Traffic Signs Manual – Chapter 5 Traffic Signs
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Effect of Road Narrowings on Cyclists
The effect of road narrowings on cyclists Prepared for Charging and Local Transport Division, Department for Transport A Gibbard, S Reid, J Mitchell, B Lawton, E Brown and H Harper TRL Report TRL621 First Published 2004 ISSN 0968-4107 Copyright TRL Limited 2004. This report has been produced by TRL Limited, under/as part of a contract placed by the Department for Transport. Any views expressed in it are not necessarily those of the Department. This report focuses on highway infrastructure as installed by a highway authority. Some illustrations may depict non- prescribed and unauthorised signing and road markings, which may be unlawful. Unless specifically referred to and explained in the report, the inclusion of non-standard signing in illustrations does not imply endorsement of its use by the Department for Transport. All prescribed signs are set out in Regulations (the Traffic Signs Regulations and General Directions and the Pedestrian Crossings Regulations) made under the provisions of the Road Traffic Regulation Act and published by the Stationery Office. TRL is committed to optimising energy efficiency, reducing waste and promoting recycling and re-use. In support of these environmental goals, this report has been printed on recycled paper, comprising 100% post-consumer waste, manufactured using a TCF (totally chlorine free) process. ii CONTENTS Page Executive Summary 1 1 Introduction 3 1.1 Study objectives 3 2 Current guidance 3 3 Consultation exercise 5 3.1 Consultation results 5 4 Questionnaire survey 7 4.1 Survey results 8 4.2 -
An Intelligent Transportation Systems (Its) Plan for Canada: En Route to Intelligent Mobility
Transport Transports TP 13501 E Canada Canada AN INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLAN FOR CANADA: EN ROUTE TO INTELLIGENT MOBILITY November 1999 TABLE OF CONTENTS EXECUTIVE SUMMARY ..............................................................................................1 1. INTRODUCTION.......................................................................................................5 2. ADDRESSING TRANSPORTATION CHALLENGES.............................................5 3. WHAT ARE INTELLIGENT TRANSPORTATION SYSTEMS?..............................7 4. BENEFITS OF ITS....................................................................................................9 5. AN ITS PLAN FOR CANADA - VISION AND SCOPE ..........................................12 6. MISSION: EN ROUTE TO INTELLIGENT MOBILITY .........................................14 7. OBJECTIVES .........................................................................................................14 8. PILLARS OF THE ITS PLAN.................................................................................17 9. MILESTONES.........................................................................................................27 10. CONCLUSION ......................................................................................................30 APPENDIX A ........................................................................................................... i An ITS Plan for Canada: En Route to Intelligent Mobility An ITS Plan for Canada: En Route to Intelligent -
The Gibraltar Highway Code
P ! CONTENTS Introduction Rules for pedestrians 3 Rules for users of powered wheelchairs and mobility scooters 10 Rules about animals 12 Rules for cyclists 13 Rules for motorcyclists 17 Rules for drivers and motorcyclists 19 General rules, techniques and advice for all drivers and riders 25 Road users requiring extra care 60 Driving in adverse weather conditions 66 Waiting and parking 70 Motorways 74 Breakdowns and incidents 79 Road works, level crossings and tramways 85 Light signals controlling traffic 92 Signals by authorised persons 93 Signals to other road users 94 Traffic signs 96 Road markings 105 Vehicle markings 109 Annexes 1. You and your bicycle 112 2. Vehicle maintenance and safety 113 3. Vehicle security 116 4. First aid on the road 116 5. Safety code for new drivers 119 1 Introduction This Highway Code applies to Gibraltar. However it also focuses on Traffic Signs and Road Situations outside Gibraltar, that as a driver you will come across most often. The most vulnerable road users are pedestrians, particularly children, older or disabled people, cyclists, motorcyclists and horse riders. It is important that all road users are aware of The Code and are considerate towards each other. This applies to pedestrians as much as to drivers and riders. Many of the rules in the Code are legal requirements, and if you disobey these rules you are committing a criminal offence. You may be fined, or be disqualified from driving. In the most serious cases you may be sent to prison. Such rules are identified by the use of the words ‘MUST/ MUST NOT’. -
