<<

27 March 2014

John Traversy Secretary General CRTC Ottawa, ONK1A 0N2

Dear Mr. Secretary General,

Re: Applications for the renewal of the broadcasting licences for English‐language conventional and multilingual ethnic television stations and for certain specialty television services, Broadcasting Notice of Consultation 2014‐26 (Ottawa, 29 January 2014)

1 The Forum for Research and Policy in Communications (FRPC) appreciates the decision by the CRTC panel hearing the licence renewal applications to grant FRPC’s 21 March 2014 request to present additional evidence for the public record, drawn from OMNI television station program logs submitted to the CRTC pursuant to the Regulations, 1987 (Television Regulations)

2 Section 10(3) of the Television Regulations requires television licensees to submit these logs to the CRTC with “a certificate signed by or on behalf of the licensee attesting to the accuracy of the contents of the log”. In September 2013 the CRTC reminded television licensees that their logs must “at all times … be accurate, complete and corrected immediately when errors arise”: New procedures related to the evaluation of television program logs, Broadcasting Information Bulletin 2013‐ 515, (Ottawa, 26 September 2013), at paragraph 3.

3 The evidence is attached, and consists of statistics calculated from the information contained in the OMNI program logs.

Sincerely yours,

Monica L. Auer, M.A., LL.M. [email protected] Executive Director 613.526.5244 c. Susan Wheeler [email protected] Vice‐President, Regulatory Affairs, Rogers Media Inc.

OMNI television programming in the 2009/10 and 2012/13 broadcast years

Statistics from the program logs submitted by CFMT‐DT , CJMT‐DT Toronto, CJEO‐DT , CJCO‐DT and CHNM‐DT

for the months of September 2009 to August 2010 and September 2012 to August 2013

Ottawa, 27 March 2014

1

Summary

The statistics below summarize the information submitted in the 120 programming logs of the five OMNI television stations to the CRTC, pursuant to section 10(3) of the Television Regulations, 1987. The logs describe the stations’ broadcast programming in the 2009/10 and 2012/13 broadcast years. The logs for each of the five stations were downloaded from the CRTC’s website, and converted to Excel spreadsheets. The resulting information is attached, in Tables 1 through 46.

2009/10 2012/13 % change or difference All programming (includes programs, commercials, PSAs, station identification etc.) Total hours 53,084.30 53,418.23 0.6% % that are original and in a third language 8.3% 13.9% 5.6 Commercials ‐ total number 1,035,881.00 1,175,203 13.4% Commercials ‐ total hours 7,884.94 15,593.10 97.8% PSAs ‐ total number 18,015.00 8,232 ‐54.3% Programs Total hours 32,659.64 37,502.19 14.8% % in third language 56.5% 53.8% ‐2.7 % that are original 24.1% 44.7% 20.6 % that are original and in third language 13.5% 19.8% 6.2 Total original hours 7,880.42 16.758.65 112.7% Total third‐language hours 18,461.43 20,169.38 9.3% Total original third‐language hours 4,422.74 7,407.59 67.5% Accessible programs Captioned or described third‐language programs 500.38 262.78 ‐ 47.5% Average minutes per day, all stations 82.3 43.2 ‐47.5% Number of months with accessible programs in one or 47 26 ‐44.7% more third language (out of a total maximum in each year of 60 months [five stations x 12 months = 60]) Number of months with no accessible programs in one 13 34 161.5% or more third language Original local station productions Total hours 2,975.95 1,789.00 ‐39.9% Average hours/week 57.23 34.40 ‐39.9% Original third‐language hours 2,170.74 1,252.00 ‐42.3% As % of total programming 4.1% 2.3% ‐1.7 News Total hours (from all sources) 7,338.02 7.019.74 ‐4.3% Local news hours (produced by an OMNI station) 6,951.82 4,042.98 ‐41.8% Original local news hours (ie, excluding repeats) 2,565.26 1,456.22 ‐43.2% Third‐language original local news hours 1,824.63 1,036.84 ‐43.2% Average hours/week – all stations 35.09 19.94 ‐43.2% Average hours/week – per station 7.02 3.99 ‐43.2% As % of all programs 22.5% 18.7% ‐3.7 As % of total news hours 24.9% 14.8% ‐10.1

2

Tables

Table 1: September 2009‐August 2010 – total programming hours 4 Table 2: September 2009‐August 2010 – total number of commercials 4 Table 3: September 2009‐August 2010 – total number of public service announcements 5 Table 4: September 2009‐August 2010 – total hours of commercials 5 Table 5: September 2009‐August 2010 – total program hours 6 Table 6: September 2009‐August 2010 – percentage of program hours in a third language 6 Table 7: September 2009‐August 2010 – percentage of all program hours that are original 7 Table 8: September 2009‐August 2010 – percentage of all program hours that are original and in a third language 7 Table 9: September 2009‐August 2010 – total original program hours 8 Table 10: September 2009‐August 2010 – total program hours in a third language 8 Table 11: September 2009‐August 2010 – total original program hours in a third language 9 Table 12: September 2009‐August 2010 – total hours of accessible and original third‐ language programs 9 Table 13: September 2009‐August 2010 – languages used in accessible and original, third‐ language programs 10 Table 14: September 2009‐August 2010 – total original and local program hours 10 Table 15: September 2009‐August 2010 – total original and local third‐language program hours 11 Table 16: September 2009‐August 2010 – total original and local third‐language program hours as a percentage of total programming hours 11 Table 17: September 2009‐August 2010 – total news hours 12 Table 18: September 2009‐August 2010 – total local news hours 12 Table 19: September 2009‐August 2010 – total original local news hours 13 Table 20: September 2009‐August 2010 – total original local news hours in a third language 13 Table 21: September 2009‐August 2010 – third languages used in original local news 14 Table 22: September 2009‐August 2010 – total repeat hours of third‐language local news 14 Table 23: September 2009‐August 2010 – repeat factor of third‐language local news 15 Table 24: September 2012‐August 2013 – total programming hours 16

3

Table 25: September 2012‐August 2013 – total number of commercials 16 Table 26: September 2012‐August 2013 – total number of public service announcements 16 Table 27: September 2012‐August 2013 – total hours of commercials 17 Table 28: September 2012‐August 2013 – total program hours 18 Table 29: September 2012‐August 2013 – percentage of program hours in a third language 18 Table 30: September 2012‐August 2013 – percentage of all program hours that are original 19 Table 31: September 2012‐August 2013 – percentage of all program hours that are original and in a third language 19 Table 32: September 2012‐August 2013 – total original program hours 20 Table 33: September 2012‐August 2013 – total programming hours in a third language 20 Table 34: September 2012‐August 2013 – total original program hours in a third language 20 Table 35: September 2012‐August 2013 – total hours of accessible and original third‐ language programs 21 Table 36: September 2012‐August 2013 – languages used in accessible and original, third‐ language programs 21 Table 37: September 2012‐August 2013 – total original and local program hours 22 Table 38: September 2012‐August 2013 – total original and local third‐language program hours 22 Table 39: September 2012‐August 2013 – total original and local third‐language program hours as a percentage of total programming hours 23 Table 40: September 2012‐August 2013 – total news hours 23 Table 41: September 2012‐August 2013 – total local news hours 24 Table 42: September 2012‐August 2013 – total original local news hours 24 Table 43: September 2012‐August 2013 – total original local news hours in a third language 25 Table 44: September 2012‐August 2013 – third languages used in original local news 25 Table 45: September 2012‐August 2013 – total repeat hours of third‐language local news 26 Table 46: September 2012‐August 2013 – repeat factor of third‐language local news 26

