and was joined by Pilot Alan Poindexter, Mission Specialists 1 / 2 APA citation: Atlantis Returns Home After Successful Mission (2008, February 20) retrieved 27 September 2021 from https://phys.org/news/2008-02-atlantis-home-successful-mission.html This document is subject to copyright. Apart from any fair dealing for the purpose of private study or research, no part may be reproduced without the written permission. The content is provided for information purposes only. 2 / 2 Powered by TCPDF (www.tcpdf.org).
Recommended publications
  • Endeavour Set to Leave International Space Station Today 24 March 2008
    Endeavour Set to Leave International Space Station Today 24 March 2008 who replaced European Space Agency astronaut Léopold Eyharts on the station. Eyharts is returning to Earth aboard Endeavour. The astronauts also performed five spacewalks while on the station. Endeavour is scheduled to land at Kennedy Space Center, Fla., Wednesday. Source: NASA STS-123 Mission Specialist Léopold Eyharts, pictured in the foreground, and Pilot Gregory H. Johnson work at the robotics station in the International Space Station's U.S. laboratory, Destiny. Credit: NASA The crew of space shuttle Endeavour is slated to leave the International Space Station today. The STS-123 and Expedition 16 crews will bid one another farewell, and the hatches between the two spacecraft will close at 5:13 p.m. EDT. Endeavour is scheduled to undock from the International Space Station at 7:56 p.m., ending its 12-day stay at the orbital outpost. STS-123 arrived at the station March 12, delivering the Japanese Logistics Module - Pressurized Section, the first pressurized component of the Japan Aerospace Exploration Agency’s Kibo laboratory, to the station. The crew of Endeavour also delivered the final element of the station’s Mobile Servicing System, the Canadian-built Dextre, also known as the Special Purpose Dextrous Manipulator. In addition, the STS-123 astronauts delivered Expedition 16 Flight Engineer Garrett Reisman, 1 / 2 APA citation: Endeavour Set to Leave International Space Station Today (2008, March 24) retrieved 24 September 2021 from https://phys.org/news/2008-03-endeavour-international-space-station-today.html This document is subject to copyright.
    [Show full text]
  • 2008 Spaceport News Summary
    2008 Spaceport News Summary The 2008 Spaceport News used the above banner for the year. Introduction The first issue of the Spaceport News was December 13, 1962. The 1963, 1964 and 1965 Spaceport News were issued weekly. The Spaceport News was issued every two weeks, starting July 7, 1966, until the last issue on February 24, 2014. Spaceport Magazine, a monthly issue, superseded the Spaceport News in April 2014, until the final issue, Jan./Feb. 2020. The two 1962 Spaceport News issues and the issues from 1996 until the final Spaceport Magazine issue, are available for viewing at this website. The Spaceport News issues from 1963 through 1995 are currently not available online. In this Summary, black font is original Spaceport News text, blue font is something I added or someone else/some other source provided, and purple font is a hot link. All links were working at the time I completed this Spaceport News Summary. The Spaceport News writer is acknowledged, if noted in the Spaceport News article. Followup From the 2007 Spaceport News Summary The followng is in the December 14, 2007, issue of the Spaceport News. Page 1 There is an article in the 2007 Spaceport News Summary about External Tank repairs to ET-124, flown on STS-117, after it was damaged by hail. Below is a photo in the VAB, showing the extent of some of the damage. A lot of scaffolding had to be installed, some of which is in visible in the photo. From The January 11, 2008, Spaceport News On page 1, “Apollo Tribute Bike roars through KSC”, by Linda Herridge, Staff Writer.
    [Show full text]
  • International Space Station Basics Components of The
    National Aeronautics and Space Administration International Space Station Basics The International Space Station (ISS) is the largest orbiting can see 16 sunrises and 16 sunsets each day! During the laboratory ever built. It is an international, technological, daylight periods, temperatures reach 200 ºC, while and political achievement. The five international partners temperatures during the night periods drop to -200 ºC. include the space agencies of the United States, Canada, The view of Earth from the ISS reveals part of the planet, Russia, Europe, and Japan. not the whole planet. In fact, astronauts can see much of the North American continent when they pass over the The first parts of the ISS were sent and assembled in orbit United States. To see pictures of Earth from the ISS, visit in 1998. Since the year 2000, the ISS has had crews living http://eol.jsc.nasa.gov/sseop/clickmap/. continuously on board. Building the ISS is like living in a house while constructing it at the same time. Building and sustaining the ISS requires 80 launches on several kinds of rockets over a 12-year period. The assembly of the ISS Components of the ISS will continue through 2010, when the Space Shuttle is retired from service. The components of the ISS include shapes like canisters, spheres, triangles, beams, and wide, flat panels. The When fully complete, the ISS will weigh about 420,000 modules are shaped like canisters and spheres. These are kilograms (925,000 pounds). This is equivalent to more areas where the astronauts live and work. On Earth, car- than 330 automobiles.