Town of Glastonbury Bid No. Gl-2020-07
TOWN OF GLASTONBURY BID NO. GL-2020-07 MAIN STREET RAISED TRAFFIC ISLAND ADDENDUM NO. 1 SEPTEMBER 16, 2019 BID DUE DATE: SEPTEMBER 19, 2019 11:00 A.M. The attention of bidders submitting proposals for the above-referenced project is called to the following Addendum to the specifications. The items set forth herein, whether of omission, addition, substitution or other change, are all to be included in and form a part of the proposed Contract Documents for the work. Bidders shall acknowledge this Addendum in the Bid Proposal by inserting its number on Page BP-1. Make the following modifications to the Contract Documents: BID PROPOSAL FORM: The bid proposal form is hereby replaced with the attached. ALL BIDDERS MUST USE THE REVISED BID PROPOSAL FORM. CONSTRUCTION PLANS: Sheets 1 of the plan set titled “PLAN DEPICTING PROPOSED TRAFFIC ISLAND IMPROVEMENTS LOCATED AND MAIN STREET AND HEBRON AVENUE, GLASTONBURY CONNECTICUT” is hereby replaced with the attached plan. Changes shown on Sheet 1 include notes depicting removal and resetting of existing brick pavers in the vicinity of the existing town-owned locus tree which is to be completed as described in the special provision listed below. SPECIAL PROVISIONS: The following Special Provisions are hereby added to the contract: ITEM 0992093A REMOVE AND RESET BRICK PAVERS This Addendum Contains 6 Pages including the above text and 1 Plan Sheet. MAIN STREET RAISED TRAFFIC ISLAND ADDENDUM 1 BID PROPOSAL – REVISED BID #GL-2020-07 TOWN OF GLASTONBURY * 2155 MAIN STREET * GLASTONURY * CT BID / PROPOSAL NO: GL-2020-07 DATE DUE: September 19, 2019 DATE ADVERTISED: September 6, 2019 TIME DUE: 11:00 AM NAME OF PROJECT: Main Street Raised Traffic Island In compliance with this Invitation to Bid, the Bidder hereby proposes to provide goods and/or services as per this solicitation in strict accordance with the Bid Documents, within the time set forth therein, and at the prices submitted with their bid response. -
Impact Assessment
Title: Impact Assessment (IA) Raising the speed limit for HGVs >7.5T on dual carriageway roads IA No: DfT00280 Date: 23/09/2014 Lead department or agency: Stage: Final Department for Transport Source of intervention: Domestic Other departments or agencies: Type of measure: Primary legislation None Contact for enquiries: [email protected] Summary: Intervention and Options RPC Opinion: EANCB Validated Cost of Preferred (or more likely) Option Total Net Present Business Net Net cost to business per In scope of One-In, Measure qualifies as Value Present Value year (EANCB on 2009 prices) Two-Out? £0m £0m £0m Yes Zero net cost What is the problem under consideration? Why is government intervention necessary? On dual carriageways the speed limit for HGVs>7.5T is 50 mph. The average actual speed at which these HGVs travel in free flow conditions (when they are not held up by other traffic or obstructions such as junctions, hills or bends) is about 53 mph (excludes rigid 2 axle HGVs)1. More than 80% of HGVs exceed 50 mph in free-flow conditions. The limit is out of date and systematically ignored by professional HGV drivers. The proposal is to raise the speed limit on dual carriageway roads for these vehicles to 60mph, which would better reflect the capabilities of modern HGVs. Government intervention is necessary because speed is regulated by government, through speed limits, in order to balance the private benefits of speed of travel with the social costs and risks (such as related to safety) of high speeds. What are the policy objectives and the intended effects? The intention is to modernise the speed limit, improve compliance, make the limit more credible and legitimise the behaviour of professional drivers. -
Scope of Services Template
November 2018 SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). To Be Determined by Task Work Order Continuing Services Existing Roadway Condition Assessment Report (ERCAR) Development District-Wide Florida’s Turnpike Enterprise 1 PURPOSE ............................................................................................................................. 4 2 PROJECT DESCRIPTION ................................................................................................. 6 3 PROJECT COMMON AND PROJECT GENERAL TASKS....................................... 34 4 ROADWAY ANALYSIS ................................................................................................... 44 5 ROADWAY PLANS .......................................................................................................... 51 6A DRAINAGE ANALYSIS ................................................................................................... 52 6B DRAINAGE PLANS .......................................................................................................... 56 7 UTILITIES .......................................................................................................................... 57 8 ENVIRONMENTAL PERMITS, COMPLIANCE, AND ENVIRONMENTAL CLEARANCES .................................................................................................................. 61 9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND DRAWINGS ............................................................................................................................................. -
