UKTram Activity 3: Signing of Tramways and Highway Interface Mott MacDonald

Appendix As CJriginal Activity 3 Scope

This scope was included in the activity report for the workstream in September 2005.

ACTIVITY REPORT SEPT 2005

Activity Number 3(Phase 1)

Activity Name Highway Interface

Activity team Leader Andy Morris

Other Team Members Colin Robey(CENTRO)

Steve Hunt (Nottingham City Council)

David Skirrow ( Supertram)

Gerry Higgins(RPA)

Jim Snowdon (TCL)

Ian MacKenzie (Mott MacDonald)

Paul Robbins(Railway Systems Consulting)

Stephen Firth (Independent)

Description of Problem:

Concern exists in the industry as to whether there exists a satisfactory approach to safe and efficient provision of traffic and pedestrian management arrangements on tramways. Inconsistencies on many of the UK's operational tramways, with regard to the `signing and lining' issue, has given rise to an increasing worry that tramway promoters/operators have not yet established a common set of standards. There are worries that client organisations have yet to properly engage with the respective highway authorities when projects are being developed and that legislatory requirements, in certain

2551 S4///003/A 25 ~Aa~ 2010 88 {Activity 3 Phase 1 Rz~ori ls~ued AAAy 2010 UKTram Activity 3: -inn Signing of Tramways and Highway Interface Mott MacDonald

circumstances, do not provide for the safest and most economics► solutions in terms of overall highway design.

Proposed Elements of Study:

The determined first stage of the work is to undertake a full and proper assessment of the full scope of the problem. This will take the form of a comprehensive study, via a questionnaire, of each of the existing tramway systems in the UK (and the Republic of Ireland). It will look at all elements concerning the tramway/highway interface and will focus particularly on where there have been evident issues regarding safety.

Planned Output of Study:

The initial study will look at both the positive as well as the negative aspects associated with `signing and lining' and highway design of each system. The outcome of this will lead to a more thorough pan-industry understanding about the extent of the problems and how these might be addresses both in existing and future schemes.

Expected Benefits from Study:

(quantified and non-quantified)

A more consistent and standardised approach will help to ensure less ambiguity on the part of tramway operator, road user and pedestrian when on or about a tramway system. This will lead to an improvement in road safety with the attendant improvements in system performance and social acceptance. The study will also look at more innovative alternatives to certain aspects of highway design, signalling and signing.

Likely Timescale to Completion:

Phase 1 of the study can be completed within 12-months.

The second and equally important stage of this project is a little more difficult to predict as this will require detailed analysis of the issues raised in Phase 1 and the development of suitable standards. It may also necessitate changes to legislation (TSRGD, etc.) the result of which makes it difficult to determine timescales for completion.

255164/!/003/A 25 May 201 U :• Activity 3 Phase 1 Report Issued Nlay 2010 UKTram Activity 3: ~ln Signing of Tramways and Highway Interface Mott MacDonald

Appendix B. Final Agreed Phase 1 Scoff

This is the final scope as agreed between Mott MacDonald and UKTram for the Phase 1 study to identify current practice on current systems, and recommend updates to current guidance.

8.1. Scope

The scope will cover three main areas of highway/tramway interface: Signs, Lines &Signals Pedestrian &Cyclist Safety Special Surfacing

The method to be used for gathering the information is laid out in Section 4 and the output to be produced is fisted in Section 5.

B.1.1. ' Signs, Lines 8 Signals

Signs, lines and signals on the tramway, and highway interface with the tramway, will be reviewed in this subject area, using the method specified in Section 4: Standard signs required in the TSRGD (2002) and signs recommended in ORR guidance. Their impact on tramway safety and efficiency. Non-standard signs on tramways used to convey information either to drivers or other highway users. Reasons for their use and how effective they are. Current use of temporary signs and lights during construction and maintenance works. Current use of markings to improve safety and compliance on tramways. Reasons for their use and how effective they are. Innovative practices used at junctions and in pedestrian areas to improve safety and e~ciency.

B.1.2. Pedestrian ~ Cyclist Safety

Pedestrian and cyclist safety where they interact with the tramway will be reviewed in this subject area, using the method specified in Section 4: Existing practice as compared to currently available guidance. Pedestrian and cycle accident `black spots' and possible causes. Innovative methods used to reduce accidents through signage and highway interface.

1 2551641//003/A 25 May 2010 9~ ;Activity 3 Phase 1 Report Issued day 2010 UKTram Activity 3: Signing of Tramways and Highway In#erFace Mott MacDonald

6.1.3. Special Surfaces

The use of special surfaces on tramways will be reviewed in this subject area, using the method specified in Section 4: Current use of special surfacing on tramways and the reason of its use.

B.2. Method

Two main methods of study will be used to produce the results.

B.2.7. Standards 8~ Guidance Review

Standards such as the TSRGD (2002) will be studied and compared to current practice.

Some guidance on the subjects covered by Activity 3 is available. For instance, a Pedestrian Safety Guidance document has been produced by the Office of Rail Regulation. This and other relevant guidance will be reviewed and compared to the feedback from tramway operators.

B.2.2. Second Questionnaire

The initial questionnaire sent to the tramway operators highlighted areas of study which need to be pursued further and in more detail. These areas included problems with illegal turns and tram lane use by motor vehicles, the overshooting of give way lines, loss of control accident on the rails and incidents with pedestrians and cyclists. The use of non-standard signs to combat these problems was also highlighted for further investigation. A summary of the findings of the first questionnaire was issued by Mott MacDonald to UKTram on 19th i January 2009. It is proposed that a second questionnaire should be written to gather this information.

A second questionnaire, written by Dave Skirrow but not issued to the operators, contained more detailed questions which will be incorporated where relevant to the updated version, as per the scope in Section 3. The updated second questionnaire will also contain questions arising from research carried out into the three areas of the scope. It is proposed that the second questionnaire should be sent to the operators of the tramways in the UK and Ireland which were included in the initial questionnaire, that is: Dublin Luas, Midland Metro, Sheffield Supertram, , London and Nottingham Express Transit.

