Degaroute® Creative and Functional Road Markings ® Contents Degaroute a Pioneer in Expertise and Technical Service

Total Page:16

File Type:pdf, Size:1020Kb

Degaroute® Creative and Functional Road Markings ® Contents Degaroute a Pioneer in Expertise and Technical Service DEGAROUTE® CREATIVE AND FUNCTIONAL ROAD MARKINGS ® CONTENTS DEGAROUTE A PIONEER IN EXPERTISE AND TECHNICAL SERVICE 3 ABOUT DEGAROUTE® ABOUT DEGAROUTE® MMA network, to ensure the long customers and associates worldwide 4 AMERICAS DEGAROUTE® is the trademark of term supply of raw materials and with technical assistance and exper- 5 Red Bus Lane in New York City, USA Röhm for the world´s most renowned sustainable quality for our customers. tise, as well as with training courses 6 Green Bike Lane in Syracuse, USA resins which are used as binders in and further marketing services. 7 High Visibility Crosswalks in Denver, USA the production of durable cold plas- Röhm‘s long-lasting DEGAROUTE® 8 Colorful Safe Spaces in Mexico City, Mexico tic road markings. Being the pioneer solutions are available on all five All of this has one goal: to make safe 9 Road Safety in Medellin, Colombia of road marking resins since 1960, continents, reaching every corner road markings available in all parts 10 Form Stable Profile Markings, Brazil the production has become seam- of the Earth. Furthermore, the of the world. lessly back-integrated into Röhm’s DEGAROUTE® team supports its 11 EUROPE 12 Field Trial, Upper Harz Mountains, Germany 13 Area Marking on Concrete, Germany 14 Safety Marking at Federal Road, Germany 15 Rumble Stripes, Germany 16 Roundabout, Austria 17 Lillehammer Bridge, Norway 18 Biking to Lectures, Turkey ROAD MARKINGS 19 MIDDLE EAST, AFRICA, INDIA INFORMATION, GUIDANCE AND 20 Highway Line Markings, Egypt 21 Speed Transition Limit in Dubai, UAE 22 Anti-Blackening Triangular Humps in Dubai, UAE PROTECTION FOR MILLIONS OF ROAD USERS WORLDWIDE. 23 ASIA PACIFIC 24 Toll Lane Area Marking in Osaka, Japan 25 Kayemo Expressway, China 26 Structure Markings on Le’e Road, China ABOUT COLD PLASTICS BASED load from subzero to high tempera- KEY FEATURES: 27 Hong Kong-Zhuhai-Macao Bridge, China ON DEGAROUTE® tures, cold plastic road markings to- • Durability 28 Zebra Crossing, China Cold plastics were originally invented day provide long lasting functionality • Form stable and clearly visible at 29 School Zones, Thailand by the company Degussa – now in all climate zones including cold high temperatures and traffic load 30 High Friction Surface, Thailand Röhm – in the 1960s as a high quali- Alaska to hot Middle East. • CO2 reduction due to longer 31 Red Box Motorcyclists, Indonesia ty alternative to paints and thermo- DEGAROUTE® resins are used as service life plastics in order to withstand winter binders for the production of two- • Any form, any shape, any color service e.g. studded tire traffic on component cold plastic materials • Excellent wet-night visibility the German highway system. Thanks that are chemically cured upon addi- • Low VOC and low microplastic to excellent wear resistance and high tion of a hardener component to emissions form stability even at high traffic form a cold plastic road marking. • Longlasting safety functionality thanks to high wear resistance and excellent glass bead and aggregate retention 2 3 PROJECT PROFILE | AMERICAS AMERICAS RED BUS LANE NEW YORK CITY, USA PROJECT OBJECTIVE cold weather and stand up to snow tic, DEGAROUTE® based cold plastic Traffic jams are part of the daily plows. Another requirement was that road markings show excellent adhe- routine for many New Yorkers. To the material could be applied on sion to concrete, have double the life smoothen the public traffic flow, concrete surfaces. Their current cycle, are UV stable and can adhere the city has introduced colored bus specification for thermoplastic road to itself for refreshing if necessary. lanes to help this mode of transpor- markings was not fulfilling this crite- Another attribute of the resin is the tation get past queues of traffic and ria, so the city turned to cold plastic high dimensional stability of the for- pull away first when the traffic light for area marking applications. mulations which means no softening changes. These priority lanes for DEGAROUTE® based road markings in heat and remains flexible in harsh busses have contributed to a signifi- can be applied in temperatures be- winters. cant improvment of traffic flow. low 45 °F (7 °C), hold up well under snow plowing and can be applied on New York City was looking for a ma- both existing and new concrete and terial that could both be installed in asphalt surfaces. Unlike