4

OMNI program logs: September 2009 to August 2010

Table 1: September 2009‐August 2010 – total programming hours

All programming – total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 866.49 897.62 869.22 898.68 895.78 813.98 897.56 869.46 897.81 871.55 898.54 902.56 10,579.25 4.2% CJMT 858.09 892.28 862.78 895.57 888.53 806.45 893.34 865.84 892.69 867.08 893.59 894.837 10,511.08 4.3% CJCO 879.51 911.12 880.24 910.15 907.8 819.47 910.82 882.3 907.74 880.84 910.2 910.24 10,710.43 3.5% CJEO 879.76 911.24 872.89 910.54 907.99 819.76 911.17 882.435 907.64 880.22 910.16 909.88 10,703.69 3.4% CHNM 865.92 901.03 870.52 899.4 892.8 806.58 897.54 871.98 899.77 871.45 900.62 902.24 10,579.85 4.2% Total 4349.77 4513.29 4355.65 4514.34 4492.9 4066.244 4510.43 4372.015 4505.65 4371.14 4513.11 4519.757 53,084.30 3.9% Includes all programming, such as programs, (PGR) commercials (COM), station identification (ID), promotions (PRO) and public service announcements (PSAs) Olympics held in February 2012 Original and 3rd language program hrs 9.5% 9.3% 8.4% 7.7% 7.8% 11.8% 7.7% 8.0% 8.8% 7.1% 7.1% 7.1% 8.3% ‐2.4% as % of total programming

Table 2: September 2009‐August 2010 – total number of commercials

Commercials ‐ total number Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 17,002 17,855 17,336 17,831 16,503 16,418 18,178 17,664 18,257 17,996 17,934 18,235 211,209.00 7.3% CJMT 15,751 16,810 16,130 16,775 15,058 16,037 17,264 16,796 17,102 16,695 16,426 16,999 197,843.00 7.9% CJCO 16,657 17,783 17,332 17,928 17,977 16,602 19,088 18,088 18,259 18,361 18,544 18,651 215,270.00 12.0% CJEO 16,539 17,675 17,013 17,889 17,813 16,544 19,228 18,649 26,806 18,378 18,290 18,527 223,351.00 12.0% CHNM 16,412 16,720 16,207 16,425 15,541 15,320 17,534 17,177 18,370 18,050 18,360 18,504 188,208.00 12.7% Total 82,361 86,843 84,018 86,848 82,892 80,921 91,292 88,374 98,794 89,480 89,554 90,916 1,035,881.00 10.4% Type = "COM" Olympics held in February 2012

5

Table 3: September 2009‐August 2010 – total number of public service announcements

PSAs ‐ total number aired Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 475 401 424 492 487 261 331 305 375 277.0 270 230 4,328.00 ‐52% CJMT 565 483 493 495 507 227 302 339 423 207 324 285 4,650.00 ‐50% CJCO 332 290 320 316 265 166 165 94 219 175 190 136 2,668.00 ‐59% CJEO 315 290 278 305 266 157 160 86 187 166 173 136 2,519.00 ‐57% CHNM 458 417 444 423 370 268 187 171 259 338 338 177 3,850.00 ‐61% Total 2145 1881 1959 2031 1895 1079 1145 995 1463 1163 1295 964 18,015.00 ‐55% Average 429 376.2 391.8 406.2 379 215.8 229 199 292.6 232.6 259 192.8 Type = "PSA" Olympics held in February 2012

Table 4: September 2009‐August 2010 – total hours of commercials

Commercials ‐ total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 125.5 133.7 130.2 132.6 125.8 125.1 136.8 131.7 136.7 135.7 135.7 138.5 1,588.00 10.3% CJMT 119.0 128.7 123.8 129.6 119.8 119.2 132.7 128.4 131.8 133.3 130.3 132.3 1,528.78 11.1% CJCO 135.0 140.9 135.8 140.6 136.0 125.1 142.5 139.3 140.5 137.8 140.7 140.4 1,654.59 4.1% CJEO 133.9 139.6 134.3 140.1 138.3 125.5 143.1 139.9 141.7 136.1 140.5 139.8 1,652.76 4.4% CHNM 125.5 134.63 130.91 130.9 123.79 116.38 136.69 133.64 137.98 135.77 139.1 141.1 1,460.81 12.4% Total 638.82 677.49 655 673.77 643.715 611.22 691.72 672.89 688.75 3237.32 686.29 692.01 7,884.94 8.3% Type = "COM" Olympics held in February 2012

6

Table 5: September 2009‐August 2010 – total program hours

Programs ‐ total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 561.39 581.83 566.81 597.35 579.97 541.8 580.13 562.6 580 571.88 593.25 604.99 6,922.00 7.8% CJMT 552.49 570.52 555.52 592.62 569.45 522.12 566.77 547.09 566.39 545.37 566.87 569.34 6,724.55 3.0% CJCO 614.07 631.53 609.97 638.54 626.88 575.89 628.02 608.98 626.35 608.22 630.21 628.58 7,427.24 2.4% CJEO 614.44 631.53 607.53 638.43 626.28 576.45 628.09 609.05 626.34 607.93 630.07 628.68 7,424.82 2.3% CHNM 599.05 623.01 602.58 622.6 600.83 548.83 597.85 589.82 609.59 588.2 610.26 613.9 7,206.52 2.5% Total 2941.44 3038.42 2942.41 3089.54 3003.41 2765.09 3000.86 2917.54 3008.67 2921.6 3030.66 3045.49 32,659.64 3.5% Type = “PGR” Olympics held in February 2012

Table 6: September 2009‐August 2010 – percentage of program hours in a third language

Program hours: percent of program hours that are in a 3rd language Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 50.3% 52.5% 51.3% 52.8% 54.1% 54.9% 52.7% 53.7% 55.6% 52.9% 53.7% 51.8% 0.53 1.5% CJMT 49.1% 50.3% 49.7% 49.4% 55.0% 54.7% 50.3% 49.5% 67.7% 53.2% 53.9% 54.4% 0.53 5.3% CJCO 48.9% 48.4% 48.5% 47.9% 50.5% 53.7% 48.6% 47.6% 50.8% 48.6% 49.6% 49.8% 0.49 0.9% CJEO 48.8% 48.4% 47.6% 47.9% 50.6% 53.7% 48.6% 47.4% 50.4% 48.5% 50.1% 49.8% 0.49 1.0% CHNM 54.2% 50.8% 50.0% 51.3% 54.8% 57.8% 52.8% 52.6% 56.6% 55.7% 56.1% 55.8% 0.54 1.6% Total 50.3% 50.0% 49.4% 49.8% 52.9% 54.9% 50.5% 50.1% 56.0% 51.7% 52.6% 52.3% 0.57 2.0% Includes “PGR”, excludes ‘ENG’ and ‘FRE’ Olympics held in February 2012

7

Table 7: September 2009‐August 2010 – percentage of all program hours that are original

Program hours: % that are original Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 32.0% 33.6% 30.3% 26.9% 24.1% 31.4% 25.9% 24.3% 20.1% 22.9% 23.7% 20.6% 0.26 ‐11.4% CJMT 25.6% 29.6% 27.3% 27.2% 27.1% 37.3% 26.6% 25.9% 27.9% 23.6% 26.1% 24.0% 0.27 ‐1.6% CJCO 25.8% 23.2% 23.8% 25.7% 22.2% 20.0% 20.3% 22.9% 26.1% 20.1% 17.2% 17.0% 0.22 ‐8.8% CJEO 26.0% 23.5% 23.5% 25.6% 22.2% 20.6% 20.5% 22.1% 26.6% 18.3% 17.1% 17.2% 0.22 ‐8.8% CHNM 20.3% 14.5% 12.6% 13.2% 11.4% 11.0% 13.4% 12.1% 13.4% 12.4% 12.5% 12.9% 0.13 ‐7.4% Total 25.9% 24.7% 23.3% 23.7% 21.3% 23.8% 21.2% 21.4% 22.8% 19.4% 19.2% 18.2% 0.24 ‐7.6% Includes live, recorded live and first play programs Olympics held in February 2012

