Fichetechnique REM MA an Rev9 REM MITIGATION MEASURES Starting August 24, 2020 – Mascouche/Terrebonne area REPENTIGNPENENTIGNE TIG Y MASCOUCHEUCCHHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNET ON 30 0 S TERREBONNE 14 H TERREBONNE U STATION VARENNESESE TERMINAL T T L E 5 15 0 0 MONTRÉAMONTRÉO ÉAL- EST 25 LAVAL 30 SUSPENDED SERVICE 30 640 SHUTTLE 501 440 E 140 IN L E H BOUCHERUCUCHERVILLEVIL C 40 SAUVÉ U Bus terminal O 20 C STATION S MONTRÉAMOONTRÉAN L A RADISSON M Train station STATION Metro station AHUNTSIC LONGUEUILONGUON U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) or line 140 from Lachenaie to the Radisson station (±60 min) or shuttle 500 from the Mascouche station to the Radisson station (±45 min) or shuttle 501 from the Terrebonne station to the Radisson station (±35 min) SUSPENDED SERVICE 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) to the Sauvé1 metro station (5-7 min) 2 Walk ±1 h 10 3 Metro from the Sauvé station to the Bonaventure station (±20 min) (see reverse) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne area LAVAAVAVAAL E 15 INNEN MMOUNTOUNT R ROYALOYAL BY BYPASSPASS 1919 LINL 4040 25 EEL 2020 440440 HHE SASAUVÉUVÉ CHC OUCHE LINE STATATION C MOONONTRÉALN RRÉÉÉAAALL SC MONTMORENCMONTMORENCY MAM STATATION AHUNTAHUNTSICSIC 1313 STAATIONTION LONGONGUEUILONGUNNGGGUUEUILU UILUIL CENTRAL CÔTE-CÔTE-VERTU STATION STATATION 520520 113434 TrainTrain stationstation 1010 1155 2020 Metro stationstation 132132 2020 Mount RoyalRoyal bypassbypass Train line exo 5 Mascouche from the Mascouche station to Central Station • 2 departures during the morning and evening rush hours ±1 h 45 During the first months, work will be performed to improve rail infrastructure between the Ahuntsic station and Central Station in order to facilitate rail traffic. Consequently, a 5-10-minute delay should be expected, increasing the total transit time between the Mascouche station and Central Station to 1 hour and 45 minutes. Once the work completed, the transit time between Mascouche and downtown Montréal will be 1 hour and 35 minutes. (reverse side) REM MITIGATION MEASURES Starting August 24, 2020 – Repentigny/L’Assomption area L‘’‘ASSOMPTIOPT ONN 40 2020 400 25 300 30 100 REPENTIGNYG MASCCOUCHEO HE REPENTIGNY STATION TERREBONNET 640 40 VARENNEESES 15 0 40 25 2 LAVAL SUSPENDED SERVICE OUCHE LINE SC 300 30 MA Train station 440 SHUTTLE 50 100 Metro station RADISSON BOUCHERBOBOUCHHE VILLIL E 20 19 MONTRÉALMONTRÉNT A STATION PREFERRED ROUTES RUSH HOURS (WEEKDAYS) 1 Line 100 from L’Assomption (Saint-Gérard-Majella) to the Radisson station (±1 h 10 min) or line 300 from Repentigny to the Radisson station (±30 min) or line 400 from L’Assomption station to the Radisson station (±30 min) or shuttle 502 from Repentigny to the Radisson station (±35 min) SUSPENDED SERVICE 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Repentigny station to the Sauvé station (±35 min) to the Sauvé1 metro station (5-7 min) 2 Walk ±1 h 3 Metro from the Sauvé station to the Bonaventure station (±20 min) (see reverse) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Repentigny/L’Assomption area LAVAAVAVAAL E 15 INNEN MMOUNTOUNT R ROYALOYAL BY BYPASSPASS 1919 LINL 4040 25 EEL 2020 440440 HHE SASAUVÉUVÉ CHC OUCHE LINE STATATION C MOONONTRÉALN RRÉÉÉAAALL SC MONTMORENCMONTMORENCY MAM STATATION AHUNTAHUNTSICSIC 1313 STAATIONTION