thermoplas- SITE APPLICATION COUNTRY USA SYSTEM Area marking LOCATION New York City, NY SURFACE Asphalt ROAD 125th Street PREPARATION Water blast APPLICATION DATE July 2016 EQUIPMENT Manual mix application 4 5 PROJECT PROFILE | AMERICAS PROJECT PROFILE | AMERICAS GREEN BIKE LANE HIGH VISIBILITY CROSSWALKS SYRACUSE, USA DENVER, USA PROJECT OBJECTIVE and extended color retention of The “Connective Corridor” is a show- the area markings, but the eco- case for green infrastructure, incor- friendliness achieved through the porating a number of multidisci- application process fulfilled the plinary projects that reshape the City sustainability vision of the of Syracuse and provide multiple en- “Connective Corridor”. vironmental benefits. As part of this “Connective Corridor”, the city of According to the city, the new “green- Syracuse has applied green bike lanes, way” bike lanes also represent a novel or “greenways”, using DEGAROUTE® approach to emerging technologies. based cold plastic area markings to This new generation resin provides provide a safer biking network for exceptional durability on asphalt and students and residents navigating concrete, skid-resistance, and the PROJECT OBJECTIVE DEGAROUTE® based area markings trians to safely cross the street, also through the city. highest reflective values for safety. The Colorado Department of Trans- were installed to define red cross- at night and during rainfall. portation aimed at decreasing the walks with white accent stripes in This new green bike network in The bike lane in the Syracuse was number of vehicle-pedestrian crash- order to increase pedestrian safety. The largest of the crosswalks in Syracuse was one of the first in the a two phase project with a total of es by redesigning crosswalks at The red color draws attention to the Denver is spanning 16 lanes of traf- country to implement new MUTCD 28,000 ft2 (2,600 m2) of green bike three high-traffic intersections in the crosswalk and catches the attention fic. The marking material covered a interim standards for green as a uni- lane. These were the first of many Denver metro area (Colorado Boule- of both pedestrians and drivers. The 4,750 ft2 (441 m2) area and reflective versal bike lane color. Not only was green DEGAROUTE® based cold vard & East Colfax Avenue, East 14th high-friction surface ensures grip beads were added to the surface of the city interested in the durability plastic bikeways across the country. Avenue, and East Montview Boulevard). and retro-reflectivity allows pedes- the accent stripe. SITE APPLICATION SITE APPLICATION COUNTRY USA SYSTEM One-layer area marking COUNTRY USA SYSTEM One-layer area marking LOCATION Syracuse, NY SURFACE Asphalt LOCATION Denver, CO EQUIPMENT Manual Intersections of Colorado Blvd and East Colfax ROAD University of Syracuse/City of Syracuse PREPARATION Swept, scraped and blew debris off the surface ROAD Ave, East 14th Ave, and East Montview Blvd AGGREGATE #1 Silica sand APPLICATION DATE August – September 2012 EQUIPMENT Manual mix application APPLICATION DATE August – September 2012 MARKING 100 mils (2 – 3 mm) PERFORMANCE PERFORMANCE • The bike lane was completely cured and ready for use within Colorado Department of Transportation (CDOT) • CDOT foresees that the newly applied crosswalks 45 minutes Testimonial: based on cold plastic will have the same effect as • Since the application, both the City and Syracuse University • Prior to installing contrast area markings to the seen at the intersection of Colorado Boulevard and have been very satisfied with the project results crosswalks at the intersection of Colorado Boule- Louisiana Avenue. • Still looks great after many years vard and Louisiana Avenue, an average of two peop- • Since this project, Denver has continued to apply le were being struck each year by oncoming vehicles. more red crosswalks using DEGAROUTE® based • Since installing the area markings, there has only material. been 1 person hit within the past 3 years. Bike lane in 2018 after 6 years in service Photos © Transpo Industries Photos 1 + 3 © Transpo Industries, Photo 2 © Google Maps 6 7 PROJECT PROFILE | AMERICAS PROJECT PROFILE | AMERICAS COLORFUL SAFE SPACES ROAD SAFETY MEXICO CITY, MEXICO MEDELLIN, COLOMBIA PROJECT OBJECTIVE One of these “public pocket parks” ness of 0.6 mm (25 mils), using auto- The implementation of “public pock- was transformed to designate an mated spray equipment and tem- et parks” throughout Mexico City ex- area where car rentals by the hour plates to ensure a precise design. emplify how authorities are trans- could be parked, thus sparking a Due to the rapid application process forming