<<

Mike's Work History

Employee and Entrepreneurial Experience

Entrepreneurial DATA MANAGEMENT INSTITUTE, LLC Naperville, IL Experience (1985-Present) 2013 – Present Manager  Responsibilities: Executive decisions.

2003 – 2012 Estimator/Sales Consultant  Responsibilities: Design/Develop/Market/Sell/Conduct construction takeoff and estimating seminars and software for painting and contractors.

MICHAEL W. LITZ, INC. Naperville, IL

2013 – Present President  Responsibilities: Executive decisions.

1985 – 2012 Estimator/Sales Consultant  Responsibilities: Takeoff/Estimate/Manage projects for painting and drywall contractor customers.

datamanagementinstitute.com Page 1 of 20

Mike's Work History

Employee and Entrepreneurial Experience

Employee 1984 – 1985 BAGWELL-GAW CO. Chicago, IL Experience Estimator/Salesman/Project Manager (1977-1985) . Responsibilities: Takeoff/Estimate/Sell/Manage light gage

structural steel framing, rough , Insulation, EIFS, lath/, metal stud framing, drywall, and acoustic ceiling projects.

1983 – 1984 THE LEVY CO. Northbrook, IL Estimator/Project Manager . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, insulation, EIFS, casework, millwork, door, frame, hardware, lath/plaster, metal stud framing, drywall, acoustic ceiling, and painting projects.

1982 – 1983 TIFFINY DECORATING CO. Chicago, IL Estimator/Salesman/Project Manager . Responsibilities: Takeoff/Estimate/Sell/Manage painting and decorating projects.

1980 – 1982 MEIER ACOUSTICS, INC. Posen, IL Estimator/Salesman/Project Manager . Responsibilities: Takeoff/Estimate/Sell/Manage light gage structural steel framing, metal stud framing, drywall, and acoustic ceiling projects.

1979 – 1980 G. T. CURRAN CO. Crest Hill, IL Estimator/Salesman/Project Manager . Responsibilities: Takeoff/Estimate/Sell/Manage light gage structural steel framing, metal stud framing, drywall, and acoustic ceiling projects.

1977 – 1979 ANNING-JOHNSON CO. Melrose Park, IL Draftsman/Quantity Surveyor/Assist.Project Mgr . Responsibilities: Drafting/Takeoff roof deck, interstitial floor, light gage structural steel framing, metal stud framing, drywall, and acoustic ceiling projects.

datamanagementinstitute.com Page 2 of 20

Mike's Work History

Educational and Personal Experience

Educational ELMHURST COLLEGE Experience Elmhurst, IL

NORTHERN ILLINOIS UNIVERSITY DeKalb, IL

OAK PARK - RIVER FOREST HIGH SCHOOL Oak Park, IL

Personal BORN: 1954 IN WASHINGTON D.C. Experience MARRIED: (40TH ANNIVERSARY IN 2016)

ELDER DAUGHTER: FIRST GRADE TEACHER (MARRIED – 14TH ANNIVERSARY IN 2016)

YOUNGER DAUGHTER: HOSPITAL PHARMACIST (MARRIED – 10TH ANNIVERSARY IN 2016)

datamanagementinstitute.com Page 3 of 20

Mike's Work History

Significant Projects (Pages 4 – 20)

Consulting Years 2009 KENPAT USA, LLC 10-Story (Pages 4 – 16) Orlando Events Center - Orlando, FL . Description: Professional Indoor Sports Stadium and Entertainment Facility . Responsibilities: Takeoff insulation, backing, and drywall.

2009 Hang-It-Wright Drywall, Inc. 2-Story P-8A Integrated Training Ctr-Naval Air Station Jacksonville, FL . Description: Low-rise U.S. Navy Training Facility . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, and drywall.

2008 Hang-It-Wright Drywall, Inc. 1-Story Lady Lake Assisted Living Facility - Lady Lake, FL . Description: Low-rise Assisted Living Facility . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, and drywall.