LONGONGUEUILONGUNNGGGUUEUILU UILUIL CENTRAL CÔTE-CÔTE-VERTU STATION STATATION 520520 113434 TrainTrain stationstation 1010 1155 2020 Metro stationstation 132132 2020 Mount RoyalRoyal bypassbypass Train line exo 5 Mascouche from the Repentigny station to Central Station • 2 departures during the morning and evening rush hours ±1 h 30 During the first months, work will be performed to improve rail infrastructure between the Ahuntsic station and Central Station in order to facilitate rail traffic. Consequently, a 5-10-minute delay should be expected, increasing the total transit time between the Repentigny station and Central Station to 1 hour and 30 minutes. Once the work completed, the transit time between Repentigny and downtown Montréal will be 1 hour and 20 minutes. (reverse side) REM MITIGATION MEASURES Montreal's east end RIVIÈRE- DES-PRAIRIES SHERBROOKE/GOUIN 2020 STATION TERMINAL 25 VAVARENNESRENNN ANJOU 640 STATION 9 44 POINTE- 30 LAVAL 0 AUX-TREMBLES 486 43 STATION 440 OUCHE LINE 432 SC 40 0 SAINT-LÉONARD/ MA 41 MONTRÉAL-NORD STATION 15 43 9 HONORÉ-BEAUGRAND 19 25 STATION 44 9 RADISSON BOUCHERE VILLEVI SAINT-MICHEL/ 43 STATION 2 Bus terminal MONTRÉAL-NORD 13 STATION 9 43 20 Train station 9 CADILLAC STATION MONTRÉAMOMO ÉÉAALAL Metro station 30 PIE-IX Reserved lane AHUNTSIC towaVerseerrs rdlele STATION CENTRE-CCEENENTRTRREE 430 0 STATION VILLVILLLLE 41 LOLONGUEUILNGUE L TRAVEL OPTIONS RUSH HOURS (WEEKDAYS) POINTEAUXTREMBLES STATION - Line 410 – Express Notre-Dame to downtown - Line 430 – Express Pointe-aux-Trembles to downtown - Line 486 – Express Sherbrooke to the Honoré-Beaugrand station RIVIÈREDESPRAIRIES STATION - Line 449 – Express Rivière-des-Prairies to the Radisson station SAINTLÉONARD/MONTRÉALNORD STATION - Line 432 – Express Lacordaire to the Cadillac station SAINTMICHEL/MONTRÉALNORD STATION - Line 139 – Pie-IX and Line 439 Express Pie-IX to the Pie-IX station* AHUNTSIC STATION - Line 31 – Saint-Denis southbound to the Rosemont station (option for mobility-impaired users) - Line 121 – Sauvé to the Côte-Vertu station (see reverse) * Please note that major detours are planned northbound on lines 139 and 439 due to work related with the Pie-IX BRT 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Montreal's east end LAVAAVAVAAL E 15 INNEN MMOUNTOUNT R ROYALOYAL BY BYPASSPASS 1919 LINL 4040 25 EEL 2020 440440 HHE SASAUVÉUVÉ CHC OUCHE LINE STATATION C MOONONTRÉALN RRÉÉÉAAALL SC MONTMORENCMONTMORENCY MAM STATATION AHUNTAHUNTSICSIC 1313 STAATIONTION LONGONGUEUILONGUNNGGGUUEUILU UILUIL CENTRAL CÔTE-CÔTE-VERTU STATION STATATION 520520 113434 TrainTrain stationstation 1010 1155 2020 Metro stationstation 132132 2020 Mount RoyalRoyal bypassbypass Train line exo 5 Mascouche from the Pointe-aux-Trembles to Sauvé stations to Central Station • 2 departures during the morning and evening rush hours ±1 h 05 - 1 h 25 During the first months, work will be performed to improve rail infrastructure between the Ahuntsic station and Central Station in order to facilitate rail traffic. Consequently, a 5-10-minute delay should be expected, increasing the total transit time between the Pointe-aux-Trembles to Sauvé stations to Central Station to 1 hour and 5 minutes - 1 hour and 25 minutes. Once the work completed, the transit time between those stations and downtown Montréal will be 55 to 1 h 15 minutes. (reverse side).