255164///003/A 25 Nlay 2410 91 ,Activity 3 Phase 1 t~~port issued May 2010 UKTram Activity 3: Signing of Tramways and Highway Interface Mo#t MacDonald

Blackpool , from whom no answer was received for the initial questionnaire, should be encouraged to participate, and information should also be sought from TIE with respect to . Any relevant missing information on these two tramways, which would have come from the initial questionnaire and is within the scope of this project, will be gained by expanding their second questionnaires as appropriate.

It is proposed that the second questionnaire should be delivered in the form of an interview with the list of questions being sent to the operator previously to allow them to gather any necessary information. This method is felt to be best, as it will enable responses to be gathered more swiftly then if the operators were left to reply in their own time. It will also enable the interviewer to ensure that questions are answered in the same manner for each tramway. This was a problem encountered in the replies from the first questionnaire, which made direct comparisons difficult.

8.3. ' Output

B.3.1. Signs, Lines and Signals

A report will be produced using the information gathered from the questionnaires and research into standards and guidance. This will contain: A description of current usage of signs, markings and signals from standards or guidance A overview of practice currently used Suggestions for additions or changes to current standards and guidance

B.3.2. , Pedestrian and Cyclist Safety

A report will be produced using the information gathered from the questionnaires and research into standards and guidance. This will contain: A comparison of current practice with available guidance on pedestrian and cyclist safety An overview of any innovative practice currently used Suggestions for additions or changes to guidance

i 25~164///OQ3/A 25 N1~y 2010 92 ? f-lciivit~ 3 ~h~sa 1 Rppo~t issued ~~1ay 20'10 UKTram Activity 3: Signing of Tramways and Highway Interface Mott MacDonald

B.3.3. Special Surfaces

A report will be produced using the information gathered from the questionnaires and research into standards and guidance. This will contain: ~ An overview of the current usage of special surfaces and their level of success ■Suggestions for additions or changes to guidance

255164///003/A 25 May 2010 93 j Activity 3 phase 1 Report Issued May 2010 —

to

to

City

to

key

for

allow

the

flats

street

with

by-

and

1993.

section

from

the

the

to

of

shift

City

the

housing.

high

end

Bridge

the

if

from

in

On-

the

of

moving

be

replaced

areas,

to

MacDonald

of

the

signal

and

to

latter

those

on

Improved

east

University

help

g

modal

suffers

and

Regeneration

slow

quality

been

traffic

much

le

Vams

accessibility

company

the

Mott

a

y

by

many

This

~~1

formation

of

linking

where

sections

housing

from

Stagecoach

segregated

of in

can't

too

transport

queues

queue.

since

the

is

higher

.

key

tram.

are

especially

remove

Halfwa

particular

%

Meadowhall. MiddlewoodlMain public

passed.