Access Management Manual, September 5, 2019 TABLE of CONTENTS
AccessAccess ManagementManagement ManualManual T E X A S Prepared by the City of Irving Public Works/Traffic and Transportation Department Adopted September 5, 2019 Access Management Manual, September 5, 2019 TABLE OF CONTENTS Section 1 Introduction Page 1.0 Purpose 1 1.1 Scope 1 1.2 Definitions 3 1.3 Authority 10 Section 2 Principles of Access Management 2.1 Relationship between Access and Mobility 11 2.2 Integration of Land Use and Transportation 11 2.3 Relationship between Access and Roadway Efficiency 12 2.4 Relationship between Access and Traffic Safety 12 Section 3 Access Management Programs and Policies 3.1 Identifying Functional Hierarchy of Roadways 14 3.1.1 Sub-Classifications of Roadways 14 3.1.1.1 Revising the “Master Thoroughfare Plan” 15 3.1.2 Comprehensive Plan 15 3.1.3 Discretionary Treatment by the Director 15 3.2 Land Use 15 3.3 Unified Access Planning Policy 16 3.4 Granting Access 16 3.4.1 General Mutual Access 17 3.4.2 Expiration of Access Permission 17 3.4.3 “Grandfathered” Access and Non-Conforming Access 17 3.4.4 Illegal Access 19 3.4.4.1 Stealth Connection 19 3.4.5 Temporary Access 19 3.4.6 Emergency Access 19 3.4.7 Abandoned Access 20 3.4.8 Field Access 20 3.4.9 Provision for Special Case Access 20 3.4.10 Appeals, Variances and Administrative Remedies 20 3.5 Parking and Access Policy 20 3.6 Access vs Accessibility 21 3.7 Precedence of Access Rights Policy 21 3.8 Right to Access A Specific Roadway 22 3.9 Traffic Impact Analyses (TIA’s) 22 3.9.1 Level of Service (LOS) 22 3.9.2 Traffic Impact Analysis (TIA) Requirements -
A Study and Analysis of Existing Road Junction
Special Issue - 2016 International Journal of Engineering Research & Technology (IJERT) ISSN: 2278-0181 SNCIPCE - 2016 Conference Proceedings A Study and Analysis of Existing Road Junction Bavithran. R, Sasikumar. N Ms. G. Yamuna,.. Asst Professor Department of Civil Engg Department of Civil Engg V.R.S College of Engg & Tech, Araur, VPM Dst V.R.S College of Engg & Tech, Araur, VPM Dst Abstract - Road junction is the point at which more than are also three major groups of sedimentary rocks, layers of two roads are connecting at the point. The junction is particles that settled in different geological periods. analyzed by Volume Count Survey. The volume count survey Viluppuram's GPS location is 11° 56' N 79° 29' E. is one of the methods of finding out the Traffic volume. The Villupuram is the one of the most popular city in junction which is situated in Villupuram is taken as study tamilnadu. In this project, an existing road junction is area. In this junction, the volume count survey is taken for 15 days for determine the Passenger Car Unit and the Level Of studied and analyzed by using volume count survey.. Some Service for the junction is computed. To improve the information are to be carried before the project has started. junction, some suggestions are suggested. The greener time of the Traffic flow from Chennai, Trichy, thirukovillur, Pondicherry are 20 sec, 25 Keywords:- Volume count survey, Peak hour, Passenger sec, 15 sec, and 20 sec respectively. CCTV is provided car unit, Level of service from junction to junction near veeravaliamman temple. -
Roundabouts Applying the 'System'
Roundabouts Applying the 'System' to Roundabouts Let us suppose that you are on a dual carriageway approaching a roundabout (400m away). You are currently in the left lane and you intend to turn right at the roundabout. Information: - Take - You see the roundabout and its triangular warning signs in the distance. There are no vehicles between you and the roundabout but you see vehicles on the roundabout. Mirror check. There are two vehicles behind, both in the left lane. - Use - You know that you have to change to the right lane and that you will need to signal to change lane and then to signal continuously on the approach and through the roundabout (the standard Highway Code procedure for turning right at a roundabout)- Give - After checking your mirrors you signal right to the vehicles behind. Position: The right signal remains on for a few seconds and then gradually you move to the right hand lane (Information-Use/Give). When the manoeuver is complete you cancel the signal. After a few more seconds the right signal is re-applied to confirm to the drivers behind that you intend to turn right at the roundabout. Information: The speed and position of the vehicles behind are monitored as you approach the roundabout. An assessment is made of the movement of vehicles on the roundabout and those approaching it from the right and left. You look over the roundabout to see, if possible, vehicles approaching it from the opposite direction (Information-Take). Speed: As you approach the roundabout you begin to brake and lose speed smoothly and progressively (Information-Give). -