underutilized areas into decrease in the use of alternate and curing capabilities of the system flexible public spaces that provide means of transport and creating based on DEGAROUTE®, each pe- pedestrians with a designated area colorful spaces for coexistence destrian area was completely pass- to enjoy recreation and relaxation, using DEGAROUTE® resins. able within 45 minutes. The UV resis- while also enhancing the community tance and excellent adhesion of the with unique designs created by local Covering an area of 800 m2 (8,611 newly applied area markings will en- companies and institutions. ft2), the area markings were applied sure optimal color stability and du- PROJECT OBJECTIVE the number of conflicts among road from January 2013 and August 2017, to the asphalt substrate at a thick- rability for years to come. Medellin has shown a strong com- users and are also receiving positive 45 accidents had been recorded, mitment to the implementation of feedback from citizens. which is an average of 9.5 per year.
Recommended publications
  • Matakana Link Road Public Consultation Feedback
    Matakana link road Public Consultation Feedback Report – July 2017 AT.govt.nz Contents 1. Background ................................................................................................................. 5 1.1 Project Development ..................................................................................... 5 1.2 Public Consultation ....................................................................................... 6 2. Feedback Received ..................................................................................................... 8 Question 1 – Which option do you prefer? ................................................................... 9 Question 4 – How would you use the road? .................................................................. 9 Questions 2, 3, 5 & 6 – Issues and Constraints (Key themes identified) ................... 10 3. Next Steps ................................................................................................................. 22 4. Conclusion................................................................................................................. 22 5. Appendix A. Consultation feedback ........................................................................ 23 2 Executive Summary In April 2017, Auckland Transport (AT) sought public feedback on the four short-listed options for the proposed Matakana Link Road. Feedback on the short-listed options was invited from 26 April to 20 May 2017. Submitters were asked to identify their preferred route option (see map
    [Show full text]
  • Road Network Selection for Small-Scale Maps Using an Improved Centrality-Based Algorithm
    JOURNAL OF SPATIAL INFORMATION SCIENCE Number 9 (2014), pp. 71–99 doi:10.5311/JOSIS.2014.9.166 RESEARCH ARTICLE Road network selection for small-scale maps using an improved centrality-based algorithm Roy Weiss and Robert Weibel Department of Geography, University of Zurich, Zurich, Switzerland Received: January 31, 2014; returned: March 13, 2014; revised: July 29, 2014; accepted: August 18, 2014. Abstract: The road network is one of the key feature classes in topographic maps and databases. In the task of deriving road networks for products at smaller scales, road net- work selection forms a prerequisite for all other generalization operators, and is thus a fun- damental operation in the overall process of topographic map and database production. The objective of this work was to develop an algorithm for automated road network selec- tion from a large-scale (1:10,000) to a small-scale database (1:200,000). The project was pur- sued in collaboration with swisstopo, the national mapping agency of Switzerland, with generic mapping requirements in mind. Preliminary experiments suggested that a selec- tion algorithm based on betweenness centrality performed best for this purpose, yet also exposed problems. The main contribution of this paper thus consists of four extensions that address deficiencies of the basic centrality-based algorithm and lead to a significant improvement of the results. The first two extensions improve the formation of strokes concatenating the road segments, which is crucial since strokes provide the foundation upon which the network centrality measure is computed. Thus, the first extension en- sures that roundabouts are detected and collapsed, thus avoiding interruptions of strokes by roundabouts, while the second introduces additional semantics in the process of stroke formation, allowing longer and more plausible strokes to built.