priority have having But

density delivery

After initially operating although demolished with

all, disabilities. section traffic Shalesmoore running

corridors in tram

the to corridor traffic

To

Improved

leg

50

~~~~

of

23

from

Study

the

it

city

and

between

fully

demands

was

System

and

stage

1

is

over

8

influence

Accessibility

1994

1995

in

SYPTE

ated

initiatives

1970s

length

phase

congested

genesis

Centre

re

the

9 9 9

Transportation

between

Meadowhall

October

opened

in

European

Environment

The

a Only City

over improved se

centre s7km

in

to

is

/

to

May

the

June

in

to

and

to

of

to

Line

31

volume

running,

inbound

wide

TMM

route

is

1988

long

-street

access

CENTRO

shared

and

start

on outbound

Georges

}~l~B'ia

Road.

high Road

the

merge

lane

Metro

diverge

~

merge

opened

accessibility

kms

running

street

2.Okm:

from

St

of

of

the

regeneration

metres

of

operetlon transport

20

Midlands

metres

Act,

be

improve

that

!

mobility

metres

is regeneration

Royal

corcidor

-way

years

%segregated

-sVeet

WCC

p50

priestfield

public

Ettingshall public 1899

network 1969 1999 Wolverhampton) Ettingshall

West Wolverhampton Priestfield

11

and _ 1.To 1.Midland 12km p50

and tram

the one TWO Improved on 2•To 2.2.Okm

support

the 3.Of

segregated 30

-1027

(towards

is an

to

%

this

on

Ciry

The

(both

20

as

road

corridor

and

but

ort

opening

20%

were

not

P

-street

tramway

and

objectives:

to

the

public

-mode

on

work

other

1994.

congestion

traffic

the

designed

congestion

segregation

and

the

of approx.

trans

tramway

in

Inclusion

into

NTC

groups)

access

the

of

to

—15

of

identified 1988

multi

system

to

powere

are

Nottingham

Link

with

along

the

treffic

use

in

of

on

ublic

running

centre

NET

Accessibility

NCC

in

of

P

mixed;

accessibility

amongst

Social

traffic

2004.

—first

1988,

levels

of

for

corridor

11

related is

City

in

around

development ewnomic

incidental

rated

road

NW

empl0oyed

9

years

March

Increased

and

terms

co- segregated

promotion

Nottingham

Initial

Parliamentary

Reduction

Centre Regeneration 16 Regeneration

Different

in

in are 1.Management is

in commenced option Improved traffic. directly socio- operating

inte Transportation(LTP) Segregation remainder arcangements 3. is Improved segregated section 9~nted

lim@ the transport

Z,

a

for

in

for

high

of

split

on

road

the

lane

Luas

a

in

Luas

traffic

Plan

part

Luas

transport

operation

Green

the

tram

mode

modal

street

(used

64mm

~

The

embedded

of

a

of

was

segregation

within

ad'acent

operatlon

on-

public

Luas

operation

1994.

kerb

RPA

of

by

minimal

of

accessibility

commenced

of

in

defined

2004.

(a)

Transportation

plateau The

Redress

capacity

a

system

Line

commenced

levels

recommended

inception

usedfor

region

Transportation

operation

June

favour

Line

Red

was Dublin

higher

Regeneration volumes). Replacement Reduction Initiafive

Within 2004. commenced The in raised

in

Improved Separated

Two traffic. streetwith are Tram running

.

the the

chamfered

(b)

%

30

Fully

%

%

40

integrated:

Veolla

accessibility

segregation:

of

integrated:30

street,

years.

Level

Fully

Improved

On-

Segregated:

9

but

not

mode

better

from

—some

buses

out

but

with

is

this,

be

system

of

of

(partial

segregation

1992.

Full

rail

taxis

of

in

capacity centre

accessibility

would

1991

traffic.

running

answer

and

local

city

to

.~

level

to

Responses

recollection

higher

the

my

buses operation). operation High Regeneration 1985

Replacement

Replacement

dated general

GMPTE

able in

Improved shared

for

20'IU

5

May

local

approx. lanes

and

Issued

bus

segregated

2010

in

street,

buses

fully

May

highway

Report

approximately

on

to

1

in

Y1

in

of

25

1.5km

is

-km

lanes.

2km

years.

interface

Phase

3

Mixed

16

1.Skm restricted

traffic. ~ routes

and

tram

uest~onnarre

--

-

Act~v~ty

255164/!l003/A

i.e.

_-

exists

to

Highway

_

for

for

94

_

__...

Y

System?

and

buses

~:~

mode

inception

of

segregation

reasons

running?

Tram

3:

of

~

of

accessibility

from

the

street

are

level

long

=~A

on-

Tramways ~

_

_

Activity

How

Regeneration

Replacement

operation:

highercapacity

What

What

existence

Improved

for

of

Description

_

~..

System

UKTram

~~

Signing

the

road

full

the

for

into

and

and

TSC

to to

and

but but

only.

to to

owns

have

financial

maintains

contracting

and

MacDonald

signalling

inputs inputs

maintains maintains

tramway

complex complex

system system

close close

to to

this this

5 5

tramway tramway

operates operates

and and

notionally

trams

the the

of of

on on

and and

SYPTE SYPTE

LRT LRT

and and

or or

Moti Moti

give give

Council Council

tramway tramway

to to

4 4

Stagecoach

by by

"the "the

are are

is is

systems systems

bits bits

'~1

sold sold

City City

Stagecoach

infrastructure, infrastructure,

maintenance maintenance

signalling signalling

but but

street street

priority priority

All All

junction junction

which which

maintains maintains

Ltd. Ltd.

off off

detectors detectors

operates operates

these these

roadjundions, roadjundions, Supertram Supertram

the the

The The the the

major major

"operates" "operates" been been

institutions.

indeed indeed

The The

owned owned

trams" trams"

to

at

the

traffic

of of

Acl

agreed

56 56

road road

obtained

Supertram

Supertram

priority priority

Supertram

with

an an

(Lloyds) (Lloyds)

designed designed

Department

Utilities

City

the the

Practice

was was

Ltd Ltd

trams trams

SYPTE SYPTE

Commercial Commercial

takes takes

of of

Section Section

Transport Transport

the the

(SYSL)

(SYSL)

(SYSL) (SYSL)

signals

override override

Junctions Junctions

Tram Tram

Ltd Ltd

Ltd Ltd

Stagecoach Stagecoach

Statutory Statutory

Stagecoach Stagecoach

Code Code

established established

Highways Highways

Ltd. Ltd.

Sheffield Sheffield

Stagecoach Stagecoach

--

Leasing Leasing

Lloyds Lloyds

under under

own own

1968 1968

Funding Funding

-

-

be

to

/

the

and

/

to to

the

of of

and

-23

City

City

Council

and

Metro

Metro

posts

Metro

now

Act) had had

Operator

became

!

private

TMM TMM

Act

should

(called

However,

that that

it it

Centro Centro

CENTRO

by by

traThc traThc

behalf behalf

1992 1992

junction

System

construction construction

PTE PTE

and

signal signal

was was

Metro Metro

controllers controllers

tram tram

Express

all all

turn. turn.

on on

trials trials

Midland Midland

Midland Midland

—West

Centro, Centro,

Midland Midland

formally.

signals signals

to to

detectors detectors

its its

the the

concession

1989, 1989,

heads heads

_.....---

WCC WCC

proposed proposed

during during

position position

None None

lake lake

that that

arrangements arrangements

Wolverhampton's

"fair' "fair'