2008 Western Drywall Inc. 3-Story

University of California - Merced, CA . Description: Low-rise Social Sciences and Management Facility . Responsibilities: Takeoff/Estimate light gage structural steel framing, metal stud framing, and drywall.

2008 American Interior Construction, Inc. 3-Story

Amtrak Station - Wilmington, DE

. Description: Multi-phase, Exterior Restoration and Interior Renovations . Responsibilities: Takeoff/Estimate light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, metal stud framing, drywall, acoustical ceilings, linear metal ceilings, stainless steel column covers, and graffiti resistant wall panels. datamanagementinstitute.com Page 4 of 20

Mike's Work History

Consulting Years 2008 American Interior Construction, Inc. 2-Story (Pages 4 – 16) Alfred I. duPont Hospital for Children - Wilmington, DE . Description: Multi-phase, Catheterization Lab/Operating Rm. Renovations . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, GFRG, metal stud framing, drywall, acoustical ceilings, and acoustical wall panels.

2008 Smart Interiors LLC 2-Story

Healthcare Supportive Living Facility - Morris, IL

. Description: Low-rise Assisted Living Facility

. Responsibilities: Takeoff/Estimate metal stud framing, drywall, and paint.

2007 Suncoast Wall & Ceiling Systems, Inc. 2-Story Watersong at Viera - Buildings 1, 4, & 5 - Viera, FL

. Description: Low-rise Clubhouse, Assisted Living and Wellness Centers . Responsibilities: Takeoff/Estimate light gage structural steel framing, rough carpentry, insulation, EIFS, lath, plaster, metal stud framing, drywall, and acoustical ceilings

2007 McCahill Painting Company 18-Story Dearborn Tower - 1530 S. State - Chicago IL . Description: Hi-rise Exterior Balcony Railings . Responsibilities: Takeoff/Estimate paint.

2007 Milan Decorators, Inc. 4-Story

New Student Housing-Phase 1-Union University - Jackson, TN

. Description: Multi-building, Mid-rise Student Housing

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, insulation, metal stud framing, drywall, and acoustical ceilings.

datamanagementinstitute.com Page 5 of 20

Mike's Work History

Consulting Years 2007 Patriot Construction Framing & Drywall 1-Story (Pages 4 – 16) Genito Road High School - Chesterfield County, VA . Description: New High School . Responsibilities: Takeoff/Estimate light gage structural steel framing, rough carpentry, insulation, metal stud framing, drywall, and acoustical ceilings.

2007 Milan Decorators, Inc. 1-Story Dyersburg State Community College - Dyersburg, TN

. Description: Multi-building, Student Center Addition & Remodeling

. Responsibilities: Takeoff/Estimate/Manage light gage structural

steel framing, rough carpentry, insulation, metal stud framing, drywall, acoustical ceilings and linear metal ceilings.

2007 Emco Interiors Inc. 74-Story Water Tower Place Remod. 2007-835 N. Michigan-Chicago, IL . Description: Ground thru 7th Floor Renovations . Responsibilities: Takeoff/Estimate/Manage rough carpentry, doors, frames, hardware, insulation, metal stud framing, drywall, and acoustical ceilings.

2007 Milan Decorators, Inc. 3-Story Lawrence County Justice Center - Lawrenceburg, TN . Description: Multi-building, Mid-rise Prison Facility

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, insulation, metal stud framing, drywall, acoustical ceilings, and steel pan security ceilings.

2007 Tempus Construction Services, Inc. 23-Story

1035 W. Van Buren - Chicago, IL . Description: Hi-rise Residential Shell & Core . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, and drywall.

datamanagementinstitute.com Page 6 of 20

Mike's Work History

Consulting Years 2007 Tempus Construction Services, Inc. 32-Story (Pages 4 – 16) THE ADMIRAL at the LAKE - 909 W. Foster - Chicago, IL . Description: Hi-rise Residential Shell & Core . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, and drywall.