Table 8: September 2009‐August 2010 – percentage of all program hours that are original and in a third language

Program hours: % that are original and third language Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 17.8% 18.5% 16.3% 12.0% 13.3% 21.3% 16.4% 16.2% 13.7% 14.7% 13.8% 13.9% 15.6% ‐3.9% CJMT 18.1% 15.9% 12.3% 12.0% 13.3% 23.0% 9.3% 10.0% 16.9% 10.3% 11.9% 12.2% 13.7% ‐5.9% CJCO 14.4% 14.2% 14.7% 13.5% 13.6% 12.9% 13.0% 14.7% 15.0% 11.8% 11.0% 10.7% 13.3% ‐3.7% CJEO 14.3% 14.1% 13.7% 13.6% 13.8% 13.4% 13.1% 15.0% 15.0% 11.0% 11.0% 10.4% 13.2% ‐3.9% CHNM 6.3% 6.6% 5.5% 4.8% 4.1% 16.7% 6.2% 4.1% 5.5% 5.5% 5.7% 5.6% 6.3% ‐0.7% Total 14.0% 13.8% 12.5% 11.2% 11.6% 17.3% 11.6% 12.0% 13.2% 10.6% 10.6% 10.5% 13.5% ‐3.5% All programs (ie, excludes commercials, PSAs, station identification) Composition = 1, 2 or 3 (live, recorded live, 1st play) Olympics held in February 2012

8

Table 9: September 2009‐August 2010 – total original program hours

Programs – total original hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 179.74 195.75 171.64 160.47 139.99 170.20 150.53 136.99 116.83 130.83 140.77 124.66 1,818.40 CJMT 141.46 168.84 151.57 161.27 154.50 194.69 150.72 141.86 157.86 128.60 148.04 136.74 1,836.15 CJCO 158.38 146.45 144.93 164.15 138.91 115.16 127.48 139.74 163.76 122.38 108.36 106.62 1,636.32 CJEO 159.66 148.46 142.53 163.64 138.78 118.90 128.70 134.82 166.36 111.42 107.81 108.03 1,629.11 CHNM 121.57 90.24 75.81 82.19 68.75 60.19 80.08 71.22 81.79 72.68 76.54 79.38 960.44 Total 760.81 749.74 686.48 731.72 640.93 659.14 637.51 624.63 686.60 565.91 581.52 555.43 7,880.42 All programs (ie, excludes commercials, PSAs, station identification) Composition = 1, 2 or 3 (live, recorded live, 1st play) Olympics held in February 2012

Table 10: September 2009‐August 2010 – total program hours in a third language

Programs ‐ total third‐language hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Hours/day 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 282.64 305.18 290.63 315.12 313.62 297.58 305.70 301.88 322.22 302.65 318.73 313.39 3,669.34 10.05 CJMT 271.24 286.94 275.83 292.69 313.41 285.82 285.19 271.05 383.69 290.39 305.35 309.81 3,571.41 9.78 CJCO 300.40 305.75 295.70 305.98 316.67 309.06 305.06 289.70 318.48 295.60 312.43 313.13 3,667.96 10.05 CJEO 300.05 305.93 288.97 305.84 316.94 309.39 305.01 288.88 315.93 294.90 315.52 313.39 3,660.75 10.03 CHNM 324.82 316.43 301.08 319.27 329.11 317.09 315.41 310.42 345.19 327.80 342.65 342.70 3,891.97 10.66 Total 1479.15 1520.23 1452.21 1538.90 1589.75 1518.94 1516.37 1461.93 1685.51 1511.34 1594.68 1592.42 18,461.43 50.58 All programs and all languages excluding 'ENG', 'FRE' and 'blank' Olympics in February 2012

9

Table 11: September 2009‐August 2010 – total original program hours in a third language

Third‐language programs ‐ original hours Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Hours/day 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 99.85 107.44 92.59 71.88 77.01 115.33 95.14 91.05 79.32 83.82 81.90 84.13 1,079.46 2.96 CJMT 99.85 90.88 68.34 71.19 75.51 120.19 52.62 54.96 95.47 56.28 67.23 69.48 922.00 2.53 CJCO 88.18 89.50 89.37 86.21 85.49 74.40 81.37 89.58 94.13 71.87 69.03 67.29 986.42 2.70 CJEO 87.67 88.90 82.99 86.96 86.23 77.32 82.57 91.32 94.16 66.94 69.22 65.26 979.54 2.68 CHNM 37.72 41.29 33.27 30.15 24.68 91.53 37.21 24.26 33.61 32.21 34.89 34.50 455.32 1.25 Total 413.27 418.01 366.56 346.39 348.92 478.77 348.91 351.17 396.69 311.12 322.27 320.66 4,422.74 12.12 Excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

Table 12: September 2009‐August 2010 – total hours of accessible and original third‐language programs

Hours of third‐language original programs that are captioned and/or described Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Avg Avg 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 mins/day hrs/wk CFMT 26.55 29.12 31.72 29.85 29.14 14.11 35.53 32.34 28.03 31.11 23.41 32.25 343.16 56.4 6.6 CJMT 0.53 4.91 0.99 0.00 0.00 3.33 0.00 1.25 0.00 0.00 0.00 0.00 11.01 1.8 0.2 CJCO 3.83 3.95 4.95 4.95 4.13 11.73 6.27 3.14 5.01 3.98 0.00 0.00 51.94 8.5 1.0 CJEO 3.90 3.56 3.56 4.89 4.94 14.81 6.76 3.95 5.01 4.00 0.00 0.00 55.38 9.1 1.1 CHNM 2.95 4.01 2.98 3.99 4.96 3.05 4.00 4.00 4.98 3.97 0.00 0.00 38.89 6.4 0.7 Total 37.76 45.55 44.20 43.68 43.17 47.03 52.56 44.68 43.03 43.06 23.41 32.25 500.38 82.3 9.6 Includes 'CC' and 'CD' programs; excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

10

Table 13: September 2009‐August 2010 – languages used in accessible and original, third‐language programs

# of original third‐language programs with captioned or described hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Months Months Max # 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 with cc'g with no of langs or DV cc'g or DV CFMT ITA, POR ITA, ITA, ITA, ITA, ITA, POR ITA, ITA, POR, ITA, ITA, ITA, ITA, POR 12 ‐ 3 POR POR POR POR POR POL POR, POR POR POL CJMT MAA HIN, HIN none none HIN, none CAN, none none none none 5 7 2 MAA MAA MAA CJCO HIN HIN HIN HIN, HIN HIN, HIN HIN HIN HIN none none 10 2 2 (CJMT) (CJMT) (CJMT) PAN (CJMT) MAA: (CJMT) (CJMT) (CJMT) (CJMT) (CJMT) CJEO HIN HIN HIN HIN HIN CAN, HIN HIN HIN HIN none none 10 2 3 (CJMT) (CJMT) (CJMT) (CJMT), (CJMT) HIN, (CJMT) (CJMT) (CJMT) (CJMT) PAN MAA: CJMT CHNM HIN HIN HIN HIN HIN HIN HIN HIN HIN HIN none none 10 2 2 (CJMT, (CJMT) (CJMT) (CJMT) (CJMT) (CJMT), (CJMT, (CJMT) (CJMT, (CJMT) CFMT) PUS CFMT) CFMT) Total 47 13 3 Shading: Log description suggests from another OMNI station Includes 'CC' and 'CD' programs; excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