Wolverhampton Wolverhampton

Wolverhampton Wolverhampton

Travel Travel

Council

Council

Wolverhampton Wolverhampton

Junction Junction

traffic traffic

Concessionaire.

and and

tramway tramway

Tram Tram

National National

Travel Travel

Owner Owner

year year

maintained maintained

including including

Midlands Midlands

Centro) Centro)

WMPTA. WMPTA.

operated operated concessionaire concessionaire

2018

1993

Parliamentary Parliamentary

Owned Owned

Private Private

Ads Ads

(NEG)

(Midland (Midland

by

Act

are

the

for

NET

day

and

City

Light

(City

year

with with

owned

to to

GNLRT

system

__

the

2004

informal

all

control

county

between

Light

GNLRT GNLRT

of

appointed

commercial

the the

day day

Consortium

30.5 30.5

for for

— —

operation operation

1994

signal

Nottingham

and and

associated

a

Tram

the the

Country

tram

boundary)

Arzow Arzow

subcontract subcontract

Council Council

tram tram

affecting affecting

a a

NTC

by by

for for

responsible responsible

for for

March March

Maintained

City City

issues.

traffic traffic

to to

Bill Bill

Arrow

all all

by by

Authority Authority

exists exists

Concessionaire

Act Act

their their

Further Further

junctions junctions

and and

Construction,

signalling signalling

Concession

9 9

the the

and and

&M &M

(NCC)

Tram Tram

City City

Cify Cify

to to

Nottingham Nottingham

for for

O

the the

as as

NCC NCC

NTC NTC

and and

under under

the the

and and

on on

issues issues

Council Council

the the

in in

maintain maintain

the the

wholly wholly

Nottingham Nottingham

(Arrow).

own own

defined defined

opened opened

belong belong

as as

maintains maintains

street street

and and

Transit Transit

responsible responsible

is is

is is

operations

Nottingham Nottingham

Highway Highway

Council Council

Ciy Ciy

Ltd Ltd

operated operated

and and

signalled signalled

operation operation

on-

partners. partners.

management management

Ap Ap

operator operator

Agreement. Agreement.

co-

NTC NTC

This This

the the

Act Act

ram ram

NCC NCC

highway highway

Nottingham Nottingham

representative

Company Company

Arrow Arrow

and and

beyond beyond

Council Council

The The

City City

Nottingham Nottingham

All All

Council Council

and and

Arrow Arrow

equipment equipment

signalling. signalling.

under under

Operated Operated Rail Rail

managed managed

maintenance maintenance

Concessionaire, Concessionaire,

Nottinghamshire Nottinghamshire

Nottingham Nottingham

Tramway Tramway

assets assets

concession concession

as as

Rapid Rapid

Council Council

Greater Greater

1994 operation operation

Parliamentary Parliamentary

(NTC)

system system

and

was

local

of

on

the

South

the

the the

~nn~

by by

and

to

signal

the

maintain

Rathdown

Council Council

system system

an an

led led

with with

the

by by

the the

September

during during

Council, Council,

junctions junctions

by by

RPA

owned owned

Authorities Authorities

LRT LRT

in in

(Railway

of of

equipment.

Procurement

years years

Council Council

Ireland

City City

County County

are are

priority.

Laoghaire Laoghaire

Local Local

Government

operate operate

infrastructure infrastructure

Luas Luas

above.

.

majority majority

high high

Negotiations Negotiations

design design

authorities authorities

Veolia Veolia

As As

Dublin Dublin

Dublin Dublin

Dun Dun

County County

and and

The The

Railway Railway

junction junction

Irish Irish

Agency.

administered administered

assets assets

i~Na~o-~~~.e~~..,i i~Na~o-~~~.e~~..,i

The The

Transport Transport

authorised authorised The The

operation operation

2004.

__ __

the

Veolia

to

called

disabled

Dublin

System

high

early

instead

signal

is

operates

owns owns

tramway

trams,

for for

for for

a

operation

have have

and and

scheduled

for for

agency agency

Procurement

of of

under

late late

priorities priorities

low low

priority: priority:

Ireland Ireland

Vedia

Orders

for for

Govemment—

However, However,

equipment. equipment.

including including

for for

allows allows

of of

Transport Transport

and and

fixed fixed

Council Council

Rail Rail

highway highway

function function

government government

Irish Irish

Railway Railway

system system

give give

this this

medium medium

priority priority

City City

trans trans

trams. trams. Levels Levels

design design

Veolia Veolia

responsible responsible and and

Agency(RPA).

government government

the the

supervision supervision

Light Light

Transport Transport

system, system,

The The the the

junction junction

The The

a

by

by

is is

there

are

party.

etc.

the

Council

Traffic

signal

city

takes

and and

way

for for

priority priority

etc. etc.

[1988,

flows,

City City

operated operated

signals

works works

the the Transit Transit

the the

either either

many

through

reflect

1988, 1990, 1988,

Two Two

maintained maintained

Serco

in in

to to

issue issue

by by

(Urban (Urban

"Railway"

Acts Acts

to to

Manchester Manchester

treffic treffic

signal signal

Act Act

when when Metrolink

been been

Rapid Rapid

owned, owned,

2) 2)

operator.

highway highway

responsible responsible

regeneration regeneration

have have

centre centre

timings timings

changes changes

dynamic dynamic

changes changes

Traffic Traffic

Metrolink

place place

Currently Currently

Manchester Manchester

highway. highway.

required required

communication communication

is is

maintained maintained

signalling signalling

Control) Control)

GMUTC GMUTC the the

On On

PTE PTE

1991

Serco Serco

Greater Greater

System) System)

(Light (Light

(No. (No.

20'10

May

as as

as as

(as

(as

Council,

scheme

Ltd., Ltd.,

Issued Issued

(Croydon (Croydon

(lBC) (lBC)

?010

the the

Council Council

agreement

Act Act

London London

Transport)

TCL TCL

of of

1994). 1994).

highway

May May

P,eport P,eport

Operations Operations

to to

Croydon Croydon

Croydon Croydon

I I

for for

Council Council

25 25

Act Act

the the

for for

formal formal

-

London London

Tram Tram

Croydon Croydon

are are

promoter promoter

Concessionaire Concessionaire

Phase Phase

Interface

3 3

with with

with with

co-

Quasi

First First

contractor contractor

Croydon Croydon

who who

authority).

agents agents

Transport Transport

Tramlrack Tramlrack

the the Tramlink Tramlink

Parliamentary Parliamentary

Aciiwry

255164l/l003/A 255164l/l003/A

to

the the

to to

Highway Highway

highway highway

the the

95 95

priority priority

and and

junction junction

for for

for for

were

used used

of of

stakeholders

and and

highway?

maintains maintains

signal signal

were were

on on

system? system?

generally? generally?

levels levels

operates operates

and and

3:

generally? generally?

the the

operation? operation?

between between

the the

responsible responsible

responsible responsible

agreements agreements

is is

powers powers

is is

owns, owns,

owns owns

system system

provided provided

Tramways Tramways

be be

What What