2007 Patriot Construction Framing & Drywall 2-Story

Northumberland Middle School-High School - Heathsville, VA . Description: New Middle School and High School Complex . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, insulation, metal stud framing, drywall, and acoustical ceilings.

2006 Acoustics & Specialties, Inc. 2-Story St. John the Evangelist Catholic Church - St. John, IN . Description: New Church

. Responsibilities: Takeoff/Estimate light gage structural steel framing, rough carpentry, insulation, metal stud framing, and drywall, and acoustical ceilings.

2006 Emco Interiors Inc. 27-Story

The Buckingham - 59 E. Van Buren - Chicago, IL . Description: Hi-rise Residential Renovation . Responsibilities: Takeoff/Estimate light gage structural steel framing, rough carpentry, doors, frames, hardware, insulation, metal stud framing, and drywall.

2006 Tempus Construction Services, Inc. 5-Story Monarch Landing - Residential Building 1.2 - Naperville, IL . Description: Mid-rise Residential Build-out

. Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, and drywall.

datamanagementinstitute.com Page 7 of 20

Mike's Work History

Consulting Years 2006 Tempus Construction Services, Inc. 37-Story (Pages 4 – 16) The Ritz Carlton Residences - Magnificent Mile - Chicago, IL . Description: Hi-rise Residential Shell & Core and Historic Restoration . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, plaster, and drywall.

2006 Tempus Construction Services, Inc. 25-Story

Marquee Michigan Avenue - 1464 S. Michigan - Chicago, IL . Description: Hi-rise Residential Shell & Core . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, plaster, and drywall.

2006 Pinto Construction Group Inc. 36-Story CNA Center - 333 S. Wabash - Chicago, IL . Description: Multi-phase, 1st Floor Lobby Renovation/Expansion

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, doors, frames, hardware, insulation, metal stud framing, and drywall.

2005 Paradigm Applicators, Inc. 9-Story

Rosewood - Commons and Towers 1, 2, and 3 - Charlotte, NC . Description: Mid-rise Residential Shell . Responsibilities: Takeoff EIFS, lath, plaster, and .

2005 Paradigm Applicators, Inc. 10-Story Lost Key Golf & Beach Club - La Salbadora, FL

. Description: Mid-rise Residential Shell

. Responsibilities: Takeoff EIFS, lath, plaster, and stucco.

datamanagementinstitute.com Page 8 of 20

Mike's Work History

Consulting Years 2004 Sellergren Bros. 8-Story (Pages 4 – 16) 1224 W. Van Buren - Chicago, IL . Description: Mid-rise Residential . Responsibilities: Takeoff/Estimate casework, millwork, doors, frames, and hardware.

2004 Construction Services 2000, Inc. 10-Story

Drury Plaza Hotel - Clarkson & I-40 - Chesterfield, MO . Description: Mid-rise Hotel . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

2004 Heights Construction Company 12-Story University Station - 1530 S. Throop - Chicago, IL . Description: Low-rise Community Center and Residential

. Responsibilities: Takeoff/Estimate casework, millwork, doors, frames, and hardware.

2004 Hollenbeck Group Inc. 4-Story Northbrook Pointe Condos - Northbrook, IL . Description: Low-rise Residential . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, and drywall.

2004 Heights Construction Company 5-Story Sedgebrook-Buildings CB1.0, RB1.1, & RB1.2 - Lincolnshire, IL

. Description: Low-rise Community Center and Residential

. Responsibilities: Takeoff/Estimate casework, millwork, doors, frames, and hardware.

datamanagementinstitute.com Page 9 of 20

Mike's Work History

Consulting Years 2004 Alley Drywall Inc. 3-Story (Pages 4 – 16) Plainfield High School - Plainfield, IL . Description: New High School . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, GFRG, metal stud framing, drywall, acoustical ceilings, and acoustical wall panels.

2003 Alf's Painting & Decorating, Inc. 7-Story

Loyola Life Science Building - 1050 W. Sheridan - Chicago, IL . Description: Low-rise University Building Renovation . Responsibilities: Takeoff/Estimate painting and decorating.

