ISS External Payload Proposer's Guide

Total Page:16

File Type:pdf, Size:1020Kb

ISS External Payload Proposer's Guide GSFC 420-01-09 Change 01 Effective Date: 06/22/2015 EXTERNAL PAYLOADS PROPOSER’S GUIDE to the International Space Station Goddard Space Flight Center Greenbelt, Maryland CHECK THE ESP DIVISION WEBSITE AT http://espd.gsfc.nasa.gov/isseppg/ TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE. GSFC 420-01-09 Rev - Effective Date: 04/30/2015 External Payloads Proposer’s Guide to the International Space Station [ This page intentionally left blank] CHECK THE ESP DIVISION WEBSITE AT http://espd.gsfc.nasa.gov/isseppg/ TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE. i GSFC 420-01-09 Change 01 Effective Date: 06/22/2015 External Payloads Proposer’s Guide to the International Space Station Acknowledgement This Guide has been developed by the Systems Engineering Working Group (SEWG) of the Earth Systematic Missions Program (ESMP), the Earth Science Systems Pathfinders Program (ESSP), and the International Space Station (ISS) Research Integration Office (formerly known as “Payloads Office”). Several NASA developers of payloads for the ISS reviewed early drafts of the document and provided inputs. Participation of the ESSP included several members of the Common Instrument Interface team. The intent of this document is to level the playing field in competitions for Earth Science funds, 01 and to improve the quality of NASA Earth science, space science, technology demonstrations, and all other external payloads operating on the ISS. The problem being addressed is that the ISS has recently become much more available for hosting science payloads, but the science community has widely variable levels of experience and expertise to accommodations information about the ISS. This may unduly favor organizations with past experience in the development of ISS payloads. With this document, scientists and principal investigators and their engineering teams can more readily gain the level of understanding of the ISS interfaces 01 and accommodations needed to develop a winning proposal. This improves the chances of the best science being done from the ISS, reduces workload within the proposal development workforce and reduces the expense of developing a proposal, reduces workload on those within the ISS Research Integration Office who work with proposal teams and review proposals, and reduces post-award surprises which might lead to cost over-runs or cancellation. This initial release is under the configuration control of the ESMP and the GSFC Flight Projects Directorate, Earth Science Projects Division. To ensure you have the current version, visit the web site at the bottom of each page. CHECK THE ESP DIVISION WEBSITE AT http://espd.gsfc.nasa.gov/isseppg/ TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE. iii GSFC 420-01-09 Change 01 Effective Date: 06/22/2015 CHANGE RECORD PAGE Document Title: External Payloads Proposer’s Guide to the International Space Station Document Date: April 2015 ISSUE DATE PAGES AFFECTED DESCRIPTION Original April 2015 All Baselined - Approved By CCR# 1014 Change 01 June 2015 Pages iii, 3 Changes noted – Approved by CCR# 1015 CHECK THE ESP DIVISION WEBSITE AT http://espd.gsfc.nasa.gov/isseppg/ TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE. vi GSFC 420-01-09 Rev - Effective Date: 04/30/2015 External Payloads Proposer’s Guide to the International Space Station Table of Contents 1.0 Introduction .................................................................................................................. 1 2.0 General Information for Operating on ISS .................................................................. 3 2.1 How to Get Started ............................................................................................. 3 2.2 What You Should Know ...................................................................................... 4 2.3 Roles/Responsibilities of ISS Organizations ........................................................ 5 2.4 Roles /Responsibilities of Payload Providers ...................................................... 6 2.5 Manifesting Process ............................................................................................ 6 3.0 ISS Accommodations ................................................................................................... 7 3.1 Integrated Truss Assembly/ExPRESS Logistics Carrier .................................... 18 Physical Accommodations ................................................................................ 18 Robotics ............................................................................................................ 23 Thermal ............................................................................................................ 25 Power .............................................................................................................. 27 Command and Data Handling (C&DH) .............................................................. 30 Field Of View (FOV) .......................................................................................... 34 Microgravity Environment .................................................................................. 38 Electromagnetic Compatibility/Electromagnetic Interference (EMC/EMI) .......... 41 3.2 Japanese Experiment Module-External Facility (JEM-EF) ................................. 42 Physical Accommodations ................................................................................ 43 Robotics ............................................................................................................ 49 Thermal ............................................................................................................ 