Table 14: September 2009‐August 2010 – total original and local program hours

Original local programs – total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/day hours/wk CFMT 52.2 53.45 48.66 41.03 43.37 85.28 49.63 45.23 40.93 42.23 41.95 41.98 585.94 1.61 11.27 CJMT 61.82 71.47 58.85 57.43 51.66 96.93 64.36 60.94 72.44 67 65.33 67.76 795.99 2.18 15.31 CJCO 52.58 53.69 51.37 52.37 49.82 48.86 56.35 55.39 52.72 55.73 56.84 56.39 642.11 1.76 12.35 CJEO 53.45 53.79 52.81 52.16 49.56 53.47 56.78 54.17 51.76 55.88 56.1 54.02 643.95 1.76 12.38 CHNM 28.37 19.06 14.75 8.44 8.96 83.47 33.08 13.98 19.33 24.32 29.14 25.06 307.96 0.84 5.92 Total 248.42 251.46 226.44 211.43 203.37 368.01 260.2 229.71 237.18 245.16 249.36 245.209 2,975.95 8.15 57.23 All programs, production source = 1, composition = 1, 2 or 3, any language; Olympics held in February 2010

11

Table 15: September 2009‐August 2010 – total original and local third‐language program hours

Original third‐language local programs – total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/ day hours/ wk CFMT 48.16 50.43 46.16 38.37 38.51 78.53 46.53 42.47 38.57 39.93 39.01 39.64 546.31 1.50 10.51 CJMT 40.91 49.01 34.29 36.23 33.46 120.19 40.84 38.48 70.75 45.30 45.23 44.83 599.52 1.64 11.53 CJCO 32.24 31.96 30.43 31.19 29.34 29.85 34.08 33.09 30.44 33.93 33.48 33.28 383.31 1.05 7.37 CJEO 31.89 32.07 31.10 31.08 29.27 33.67 33.90 32.11 29.77 32.94 33.00 30.73 381.53 1.05 7.34 CHNM 22.11 13.60 9.56 2.55 5.40 77.40 29.21 11.44 17.17 22.30 26.92 22.41 260.07 0.71 5.00 Total 175.31 177.07 151.54 139.42 135.98 339.64 184.56 157.59 186.70 174.40 177.64 170.89 2,170.74 5.95 41.75 All programs, production source = 1, composition = 1, 2 or 3; all languages excluding 'ENG', 'FRE' or 'blank' Olympics held in February 2010

Table 16: September 2009‐August 2010 – total original and local third‐language program hours as a percentage of total programming hours

Total hours of original third‐language local programs as % of total programming Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2009/10 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 CFMT 5.6% 5.6% 5.3% 4.3% 4.3% 9.6% 5.2% 4.9% 4.3% 4.6% 4.3% 4.4% 5.2% CJMT 4.8% 5.5% 4.0% 4.0% 3.8% 14.9% 4.6% 4.4% 7.9% 5.2% 5.1% 5.0% 5.7% CJCO 3.7% 3.5% 5.8% 3.4% 3.2% 3.6% 3.7% 3.8% 3.4% 3.9% 3.7% 3.7% 3.6% CJEO 3.6% 3.5% 3.6% 3.4% 3.2% 4.1% 3.7% 3.6% 3.3% 3.7% 3.6% 3.4% 3.6% CHNM 2.6% 1.5% 1.1% 0.3% 0.6% 9.6% 3.3% 1.3% 1.9% 2.6% 3.0% 2.5% 2.5% Total 4.0% 3.9% 3.5% 3.1% 3.0% 8.4% 4.1% 3.6% 4.1% 4.0% 3.9% 3.8% 4.1% All programming (including programs, commercials, PSAs etc.), production source = 1, composition = 1, 2 or 3; all languages excluding 'ENG', 'FRE' or 'blank' Olympics held in February 2010

12

Table 17: September 2009‐August 2010 – total news hours

News: total hours Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/wk CFMT 86.01 88.16 81.23 81.94 79.51 45.64 88.56 86.29 81.98 85.51 87.24 84.09 976.16 18.77 CJMT 121.86 124.4 114.99 115.83 114.98 76.33 124.48 120.57 138.79 143.5 146.54 141.73 1,484.00 28.54 CJCO 126.52 130.5 119.83 122.16 118.62 82.08 130.7 126.57 124.4 128.01 130.61 126.41 1,466.41 28.20 CJEO 126.57 130.57 125.63 122.04 118.64 82.1 130.39 126.37 123.58 127.88 131.72 126.48 1,471.97 28.31 CHNM 159.87 168.63 155.01 156.25 156.77 97.73 168.66 164.93 168.94 179.79 184.58 178.32 1,939.48 37.30 Total 620.83 642.26 596.69 598.22 588.52 383.88 642.79 624.73 637.69 664.69 680.69 657.03 7,338.02 Program category '10' % that is original, from local station, and 23.9% 23.7% 23.4% 22.6% 24.2% 28.7% 27.3% 23.8% 24.1% 26.1% 25.9% 25.9% 24.9% in a 3rd lang. (excl’g 'ENG' and 'FRE') Olympics held in February 2010

Table 18: September 2009‐August 2010 – total local news hours

Local news ‐ total hrs Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/day hrs/wk CFMT 73.19 75.16 69.02 79.7 79.51 33.85 74.75 73.1 69.58 73.77 74.16 70.95 846.74 2.32 16.28 CJMT 121.86 124.41 113.97 115.83 114.98 76.33 124.48 120.57 138.79 143.5 146.54 141.73 1,482.99 4.06 28.52 CJCO 118.56 121.56 110.92 114.2 108.69 80.09 122.77 119.56 114.53 120.1 121.68 117.53 1,370.19 3.75 26.35 CJEO 118.63 121.64 117.69 114.14 108.71 80.14 122.4 119.38 113.72 120 122.79 126.48 1,385.72 3.80 26.65 CHNM 159.87 168.63 151.06 148.36 146.9 96.73 160.69 158.04 159.02 171.86 175.64 169.38 1,866.18 5.11 35.89 Total 592.11 611.4 562.66 572.23 558.79 367.14 605.09 590.65 595.64 629.23 640.81 626.07 6,951.82 19.05 133.69 Program category '10' and Production source = 1 ('station') Olympics held in February 2010

13

Table 19: September 2009‐August 2010 – total original local news hours

Original local news – total hrs Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/day hrs/wk CFMT 40.53 39.06 39.41 38.23 37.50 20.69 42.51 39.43 34.52 39.93 39.1 39.69 450.60 1.23 8.67 CJMT 53.68 56.33 47.48 49.02 45.8 28.63 57.5 54.88 72.44 64.93 62.84 65.89 659.42 1.81 12.68 CJCO 52.48 53.41 50.87 51.61 48.96 48.86 56.35 53.8 51.02 55.73 55.05 56.39 634.53 1.74 12.20 CJEO 53.05 53.52 52.56 51.48 48.89 44.52 56.78 53.41 50.22 54.51 54.57 52.32 625.83 1.71 12.04 CHNM 21.24 13.04 9.4 2.25 5.26 16.33 29.07 10.84 16.67 22.07 26.65 22.06 194.88 0.53 3.75 Total 220.98 215.36 199.72 192.59 186.41 159.03 242.21 212.36 224.87 237.17 238.21 236.35 2,565.26 7.03 9.87 Live, recorded live or first‐play news Olympics held in February 2010