Type 1 Single Carriageway Pavement Detail A
A1 A B C D E F G H I J K L M N O P DESIGN REPORT 1 Notes: 1. This Drawing is only to be used for the Design Element identified in the title box. All other information shown on the drawing is to be considered indicative only. 2. These drawings are to be read in conjunction with all other relevant design drawings. 3. All dimensions are in (m) & are typical dimensions which are subject to requirements for visibility & curve widening. 2 3 3.00(MIN.) VARIES 3.00 2.50 7.30 2.50 3.00 VARIES VARIES 3.00 (MIN) VERGE HARD CARRIAGEWAY HARD VERGE SHOULDER 3.65 3.65 SHOULDER TRAFFIC TRAFFIC 1.00 LANE LANE FENCE LINE ROUNDING 0.50 VERGE LINE CONCRETE CHANNEL 1.00 1.00 CUT LINE IN ACCORDANCE WITH FENCE LINE 4 1.00 RCD/500/22 ROUNDING ROUNDING 0.10 TOPSOIL ROUNDING NORMAL CROSS NORMAL CROSS 0.50 0.50 FALL FALL TOE OF 1 5% VERGE LINE EMBANKMENT FOR FURTHER DETAILS 3 ON EARTHWORKS, 1 1 1 1 SEALED CARRIER DRAIN 5 5 5 5 REFER TO THE A EARTHWORKS SERIES 600 CUT CONDITION FILL CONDITION 1 0.10 TOPSOIL 0.75 3 VARIES FIN OR NARROW FOR FURTHER DETAILS FILTER DRAIN ON ROAD EDGE DRAINAGE TYPES, (WHERE REQUIRED) FOR FURTHER DETAILS REFER TO THE DRAINAGE SERIES 500 5 ON EARTHWORKS, REFER TO THE VARIES EARTHWORKS SERIES 600 UNLINED INTERCEPTOR DRAIN WHERE REQUIRED TYPE 1 SINGLE CARRIAGEWAY SCALE 1:100 (A1) 6 7 PAVEMENT DETAIL A Type A: N6 Type Single Carriageway. -
Formalisation and Implementation of Road Junction Rules on an Autonomous Vehicle Modelled As an Agent
Formalisation and Implementation of Road Junction Rules on an Autonomous Vehicle Modelled as an Agent Gleifer Vaz Alves1[0000−0002−5937−8193], Louise Dennis2[0000−0003−1426−1896], and Michael Fisher2[0000−0002−0875−3862] 1 UTFPR - Universidade Tecnol´ogicaFederal do Paran´a- Brazil [email protected] 2 Department of Computer Science, Univ. Liverpool, UK fL.A.Dennis, [email protected] Abstract. The design of autonomous vehicles includes obstacle detec- tion and avoidance, route planning, speed control, etc. However, there is a lack of an explicitely representation of the rules of the road on an autonomous vehicle. Additionally, it is necessary to understand the be- haviour of an autonomous vehicle in order to check whether or not it works according to the rules of the road. Here, we propose an agent- based architecture to embed the rules of the road into an agent repre- senting the behaviour of an autonomous vehicle. We use temporal logic to formally represent the rules of the road in a way it should be possible to capture when and how a given rule of the road can be applied. Our contributions include: i. suggestion of changes in the rules of the road; ii. representation of rules in a suitable way for an autonomous vehicle agent; iii. dealing with indeterminate terms in the Highway Code. Keywords: Agent · Autonomous Vehicles · Temporal Logic · Rules of the Road. 1 Introduction Usually, the design of current control software in autonomous vehicle does not explicitely implement the rules of the road. Here, we propose an architecture, where an agent represents the behaviour of an autonomous vehicle and temporal logic is used to formally specify a subset from the rules of the road. -
Navigation Signing for Roundabouts
SAIC N N a a t t Bryan J. Katz, PE, PTOE i i o o n n a a l l R R o o u u n n d d a a b b o o May 24, 2005 Vail, Colorado u u t t C C o o Study Performed for: n n f f e e Roundabouts r r e e n n SAIC c c e e 2 2 0 0 0 0 5 5 TRB National Roundabouts Conference D D Traffic Control Devices Pooled Fund Study Navigation Signing for R R A A Vaughan W. Inman, PhD. F F T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u Problem t t C C o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 rowing and Widespread Adoption of o Standard for Navigation Signing at D D R R Roundabouts Roundabouts G N A A F F • • T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C Approach o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 onduct Laboratory Evaluation of tate of Practice Review Roundabout election of Four Representative D D R R Navigation Signage Signing Approaches for Evaluation Comprehension of Representative Signs C S S A A F F • • • T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u k t t C C r o o n n o f Alternatives f Four Signing e e r r e e n n Y c c e e 2 2 w 0 0 0 0 aryland onventional iagrammatic e 5 5 D D R R C M D A A F F • • • •N T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f e e r r e e n n c c e e 2 2 Conventional 0 0 0 0 5 5 D D R R A A F F T T Route Number Shields on One Assembly, Destination Names on Separate Guide Sign N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f Maryland e e r