52 Power .............................................................................................................. 58 Command and Data Handling (C&DH) .............................................................. 59 Field of View (FOV) ........................................................................................... 63 Microgravity Environment .................................................................................. 71 Electromagnetic Compatibility/Electromagnetic Interference (EMC/EMI) .......... 73 3.3 Columbus External Payload Facility (Columbus-EPF) ....................................... 73 Physical Accommodations ................................................................................ 76 Robotics (SSRMS/SPDM (Dextre)) ................................................................... 79 Thermal ............................................................................................................ 81 Power (and Electrical Interfaces) ...................................................................... 83 Command and Data Handling (C&DH) .............................................................. 86 Fields of View (FOV) ......................................................................................... 88 Microgravity Environment .................................................................................. 91 Electromagnetic Compatibility/Electromagnetic Interference (EMC/EMI) .......... 92 3.4 Additional Factors Common to All ISS External Sites ........................................ 93 Attitude and Pointing ......................................................................................... 93 Micrometeoroids/Orbital Debris ......................................................................... 94 Magnetic Field and Gravitational Field .............................................................. 95 Atomic Oxygen ................................................................................................. 96 On-orbit Minimum Pressure Environment ......................................................... 96 Space Sink Temperature .................................................................................. 96 Electromagnetic Radiation (EMR) ..................................................................... 96 CHECK THE ESP DIVISION WEBSITE AT http://espd.gsfc.nasa.gov/isseppg/ TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE. vii GSFC 420-01-09 Rev - Effective Date: 04/30/2015 Contamination ................................................................................................... 96 Contingency EVA (as required) ....................................................................... 101 End of Mission ................................................................................................ 101 4.0 Integration and Operations ...................................................................................... 102 4.1 Integration ....................................................................................................... 102 Integration Template (Reference Milestones) .................................................. 102 Engineering Integration Process ..................................................................... 104 Verification Interface Testing (Part of Verification Process) ............................. 108 4.2 ISS Operations ............................................................................................... 110 Overview ISS Integrated Mission Elements .................................................. 111 Typical Profile (Day-in-the-Life) ....................................................................... 112 Attitude/Altitude Adjustments/Corrections ....................................................... 113 Visiting Vehicle Timeline ................................................................................
Recommended publications
  • Attachment J-4 Applicable and Reference Documents Lists
    NNJ12GA46C SECTION J Attachment J-4 MISSION AND PROGRAM INTEGRATION CONTRACT Attachment J-4 Applicable and Reference Documents Lists J-A4-1 NNJ12GA46C SECTION J Attachment J-4 MISSION AND PROGRAM INTEGRATION CONTRACT This attachment contains applicable documents for the contract effort. The contractor shall comply with these requirements in performing Statement of Work (SOW) requirements. This attachment is structured as follows: Table J4-1: Applicable Documents List Table J4-2: Reference Documents List Table J4-3: Book Editor/Book Coordinated/Managed Documents List Table J4-4: Orion Documents List The documents identified within Table J4-1 or within a document listed in this table (second tier) are applicable to this contract. Requirements written in these documents have full force and effect as if their text were written in this contract to the extent that the requirements relate to context of the work to be performed within the scope of this contract. When a document is classified as “reference,” the document is provided for information about the ISS Program execution and the Mission and Program Integration Contract’s role in the ISS Program. The general approach for interpreting whether a document impacts the contractor’s performance is that if a document is “applicable,” then the contractor has solid requirements that derive from that document. Applicable documents contain additional requirements and are considered binding to the extent specified. Applicable documents cited in the text of the document in a manner that indicates applicability such as follows: • In accordance with • As stated in • As specified in • As defined in • Per • In conformance with When a document is classified as “reference,” the document is provided for general context of the ISS Program execution and for influence on the performance of the Mission and Program Integration Contract in its role of support to the ISS Program.