2002 Vonau Construction, Inc. 3-Story Central DuPage Hospital - Services Distribution - Winfield, IL . Description: Multi-pavilion, Low-rise Hospital Expansion

. Responsibilities: Takeoff/Estimate drywall.

2002 Pinto Construction Group Inc. 3-Story University Village Condominiums & Town Homes - Chicago, IL . Description: Multi-building, Low-rise Residential . Responsibilities: Takeoff/Estimate/Billing light gage structural steel framing, insulation, metal stud framing, and drywall.

2001 Atlas Construction Services, Inc. 22-Story

Belle Maison - 60 W. Erie - Chicago, IL

. Description: Hi-rise Residential . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

datamanagementinstitute.com Page 10 of 20

Mike's Work History

Consulting Years 2001 Atlas Construction Services, Inc. 23-Story (Pages 4 – 16) Courtyard Marriott - 165 East Ontario - Chicago, IL . Description: Hi-rise Hotel . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

2001 Atlas Construction Services, Inc. 8-Story

Louis Joliet Apartments - 24 East Clinton - Joliet, IL . Description: Mid-rise Residential Renovation . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

2001 Ceco Concrete Construction LLC 9-Story Optima Towers - 1580 Sherman - Evanston, IL . Description: Mid-rise Residential . Responsibilities: Takeoff (concrete) formwork.

2001 Ceco Concrete Construction LLC 12-Story Winthrop Properties - 111 Morgan - Chicago, IL . Description: Mid-rise Residential . Responsibilities: Takeoff (concrete) formwork.

2000 Atlas Construction Services, Inc. 10-Story

Chicagoland Speedway - Joliet, IL

. Description: Mid-rise Skybox Stadium

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, metal stud framing, plaster,

drywall, and acoustical ceilings.

datamanagementinstitute.com Page 11 of 20

Mike's Work History

Consulting Years 1999 Jim's Decorating Co. 3-Story (Pages 4 – 16) Student Housing Bldgs. 1-7 - Benedictine University - Lisle, IL . Description: Low-rise Residential and Community Center . Responsibilities: Takeoff/Estimate/Manage drywall.

1999 Atlas Construction Services, Inc. 3-Story Smith Pavilion at Silver Cross Hospital - Joliet, IL . Description: Low-rise Hospital Expansion . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

1998 Jade Carpentry Co. 68-Story The Park Tower - 800 North Michigan - Chicago, IL . Description: Hi-rise Hotel and Residential Shell and Core.

. Responsibilities: Takeoff casework, millwork, doors, frames, and hardware.

1998 Jade Carpentry Co. 11-Story The New Cook County Hospital - Chicago, IL . Description: Mid-rise Replacement Hospital. . Responsibilities: Takeoff casework, millwork, doors, frames, and hardware.

1998 Jim's Decorating Co. 12-Story Chicago Marriott Oakbrook - Renovations - Oakbrook, IL

. Description: Mid-rise Hotel

. Responsibilities: Takeoff/Estimate painting and decorating.

1998 Three-Way Drywall ?-Story Remington - Fairfield Meadows - Romeoville, IL . Description: Low-rise Apartment Complex . Responsibilities: Takeoff/Estimate drywall and painting. datamanagementinstitute.com Page 12 of 20

Mike's Work History

Consulting Years 1997 Atlas Construction Services, Inc. 4-Story (Pages 4 – 16) Route 66 Raceway - Joliet, IL . Description: Mid-rise Skybox Stadium . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

1997 Welch Drywall Company ?-Story

Village Green at Cantera - Warrenville, IL

. Description: Low-rise Apartment Complex . Responsibilities: Contract scope analysis.