    [Show full text]
  • The Putney Road Link Road Scheme
    The Putney Road Link Road Scheme: Why the Council should think again about building this link road Contents Page 1. Introduction 1 2. Is Putney Road suitable for use as a link road? 1 3. Is the Putney Road scheme linked to an Evesham Road scheme? 2 4. Does the Putney Road scheme meet its objectives? 2 5. What are the outcomes from the Putney Road scheme? 3 6. Are the Putney Road scheme outcomes positive? 4 7. Overall conclusions about outcomes and objectives 5 8. Will it reduce rat-running? 6 9. How good is the traffic modelling? 7 10. Testing the traffic model 8 11. Count point accuracy 8 12. Conclusions about the scheme and concluding comments 11 13. The conduct of the bid and the consultation 12 0 The Putney Road Link Road Scheme: Why the Council should think again about building this link road 1. Introduction The Putney Road Link Road scheme will create a new junction where Putney Road West meets Aylestone Road/Saffron Lane, and create a link road running through to Welford Road/Victoria Park Road. Although it is intended to create a new local access to the business area, the main purpose of the scheme is the creation of the link road which at this stage will extend to the A6 London Road through Victoria Park Road. Although the council claims this scheme is not connected with a further scheme, linking Aylestone Road to Narborough Road through Evesham Road, it is self-evident that it is, and the council says this in the bid for the funding for this first stage.
    [Show full text]
  • Parkside Development New Link Road Access to the M6 Motorway Proposal
    Richard Ward PINS Reference 3253194; 3253230; and 3253232 Parkside Development New Link Road Access to the M6 Motorway Proposal Page 1 of 20 June 2020 Current Link Road proposal as shown in the Drainage Plan Page 2 of 20 The Current Proposal for the Parkside Link Road by not being a dedicated direct link to the M6 motorway, the Commercial Vehicle Traffic that will be generated by the proposed development(s) in total will impact on the local roads from all directions as measures to prevent are impossible to manage. The following plan of road access to the proposed Parkside development show the Commercial Vehicle Traffic impact on the Local Roads. Where the utilisation of the Motorway M6 junction 22 will be little used with respect to the access to the proposed development from the local roads. The Access was not solved by the previous Parkside Proposals by the developers: 1996 British Coal/Morrisons; 2000+ RailTrack; 2004-2009 Astral Developments; and 2009-2012 Prologis. To whom all had withdrawn due to not being able to solve the Traffic situation, over and above the reason for the development for the need for jobs which has become secondary and not a main issue considering the Parkside proposals having been an issue since 1993 to 2018, (ie 25 years). So the need for jobs is still not the issue the traffic impact still is the issue purely due to the urban location surrounded by a major road infrastructure. It is this that is the problem, due to heavily industrialising an area that the surrounding locality can not cope with the proposed situation – traffic wise.