    [Show full text]
  • Endeavour Set to Leave International Space Station Today 24 March 2008
    Endeavour Set to Leave International Space Station Today 24 March 2008 who replaced European Space Agency astronaut Léopold Eyharts on the station. Eyharts is returning to Earth aboard Endeavour. The astronauts also performed five spacewalks while on the station. Endeavour is scheduled to land at Kennedy Space Center, Fla., Wednesday. Source: NASA STS-123 Mission Specialist Léopold Eyharts, pictured in the foreground, and Pilot Gregory H. Johnson work at the robotics station in the International Space Station's U.S. laboratory, Destiny. Credit: NASA The crew of space shuttle Endeavour is slated to leave the International Space Station today. The STS-123 and Expedition 16 crews will bid one another farewell, and the hatches between the two spacecraft will close at 5:13 p.m. EDT. Endeavour is scheduled to undock from the International Space Station at 7:56 p.m., ending its 12-day stay at the orbital outpost. STS-123 arrived at the station March 12, delivering the Japanese Logistics Module - Pressurized Section, the first pressurized component of the Japan Aerospace Exploration Agency’s Kibo laboratory, to the station. The crew of Endeavour also delivered the final element of the station’s Mobile Servicing System, the Canadian-built Dextre, also known as the Special Purpose Dextrous Manipulator. In addition, the STS-123 astronauts delivered Expedition 16 Flight Engineer Garrett Reisman, 1 / 2 APA citation: Endeavour Set to Leave International Space Station Today (2008, March 24) retrieved 24 September 2021 from https://phys.org/news/2008-03-endeavour-international-space-station-today.html This document is subject to copyright.
    [Show full text]
  • Correlation of the SAGE III on ISS Thermal Models in Thermal Desktop
    47th International Conference on Environmental Systems ICES-2017-171 16-20 July 2017, Charleston, South Carolina Correlation of the SAGE III on ISS Thermal Models in Thermal Desktop Ruth M. Amundsen1, Warren T. Davis2, and Kaitlin A. K. Liles3 NASA Langley Research Center, Hampton, VA, 23681 and Shawn C. McLeod4 Analytical Mechanics Associates, Inc., Hampton, VA, 23666 The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument is the fifth in a series of instruments developed for monitoring aerosols and gaseous constituents in the stratosphere and troposphere. SAGE III was launched on February 19, 2017 and mounted to the International Space Station (ISS) to begin its three-year mission. A detailed thermal model of the SAGE III payload, which consists of multiple subsystems, has been developed in Thermal Desktop (TD). Correlation of the thermal model is important since the payload will be expected to survive a three-year mission on ISS under varying thermal environments. Three major thermal vacuum (TVAC) tests were completed during the development of the SAGE III Instrument Payload (IP); two subsystem-level tests and a payload-level test. Additionally, a characterization TVAC test was performed in order to verify performance of a system of heater plates that was designed to allow the IP to achieve the required temperatures during payload-level testing; model correlation was performed for this test configuration as well as those including the SAGE III flight hardware. This document presents the methods that were used to correlate the SAGE III models to TVAC at the subsystem and IP level, including the approach for modeling the parts of the payload in the thermal chamber, generating pre-test predictions, and making adjustments to the model to align predictions with temperatures observed during testing.
    [Show full text]
  • Jules Verne ATV Launch Approaching 11 February 2008
    Jules Verne ATV launch approaching 11 February 2008 will carry up to 9 tonnes of cargo to the station as it orbits 400 km above the Earth. Equipped with its own propulsion and navigation systems, the ATV is a multi-functional spacecraft, combining the fully automatic capabilities of an unmanned vehicle with the safety requirements of a crewed vehicle . Its mission in space will resemble that, on the ground, of a truck (the ATV) delivering goods and services to a research establishment (the space station). A new-generation high-precision navigation system will guide the ATV on a rendezvous trajectory towards the station. In early April, Jules Verne will automatically dock with the station’s Russian Preview of the maiden launch and docking of ESA's Jules Verne ATV. Jules Verne will be lifted into space on Service Module, following a number of specific board an Ariane 5 launch vehicle. Credits: ESA - D. operations and manoeuvres (on 'Demonstration Ducros Days') to show that the vehicle is performing as planned in nominal and contingency situations. It will remain there as a pressurised and integral After the successful launch of ESA’s Columbus part of the station for up to six months until a laboratory aboard Space Shuttle Atlantis on controlled re-entry into the Earth’s atmosphere Thursday (7 February), it is now time to focus on takes place, during which it will burn up and, in the the next imminent milestone for ESA: the launch of process, dispose of 6.3 tonnes of waste material no Jules Verne, the first Automated Transfer Vehicle longer needed on the station.