Recommended publications
  • Fichetechnique REM Mesures D'attenuation ANGLAIS 4
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNG Y MASCOUCHUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNENES TERMINAL S H U T T 15 L E MONTRÉAMMOONTRÉAR L- ESST 25 LAVAL 30 30 640 BUS SHUTTLE 440 E 140 IN L E H BOUCHEBOUCB CHERH RVILLEVIV E C 40 SAUVÉ U Bus terminal O 20 C STATION S MONMOONNTRÉALNTTRÉA A RADISSON M Train station STATION Metro station AHUNTSIC LOLONGUEUIN U L STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) or line 140 from Lachenaie to the Radisson station (±60 min) or bus shuttle from the Terrebonne station to the Radisson station (±35 min) or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) to the Sauvé1 metro station 2 Walk ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • Présentation Powerpoint
    Media briefing June 2019 Overview of REM’s construction sites Agenda 2 – The REM project – Project scope and challenges – Major accomplishments in 2018-2019 – 2019 construction goals – South Shore – Deux-Montagnes – Sainte-Anne-de-Bellevue/Airport – Question & answer period The REM project Structure of the project 4 Project Office Project Execution Engineering, procurement and Rolling stock, systems, operation and construction of the infrastructures maintenance services Project Integration Coordination committees – Coordination committees – Work impact management Mobilité Montréal committees ARTM and government departments, committees transit authorities municipalities and partners More than 20 work planning and monitoring committees Project 5 100% automated light rail project 67 km of track 26 stations in the Greater Montréal area 3 connections to the Montréal metro Project scope and challenges A completely new system 7 OVERHEAD CONTACT LINE STATION CATENARY SUPPORT RAILS DECK PRE-CAST CONCRETE SEGMENT SUBSTATION COLUMN CABLE DUCTS GROUNDING Varied settings 8 ELEVATED GROUND LEVEL ENCLOSED UNDERGROUND Scope of the work to perform 9 67 14 26 5 3.5 KM OF TRACK PARK-AND-RIDE STATIONS KM OF KM OF TUNNELS OF WHICH LOTS TUNNEL TO BE 18.2 KM MODERNIZED ARE ON ELEVATED 8 STRUCTURE ELEVATED STATIONS 13 GROUND- LEVEL STATIONS 5 2 11 5 BRIDGES UNDERGROUND MAINTENANCE BUS STATIONS CENTRES STATIONS 1.16 KM Linear project A 67-km route, which is almost as long10 Challenges and issues as the Montréal metro. Many different trades Thousands of workers, experts and professionals employed during DEUX-MONTAGNES construction. Linear project ACoordination 67-km route, with which 11 municipalities, is almost as 8 longboroughs as the and Montréal 6 public transit metro.