    [Show full text]
  • STS-132 Mission Summary
    NASA Mission Summary National Aeronautics and Space Administration Washington, D.C. 20546 (202) 358-1100 STS-132 MISSION SUMMARY May 2010 SPACE SHUTTLE ATLANTIS Atlantis’ 12-day mission will deliver the Russian-built Mini Research Module-1 that will provide additional storage space and a new docking port for Russian Soyuz and Progress spacecraft. MRM-1, also known as Rassvet, which means dawn in Russian, will be permanently attached to the bottom port of the station’s Zarya module. MRM-1 will carry important hardware on its exterior including a radiator, airlock and a European robotic arm. Atlantis also will deliver addi- tional station hardware stored inside a cargo carrier. Three spacewalks are planned to stage spare components outside the station, including six spare batteries, a Ku-band antenna and spare parts for the Canadian Dextre robotic arm. Shuttle mission STS-132 is the final sched- uled flight for Atlantis . CREW Ken Ham Tony Antonelli (an-tuh-NEL-lee) Commander (Captain, U.S. Navy) Pilot (Commander, U.S. Navy) ● Veteran of one spaceflight, STS-124 pilot ● Veteran of one spaceflight, STS-119 pilot ● Age: 45, Born: Plainfield, N.J. ● Born: Detroit ● Married with two children ● Married with two children ● Logged 5,000+ hours in 40 different aircraft ● Logged 3,200+ hours in 41 different aircraft ● Call sign: Hock ● Interests include snow boarding and NASCAR Garrett Reisman (REESE-man) Michael Good Mission Specialist-1 Mission Specialist-2 (Col., U.S. Air Force, Ret.) ● Veteran flight engineer on Expedition 16 & 17 ● Veteran of one spaceflight, STS-125 ● Launched on STS-123; returned STS-124 ● Age: 47, Hometown: Broadview Heights, Ohio ● Age: 42, Hometown: Parsippany, N.J.
    [Show full text]
  • The European Columbus Space Laboratory Set to Reach ISS 3 December 2007
    The European Columbus space laboratory set to reach ISS 3 December 2007 cornerstone of Europe’s contribution to this international endeavour. Once Columbus is launched, assembled to the Space Station and verified, ESA will become an active partner in the operations and utilization of mankind’s only permanent outpost in space. As the first European laboratory devoted to long- term research in space, Columbus will further expand the science capabilities of the ISS. In its interior, the Columbus laboratory will provide accommodation for experiments in the field of multidisciplinary research into biology, physiology, material science, fluid physics, technology, life science and education. In addition, its external payload facility hosts experiments and applications The Columbus laboratory is ESA's biggest contribution in the field of space science, Earth observation and to the International Space Station (ISS). Delivered to technology. ESA by EADS SPACE Transportation on 2 May 2006, this laboratory will provide internal payload Columbus will be transported into Earth orbit in the accommodation for various scientific experiments. The Shuttle’s cargo bay, pre equipped with five internal Columbus laboratory is due to be flown on Space Shuttle rack. Two of its external experiment facilities will be Atlantis to the ISS in December 2007. Credits: ESA - D. stowed separately in the Shuttle’s cargo bay and Ducros attached to the outside of the laboratory module structure in orbit. German ESA astronaut Hans Schlegel will play a key role in two of the three With NASA’s announcement today of the launch spacewalks or EVA (Extra-Vehicular Activity) of Space Shuttle Atlantis on 6 December, ESA scheduled for the mission.
    [Show full text]
  • See How the Flow
    Integrated Defense Systems BOEING FRONTIERS s ewith- o in that re- g gion are a man- ageable 2,000 to 3,000 owdegrees, while just a few inches fl away from the orbiter’s surface the full e signed a force of heating results in a total tempera- h ture of up to 10,000 degrees. t special 6-inch-by- w As long as the orbiter’s surface is ho 6-inch (15.2-centemeter-by-15.2- e smooth, the boundary layer keeps the tiles’ Se centimeter) test tile, to be installed on the lower side of the orbiter port-side wing temperature within the limits of their de- Test tile to measure near the main landing gear door. The tile sign. But any interruption in the air fl ow will test airfl ow on three upcoming shut- causes a boundary layer “trip,” where tur- shuttle’s re-entry airfl ow tle fl ights, beginning with the STS-119 bulence behind the trip point brings down Discovery fl ight this December. The goal to the surface of the shuttle the extreme BY ED MEMI is to understand boundary layer transi- heat that was outside the laminar boundary layer. This could cause the tiles to overheat hen the Space Shuttle re-enters tions, and the data from this experiment will help NASA in its efforts to develop and damage the underlying surface. Earth’s atmosphere at 25 times The phenomenon is similar to a smooth the speed of sound, its Thermal new spacecraft such as the Orion crew ex- W ploration vehicle.