    [Show full text]
  • DN-GEO-03031 June 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS
    Rural Road Link Design DN-GEO-03031 June 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving the country’s national road and light rail networks. About TII Publications TII maintains an online suite of technical publications, which is managed through the TII Publications website. The contents of TII Publications is clearly split into ‘Standards’ and ‘Technical’ documentation. All documentation for implementation on TII schemes is collectively referred to as TII Publications (Standards), and all other documentation within the system is collectively referred to as TII Publications (Technical). Document Attributes Each document within TII Publications has a range of attributes associated with it, which allows for efficient access and retrieval of the document from the website. These attributes are also contained on the inside cover of each current document, for reference. TII Publication Title Rural Road Link Design TII Publication Number DN-GEO-03031 Activity Design (DN) Document Set Standards Stream Geometry (GEO) Publication Date June 2017 Document 03031 Historical NRA TD 9 Number Reference TII Publications Website This document is part of the TII publications system all of which is available free of charge at http://www.tiipublications.ie. For more information on the TII Publications system or to access further TII Publications documentation, please refer to the TII Publications website. TII Authorisation and Contact Details This document
    [Show full text]
  • Hospital Link Project Project Update – April 2019
    Hospital Link Project Project Update – April 2019 General The project provides an approximately 1.2 kilometre multi-use pathway (MUP) along the Hospital Ring Road and extensive final landscaping within the new Alta Vista Hospital Link corridor. Work includes the construction of final landscaping throughout the Alta Vista Hospital Link from Riverside Drive to Ring Road, and a multi-use- pathway along the Hospital Ring Road connecting to Smyth Road to improved cycling and pedestrian connectivity to the area. In addition, a section of Smyth Road (170m length) from the Transitway to the east side of the VIA underpass, will be resurfaced with selective sections of sidewalk replaced. This work will also include a new retaining wall (27m length) behind the sidewalk along Smyth Road, extending from the southeast side of the VIA bridge, to improve drainage in the area. Construction is scheduled to take place until August 2019. Work areas will change as operations are initiated and completed. Read on for important construction updates. Construction Forecast Over the next month, neighbours can expect the following impacts: Level of dust will be low. North Level of noise will be low. Level of vibration will be low. Level of construction traffic will be low. Key Plan of Alta Vista Hospital Link and MUP Work Completed to Date • The Alta Vista Hospital Link facility is open to vehicular traffic and emergency medical services on Riverside Drive, the Transitway, Alta Vista Drive, Hospital Ring Road and Hospital Link Road. Key Activities for April 2019 The key activities anticipated for the April 2019 period include: City of Ottawa – Hospital Link Project [email protected] - 2 - Hospital Link Road Landscaping • Preparation for plant beds and tree pits will continue for the extensive landscaping throughout the new Alta Vista Hospital Link.
    [Show full text]
  • Approaching Bike Hazards Via Crowdsourcing of Volunteered Geographic Information
    sustainability Article Approaching Bike Hazards via Crowdsourcing of Volunteered Geographic Information Rafael Hologa *,† and Nils Riach † Physical Geography, University of Freiburg, Schreiberstraße 20, 79085 Freiburg, Germany; [email protected] * Correspondence: [email protected] † These authors contributed equally to this work. Received: 3 August 2020; Accepted: 25 August 2020; Published: 28 August 2020 Abstract: Information on individual hazard perception while cycling and the associated feeling of safety are key aspects to foster sustainable urban cycling mobility. Although cyclist’s perceptions must also be critically reviewed, such crowdsourced Volunteered Geographic Information (VGI) provides wide-ranging insights on diverse hazard categories in cycling. In this case study in the city of Freiburg, Germany, hazard perceptions, information about lane types, and the underlying routes were crowdsourced via an open source smartphone application by a small group with the aim of providing cyclists with effective solutions. By dealing with levels of reliability, we show that even a small group of laypersons can generate an extensive and valuable set of VGI consisting of comprehensive hazard categories. We demonstrate that (1) certain hazards are interlinked to specific lane types, and (2) the individual hazard perceptions and objective parameters, i.e., accident data, are often congruent spatially; consequently, (3) dangerous hot spots can be derived. By considering cyclists’ needs, this approach outlines how a people-based perspective can supplement regional planning on the local scale. Keywords: crowdsourcing; Volunteered Geographic Information; safety; hazards; cycling; perception; GIScience; regional planning 1. Introduction In their daily routines, cyclists are often confronted with dangerous situations while commuting in an urban context.