1996 R G Construction Services, Inc. ?-Story Trinity Medical Center - 7th St Campus - Moline, IL . Description: Low-rise Branch Medical Clinic and In-processing Clinic . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1996 R G Construction Services, Inc. ?-Story

Recruit Training Center - Bldgs. 1007 & 1523 - Great Lakes, IL . Description: Low-rise U.S. Navy Training Facility . Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1996 R G Construction Services, Inc. ?-Story Northeastern IL Univ.-G Bldg & Auditorium Renov.-Chicago, IL . Description: Mid-rise Educational Facility and Auditorium Renovation

. Responsibilities: Takeoff light gage structural steel framing, insulation, metal stud framing, plaster, drywall, and acoustical ceilings.

datamanagementinstitute.com Page 13 of 20

Mike's Work History

Consulting Years 1991 Michael W. Litz, Inc. 1-Story (Pages 4 – 16) River Forest Civic Center - River Forest, IL . Description: Community Center Renovation . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, lath, plaster, metal stud framing, drywall, and acoustical ceilings.

1990 Michael W. Litz, Inc. 1-Story

607 Di Lorenzo - Naperville, IL . Description: Single Family Speculative Residence . Responsibilities: Design-build.

1989 AK Acoustics, Inc. ?-Story Comisky Park (Cellular Field) - Chicago, IL . Description: Low-rise Replacement Stadium

. Responsibilities: Takeoff/Estimate light gage structural steel

framing, insulation, lath, plaster, metal stud framing, drywall, and acoustical ceilings.

1988 AK Acoustics, Inc. 2-Story FexEx Terminal - O'Hare - Chicago, IL . Description: Low-rise Hanger . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1988 R & D Decorators, Inc. 61-Story AT&T Corporate Center - 125 South Franklin - Chicago, IL . Description: Hi-rise Office Shell and Core

. Responsibilities: Takeoff/Estimate painting and decorating.

datamanagementinstitute.com Page 14 of 20

Mike's Work History

Consulting Years 1987 Michael W. Litz, Inc. 1-Story (Pages 4 – 16) 1933 Sprucewood - Naperville, IL . Description: Single Family Residence . Responsibilities: Design-build.

1987 Michael W. Litz, Inc. 1-Story 1929 Sprucewood - Naperville, IL . Description: Single Family Residence . Responsibilities: Design-build.

1986 Crane Construction Company LLC 40-Story

40 South Wacker - Chicago, IL

. Description: Hi-rise Office Shell and Core

. Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1986 Crane Construction Company LLC 40-Story 10 South Wacker - Chicago, IL . Description: Hi-rise Office Shell and Core . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1986 Dual Construction Company 2-Story

Mainstreet (Kohls) Department Stores - Chicago (Area), IL

. Description: Multiple-stores, Low-rise Retail Build-outs

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

datamanagementinstitute.com Page 15 of 20

Mike's Work History

Consulting Years 1985 Atlas Construction Services, Inc. 1-Story (Pages 4 – 16) Caterpillar Factory - Joliet, IL . Description: Low-rise Office Build-out (within manufacturing plant) . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

Employee Years 1985 Bagwell-Gaw Company 2-Story (Pages 16 – 20) Mainstreet (Kohls) Department Stores - Chicago (Area), IL . Description: Multiple-stores, Low-rise Retail Shells, Cores, and Build-outs . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1984 Bagwell-Gaw Company 3-Story University of Chicago - Science Building - Chicago, IL . Description: New Chemistry Department Facility . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1984 Bagwell-Gaw Company 2-Story

Chicago Ridge Mall Expansion – Chicago Ridge, IL

. Description: Low-rise Retail Shell and Core

. Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

datamanagementinstitute.com Page 16 of 20

Mike's Work History

Employee Years 1983 The Levy Company 41-Story (Pages 16 – 20) Smurfit-Stone Building - 150 North Michigan - Chicago, IL . Description: Hi-rise Office – Multi-floor Tenant Improvements . Responsibilities: Takeoff/Estimate insulation, metal stud framing, drywall, and acoustical ceilings.