    [Show full text]
  • The REM Arrives in Laval – Work Strategy – Upcoming Work in 2019 – Interim Public Transit Mitigation Strategy – Question & Answer Period
    Presentation begins at 7 p.m. If you have any questions about the project please visit rem.info/en Réseau express métropolitain Informational meeting Laval 2019-06-10 Agenda – The REM arrives in Laval – Work strategy – Upcoming work in 2019 – Interim public transit mitigation strategy – Question & answer period 3 The REM arrives in Laval Réseau express métropolitain Largest public transit project in Québec in the last 50 years Light rail 100% electric and automated 26 stations, 67 km Commissioning in 2023 The REM in Laval Sainte- Dorothée X Access permanently closed Île-Bigras (Graveline Street) Rivière-des-Prairies Raised route Road access Frequency, travel time and capacity Île-Bigras – Gare Centrale: 26 minutes Fast Sainte-Dorothée – Gare Centrale: 28 minutes + Île-Bigras – Airport: 19 minutes Sainte-Dorothée – South Shore: 44 minutes 20% more frequent + Frequent 5 minutes during peak hours 15 minutes during off-peak hours Large 2.5 times more people during peak hours (42,120 + people) capacity Nearly 7000 seats during peak hours (MR-90 = 8100 seats) The REM: quieter technology Current exo trains – 300 metres 2 cars during off-peak hours — 40 metres — 14 hours/day 4 cars during peak hours — 80 metres — 6 hours/day REM cars ―Weight: 180 tons ―No train whistles at station arrival or grade crossing alarms ―Electric brakes ―Welded rails with rubber pads across the entire network 8 REM stations and rail car 1000 parking spaces Stations accessible 65 bicycle racks by various means 5 kiss-and-ride lanes 6 bus platforms (more stops on streets)
    [Show full text]
  • Bois-Franc Station — Rail Shuttle and Trainbus Shuttle 964 of the Société De Transport De Montréal (STM)
    Frequently asked questions Bois-Franc station — rail shuttle and Trainbus shuttle 964 of the Société de transport de Montréal (STM) ....... 3 1. How frequent will rail shuttle departures be? ................................................................................................................................................... 3 2. Will bus departures from the Bois-Franc station be coordinated with the arrival of rail shuttles? ................................................................... 3 3. How will boarding bus shuttles work at the Bois-Franc Station? ..................................................................................................................... 3 4. Will a bus boarding platform be built at the Bois-Franc station? ..................................................................................................................... 3 5. How long will bus shuttle 964 need to reach the Côte-Vertu metro station? ................................................................................................... 3 6. How will evening rush hours work, given that the rail shuttle will depart every 30 minutes? ........................................................................... 3 7. Can we park at the Bois-Franc station to use bus shuttles during the work? .................................................................................................. 4 8. Major work is planned at the Côte-Vertu metro station. How will users be impacted by the work? ...............................................................
    [Show full text]
  • Rem Mitigation Measures
    REM MITIGATION RÉSEAUMEASURES TRANSITOIRE Csd23 décembre 2019d REM UPCOMING WORK PROJECT OVERVIEW 3 The REM ➢ fast ➢ frequent ➢ Safe and reliable ➢ Connects to current public transit network Deux-Montagnes Line ➢ + 100 000 additionnal trips in both directions during rush hours UPCOMING WORK 4 SOUTH SHORE BRANCH UPCOMING WORK 5 DOWNTOWN AREA MCGILL ÉDOUARD-MONTPETIT UPCOMING WORK 6 DEUX-MONTAGNES BRANCH CANORA MONT-ROYAL UPCOMING WORK 7 DEUX-MONTAGNES BRANCH BOIS-FRANC SAINT-EUSTACHE UPCOMING WORK 8 WEST ISLAND AND AIRPORT BRANCHES PROJECT OVERVIEW 9 MAIN PHASES Date to be Train route stops at the determined* Bois-Franc station Complete interruption of Mid-2021 Deux-Montagnes rail services on the line line Opening of the REM 2022 central segment from the De Ruisseau station Complete opening of the Late 2023 REM * Temporary suspension of REM worksite due to COVID-19 PROJECT OVERVIEW 10 MAIN PHASES Train route stops at the Date to be Ahuntsic station + mont determined* Royal bypass Mascouche Line Connection to the Correspondance A40 2022 station * Temporary suspension of REM worksite due to COVID-19 COMMISSIONING SEQUENCE 11 2021 South Shore to Central station 2022 Central station to Du Ruisseau 2023 ▪ Deux-Montagnes ▪ West Island ▪ Airport MITIGATION STRATEGY CLOSED STATIONS 2020 13 CLOSED STATIONS MID-2021 14 FOUR PILLARS OF THE NEW ANNOUNCEMENT OF FEBRUARY 28, 2019 15 TEMPORARY NETWORK Rail Improvement of Preferential Green and blue lines, shuttle current service measures and west branch and bus shuttles for buses of the orange line METROPOLITAN