    [Show full text]
  • Parkgate Link Road, Park & Ride and Taylors Lane Scheme Proposals
    Parkgate Link Road, Park & Ride and Taylors Lane scheme proposals Public Consultation 15 March – 16 April 2021 Parkgate Link Road, Park & Ride and Taylors Lane Roundabout Scheme Public consultation Introduction Welcome to the Parkgate Link Road, Park & Ride and Taylors Funding Lane Roundabout Scheme. In March 2020, Sheffield City Region secured £166m in funding South Yorkshire Passenger Transport Executive (SYPTE) and the Parkgate Link Road, Park & Ride and Taylors Lane is working on proposals for a large highway improvement Roundabout Scheme forms part of this programme, improving scheme at Parkgate in Rotherham. The proposals aim to ease connectivity and making public transport a better option for congestion, improve traffic flow, public transport connectivity, those travelling in the area. reliability and journey times, and walking and cycling opportunities. Key Parties The purpose of this document is to provide information The key parties involved in delivering this scheme are Sheffield about the Parkgate Link Road, Park & Ride and Taylors City Region Mayoral Combined Authority (SCRMCA), South Lane Roundabout Scheme proposals. SYPTE is seeking Yorkshire Passenger Transport Executive (SYPTE), Rotherham feedback from you on the proposals to help shape the design Council and consultants working on behalf of SYPTE. development work, in advance of submission of a planning application to Rotherham Council. SCRMCA: The agreed Devolution Deal between Government and the leaders of Sheffield City Region devolved a range of powers and responsibilities to the Sheffield City Region Combined Sheffield City Region (SCR) Authority and an elected mayor. This formal partnership of Sheffield City Region was one of 12 shortlisted areas invited by Councils shapes policy and leads on decision-making in South Government to develop a business case for the Transforming Yorkshire.
    [Show full text]
  • Traffic Signs Manual – Chapter 5 Traffic Signs
    Traffic Signs Manual – Chapter 5 Traffic Traffic Signs Manual CHAPTER 5 2018 Road Markings 2018 Traffic Signs Manual Chapter 5 Road Markings Department for Transport Department for Infrastructure (Northern Ireland) Scottish Government Welsh Government London: TSO Traffic Signs Manual Contents of Chapters 1–8 CHAPTER 1 Introduction CHAPTER 2 Informatory Signs* CHAPTER 3 Regulatory Signs CHAPTER 4 Warning Signs CHAPTER 5 Road Markings CHAPTER 6 Traffic Control CHAPTER 7 The Design of Traffic Signs CHAPTER 8 Traffic Safety Measures and Signs for Road Works and Temporary Situations * To be published at a later date Designers should consult the Department for Transport’s website www.gov.uk for confirmation of current publication dates. Published for The Department for Transport under licence from the Controller of Her Majesty’s Stationery Office © Crown copyright 2019 All rights reserved Copyright in the typographical arrangement rests with the Crown. This publication, excluding logos, may be reproduced free of charge in any format or medium for non‑commercial research, private study or for internal circulation within an organisation. This is subject to it being reproduced accurately and not used in a misleading context. The copyright source of the material must be acknowledged and the title of the publication specified. First published 2019 First edition Crown Copyright 1980 ISBN 978 0 11 553208 5 Printed In the United Kingdom for TSO (The Stationery Office) J003473475 c2 01/19 CONTENTS 1 INTRODUCTION 6 1.1 Overview 6 1.2 Legal 6 1.3 Definitions
    [Show full text]
  • Performance Evaluation of a Four-Legged Intersection Using Microscopic Simulation Model
    Building Tomorrow’s Society Bâtir la Société de Demain Fredericton, Canada June 13 – June 16, 2018/ Juin 13 – Juin 16, 2018 PERFORMANCE EVALUATION OF A FOUR-LEGGED INTERSECTION USING MICROSCOPIC SIMULATION MODEL Orvin, Muntahith1,5, Ivy, Afia2, Hadiuzzaman,Md3 and Ahsan, Hasib4 1 BSc, Military Institute of Science And Technology (MIST), Bangladesh 2 BSc, Military Institute of Science And Technology (MIST), Bangladesh 3 PhD, Professor, Bangladesh University of Engineering And Technology (BUET), Bangladesh 4 PhD, Professor, Bangladesh University of Engineering And Technology (BUET), Bangladesh 5 [email protected] Abstract: Traffic congestion is a widely spreading problem throughout the world. The gap between traffic demand and supply is increasing day by day that makes junctions, a traffic congestion spot. In this study, a four legged intersection has been evaluated that suffers from high congestion. The traffic within the study area is mostly heterogeneous with non-lane based flow. A microscopic simulation model has been used to assess the performance of the intersection. Using VISSIM, the on-field condition is replicated to observe the behaviour of the prevailing system. Several traffic data are collected from the study area. Then the simulation model is calibrated with the field data and validated with another day’s field data, signifies that the developed model clearly mimics the reality. The driving behaviour parameters are tuned to replicate the lane indiscipline existing in the field. The model is analyzed for several conditions such as existing two phase, modified two phase and four phase signal control. It is found that travel time for modified two-phase is more favourable than the existing two-phase signal.