concerning concerning

reached reached

Who Who

tramway tramway

Who Who

operation operation maintains maintains

Who Who

equipment? equipment?

Activity Activity

Who Who

tram tram

What What

construct construct

of of

UKTram UKTram Signing Signing UKTram Activity 3: Signing of Tramways and Highway Interface Mott MacDanuld

Veolia RPA NCC NTC WCC TMM / SYPTE Stagecoach ._ ___ CENTRO junctions. Some junctions exception of 1_____ give priority to clear that the operators are high during off peak the tram performance and low during peak, specification (of which others may be medium. Wolverhampton was not a part) could not be met and Wolverhampton agreed to introduce hurry calls and green waves as experience was gained in on-street trem running.

Tram has"Greenwave" priority on the on-street section ______Other public transport issues Tramlink operates in Bus deregulation Nottingham is de-regulated Most daytime bus Public trensport in regulated — deregulated accordance with the service continues to cause environment, there is not PTE services along Metro environment. PTEs requirements set by TfL. as problems with the wrtidor operated deregulated since late the public transport number of bus operators Commercially — 86% by SOs. Some authority for London as a and their buses Nottingham does not have a National Express as "integration"in the whole, and is integrated wmpeting for space on PTE. Is sponsored by Travel West Midlands, form of through with the London fares city centre stops. This Nottingham City Council and Surprisingly there was ticketing arrangements Nottinghamshire County system. Bus competition is frequently results in ^a ~edudion in bus with local bus regulated through a legal tailbacks on some of the Council jointly through a services along the cram operators in particular agreement between TfL and shred areas or across specialist team (The Promoter). ~mdor(79 bus) as the since the recent TCL so as not to prejudice key junctions (even with operator of trams was acquisition by TCL's commercial position. yellow box protection). Public Transport is deregulated National Express as Stagecoach of one by NCC still owns 85% of the Trevel Midland Metro! local bus operation. city's principal bus operetor In a policy of differential (who also own a 50%share of fare levels kept short NTC). journeys on the buses resulting in Midland Metro never Net was designed and is achieving its predicted loadings. opereted and maintained under a PFI arrangement. System Design Are there any specific design No, other than maximising Swept path guidance The Luas system was General design of on street and Wolverhampton CCUTC The signalling The entire system is and operating principles used segregation and traffic (either by lining or designed in accordance off street sections to manage officers took a strong systems operated "line of sight'. T within the system which effect signal priority. material changes / level with Railway Safety and control intertaces. handson approach at here are only 2 significant safety or operation? changes) is important to Principles and Guidance Maximum integration of the the design stage sections of single line. A t provide information to (RSPG) produced by the tram into the highway establishing a good Meadowhall this is pedestrians, particularly HSE. environment working relationship controlled by railway in areas of high footfall in with the contractors standard track circuited Signalling busy city centre operation /priority highway design safety signalling, but is still locations. linked in the design process engineers. This lead to driven light of sight. At Removal of conflicting highway good practical and safe Herding park, the single traffic over the radial route as a junctions and resulted line was protected by track whole into the complete circuits as above, in Strong development of new redesign of the addition to a magnet and existing park and ride and Steelhouse Lane detection system. This was interchange junGion with restricted considered to be more franc movements —see complex than the location later. Trams driven under "line of required and the track sight' principle circuit system was removed some time ago, along with Points and routes re set by the Safety —poor choice of a slight reduction in tram driver — Control Room wheel /rail interface at operating speed to facilitate involvement is minimised points (Vignola Rail) true lire of sight operation. Unlike other systems, points and routes are not set automatically by the use of a predefined code ~~__ Who was responsible for Design was undertaken by DBOM contract, but all The RPA was reaponsible Railway Procurement Arrow are responsible for the Wolverhampton as South Yorkshire HMRI

255164!//003fA 25 May 2010 96 Activity 3 Phase '1 Report issued May 20'10

traffic

running

fully

mixed mixed

MacDonald

are are

street street

with with

that that

Mott Mott

the the

Stagecoach

of of

'~1

Most Most

integrated integrated

sections sections

is

street

reserve

of of

22km 22km

Transport

street

segregated

and

or or

SYPTE

fully fully

central central

29km, 29km,

(Meadowhall

mixture mixture

a a

the the

None

Route)

7km 7km

running running

segregated

or or

running running

either either

in in

Total Total

Executive

Passenger Passenger

in

/ /

note note

but

_

/bus /bus

way

Lane)

TMM TMM

1.8

street

route

Venture

light

segregated

CENTRO

tram tram

one one

(running (running

+additional

Laing

highway

on on

segregated segregated

running2.Okm

reserve reserve

highway

total total

Authority Authority

tally tally

(Swan (Swan

Joint Joint

traffic traffic

LRT LRT

of of

refers. refers.

Wolverhampton-

metres metres

metres metres

5 5

metres metres

one one

__- __-

street street

kilometres kilometres

Kilometre

-street -street

central central

WCC WCC

1 1

250 250

lane lane

crossings) crossings)

250 250

with with 10M 10M

controlled controlled

On-

a a

18kilometres

755 755

19.Okm 19.Okm

with with

junction junction

kilometres kilometres

On

Birmingham

23 23

length

20km 20km

Company

Ansaldo Ansaldo

Highway Highway

above above

Altram Altram

4km

the

the

by

the

- -

was

expertise

are are

approval

was was

are are

relevant

Turnkey

relevant

of of

DepaAment

input input

segregated

intertace

running running

NTC

the the

-street

the the

km

the the

Operator

approved approved

but but

on

of of

of of

of of

fully fully

14 14

required required

source source

approval approval

the the

NCC NCC

(planning) (planning)

(highways) (highways)

Authority

8.5 8.5

finally finally

Authority by by Highways Highways

highway highway

2km 2km

the the

and and

omstreet omstreet

length length

no no

the the

Design Design

was was

%)

km

2.5km

1 1

with with

APProx. APProx.

10km

Approx. Approx.

Total Total

HMRI

14km, 14km,

and and

Design Design

wherein wherein

panning panning

required required

responsibility responsibility lay. lay.

subcontractor subcontractor

responsibility responsibility from from

Highway Highway

Approvals Approvals