Table 20: September 2009‐August 2010 – total original local news hours in a third language

Third‐language local news ‐ original hours Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 hrs/day hrs/wk CFMT 40.46 39.06 39.37 38.23 49.19 20.69 42.51 39.4 34.52 39.93 39.01 39.64 462.01 1.27 8.88 CJMT 22.31 35.91 29.23 32.27 29.12 19.79 35.87 34.24 42.2 44.29 44.19 44.32 413.74 1.13 7.96 CJCO 32.24 31.96 30.42 31.19 29.34 26.76 34.08 32.35 30.44 33.93 33.48 33.28 379.47 1.04 7.30 CJEO 31.89 32.07 31.1 31.08 29.27 26.67 33.9 32.11 29.77 32.94 33 30.73 374.53 1.03 7.20 CHNM 21.24 13.04 9.4 2.25 5.26 16.33 29.07 10.84 16.67 22.07 26.65 22.06 194.88 0.53 3.75 Total 148.14 152.04 139.52 135.02 142.18 110.24 175.43 148.94 153.6 173.16 176.33 170.03 1,824.63 5.00 35.09 Excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

14

Table 21: September 2009‐August 2010 – third languages used in original local news

Third‐language original local news – languages Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Minimum Maximum 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 CFMT ITA, POR ITA, ITA, ITA, ITA, ITA, POR ITA, ITA, POR ITA, POR ITA, ITA, ITA, POR 2 2 POR POR POR POR POR POR POR CJMT CAN, CAN, CAN, CAN, CAN, MAA, CAN, CAN, CAN, MAA, MAA, CAN, 2 2 MAA MAA MAA MAA MAA CAN MAA MAA MAA CAN CAN MAA CJCO CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, 2 2 MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA CJEO CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, 2 2 MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA MAA CHNM CAN, KOR, KOR, KOR, PAN, KOR, KOR, KOR, KOR, MAA, MAA, MAA, 2 5 KOR, MAA, MAA, TAG TAG PAN, PAN PAN MAA KOR, KOR KOR MAA, TAG TAG TAG PAN PAN, TAG

Table 22: September 2009‐August 2010 – total repeat hours of third‐language local news

Third‐language local news ‐ repeat hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2009 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 32.67 36.1 29.61 31.47 30.32 13.16 32.24 33.67 35.06 33.84 35.06 30.77 373.97 CJMT 87.89 44.5 44.9 42.57 46.01 30.22 44.71 43.5 75.95 55.58 58.39 55.41 629.63 CJCO 42.93 45.32 40.24 41.78 39.82 26.67 44.37 43.81 42.64 42.76 43.76 41.75 495.85 CJEO 42.84 45.29 43.29 41.77 39.9 26.64 44.28 43.91 42.67 43.62 45.29 44.44 503.94 CHNM 137.63 155.59 141.65 146.12 141.64 80.4 131.62 147.2 142.34 149.79 148.99 147.32 1,670.29 Total 343.96 326.8 299.69 303.71 297.69 177.09 297.22 312.09 338.66 325.59 331.49 319.69 3,673.68 Includes repeat programs, excludes live, recorded live or first‐play programs Excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

15

Table 23: September 2009‐August 2010 – repeat factor of third‐language local news

Third‐language local news ‐ repeat factor (repeat hours / original hours) Sep 2009 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2009 2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2009/10 CFMT 0.8 0.9 0.8 0.8 0.6 0.6 0.8 0.9 1.0 0.8 0.9 0.8 0.81 CJMT 3.9 1.2 1.5 1.3 1.6 1.5 1.2 1.3 1.8 1.3 1.3 1.3 1.52 CJCO 1.3 1.4 1.3 1.3 1.4 1.0 1.3 1.4 1.4 1.3 1.3 1.3 1.31 CJEO 1.3 1.4 1.4 1.3 1.4 1.0 1.3 1.4 1.4 1.3 1.4 1.4 1.35 CHNM 6.5 11.9 15.1 64.9 26.9 4.9 4.5 13.6 8.5 6.8 5.6 6.7 8.57 Total 2.3 2.1 2.1 2.2 2.1 1.6 1.7 2.1 2.2 1.9 1.9 1.9 2.01 Excludes 'ENG', 'FRE' and 'blank' Olympics held in February 2010

16 OMNI program logs: September 2012 to August 2013

Table 24: September 2012‐August 2013 – total programming hours

All programming – total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 873.45 907.32 875.75 899.79 910.71 833.44 920.13 893.18 925.06 890.64 924.56 923.38 10777.41 5.7% CJMT 863.53 892.69 859.35 886.38 883.43 796.29 878.27 851.14 876.42 844.47 871.35 873.97 10377.29 1.2% CJCO 882.16 915.69 881.82 906.58 915.89 829.14 912.62 885.35 888.09 880.82 912.30 909.50 10719.96 3.1% CJEO 882.03 915.88 882.23 906.29 916.45 830.24 912.33 886.04 913.94 881.27 912.83 908.81 10748.34 3.0% CHNM 880.09 915.96 882.35 907.85 919.14 829.97 917.68 890.76 921.26 890.28 922.67 917.22 10795.23 4.2% Total 4381.26 4547.54 4381.5 4506.885 4545.62 4119.08 4541.03 4406.47 4524.77 4387.48 4543.71 4532.88 53,418.23 3.5% Includes all programming, such as programs, (PGR) commercials (COM), station identification (ID), promotions (PRO) and public service announcements (PSAs) Original and 3rd language program hrs 13.3% 12.9% 13.3% 13.4% 11.7% 15.3% 14.8% 14.0% 14.0% 14.3% 11.8% 17.7% 13.9% as % of total programming

Table 25: September 2012‐August 2013 – total number of commercials

Commercials ‐ total number Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 18,260 19,509 19,329 19,094 19,744 19,266 20,996 21,065 22,751 21,584 21,316 20,742 243,656 13.6% CJMT 17,670 18,065 17,448 17,035 16,124 14,741 15,892 15,898 15,773 14,777 15,110 14,790 193,323 ‐16.3% CJCO 19,978 20,173 19,429 19,225 20,206 18,948 20,785 21,071 21,217 20,789 21,100 21,513 244,434 7.7% CJEO 19,114 20,231 19,358 19,090 19,596 18,252 19,643 20,329 21,567 20,842 27,783 21,597 247,402 13.0% CHNM 19,785 20,905 20,450 19,201 20,579 19,316 20,723 20,368 21,918 21,362 20,796 20,985 246,388 6.1% Total 94,807 98,883 96,014 93,645 96,249 90,523 98,039 98,731 103,226 99,354 106,105 99,627 1,175,203 5.1% Type = "COM"

Table 26: September 2012‐August 2013 – total number of public service announcements

17

PSAs ‐ total number aired Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 168 121 196 375 334 296 298 151 125 112.0 114 46 2,336 ‐73% CJMT 206 156 233 278 268 241 298 143 117 106 98 70 2,214 ‐66% CJCO 93 25 75 92 91 97 86 82 79 89 80 115 1,004 24% CJEO 86 12 75 91 78 87 89 75 76 92 86 133 980 55% CHNM 85 35 147 165 151 161 167 164 147 143 132 201 1,698 136% Total 638 349 726 1001 922 882 938 615 544 542 510 565 8,232 ‐11% Type = "PSA"