    [Show full text]
  • Transportation
    TRANSPORTATION INTRODUCTION York County’s first transportation plan was a thoroughfares plan that gave no consideration to non-highway modes of transportation. It was not until the 1991 Comprehensive Plan that other modes of transportation – air, rail, transit, bikeways, walkways, and water – came to be fully recognized as components of the transportation system. The year 1991 also saw the passage of the federal Intermodal Surface Transportation Efficiency Act (ISTEA), which required state and regional transportation plans to be “fiscally constrained.” This means that funding must be identified for every project in the plan. Plans must also conform to federal air quality standards, which further limits the number of projects that can be included, and they must consider all modes in making transportation investment decisions. In addition to these federal mandates governing regional transportation planning, there are several state mandates that govern the development of transportation plans at the local level. Most importantly, Section 15.2-2223.B.1 of the Code of Virginia specifies that “As part of the comprehensive plan, each locality shall develop a transportation plan that designates a system of transportation infrastructure needs and recommendations that include the designation of new and expanded transportation facilities and that support the planned development of the territory covered by the plan and shall include, as appropriate, but not be limited to, roadways, bicycle accommodations, pedestrian accommodations, railways, bridges, waterways, airports, ports, and public transportation facilities. The plan shall recognize and differentiate among a hierarchy of roads such as expressways, arterials, and collectors.” Furthermore, Section 15.2-2223.B.1.2.
    [Show full text]
  • Link Road Planning Statement
    1 Bexhill to Hastings Link Road Planning Statement East Sussex County Council County Hall St Anne's Crescent Lewes East Sussex 2 Bexhill Hastings Link Road Planning Statement 3 1. Introduction 1.1 Purpose of the Planning Statement 1.1.1 This statement has been prepared in support of the planning application for the Bexhill Hastings Link Road (the Scheme). It is one of a number of documents that accompany the planning application. Its purpose is to explain the rationale for the proposal including its background and the principles behind it. 1.1.2 In addition to this statement, the application submission comprises the following suite of documents: • The application form, plans and drawings, requisite notices; • A Regeneration Statement – reporting the results of an assessment of the regeneration effects of the Scheme and how far it facilitates the regeneration objectives for the area; • An Environmental Statement (ES) – a statutory document required to inform the decision maker of the scale and potential environmental effects of the proposal. The ES comprises a non-technical summary; a main report; appendices and figures and illustrations; • A Sustainability Appraisal – setting out how the Scheme performs against a set of agreed sustainability objectives. These objectives reflect national regional and local objectives for sustainability; • A Traffic and Transport Report – setting out the traffic modelling results and incorporating the economic assessment report of the Scheme; • A Design and Access Statement; and • A Waste Management Strategy. 1.1.3 The extent of the information provided in support of the Scheme proposals reflects the comprehensive approach taken to the overall design.
    [Show full text]