    [Show full text]
  • + STS-123 Press
    CONTENTS Section Page STS-123 MISSION OVERVIEW................................................................................................ 1 TIMELINE OVERVIEW.............................................................................................................. 11 MISSION PROFILE................................................................................................................... 15 MISSION PRIORITIES............................................................................................................. 17 MISSION PERSONNEL............................................................................................................. 19 STS-123 ENDEAVOUR CREW .................................................................................................. 21 PAYLOAD OVERVIEW .............................................................................................................. 31 KIBO OVERVIEW.................................................................................................................................. 31 KIBO MISSION CONTROL CENTER ....................................................................................................... 39 TSUKUBA SPACE CENTER.................................................................................................................... 43 SPACE STATION INTEGRATION AND PROMOTION CENTER .................................................................. 47 JAXA’S EXPERIMENTS DURING THE 1J/A STAGE.................................................................................
    [Show full text]
  • A Call for a New Human Missions Cost Model
    A Call For A New Human Missions Cost Model NASA 2019 Cost and Schedule Analysis Symposium NASA Johnson Space Center, August 13-15, 2019 Joseph Hamaker, PhD Christian Smart, PhD Galorath Human Missions Cost Model Advocates Dr. Joseph Hamaker Dr. Christian Smart Director, NASA and DoD Programs Chief Scientist • Former Director for Cost Analytics • Founding Director of the Cost and Parametric Estimating for the Analysis Division at NASA U.S. Missile Defense Agency Headquarters • Oversaw development of the • Originator of NASA’s NAFCOM NASA/Air Force Cost Model cost model, the NASA QuickCost (NAFCOM) Model, the NASA Cost Analysis • Provides subject matter expertise to Data Requirement and the NASA NASA Headquarters, DARPA, and ONCE database Space Development Agency • Recognized expert on parametrics 2 Agenda Historical human space projects Why consider a new Human Missions Cost Model Database for a Human Missions Cost Model • NASA has over 50 years of Human Space Missions experience • NASA’s International Partners have accomplished additional projects . • There are around 70 projects that can provide cost and schedule data • This talk will explore how that data might be assembled to form the basis for a Human Missions Cost Model WHY A NEW HUMAN MISSIONS COST MODEL? NASA’s Artemis Program plans to Artemis needs cost and schedule land humans on the moon by 2024 estimates Lots of projects: Lunar Gateway, Existing tools have some Orion, landers, SLS, commercially applicability but it seems obvious provided elements (which we may (to us) that a dedicated HMCM is want to independently estimate) needed Some of these elements have And this can be done—all we ongoing cost trajectories (e.g.
    [Show full text]
  • STS-135: the Final Mission Dedicated to the Courageous Men and Women Who Have Devoted Their Lives to the Space Shuttle Program and the Pursuit of Space Exploration
    National Aeronautics and Space Administration STS-135: The Final Mission Dedicated to the courageous men and women who have devoted their lives to the Space Shuttle Program and the pursuit of space exploration PRESS KIT/JULY 2011 www.nasa.gov 2 011 2009 2008 2007 2003 2002 2001 1999 1998 1996 1994 1992 1991 1990 1989 STS-1: The First Mission 1985 1981 CONTENTS Section Page SPACE SHUTTLE HISTORY ...................................................................................................... 1 INTRODUCTION ................................................................................................................................... 1 SPACE SHUTTLE CONCEPT AND DEVELOPMENT ................................................................................... 2 THE SPACE SHUTTLE ERA BEGINS ....................................................................................................... 7 NASA REBOUNDS INTO SPACE ............................................................................................................ 14 FROM MIR TO THE INTERNATIONAL SPACE STATION .......................................................................... 20 STATION ASSEMBLY COMPLETED AFTER COLUMBIA ........................................................................... 25 MISSION CONTROL ROSES EXPRESS THANKS, SUPPORT .................................................................... 30 SPACE SHUTTLE PROGRAM’S KEY STATISTICS (THRU STS-134) ........................................................ 32 THE ORBITER FLEET ............................................................................................................................