responsibility responsibility

design

(28 (28

gpprovals gpprovals

/

in

in

on-

the

the

road road

in

the

at

the the

Luas

to

this

Cow

of

west

of of

the

of of

the

of of

of of

with

major

was

at

(8km (8km

lane

in

rolling

side

the

the

whilst

generally

of of

to

a a

by by

between

interaction

The The

between

other other

Milltown

centre) centre)

junctions,

traffic traffic

previous

operates operates

is is

(St

works

10% 10%

40$ 40$

for for (Red (Red

is

30~ 30~

within within

developing

50% 50%

Line Line

south south

a a

new new

Centre Centre

tram tram

to to

Blackhorse).

lengths lengths

Line

% %

with with

whilst

city city

(NaasRoad-

with with

responsible

whilst whilst (RSC)

a a

in in

south south

(15km (15km junctions,

adjacent

for for

road road

road road

Line Line

the the

Line Line

to to

RPA

new new

50 50

Line Line

Green) Green)

Red Red

case case

in in

and

interchange, interchange,

Ciry Ciry

generally generally

Station, Station,

in in

contractor contractor the the

Centro Centro

and and

controlled controlled

approval approval

Safety

reservation reservation

running. running.

centre.

operates operates

was was

lane lane

operates operates

Line Line

is is

operate operate

Red Red

Green Green

Red Red

Cow Cow

Red Red

other other

assessment assessment

(in (in

minimal minimal

Luas Luas

centre, centre,

City City

city city

RPA RPA

street street

safety safety

design, design,

Dublin Dublin % %

tram tram

Red Red

signalised signalised

properties. properties.

Interaction Interaction

traffic traffic

priority priority

accessing accessing

streets streets

signalised signalised

with with

Luas Luas

a a

Luas Luas

Belgard) Belgard)

Approximately Approximately

environment

approximately approximately

Stop) Stop)

Luas Luas

Approximately Approximately

railway railway

city city

street.

10 10

Sandyford, Sandyford,

with with Stephens Stephens

length) length)

Green Green

Luas Luas

the the

on-

remaining remaining

shared shared

Approximately Approximately

(Beechwood (Beechwood

segregated segregated

Connolly Connolly

Tallaght Tallaght

the the transport transport

of of

length) length)

The The

ultimate ultimate

Railway Railway

responsible responsible

Commission Commission

the the

tha tha

assessments, assessments,

Agency Agency

stock stock

far far

approvals approvals

and and

Veolla Veolla

system. system.

design design

the the

of of

for for

of

only

taxis

part

on

some some

from

other

the

as as

with with receive

sections).

and and

traffic

process.

to to

significant

2.7km 2.7km

15 15

little little

approximately

points, points,

street

Authority

is is

some some

had had

length length

approval approval

are are

routes.

has has

2 2

on on being being

affecting affecting

(Buses (Buses

in in

design design

on on

whole whole

.a

the the

treffic treffic

them them

There There

crossing crossing

only only traffic traffic

street street

The The

Phase Phase

2.7km 2.7km

30km 30km

Highway Highway

representatives representatives

highway highway

of of

specific specific

issues issues

20'10

May May

of

are

in

5 5

in

HMRI.

LBC

Issued Issued

sections

2C70

approval

a

by by

Approval Approval

which which

via via

-km

reserved reserved

of of

specification

May May

Report Report

with with

was was

route

1 1

running running

TCL. TCL.

25 25

1 1

Contractor Contractor

-km

System System

2km 2km

-km, -km,

by by

powers powers

whole whole

undertaken undertaken

Phase Phase

route

Main Main

Act. Act.

street-

route

street.

a a

interface

3 3

Approx Approx

Approx Approx

23 23

on on

28 28

under under

performance performance

as as was was

the the

issued issued

the the

accordance accordance

the the

operates:

__

no no

Activity Activity

255164/:I0031A 255164/:I0031A

or or

and and

system system

the the

Highway Highway

97 97

little little

traffic traffic

some some

of of

street street

conditions

with with

highway

length length

which which

on-

with with

and and

with with

but but

other other

the the

of of

traffic traffic

but but

system system

with with

with with

through through

approvals approvals

3:

the the

and and

is is segregated segregated

interaction interaction

percentage percentage

Tramways Tramways

manageable manageable

Fult Fult

interection interection Segregated, Segregated,

Fully Fully

interaction interaction

running? What What

the the

Activity Activity

design design

system? system?

of of

Environments Environments

of of

Type Type

UKTram UKTram Signing Signing at

be

to

1

with

and

to

to

of

of

no

This

early

with

3

is

no

which

of

only

10.Okm

of

bus

tram

by

issues.

figures

and

sections

12.8km

in

near

signs

inbound

might

Street

with

about planned

operarion.

most

the

SSkm

continually

lack

MacDonald

it

alongside

with

design,

with

the

mixed the

running,

access

tram

October

and

km

congested

separately:

with

is

and congested

legal

Christmas.

to

exercise

Of

1

Hillsborough

large

of

1.2km

likewise.

now

ballasted,

particularly

ballasted,

paved,

underpass, ballasted

viaducts,

West

the

latest).

to

peak,

to

footpath

path

footpaths

ped

access be

degrees

~..~

abused

but

within mostly

Matt

is

road,

restrictions

very

2007 worsening

0.3km

due

but

of

~1

quote

smooth

street

peak

message

enforcement pedestrianised

up

the

weeks

system,

due

recent

usually

can

to

running,

running,

70,

further

this

considering

for

km

which

at

times,

only

only

a

but

Centre)

about2km

a

outbound

manageable

widely our

time,

placed

spring

much

evening

this

largely

peak partiwlarfrom

Middlewood

are

promised,

be becomes pedestrian

of is

the pedestrian onwards, evening At upon route About variable stalled approaching and steadily and For

are 1.Okm relies

Camera enforcement tram authorised only 1.9km

Segregated alongside associated Segregated Segregated

Segregated coming easier traffic, so Segregated categorise track, Segregated Street 2007 and for aswciated Street 3.4km segregation.

26.6km tram

from

(city

(Note

..

~.~...:

~~.

~~-

'•

on

METRO

signals

of

metres

kilometres

MIDLAND

sets

None

1027

0.8

10

NE7

and

junctions

NOTTINGHAM

signal

17

0.5km

32

for

road

has

trem

side

or

Line

short

the

other

over

Red

access

movements.

when

and

controlled

utilises

for

Luas

applicable.

priority

Not

comparatively

streets

lengths

traffic

tracks

through

The

LUAS

aignat

44

are

There

1

PNASE

MANCHESTER

METROIINK

20'IC

May

11.

Issued

aMeel,

2Q10

TRAMLINK

an

routo-km

May

Report

12.

1

0.5

sheet,

Interface

CftOY~ON

Phase

/003:A'LS

/

3

/

Off

Approx

i64

Acuviry

?35

Vatfic

F#ighway

signal

9$

of

other

~etWOlic

anti

with

number

3:

C]UESTION

the

congested

a

are

interaction

Tramways

Activity

Full

within

What

of

UKTram

Signing

or

on

the

2 2

in

be

and

are

the

and

2