    [Show full text]
  • Level Ministerial and Scientific Event a New Era of Blue Enlightenment
    Report on the High- Level Ministerial and Scientific Event A New Era of Blue Enlightenment 12-14 July 2017 Lisbon, Portugal October 2017 EUROPEAN COMMISSION Directorate-General for Research and Innovation Directorate F — Bioeconomy Unit F.4 — Marine Resources Contact: Sieglinde Gruber E-mail: [email protected] [email protected] European Commission B-1049 Brussels EUROPEAN COMMISSION Report on the High-Level Ministerial and Scientific Event A New Era of Blue Enlightenment 12-14 July 2017 Directorate-General for Research and Innovation 2017 Bioeconomy EN 3 EUROPE DIRECT is a service to help you find answers to your questions about the European Union Freephone number (*): 00 800 6 7 8 9 10 11 (*) The information given is free, as are most calls (though some operators, phone boxes or hotels may charge you) LEGAL NOTICE This document has been prepared for the European Commission however it reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein. More information on the European Union is available on the internet (http://europa.eu). Luxembourg: Publications Office of the European Union, 2016. PDF ISBN 978-92-79-73529-5 doi: 10.2777/64644 KI-04-17-849-EN-N © European Union, 2017. Reproduction is authorised provided the source is acknowledged. Cover images: © Lonely, # 46246900, 2011. © ag visuell #16440826, 2011. © Sean Gladwell #6018533, 2011. © LwRedStorm, #3348265. 2011. © kras99, #43746830, 2012. Source: Fotolia.com Internal document image(s): © European Union, 2017, Source: EC - Audiovisual Service, Photo: Bruno Portela 3 "The Sea, the great unifier, is man's only hope.
    [Show full text]
  • 10Th International Limb Workshop – Scientific Program Greifswald, June 3 – 7, 2019
    10th International Limb Workshop – Scientific program Greifswald, June 3 – 7, 2019 Monday, June 3, 18:00: Icebreaker and Reception Restaurant Campo Alegre (Lange Reihe 1) Session 1: Tuesday, June 4, 08:30 – 10:30 (Chair: Christian von Savigny) Welcome 08:30 – 08:35 Welcome by local organizers (Christian von Savigny) 08:35 – 08:45 Welcome address by representative of the City of Greifswald (Jeanette von Busse) 08:45 – 08:55 Welcome address by University administration (Pro-rector Prof. Katharina Riedel) 08:55 – 09:05 Welcome address by Dr. Christian Suhm (Academic coordinator of Alfried Krupp Institute of Advanced Study) 09:05 – 09:15 Logistics (Christian von Savigny) New missions and mission concepts 09:15 – 09:45 Didier Fussen Forthcoming limb observations with ALTIUS (invited talk) 09:45 – 10:00 Nick Lloyd The Canadian Atmospheric Tomography System (CATS) – The Next Generation OSIRIS Instrument 10:00 – 10:15 Marilee Roell Stratospheric Aerosol and Gas Experiment (SAGE) III installed on the International Space Station (ISS): Mission overview and Science Data Product Validation 10:15 – 10:30 Matthew DeLand MASTAR: Limb Scattering Measurements of Stratospheric Aerosols 10:30 – 11:00 Coffee break 10th International Limb Workshop, June 4 – 7, 2019 Greifswald Session 2: Tuesday, June 4, 11:00 – 13:00 (Chair: Adam Bourassa) New missions and mission concepts 11:00 – 11:25 Christoph R. Englert MIGHTI (Michelson Interferometer for Global High-resolution Thermospheric Imaging): The Wind and Temperature Instrument Onboard the NASA Ionospheric Connection (ICON) Mission (invited talk) 11:25 – 11:50 Donal Murtagh MATS - a micro satellite for studies of Mesospheric Airglow /aerosol by Tomography and Spectroscopy (invited talk) 11:50 – 12:15 Kristell Pérot SIW: a New Satellite Mission to Explore Middle Atmospheric Wind Structure and Composition (invited talk) 12:15 – 12:30 John Burrows A new Concept SLIPSTREAM/SCIA-L2 12:30 – 12:45 William E.