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • Fichetechnique REM Mesures D'attenuation ANGLAIS 2
    REM MITIGATION MEASURES Mascouche/Terrebonne areas REPENTIGENNTTIT GNYG Y MASCOUCHEUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNESNES TERMINAL S H U T T 15 L E MONTRÉALMMOONTRRÉAL- ESST 25 LAVAL 30 30 640 440 BUS SHUTTLE E 140 IN L E BOUCHERBOUCHB CHERVILLEVIV E H C 40 SAUVÉ U 20 Bus terminal O STATION C MONMOONNTRÉALNTTRÉA S A RADISSON Train station M STATION Metro station AHUNTSIC LOLONGUEUILN U STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) → or line 140 from Lachenaie to the Radisson station (±60 min) → or bus shuttle from the Terrebonne station to the Radisson station (±35 min) → or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) 2 Walk to the Sauvé1 metro station ±1 h 05* 3 Metro from the Sauvé station to the Bonaventure station (±20 min) 1 → or train line exo 5 Mascouche from the Mascouche station to the Central Station (see reverse side for map) • 3 departures during the morning and evening rush hours • Commissioning in 2020 ±1 h 25 * The travel time does not include transfers between different transportation modes. 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne
    [Show full text]
  • Destination REM
    Destination REM October 7, 2019 – Upcoming work 3 First tracks installed on the South Shore South Shore branch Stations are taking shape Future Du Quartie station Connecting to the heart of the city Future McGill station Excavating 20 storeys underground Future Édouard- Montpetit station A new maintenance centre St-Eustache centre Construction techniques previously unseen in Québec An elevated structure makes headway on the West Island A 14.5-km elevated structure stretching to Sainte-Anne-de-Bellevue A tunnel-boring machine heads to Montréal 3.5 km to be dug to the airport A direct line to the airport Credit: Aéroports de Montréal (ADM) UPCOMING WORK 12 A major modernization project MONT-ROYAL TUNNEL Key phases Deux-Montagnes line January 2020 Suspension of train service at Bois-Franc Mid-2021 Full suspension of train service Opening of the REM’s central segment at Du 2022 Ruisseau Late 2023 Complete opening of the REM Key phases Mascouche line January 2020 Suspension of train service at Ahuntsic station 2022 Connection to Correspondance A40 station A NEW TRANSITIONAL NETWORK IN 2020 BY AREA METROPOLITAN PARTNERS 16 DEUX-MONTAGNES 17 PREFERRED ROUTE (peak hours) Rail shuttle Shuttle 964 ①Côte-Vertu metro ② ③ SHUTTLE 964 TRANSITIONAL NETWORK – 2020 18 Departures in sync 3 buses boarded with trains at a time Buses waiting BOIS-FRANC STATION DEUX-MONTAGNES 19 EXPRESS SHUTTLE BUS OPTION (peak hours and weekends) - Shuttle 404 DEUX-MONTAGNES TRAVEL TIMES 20 • CURRENT TIME 45 min. • PREFERRED ROUTE TIME 65 min. • TRANSFER TIME ± 15 min. • DRIVING TIME Up to 75 min. LAVAL 21 PREFERRED ROUTE (peak hours) Rail shuttle Shuttle 964 ①Côte-Vertu metro ② ③ LAVAL TRAVEL TIMES 22 • CURRENT TRAVEL TIME 38 min.
    [Show full text]
  • 333, Chabanel Montreal Midtown
    333, CHABANEL MONTREAL MIDTOWN IDEAL FOR ONLINE BUSINESSES 110,000 SQ. FT. FLOOR PLAT MONTREAL | Midtown 333, CHABANEL ST. WEST Highlights • New management and recently renovated building with Office Leasing Availabilities a great deal of natural light, offering superb views of the Please contact leasing director for availabilities city and parks • Very affordable lease rates • Ideal for online businesses and perfect for companies Property Details looking for large floor plates at highly competitive lease rates Year Built: 1985 • CIBC full service bank in building Leasable area: 963,000 sq. ft. • Canada Post distribution centre in the building Parking: Extensive indoor and • Daycare across the street and next door at 433 outdoor parking available Chabanel Transportation: Minutes from the Crémazie • Concierge and 24/7 security, cameras and access and Sauvé Metro stations system with transit bus • Full recycling program, electric car charging stations Number of floors: 9 floors and rooftop beehive initiative Ceiling height: 11'6" clear • Extensive inside and outside parking Lease rates*: Starting at $8.34 per sq. ft. Property taxes: $1.25 per sq. ft. Location Daily cleaning available: $1.45 per sq. ft. • Located on Chabanel Street in the Ahuntsic-Cartierville Heating / Air conditioning: Available borough, between St-Laurent Blvd. and Meilleur Street Electricity: Tenant responsibility • Walking distance to Marché Central, Costco, SAQ, Bureau en Gros, Guzzo and much more Loading dock spaces: 16 • Easily accessible by public transportation and bus stop Freight elevators: 8 in front of building Passenger elevators: 5 • Walking distance from the Chabanel train station (Saint-Jérôme line) and the future Ahuntsic and Fibre Optic Available • Sauvé stations (Mascouche line) * All increases above the base year are extra.