has

use

Start

pre-

all

loop,

a

for for

will

for for

priority

fixed

flashes

if if

complex

full

although

much much

confirm

To To

including

detected

prevent

signal.

(and

the the

flows flows

Improved

soon soon

cycle.

approach

5 5

flows

busiest

even

exit exit

the the

a

give give

full full

doors doors

cab. cab.

priority,

innovation

two two

opposing

-start

tram.

to to

Supettram

"Spruce"

mentioned

to

Mucoona~a

too too

then then

proposed

monitor monitor

the

or or

the the

bus bus

to to

There There almost almost

an an

on on

build build

junctions.

was was

the the

junctions junctions

tramstops

pre

an an

demand demand

toll toll

the the

been been

has has

the the

permit permit

the the

after after

flows, flows,

would would

fixed fixed

traffic traffic

-loop -loop

at at

Ready Ready

This This

about about

traffic traffic

understand understand

the the

junctions

close close

go, go,

proposals proposals

All All

and and

able able

An An ".

2

where where

of of

by by

complex

with with

should should

developed developed

I I

to to

of of

demands demands

UTC UTC

plus plus

Mo» Mo»

not not

RT3 RT3

with with

a a

to to

to to

is is

LED LED

loops loops

tram tram

at at

from from

for for

and and on on

and and

ones. ones.

Stagecoach

guided guided

phase) phase)

room room

and and

impinge impinge

ere ere

at at

directions. directions.

towards towards

traffic traffic

'~1

almost almost

original original

junctions junctions

Trem Trem

has has

generally. generally.

sure sure

illuminates illuminates

use use

"stuck

priority priority

the the

red red

input input

Centre Centre

a a

new new

is is

a a

Supertram Supertram

Not Not

passage passage

question. question.

there there

tom tom

before before

3 3

conflicting conflicting

priority priority

system system

available available compensate compensate

Leeds Leeds initially initially

software, software,

buses, buses,

tramway) tramway)

other other

acceptable acceptable

would would

other other junctlons. junctlons.

Full Full

move move

prepare prepare

above above

cycle cycle

exception exception

warning warning

junctions, junctions,

registered registered

amber amber

This This

that that

junctions, junctions,

of of at at

signal signal

UTC UTC

ar ar

duplicate duplicate

tram tram

(triggered (triggered control control

can can

prior prior

City City

operate operate

and and

detector detector

approach approach

giving giving

function function

junctions junctions

SYPTE SYPTE

4

2

not

with

/

— —

of

Metro

of

Swan

UTC

—all —all

Row— Row—

through

TMM TMM

Royal

would

junction

priority

stage stage

sets sets

/linked sensors

Road

CENTRO

sets sets

priority priority

at

Bilston

it it

tram

5 5

capability capability

g

6 6

below:

microsense

at at

VA VA

modified

as as

wave wave

"Greenwave"

from from

call call

tram tram

including including

tram tram

for for

design

Pipers Pipers

Rin Rin

signals

5 5

modified modified

signals signals

as as

borne borne

/Metro /Metro

egwpment. egwpment.

to to

with with Metro Metro

of of

control control

new new

^tre

WCC WCC

new new

p~ p~

lights lights

priority priority

activate activate

Tram Tram

5 5

reduce reduce

Lane Lane

enabled enabled

remaining remaining

signals signals

3.Hurry 3.Hurry

4.S000T 4.S000T

sets sets

stop stop

inbound inbound

Mixed Mixed

~S~and

1.Fixed 1.Fixed

2.Green 2.Green

StreeU StreeU

RTCs

junctions junctions UTC UTC

UTC UTC

Wolverhampton Wolverhampton

Linked Linked

~

principles principles

12

signals

system- system-

in

with

_.

of

been

and

tram

hurry

in

/

full

priority

and

tram

level

UTC

_. _.

a a

-

line

ham

priority

the the

/

has has

as as

tram tram

junction

junction

15

TRTS

via via

that that non

Branch

the the

full full

proceed

existing transponder

junctions

stop stop

combined,

south south

pedestrian

In In

consists consists

available

for for

the the

provide provide

8 8

proceed proceed

demand demand

exceptional

crossing

by by

which which

co-ordinated co-ordinated

northbound

The The

refurbished refurbished

1 1

NTC

for for prevail.

design design

Park Park

of of

are are

and and

time

wntrolled wntrolled

or or

priority priority

advance advance

utilise utilise

by by

next next

ensure ensure

/ /

are are

operate operate

—this —this

Siemens

and and

tram.

tram tram

bar bar

level level

trams

loops. loops.

controlled controlled

controlled controlled

environment The The

to to

crossings

were were

Rail Rail

NCC NCC

the the

unless unless

time time

a a

demand, demand,

fixed fixed

of of

the the

controlled controlled

loops loops

and and

cycle. cycle.

calls calls

provides provides

and and

designated designated

controlled controlled

design design

design) design)

time time

locations, locations,

activated activated

Phoenix Phoenix

60. 60.

under under

equipment

priority, priority,

mainly mainly

system system

cancel cancel

the the -line -line

trem trem

cases cases

junction junction

new new

junctions junctions

signal signal

the the

have have

signal signal

Network Network

signalled signalled

signalled signalled

operate operate

As As

new new

IocaYions IocaYions

9 9

all all

proceed proceed

circumstances circumstances aspect aspect

travelling travelling

optimised optimised

seconds seconds

every every

receives receives

AEI AEI Junction Junction

1st 1st

Loops Loops

tram tram

call

demand demand

and and

stop

hoop hoop

fitted fitted

advance, advance,

locations, locations,

UTC UTC All All

intertace intertace

northbound northbound

equipment equipment

crossings

1 1

alongside alongside

1 1

on on

route

11 11

3 3

southbound southbound

pedestrian pedestrian ~5 ~5

crossings

(unique (unique

Z Z

3 3

for

with

and

of

and

the

has

whilst

32

upon

phase

current

_ _ _

of of

operate

signal

into into

tram.

phase

priority

signal

South

priority

exiting

Line Line

levels levels

junctions,

a a

Line

junctions junctions

Rathdown

Principles

priority

phase

the the

signal junction junction

Council Council

call call

of of

medium medium

Lucas

(RSPG)

at at

new new

the the

total total

low low

based based

a a

prearranged

of of

tram tram

on on

junctions junctions

Council

UTC, UTC,

Red Red

a a

RPA

three three

of of

a a

Traffic Traffic

the the

12 12

Council Council tram tram

tram tram

Green Green

a a

inserted inserted

level level

with with

at at

signal signal

junctions.

Safety Safety

controlled

to to

a a

a a

were were

(high, (high,

level level

County County

City City

is is

are are

whilst whilst

far far

A A

detecting detecting

controlled controlled

Luas Luas

Laogheire Laogheire

existing existing

Luas Luas

Guidance Guidance

high high

~____Y ~____Y

signal signal

signalised signalised

the the

required required

installations installations

The The

point, point,

unction unction

demands demands

Medium Medium