Table 27: September 2012‐August 2013 – total hours of commercials

Commercials ‐ total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 137.40 145.95 137.70 138.07 148.30 145.64 159.30 157.27 164.35 157.18 164.29 161.10 3283.54 17.2% CJMT 130.42 134.68 125.52 128.50 125.16 113.41 121.98 120.03 120.78 112.83 116.39 117.29 3249.84 ‐10.1% CJCO 143.99 153.37 145.46 145.15 152.23 140.12 154.15 151.20 150.80 147.16 153.52 145.70 3568.23 1.2% CJEO 141.38 152.64 145.04 144.22 152.56 141.57 154.16 152.51 156.09 147.24 153.20 144.77 3638.44 2.4% CHNM 145.29 157.90 149.69 149.86 159.01 144.21 159.18 155.99 161.67 155.11 162.38 152.77 1853.06 5.1% Total 698.48 744.54 703.41 705.80 737.26 684.95 748.77 737.00 753.69 719.52 749.78 721.63 15593.10 3.3% Type = "COM"

18

Table 28: September 2012‐August 2013 – total program hours

Programs ‐ total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: % change 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 579.68 606.44 585.06 602.68 641.99 642.94 703.81 688.49 712.27 678.36 713.04 711.90 7866.66 22.8% CJMT 555.98 573.10 553.43 572.00 573.27 520.56 572.52 554.81 573.12 534.19 551.25 555.38 6689.61 ‐0.1% CJCO 625.00 638.88 611.89 634.76 653.26 589.67 650.80 627.34 629.38 623.73 645.30 646.07 7576.08 3.4% CJEO 624.81 638.94 611.89 634.29 652.36 589.81 650.63 627.41 647.89 623.70 645.26 645.92 7592.91 3.4% CHNM 672.40 639.24 614.62 638.90 602.59 602.60 676.18 656.13 675.00 650.71 676.35 672.21 7776.93 0.0% Total 3057.87 3096.60 2976.89 3082.63 3123.47 2945.58 3253.94 3154.18 3237.66 3110.69 3231.20 3231.48 37502.19 5.7% Type = “PGR”

Table 29: September 2012‐August 2013 – percentage of program hours in a third language

Program hours: percent of program hours that are in a 3rd language Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 52.0% 50.5% 50.6% 52.1% 47.3% 43.5% 46.1% 44.4% 44.5% 46.2% 43.8% 45.2% 47.0% ‐6.8% CJMT 58.0% 55.1% 55.9% 58.3% 68.6% 83.2% 82.6% 81.8% 82.9% 89.3% 89.3% 90.8% 74.5% 32.7% CJCO 51.9% 45.2% 45.2% 48.3% 44.5% 46.6% 48.5% 45.9% 46.4% 50.5% 48.4% 53.3% 47.9% 1.4% CJEO 52.0% 45.1% 45.3% 48.4% 44.6% 46.6% 48.5% 46.1% 45.9% 50.5% 48.4% 53.2% 47.9% 1.2% CHNM 54.0% 54.5% 52.3% 57.0% 58.9% 53.6% 54.6% 52.4% 52.4% 55.8% 52.5% 54.4% 54.3% 0.4% Total 53.5% 50.0% 49.7% 52.7% 52.3% 53.8% 55.2% 53.3% 53.6% 57.3% 55.2% 58.2% 53.8% 4.7% Includes “PGR”, excludes ‘ENG’ and ‘FRE’

19

Table 30: September 2012‐August 2013 – percentage of all program hours that are original

Program hours: % that are original Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 41.6% 48.9% 47.7% 45.5% 47.2% 44.7% 42.4% 41.2% 41.6% 42.4% 39.6% 42.5% 43.6% 0.9% CJMT 44.5% 43.7% 40.7% 34.7% 25.3% 22.6% 20.1% 22.7% 23.4% 24.8% 18.8% 18.5% 28.4% ‐26.0% CJCO 44.9% 52.0% 49.0% 50.1% 51.2% 59.3% 55.7% 54.5% 52.7% 49.1% 48.2% 64.1% 52.6% 19.2% CJEO 44.0% 51.6% 49.0% 48.8% 51.6% 59.1% 55.1% 53.5% 52.7% 48.2% 47.4% 64.0% 52.1% 20.0% CHNM 42.4% 45.3% 47.7% 40.6% 47.3% 60.6% 50.7% 49.6% 49.9% 42.0% 34.6% 30.2% 44.9% ‐12.2% Total 43.5% 48.4% 46.9% 44.1% 44.9% 49.9% 45.4% 44.8% 44.5% 41.8% 38.3% 44.4% 44.7% 1.0% Includes live, recorded live and first play programs

Table 31: September 2012‐August 2013 – percentage of all program hours that are original and in a third language

Program hours: % that are original and third language Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Difference 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 21.7% 23.1% 22.5% 20.7% 20.1% 16.7% 17.6% 17.0% 16.6% 17.0% 15.5% 18.9% 18.8% ‐2.8% CJMT 23.3% 22.1% 20.9% 20.7% 17.2% 19.6% 16.6% 18.8% 20.5% 23.2% 17.7% 17.4% 19.8% ‐5.9% CJCO 15.8% 16.0% 16.6% 18.4% 14.8% 22.9% 22.2% 19.8% 19.5% 19.1% 16.8% 35.0% 19.7% 19.2% CJEO 16.0% 15.9% 16.6% 17.4% 14.9% 22.9% 21.5% 19.5% 19.1% 19.3% 16.3% 34.9% 19.5% 19.0% CHNM 19.2% 17.9% 21.5% 20.5% 18.6% 24.9% 25.2% 22.7% 22.5% 23.0% 17.0% 17.6% 20.9% ‐1.6% Total 19.1% 18.9% 19.6% 19.5% 17.1% 21.4% 20.7% 19.6% 19.6% 20.2% 16.6% 24.8% 19.8% 5.7% All programs (ie, excludes commercials, PSAs, station identification) Composition = 1, 2 or 3 (live, recorded live, 1st play)

20

Table 32: September 2012‐August 2013 – total original program hours

Programs – total original hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2013 Jul 2013 Aug Total: 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2012/13 CFMT 241.06 296.26 279.08 274.23 302.80 287.62 298.30 283.70 296.14 287.71 282.58 302.58 3432.06 CJMT 247.15 250.53 225.28 198.22 144.92 117.79 115.23 126.15 134.29 132.38 103.48 102.66 1898.08 CJCO 280.89 332.49 299.60 317.73 334.47 349.55 362.31 341.88 331.96 306.07 310.88 414.20 3982.03 CJEO 274.85 329.71 299.64 309.73 336.45 348.42 358.70 335.73 341.52 300.59 305.70 413.39 3954.43 CHNM 284.78 289.48 293.19 259.66 284.78 365.29 342.67 325.58 336.78 273.10 233.94 202.80 3492.05 Total 1328.73 1498.47 1396.79 1359.57 1403.42 1468.67 1477.21 1413.04 1440.69 1299.85 1236.58 1435.63 16758.65 All programs (ie, excludes commercials, PSAs, station identification) Composition = 1, 2 or 3 (live, recorded live, 1st play)

Table 33: September 2012‐August 2013 – total programming hours in a third language