    [Show full text]
  • 433, Chabanel Montréal Ahuntsic-Cartierville
    Jusqu'à 240 000 pi bureaux contigus disponibles 2 d'espaces 433, CHABANEL MONTRÉAL AHUNTSIC-CARTIERVILLE ESPACE BUREAU HAUT DE GAMME À UNE FRACTION DU PRIX ! MONTRÉAL | Ahuntsic-Cartierville 433, CHABANEL OUEST Espaces de bureaux disponibles Points saillants 1 500 – 40 000 pi2 sur un étage • Nouvelle gestion et édifice récemment rénové, avec (multiples étages disponibles) beaucoup de lumière naturelle, offrant de superbes 6 étages complets disponibles vues sur la ville et les parcs • Loyer très abordable • Dépanneur sur place, restaurant, café, service complet Détails de la propriété TD Banque, cabinet dentaire, garderie, gym, lave-auto Année de construction : 1985 et agence de voyage Superficie locative : 845 000 pi2 • Concierge et sécurité 24/7, caméras et système d’accès par carte Stationnement : Vastes espaces de stationnement intérieurs et extérieurs • Programme de recyclage complet, station de recharge pour voiture électrique et ruche sur le toit Transport : À deux pas des stations de métro Crémazie et Sauvé en autobus • Nombreux espaces de stationnement intérieurs et extérieurs Nombre d’étages : 12 étages Hauteur des plafonds : 11'6" Loyer demandé* : À partir de 9,49 $ par pi2 Emplacement Taxes foncières : 1,88 $ par pi2 • Situé sur Chabanel dans l’arrondissement Ahuntsic- Cartierville, au coin du boulevard St-Laurent Nettoyage quotidien disponible : 1,45 $ par pi2 • Près du Marché Central, Costco, SAQ, Bureau en Gros, Chauffage et climatisation : Disponibles Cinéma Guzzo et beaucoup plus Électricité : À la responsabilité du locataire • Facilement accessible par transport en commun Quais de chargement : 18 et arrêt d'autobus devant le bâtiment Monte-charges : 8 • À distance de marche de la station de train Chabanel (Ligne Saint-Jérôme) et les futurs stations Ahuntsic Ascenseurs : 7 et Sauvé (Ligne Mascouche) Fibre optique disponible • Emplacement central, à l’intersection des autoroutes 40 et 15, près des stations de métro Crémazie et Sauvé * Toute augmentation au-dessus de l’année de base sera en sus.