    [Show full text]
  • The Extreme Physical Properties of the Corot-7B Super-Earth
    1 08/02/2011 The extreme physical properties of the CoRoT-7b super-Earth A. Légera,b, O. Grassetc, B. Fegleyd, F. Codrone, A., F. Albaredef, P. Bargeg, R. Barnesh, P. Cancec, S. Carpyc, F. Catalanoi, C. Cavarroca,b, O. Demangeona,b, S. Ferraz-Melloj, P. Gabora,b, J.-M. Grießmeierk, J. Leibachera,b,q, G. Libourell, A-S. Maurinl,q , S.N. Raymondl,q , D. Rouann, B. Samuela, L. Schaeferc, J. Schneidero, P. A. Schullera, F. Selsisl,q , C. Sotinp. Affiliations a. (Corresponding author) Institut d’Astrophysique Spatiale, Université Paris-Sud, bât 121, Univ. Paris-Sud, F-91405 Orsay, France; e-mail: [email protected]; ph: 33 1 69 85 85 80 b. Institut d’Astrophysique Spatiale, CNRS (UMR 8617), bât 121, Univ. Paris-Sud, F- 91405 Orsay, France, c. Université de Nantes, CNRS, Lab de planétologie et Géodynamique, UMR- CNRS 6112, F-44300 Nantes d. Planetary Chemistry Laboratory McDonnell Center for the Space Sciences, Dep. of Earth and Planetary Sciences, Washington University in St. Louis, USA; e. Laboratoire de Météorologie Dynamique CNRS/UPMC, T 45-55, E3, 75252 Paris Cedex 05 – France; f. Ecole Normale Supérieure (LST), 69364 Lyon cedex 7, France; Laboratoire d’Astrophysique de Marseille, Pôle de l'Étoile, 38 r. Frédéric Joliot-Curie, 13388 Marseille cedex 13, France g. Department of Astronomy, University of Washington, Seattle, WA, 98195-1580, USA; h. 12 av. Fontaine de la Reine, 92430 Marnes la Coquette, France; i. IAG-Universidade de Sao Paulo, Brasil; j. Centre de Biophysique Moléculaire CNRS, r. Charles Sadron, 45071 Orléans cedex 2, France; k.
    [Show full text]
  • A Launch for the International Space Station
    A launch for the International Space Station For its first mission of the year, Arianespace will launch the first Automated Transfer Vehicle (ATV), dubbed “Jules Verne”, for the European Space Agency (ESA). Right from this first launch, the ATV will play a vital role in bringing supplies to the International Space Station (ISS). Weighing more than 20 tons, this will be by far the heaviest payload ever launched by Ariane 5. An Ariane 5 ES will inject the Jules Verne ATV into a circular orbit at an altitude of 260 kilometers, inclined 51.6 degre e s . With this launch, Ariane 5 further expands its array of missions, ranging fro m scientific spacecraft in special orbits to commercial launches into geostationary orbit. The ATV is designed to bring supplies to the ISS (water, air, food, propellants for the Russian section, spare parts, experimental hard w a re, etc.), and to reboost the ISS into its nominal orbit. The ISS now weighs more than 240 metric tons, including the recently attached European labora t o r y, Columbus. After being docked to the ISS for up to six months, the ATV will be loaded with waste items by the astronauts, and sent back down. After separating from the launch vehicle, the ATV will be autonomous, using its own systems for energy (batteries and four large solar panels) and guidance (GPS, star t racker), in liaison with the control center in Toulouse. During final approach, an optical navigation system will guide the ATV to its rendezvous with the Space Station, w h e re it will automatically dock several days after launch.
    [Show full text]
  • 2008 Spaceport News Summary
    2008 Spaceport News Summary The 2008 Spaceport News used the above banner for the year. Introduction The first issue of the Spaceport News was December 13, 1962. The 1963, 1964 and 1965 Spaceport News were issued weekly. The Spaceport News was issued every two weeks, starting July 7, 1966, until the last issue on February 24, 2014. Spaceport Magazine, a monthly issue, superseded the Spaceport News in April 2014, until the final issue, Jan./Feb. 2020. The two 1962 Spaceport News issues and the issues from 1996 until the final Spaceport Magazine issue, are available for viewing at this website. The Spaceport News issues from 1963 through 1995 are currently not available online. In this Summary, black font is original Spaceport News text, blue font is something I added or someone else/some other source provided, and purple font is a hot link. All links were working at the time I completed this Spaceport News Summary. The Spaceport News writer is acknowledged, if noted in the Spaceport News article. Followup From the 2007 Spaceport News Summary The followng is in the December 14, 2007, issue of the Spaceport News. Page 1 There is an article in the 2007 Spaceport News Summary about External Tank repairs to ET-124, flown on STS-117, after it was damaged by hail. Below is a photo in the VAB, showing the extent of some of the damage. A lot of scaffolding had to be installed, some of which is in visible in the photo. From The January 11, 2008, Spaceport News On page 1, “Apollo Tribute Bike roars through KSC”, by Linda Herridge, Staff Writer.