Programs ‐ total third‐language hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Hours/day 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 301.48 306.23 296.13 313.88 303.84 279.60 324.49 305.60 316.70 313.41 312.23 322.08 3695.67 10.13 CJMT 322.72 316.01 309.16 333.67 393.27 433.23 472.62 453.63 474.83 476.77 492.30 504.17 4982.38 13.65 CJCO 324.60 288.96 276.61 306.71 290.69 275.02 315.52 288.04 292.05 315.10 312.08 344.62 3630.00 9.95 CJEO 324.78 288.44 277.16 307.04 290.78 275.04 315.53 289.06 297.57 315.09 312.09 343.60 3636.18 9.96 CHNM 363.20 348.38 321.43 364.07 354.73 322.86 369.40 343.49 353.57 363.18 354.88 365.96 4225.15 11.58 Total 1636.78 1548.02 1480.49 1625.37 1633.31 1585.75 1797.56 1679.82 1734.72 1783.55 1783.58 1880.43 20169.38 55.26 All programs All languages excluding 'ENG', 'FRE' and 'blank'

Table 34: September 2012‐August 2013 – total original program hours in a third language

Third‐language programs ‐ original hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Hours/day 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 125.64 139.89 131.63 124.46 128.89 107.33 124.03 117.02 118.53 115.30 110.86 134.28 1477.86 4.05 CJMT 129.35 126.54 115.46 118.46 98.60 102.08 95.15 104.18 117.64 124.04 97.49 96.67 1325.66 3.63

21

CJCO 98.76 102.25 101.62 116.93 96.80 134.94 144.22 123.96 122.81 119.43 108.32 226.06 1496.10 4.10 CJEO 99.74 101.62 101.34 110.64 97.37 135.36 140.19 122.30 123.88 120.60 105.15 225.55 1483.74 4.07 CHNM 129.32 114.61 132.25 131.23 111.98 150.28 170.25 149.21 152.07 149.53 114.92 118.58 1624.23 4.45 Total 582.81 584.91 582.30 601.72 533.64 629.99 673.84 616.67 634.93 628.90 536.74 801.14 7407.59 20.29 Excludes 'ENG', 'FRE' and 'blank'

Table 35: September 2012‐August 2013 – total hours of accessible and original third‐language programs

Hours of third‐language original programs that are captioned and/or described Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total hours: Avg mins Avg hrs 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 per day per wk CFMT 28.61 34.25 30.69 25.99 26.34 12.95 10.85 11.85 12.35 10.01 11.52 13.94 229.35 37.7 4.4 CJMT 2.54 2.08 2.01 1.98 1.98 1.00 0.00 0.00 0.00 0.00 0.00 0.00 11.59 1.9 0.2 CJCO 0.50 0.00 3.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.65 0.6 0.1 CJEO 9.48 0.00 3.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 14.60 2.4 0.3 CHNM 0.00 1.99 0.00 0.00 0.50 1.10 0.00 0.00 0.00 0.00 0.00 0.00 3.59 0.6 0.1 Total 41.13 38.32 38.97 27.97 28.82 15.05 10.85 11.85 12.35 10.01 11.52 15.94 262.78 43.2 5.1 Includes 'CC' and 'CD' programs; excludes 'ENG', 'FRE' and 'blank'

Table 36: September 2012‐August 2013 – languages used in accessible and original, third‐language programs

# of original third‐language programs with captioned or described hours Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Months Months Max # 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 with cc'g with no of langs or DV cc'g or DV CFMT ITA, POR ITA, ITA, ITA, ITA, ITA, POR ITA ITA ITA ITA ITA ITA 12 ‐ 2 POR POR POR POR CJMT ENGH HIN HIN HIN HIN HIN none none none none none none 6 6 1 CJCO HIN none SPA none none none none none none none none none 2 10 1 CJEO HIN none SPA none none none none none none none none ARA, 3 9 2 PAN CHNM none HIN none none HIN HIN none none none none none none 3 9 1

Total 26 34 Includes 'CC' and 'CD' programs; excludes 'ENG', 'FRE' and 'blank'

22

Table 37: September 2012‐August 2013 – total original and local program hours

Original local programs – total hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/day hours/wk CFMT 39.56 53.16 49.79 47.46 46.97 34.67 35.50 36.26 37.09 26.99 27.66 31.37 466.48 1.28 8.97 CJMT 64.41 77.49 70.53 58.91 54.15 37.66 38.29 39.84 41.33 24.72 26.46 26.14 559.93 1.53 10.77 CJCO 20.49 27.97 27.48 26.50 23.27 14.48 21.74 20.99 20.97 3.33 0.77 5.00 212.99 0.58 4.10 CJEO 20.51 28.21 25.05 25.96 23.49 14.37 21.49 20.99 20.95 2.50 0.00 5.50 209.02 0.57 4.02 CHNM 1.05 2.05 20.26 13.03 8.23 19.12 52.00 53.53 57.90 49.90 33.43 30.08 340.58 0.93 6.55 Total 146.02 188.88 193.11 171.86 156.11 120.30 169.02 171.61 178.24 107.44 88.32 98.09 1789.00 4.90 34.40 All programs, production source = 1, composition = 1, 2 or 3, any language

Table 38: September 2012‐August 2013 – total original and local third‐language program hours

Original third‐language local programs – total hours Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/ day hours/ wk CFMT 36.79 47.65 44.25 38.63 42.61 30.67 30.56 31.47 32.06 23.22 23.95 28.78 410.64 1.13 7.90 CJMT 41.27 52.77 46.05 40.15 37.70 24.63 22.81 24.85 41.33 19.73 22.96 20.01 394.26 1.08 7.58 CJCO 0.50 3.99 4.50 5.08 4.03 2.50 8.99 7.99 7.99 2.77 0.77 5.00 54.11 0.15 1.04 CJEO 0.5 4.20 3.34 5.40 4.00 2.50 9.00 7.99 7.98 2.00 0.00 5.50 52.41 0.14 1.01 CHNM 1.05 2.05 20.26 13.03 8.23 19.12 52.00 53.53 57.90 49.90 33.43 30.08 340.58 0.93 6.55 Total 80.11 110.66 118.40 102.29 96.57 79.42 123.36 125.83 147.26 97.62 81.11 89.37 1252.00 3.43 24.08 All programs, production source = 1, composition = 1, 2 or 3; all languages excluding 'ENG', 'FRE' or 'blank'

23

Table 39: September 2012‐August 2013 – total original and local third‐language program hours as a percentage of total programming hours

Total hours of original third‐language local programs as % of total programming Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 CFMT 4.2% 5.3% 5.1% 4.3% 4.7% 3.7% 3.3% 3.5% 3.5% 2.6% 2.6% 3.1% 3.8% CJMT 4.8% 5.9% 5.4% 4.5% 4.3% 3.1% 2.6% 2.9% 4.7% 2.3% 2.6% 2.3% 3.8% CJCO 0.1% 0.4% 3.1% 0.6% 0.4% 0.3% 1.0% 0.9% 0.9% 0.3% 0.1% 0.5% 0.5% CJEO 0.1% 0.5% 0.4% 0.6% 0.4% 0.3% 1.0% 0.9% 0.9% 0.2% 0.0% 0.6% 0.5% CHNM 0.1% 0.2% 2.3% 1.4% 0.9% 2.3% 5.7% 6.0% 6.3% 5.6% 3.6% 3.3% 3.2% Total 1.8% 2.4% 2.7% 2.3% 2.1% 1.9% 2.7% 2.9% 3.3% 2.2% 1.8% 2.0% 2.3% All programming (including programs, commercials, PSAs etc.), production source = 1, composition = 1, 2 or 3; all languages excluding 'ENG', 'FRE' or 'blank'