    [Show full text]
  • Fichetechnique REM MA an Rev5
    REM MITIGATION MEASURES Mascouche/Terrebonne area REPENTIGENNTTIT GNG Y MASCOUCHUCCHHEHE MASCOUCHE REPENTIGNY STATION STATION 2020 640 TERREBONNEE ON 30 0 B TERREBONNE 14 TERREBONNE U S STATION VARENNENES TERMINAL S H U T T 15 L E MONTRÉAMMOONTRÉAR L- ESST 25 LAVAL 30 30 640 BUS SHUTTLE 440 E 140 IN L E H BOUCHEBOUCB CHERH RVILLEVIV E C 40 SAUVÉ U Bus terminal O 20 C STATION S MONMOONNTRÉALNTTRÉA A RADISSON M Train station STATION Metro station AHUNTSIC LOLONGUEUIN U L STATION Reserved lane PREFERRED ROUTE RUSH HOURS (WEEKDAYS) 1 Line 30 from the Terrebonne terminal to the Radisson station (±30 min) or line 140 from Lachenaie to the Radisson station (±60 min) or bus shuttle from the Terrebonne station to the Radisson station (±35 min) or bus shuttle from the Mascouche station to the Radisson station (±45 min) 2 Metro from the Radisson station to the Bonaventure station (±30 min) ALTERNATIVE ROUTES 1 Train line exo 5 Mascouche from the Mascouche station to the Sauvé station (±45 min) to the Sauvé1 metro station (5-7 min) 2 Walk ±1 h 10 3 Metro from the Sauvé station to the Bonaventure station (±20 min) (see reverse) 1- The orange line is very busy between the Montmorency and Berri-UQAM stations. Users are encouraged to choose another route. REM MITIGATION MEASURES Mascouche/Terrebonne area LAVAAVAVAAL E 15 INNEN MMOUNTOUNT R ROYALOYAL BY BYPASSPASS 1919 LINL 4040 25 EEL 2020 440440 HHE SASAUVÉUVÉ CHC OUCHE LINE STATATION C MOONONTRÉALN RRÉÉÉAAALL SC MONTMORENCMONTMORENCY MAM STATATION AHUNTAHUNTSICSIC 1313 STAATIONTION LONGONGUEUILONGUNNGGGUUEUILU UILUIL CENTRAL CÔTE-CÔTE-VERTU STATION STATATION 520520 113434 TrainTrain stationstation 1010 1155 2020 Metro stationstation 132132 2020 Mount RoyalRoyal bypassbypass Train line exo 5 Mascouche from the Mascouche station to Central Station • 3 departures during the morning and evening rush hours ±1 h 45 • Commissioning March 30, 2020 During the first months, work will be performed to improve rail infrastructure between the Ahuntsic station and Central Station in order to facilitate rail traffic.
    [Show full text]
  • 99, Chabanel Montreal Midtown
    99, CHABANEL MONTREAL MIDTOWN THE MOST AFFORDABLE INDUSTRIAL SPACES IN MONTREAL MONTREAL | Ahuntsic-Cartierville 99, CHABANEL ST. WEST Industrial Space Available Highlights 2,500 - 72,000 sq. ft. on one floor (multiple floors available) • One of the most affordable buildings in Montreal • New management and newly renovated lobby Property Details • Abundance of natural light, offering superb views of the city and parks Leasable area: 512,000 sq. ft. • Perfect for storage, industrial space and loft offices Parking: Extensive indoor and • Concierge and 24/7 security, cameras and access outdoor parking available system Transportation: Minutes from the Crémazie • Extensive inside and outside parking and Sauvé Metro stations with transit bus Number of floors: 7 Location Ceiling height: 11'6" clear • Located on Chabanel Street in the Ahuntsic-Cartierville borough, between St-Laurent Blvd. and Meilleur Street Lease rates*: Starting at $6.98 per sq. ft. • Walking distance to Marché Central, Costco, SAQ, Property taxes: $0.68 per sq. ft. Bureau en Gros, Guzzo and much more Daily cleaning available: $1.45 per sq. ft. • Easily accessible by public transportation and bus stop Heating / Air conditioning: Available at the corner • Walking distance from the Chabanel train station Electricity: Tenant responsibility (Saint-Jérôme line) and the future Ahuntsic and Sauvé Loading dock spaces: 18 stations (Mascouche line) Freight elevators: 6 • Centrally located at the intersection of Highway 40 and Highway 15, minutes from the Crémazie and Sauvé Passenger elevators: 4 Metro stations Fibre Optic Available * All increases above the base year are extra. Louis Parent Joseph Télio Leasing Director Vice-President, Leasing Commercial Division Commercial Division Commercial Real Estate Broker Real Estate Broker 514 291-2750 450 766-2454 514 213-3910 26 [email protected] [email protected] 99, CHABANEL Street Corner facade Elevators Reception area Facade WE ARE HERE! Ahuntsic station (Mascouche line) Chabanel station (Saint-Jérôme line) 15 y S t a - hw L ig .
    [Show full text]