    [Show full text]
  • International Space Station Basics Components of The
    National Aeronautics and Space Administration International Space Station Basics The International Space Station (ISS) is the largest orbiting can see 16 sunrises and 16 sunsets each day! During the laboratory ever built. It is an international, technological, daylight periods, temperatures reach 200 ºC, while and political achievement. The five international partners temperatures during the night periods drop to -200 ºC. include the space agencies of the United States, Canada, The view of Earth from the ISS reveals part of the planet, Russia, Europe, and Japan. not the whole planet. In fact, astronauts can see much of the North American continent when they pass over the The first parts of the ISS were sent and assembled in orbit United States. To see pictures of Earth from the ISS, visit in 1998. Since the year 2000, the ISS has had crews living http://eol.jsc.nasa.gov/sseop/clickmap/. continuously on board. Building the ISS is like living in a house while constructing it at the same time. Building and sustaining the ISS requires 80 launches on several kinds of rockets over a 12-year period. The assembly of the ISS Components of the ISS will continue through 2010, when the Space Shuttle is retired from service. The components of the ISS include shapes like canisters, spheres, triangles, beams, and wide, flat panels. The When fully complete, the ISS will weigh about 420,000 modules are shaped like canisters and spheres. These are kilograms (925,000 pounds). This is equivalent to more areas where the astronauts live and work. On Earth, car- than 330 automobiles.
    [Show full text]
  • STS-132 Mission Summary
    NASA Mission Summary National Aeronautics and Space Administration Washington, D.C. 20546 (202) 358-1100 STS-132 MISSION SUMMARY May 2010 SPACE SHUTTLE ATLANTIS Atlantis’ 12-day mission will deliver the Russian-built Mini Research Module-1 that will provide additional storage space and a new docking port for Russian Soyuz and Progress spacecraft. MRM-1, also known as Rassvet, which means dawn in Russian, will be permanently attached to the bottom port of the station’s Zarya module. MRM-1 will carry important hardware on its exterior including a radiator, airlock and a European robotic arm. Atlantis also will deliver addi- tional station hardware stored inside a cargo carrier. Three spacewalks are planned to stage spare components outside the station, including six spare batteries, a Ku-band antenna and spare parts for the Canadian Dextre robotic arm. Shuttle mission STS-132 is the final sched- uled flight for Atlantis . CREW Ken Ham Tony Antonelli (an-tuh-NEL-lee) Commander (Captain, U.S. Navy) Pilot (Commander, U.S. Navy) ● Veteran of one spaceflight, STS-124 pilot ● Veteran of one spaceflight, STS-119 pilot ● Age: 45, Born: Plainfield, N.J. ● Born: Detroit ● Married with two children ● Married with two children ● Logged 5,000+ hours in 40 different aircraft ● Logged 3,200+ hours in 41 different aircraft ● Call sign: Hock ● Interests include snow boarding and NASCAR Garrett Reisman (REESE-man) Michael Good Mission Specialist-1 Mission Specialist-2 (Col., U.S. Air Force, Ret.) ● Veteran flight engineer on Expedition 16 & 17 ● Veteran of one spaceflight, STS-125 ● Launched on STS-123; returned STS-124 ● Age: 47, Hometown: Broadview Heights, Ohio ● Age: 42, Hometown: Parsippany, N.J.
    [Show full text]
  • The European Columbus Space Laboratory Set to Reach ISS 3 December 2007
    The European Columbus space laboratory set to reach ISS 3 December 2007 cornerstone of Europe’s contribution to this international endeavour. Once Columbus is launched, assembled to the Space Station and verified, ESA will become an active partner in the operations and utilization of mankind’s only permanent outpost in space. As the first European laboratory devoted to long- term research in space, Columbus will further expand the science capabilities of the ISS. In its interior, the Columbus laboratory will provide accommodation for experiments in the field of multidisciplinary research into biology, physiology, material science, fluid physics, technology, life science and education. In addition, its external payload facility hosts experiments and applications The Columbus laboratory is ESA's biggest contribution in the field of space science, Earth observation and to the International Space Station (ISS). Delivered to technology. ESA by EADS SPACE Transportation on 2 May 2006, this laboratory will provide internal payload Columbus will be transported into Earth orbit in the accommodation for various scientific experiments. The Shuttle’s cargo bay, pre equipped with five internal Columbus laboratory is due to be flown on Space Shuttle rack. Two of its external experiment facilities will be Atlantis to the ISS in December 2007. Credits: ESA - D. stowed separately in the Shuttle’s cargo bay and Ducros attached to the outside of the laboratory module structure in orbit. German ESA astronaut Hans Schlegel will play a key role in two of the three With NASA’s announcement today of the launch spacewalks or EVA (Extra-Vehicular Activity) of Space Shuttle Atlantis on 6 December, ESA scheduled for the mission.
    [Show full text]