<<

Etruria Valley Link Consultation

Road idenin at the A eteen orthill and olstanton deliered y ihays Enland

e canal ride at eport

e ride oer railay line e etension to estial ay

e canal crossin

Etension to Shelton Bouleard

proeents to roundaouts

This map is reproduced from Ordnance Survey materials with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Ofce © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceeding. Stoke-on-Trent City Council 100024286 2017

The Etruria Valley Link Road consists of four distinct parts: Section 1A Construction of a new road to connect Festival Way and Shelton , including a central , a across the Trent and Mersey Canal and a link to the Trent and Mersey Canal.

Section 1B The continuation of Shelton Boulevard to Newport Lane including a new bridge over the Trent and Mersey Canal. There will be a bus gate restricting on this new section of Newport Lane to Public Transport, pedestrians and cyclists only. This section of works also includes a new pedestrian link leading down to the Trent and Mersey canal.

Section 2 Construction of a road bridge crossing to link Sections 1A and 1B to the A500. This bridge will cross the West Coast Main line railway and Fowlea Brook.

Section 3 Improvement to the existing two on the A500/Wolstanton junction providing a connection between the A500 and A527 and forming the connection point for the Section 2 works.

Section 4 Road widening at the A500 between Porthill and Wolstanton (delivered by Highways )