Table 40: September 2012‐August 2013 – total news hours

News: total hours Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/wk CFMT 80.80 89.45 83.77 72.66 68.07 34.42 41.00 43.95 45.46 38.45 42.93 42.35 683.31 1.87 CJMT 145.04 157.70 153.30 134.27 172.98 182.60 203.48 205.73 217.43 149.99 165.12 163.58 2051.22 5.62 CJCO 116.42 123.40 117.72 107.36 105.67 91.81 106.89 108.39 112.37 81.46 84.44 88.00 1243.93 3.41 CJEO 116.39 123.44 118.07 107.30 105.72 91.90 106.91 108.41 113.88 81.43 84.47 88.00 1245.92 3.41 CHNM 148.70 161.80 152.75 136.39 153.68 137.58 153.06 153.72 163.99 137.59 148.32 147.78 1795.36 4.92 Total 607.35 655.79 625.61 557.98 606.12 538.31 611.34 620.20 653.13 488.92 525.28 529.71 7019.74 19.23 Program category '10' % that is original, from local station, 12.6% 15.6% 17.5% 16.4% 13.6% 10.4% 14.5% 17.1% 15.7% 16.6% 12.9% 13.5% 14.8% and in a 3rd lang. (excl’g 'ENG' and 'FRE')

24

Table 41: September 2012‐August 2013 – total local news hours

Local news ‐ total hrs Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/day hrs/wk CFMT 69.66 76.54 71.24 62.62 56.36 28.75 30.81 33.29 34.32 28.45 31.43 31.35 554.82 1.52 10.67 CJMT 135.07 146.28 142.31 125.35 149.51 142.59 160.89 162.57 171.24 109.24 119.90 118.40 1683.35 4.61 32.37 CJCO 54.95 55.96 54.46 51.88 46.51 25.90 33.45 33.49 33.94 3.00 0.00 0.00 393.54 1.08 7.57 CJEO 54.99 56.03 53.94 51.90 105.72 25.96 33.47 33.47 33.95 3.00 0.00 5.50 457.93 1.25 8.81 CHNM 41.48 45.04 42.27 37.07 47.48 54.08 146.07 141.74 152.01 134.61 56.42 55.07 953.34 2.61 18.33 Total 356.15 379.85 364.22 328.82 405.58 277.28 404.69 404.56 425.46 278.30 207.75 210.32 4042.98 11.08 77.75 Program category '10' and Production source = 1 ('station')

Table 42: September 2012‐August 2013 – total original local news hours

Original local news – total hrs Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/day hrs/wk CFMT 36.79 43.68 39.16 33.63 32.12 13.38 10.85 12.27 12.33 10.04 11.52 13.94 269.71 0.74 5.19 CJMT 58.76 70.39 64.05 52.47 48.83 29.83 30.56 44.28 35.32 19.22 22.96 22.01 498.68 1.37 9.59 CJCO 19.99 25.97 25.49 22.83 21.26 11.97 14.75 14.99 14.97 1.00 0.00 0.00 173.22 0.47 3.33 CJEO 20.01 26.00 23.55 22.43 21.49 11.87 14.48 14.99 14.95 1.00 0.00 5.50 176.27 0.48 3.39 CHNM 1.00 2.00 20.22 12.05 8.23 18.98 50.01 52.54 59.90 49.90 33.43 30.08 338.34 0.93 6.51 Total 136.55 168.04 172.47 143.41 131.93 86.03 120.65 139.07 137.47 81.16 67.91 71.53 1456.22 3.99 5.60 Live, recorded live or first‐play news

25

Table 43: September 2012‐August 2013 – total original local news hours in a third language

Third‐language local news ‐ original hours Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: Average Average 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 hrs/day hrs/wk CFMT 36.79 43.68 39.16 33.63 32.10 13.38 10.85 12.27 12.33 10.01 11.52 13.94 269.66 0.74 5.19 CJMT 38.73 48.37 42.04 36.01 34.34 19.83 20.06 33.29 24.64 19.22 22.96 22.01 361.50 0.99 6.95 CJCO 0.00 3.99 4.50 5.00 4.03 2.00 4.00 4.00 4.00 1.00 0.00 0.00 32.52 0.09 0.63 CJEO 0.00 4.00 3.34 4.99 4.00 2.00 4.00 4.00 3.99 1.00 0.00 5.50 36.82 0.10 0.71 CHNM 1.00 2.00 20.22 12.05 8.23 18.98 50.01 52.54 57.90 49.90 33.43 30.08 336.34 0.92 6.47 Total 76.52 102.04 109.26 91.68 82.70 56.19 88.92 106.10 102.86 81.13 67.91 71.53 1036.84 2.84 19.94 Excludes 'ENG', 'FRE' and 'blank'

Table 44: September 2012‐August 2013 – third languages used in original local news

Third‐language original local news – languages Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Minimum Maximum 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 CFMT ITA, ITA, ITA, ITA, ITA, ITA ITA ITA ITA ITA ITA ITA 1 2 POR POR POR POR POR CJMT CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, CAN, 2 3 MAA MAA MAA MAA MAA MAA MAA MAA, MAA MAA MAA MAA PAN CJCO none MAA CAN, MAA MAA MAA MAA MAA MAA MAA none none 0 2 MAA CJEO none MAA MAA MAA MAA MAA MAA MAA MAA MAA none CAN, 0 2 MAA CHNM PAN PAN PAN PAN PAN MAA, CAN, CAN, CAN, CAN, PAN PAN 1 3 (Punjabi) CAN, MAA, MAA, MAA, MAA, PAN PAN PAN PAN PAN

26

Table 45: September 2012‐August 2013 – total repeat hours of third‐language local news

Third‐language local news ‐ repeat hours Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2012 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 2013 CFMT 32.87 32.86 32.09 28.99 24.24 15.38 19.95 21.02 21.99 18.40 19.90 17.41 285.10 CJMT 55.97 55.53 57.13 52.62 72.25 82.95 97.84 129.47 102.65 90.02 96.93 96.39 989.75 CJCO 13.99 9.00 7.99 9.99 7.99 3.97 7.99 7.99 7.98 2.00 0.00 0.00 78.89 CJEO 14.00 9.00 8.65 9.97 7.97 3.99 8.00 7.99 8.00 2.00 0.00 0.00 79.57 CHNM 40.48 43.04 22.06 25.02 39.25 96.06 89.20 94.12 84.70 22.99 25.00 581.92 Total 157.31 149.43 127.92 126.59 151.70 106.29 229.84 255.67 234.74 197.12 139.82 138.80 2015.23 Includes repeat programs, excludes live, recorded live or first‐play programs Excludes 'ENG', 'FRE' and 'blank'

Table 46: September 2012‐August 2013 – repeat factor of third‐language local news

Third‐language local news ‐ repeat factor (repeat hours / original hours) Sep 2012 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Total: 2012 2012 2012 2013 2013 2013 2013 2013 2013 2013 2013 2012/13 2013 CFMT 0.9 0.8 0.8 0.9 0.8 1.1 1.8 1.7 1.8 1.8 1.7 1.2 1.1 CJMT 1.4 1.1 1.4 1.5 2.1 4.2 4.9 3.9 4.2 4.7 4.2 4.4 2.7 CJCO [none] 2.3 1.8 2.0 2.0 2.0 2.0 2.0 2.0 2.0 [none] [none] 2.4 CJEO [none] 2.3 2.6 2.0 2.0 2.0 2.0 2.0 2.0 2.0 [none] [none] 2.2 CHNM 40.5 21.5 1.1 2.1 2.1 0.0 1.9 1.7 1.6 1.7 0.7 0.8 1.7 Total 2.1 1.5 1.2 1.4 1.8 1.9 2.6 2.4 2.3 2.4 2.1 1.9 1.9 Excludes 'ENG', 'FRE' and 'blank'