    [Show full text]
  • External Payloads Proposer's Guide to the International Space Station
    SSP 51071 Baseline External Payloads Proposer’s Guide to the International Space Station International Space Station Program Baseline August 2017 National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas This Document Is Uncontrolled When Printed. Verify Current version before use. SSP 51071 Baseline REVISION AND HISTORY REV. DESCRIPTION PUB. DATE - Initial Release (Reference per SSCD 15774, EFF. 09-29-2017) 10-02-17 Public access authorization obtained via the Document Availability Authorization Control Number: “40352” This Document Is Uncontrolled When Printed. Verify Current Version Before Use. SSP 51071 Baseline TABLE OF CONTENTS PARAGRAPH PAGE 1.0 INTRODUCTION ................................................................................................................... 1-1 2.0 GENERAL INFORMATION FOR OPERATING ON ISS ........................................................ 2-1 2.1 HOW TO GET STARTED ...................................................................................................... 2-1 2.2 ISS FEASIBILITY RESOURCE ACCOMMODATION ASSESSMENT PROCESS ................ 2-2 2.3 WHAT YOU SHOULD KNOW ............................................................................................... 2-5 2.4 ORGANIZATIONAL ROLES/RESPONSIBILITIES ................................................................ 2-7 2.5 ROLES/RESPONSIBILITIES OF PAYLOAD PROVIDERS ................................................... 2-8 3.0 COMMON ACCOMMODATIONS, RESOURCES, AND ENVIRONMENTS
    [Show full text]
  • The International Space Station (ISS) Is an Experiment in the Design, Development, and Assembly of an Orbital Space Facility. It
    The International Space Station (ISS) is an experiment in the design, development, and assembly of an orbital space facility. It serves as a elements habitat for its crew, a command post for orbital operations, and a port for the rendezvous and berthing of smaller orbiting vehicles. It functions as an orbital microgravity and life sciences laboratory, a test bed for new technologies in areas like life support and robotics, and a platform for astronomical and Earth observations. PMA 2 berthed on Node 1 serves as a primary docking port for the Space Shuttle. The U.S. Lab Module Destiny provides research and habitation accommodations. Node 2 is to the left; the truss is mounted atop the U.S. Lab; Node 1, Unity, is to the right; Node 3 and the Cupola are below and to the right. INTERNATIONAL SPACE STATION GUIDE ELEMENTS 23 ARCHITECTURE DESIGN EVOLUTION Architecture Design Evolution Why does the ISS look the way it does ? The design evolved over more than a decade. The modularity and size of the U.S., Japanese, and European elements were dictated by the use of the Space Shuttle as the primary launch vehicle and by the requirement to make system components maintainable and replaceable over a lifetime of many years. When the Russians joined the program in 1993, their architecture was based largely on the Mir and Salyut stations they had built earlier. Russian space vehicle design philosophy has always emphasized automated operation and remote control. The design of the interior of the U.S., European, and Japanese elements was dictated by four specific principles: modularity, maintainability, reconfigurability, and accessibility.
    [Show full text]
  • SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E
    Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6+1 UP/6+1 DN) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES, ABORT TIMES TIMES PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S FLT DURATION, ENG. S.N. WINDS Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E STS- OV-104 CDR: KSC 39A KSC 15 (KSC 104/104/109 BI-132 51. DIRECT OI- CARGO: BRIEF MISSION SUMMARY: STS-122/1E 122/ (Flight 29) Stephen N. Frick 038:19:45:30Z 67) % 6 INSERTION 32 40296 LBS (24th ISS mission) delivered the European ISS 1E ATLANTIS (Flt 2 - STS-110) 2:45:30 PM EST 051:14:07:09Z RSRM (24) (2) Space Agency’s Columbus research (P) 9:07 AM EST PREDICTED: 99 POST OMS- PAYLOAD laboratory module to the ISS. Columbus, SEQ OMS P748/R276/V192/M2 2:45:30 PM EST Thursday (11) 100/104.5/ 2: CHARGEABLE: measuring 23 ft in length and 15 ft in FLT# 121 PODS: 42 (A) 02/21/08 (7) 104.5/72/ ET-125 124.0X118. 32941 LBS diameter, is ESA’s largest contribution to LPO4-29 Tuesday (35) 104.5 8 NM the expansion of the ISS. Also delivered PLT: 2/07/08 (9) DEORBIT SLWT DEPLOYED: KSC-121 RPO1-36 BURN: ACTUAL: 29 were ESA experiments and two ESA Alan G.
    [Show full text]