1984 The Levy Company 3-Story Port Clinton Square - Highland Park, IL . Description: Multi-building, Low-rise Office and Retail Shell and Core . Responsibilities: Takeoff/Estimate/Manage light gage structural steel framing, rough carpentry, casework, millwork, doors, frames, hardware, insulation, EIFS, lath, plaster, metal stud framing, drywall, acoustical ceilings, and painting.

1983 The Levy Company 8-Story The Westin O’Hare - 150 North Michigan - Chicago, IL . Description: Mid-rise Hotel – Main Floor . Responsibilities: Takeoff/Estimate acoustical ceiling labor.

1983 The Levy Company 17-Story Hamilton Lakes - One Pierce Place - Itasca, IL . Description: Hi-rise Office Shell and Core.

. Responsibilities: Takeoff/Estimate acoustical ceilings.

1983 Tiffiny Decorating Company 12-Story Presidents Plaza II - 8600 West Bryn Mawr - Chicago, IL

. Description: Mid-rise Office – Various Tenant Improvements

. Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1983 Tiffiny Decorating Company 40-Story One South Wacker - Chicago, IL . Description: Hi-rise Office – Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating. datamanagementinstitute.com Page 17 of 20

Mike's Work History

Employee Years 1982 Tiffiny Decorating Company 20-Story (Pages 16 – 20) 25 East Washington - Chicago, IL . Description: Hi-rise Office – Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 21-Story Mallers Building - Five South Wabash - Chicago, IL . Description: Hi-rise Office and Retail – Complete Core Renovation and Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 41-Story

200 South Wacker - Chicago, IL . Description: Hi-rise Office – Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 22-Story

300 South Riverside Plaza - Chicago, IL

. Description: Hi-rise Office – Various Tenant Improvements

. Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 35-Story 222 South Riverside Plaza - Chicago, IL . Description: Hi-rise Office – Various Tenant Improvements

. Responsibilities: Takeoff/Estimate/Manage painting and decorating.

datamanagementinstitute.com Page 18 of 20

Mike's Work History

Employee Years 1982 Tiffiny Decorating Company 22-Story (Pages 16 – 20) 120 South Riverside Plaza - Chicago, IL . Description: Hi-rise Office – Corridor Renovations and Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 22-Story 10 South Riverside Plaza - Chicago, IL . Description: Hi-rise Office – Corridor Renovations and Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 22-Story

2 North Riverside Plaza - Chicago, IL

. Description: Hi-rise Office – Various Tenant Improvements

. Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1982 Tiffiny Decorating Company 110-Story Sears (What you talkin’ about Willis?) Tower - Chicago, IL . Description: Hi-rise Office – Various Tenant Improvements . Responsibilities: Takeoff/Estimate/Manage painting and decorating.

1981 Meier Acoustics, Inc. 22-Story 300 South Riverside Plaza - Chicago, IL . Description: Hi-rise Office Shell and Core . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, drywall, acoustical ceilings, and painting.

datamanagementinstitute.com Page 19 of 20

Mike's Work History

Employee Years 1979 G. T. Curran, Inc. 5-Story (Pages 16 – 20) Gerald Rauenhorst Corporate Ctr.-Bldg. 1 - Downers Grove, IL . Description: Mid-rise Office Shell and Core . Responsibilities: Takeoff/Estimate light gage structural steel framing, insulation, metal stud framing, drywall, and acoustical ceilings.

1978 Anning-Johnson Company 7-Story University of Illinois Medical Center - Chicago, IL . Description: Mid-rise Illinois Replacement Hospital . Responsibilities: Shop drawings and assist-manage acoustical ceilings.

1978 Anning-Johnson Company 34-Story Hyatt Regency - Building 2 - Chicago, IL . Description: Hi-rise Hotel . Responsibilities: Shop drawings for interstitial floor and acoustical ceilings.

Notes clarifying extent of management responsibilities:

 During consulting years (1985 to present) “Manage” typically refers to initial project management reports and other additional, limited assistance in support of project management.

 During employment years (1977-1985) “Manage” typically refers to complete responsibility for project management.

datamanagementinstitute.com Page 20 of 20