~~~~

which which

inserts inserts

depending depending

upon upon

staging staging

reverts reverts

inserts inserts

priority priority

low). low).

a a

There There

Counl5ry Counl5ry

Dublin Dublin

Dun Dun

Dublin Dublin

isolated isolated

operates operates

Railway Railway

and and

design design

system system

signal signal

The The

junctions. junctions.

6 6

all all

isolated. isolated.

~_~—

control: control:

Veolia Veolia

junctions, junctions,

of of

Method Method

new. new.

controlled controlled

_

_..___....___.----

_,

_ _

_ _

-- --

-

2010

_.__

a

fv9ay fv9ay

as

of of

to

the

with

every

that

the

tram

_ _ _

of of

function

two

the

in

not

phases

between

Issued Issued

so so

all all

after after

changes

albeit albeit

2010

and and

priority,

t t

from from

advance advance

remainder

signalled signalled

functionally

does does

street

arranged arranged

Microsense

Microsense

in in

junctions

is is

signal signal

stage stage

full full

May May stage stage

include include

Prepare Prepare

signals signals

normal

Report Report

the the

dedicated

avoid avoid

street, street,

on-

t t

junctions, junctions,

LRT LRT

to to

25 25

inputs inputs

Stage Stage

the the

with with

to to

systems.

aspects aspects

the the

highway, highway,

tram tram

11 11

with with

OK OK

have have

tram tram

with with

Some Some

to to

new, new,

the the

Traffic Traffic

a a

demand

into into

generelly generelly

controller controller

tramway tramway

the the

Phase Phase

order order

Interface

.___.__.__ .___.__.__

3 3

modified modified

were were

tram. tram.

signalled signalled

Of Of

immediately immediately

tram tram

have have

revert revert

in in

employ employ

everytraffic everytraffic

built built

tram. tram.

using using

the the

are are

TSC. TSC.

Trams Trams

Isolated, Isolated,

controMera.

priority priority

parallel parallel

highway highway

controller controller

tramway tramway

another another

special special

The The

_.---

Activity Activity

255164/;/003/A 255164/;/003/A

___,_

many

__ __

the

of

Highway Highway

, ,

to

99 99

priority

UTC,

. .

how how

of of

_ _

or or

along along

and

usad9

_ _

used used

and and

and and

__ __

methods methods

levels levels

new new

design design

isolated isolated

the the

3:

the the

of of

junctions junctions

methods methods

equipment equipment

i.e, i.e,

ara ara

many many

are are

the the

tha tha

Tramways Tramways

modified:

How How

achieve?

What What

and and

Whore Whore

and and control, control,

principles principles

Activity Activity

route?

controlled controlled

of of

4c 4c

UKTram UKTram Signing Signing _.

over

_.....

aLove

traffic

that

was

of

tuning

main

trem theory,

-

but

that.

The dual

through

included

mods

enforced

in

MacDonnid

road

a road

the

fine

the

nothing

y

of

and

than

regulations

as follows

b

_

the

above,

slight

but

redesign

answered

minorjunctions,

abused.

hardly

trams.

Moth

~~1

much

corridor

Stagecoach

as

this traffic

while

close

are

and

restricted,

drastic

benefiting

been

and

much

tramway

well

the

timings,

think

_....

more mentioned

have major

which of noAhern

by and

artery

route, traffic downgraded carriageway

time

often

Significant development

as

the

SYPTE

Yes

a

the

/

of

add

5

on-

a

the

%).

A41

and

the

Metro

at

%

for

to

sets

of

The

Swan

of

and

fully

5

40

controls

cross

0.8

greater

of

enabled

the

TMM

section,

to

reduced

gated

junctions

(formerly

(nr CENi'RO Lane

the

the

new

junction

the

the

size

lights

Road

section,

merge

Steelhouse

6

from

calling

was

Road

2

be

signal...

(increase

were

interaction

traffic This

on

segregated

of

time

on

integrated

in

along

above

Steelhouse

for to

from

control

and

Road

Swan

full

running

railway

stop),

the

/Royal

junction

junction

stage

Me

traffic

set

sets

replacement

introduced

physical

cyde

ex-

to

the

lights

WCC

new,

new

Bilston B.Complementary measures new new

additional Ettingshall Royal Lane

1 movement wrlailed. Lane street Lane Detailed

diverge 1Junction

included kilometre of

on redesigned

and on introduced Crossing

an segregated section crossing) Yes the opportunity and small

tram the flexibility

p,Ai

junctions

junction

(Wellington

1

9

is

no

no

and

it

new

6

traffic

of

the

or

tOkm;

of

0

in

traffic

—10km;

vehicular

been

determine

interaction too

other

km;

network

was

little

result

2.Skm;

conflict

to

—little

pedestrian

a

manageable

NTC

are

/management

-1

have

refurbished

traffic

traffic

-

with

incidental,

priority

2

as

work

describe

affecting

and

questionnaire.

—some

co-

reduce forme

with

NCC redevelopment with

to

a

traTfic

new

only

routing

tram

to

refurbished

congested

of

2

cycle

refurbished

were refurbished

refurbished.

8 re-

a

wmplementary

junctions

conditions

Examples

segregated

segregated

interaction

1

other

5

8

interaction

centre

traffic

new

refurbished

modified

management

Much works Fully

which new Fully undertaken,

Ves

new numerous Fully

new impossible Full O.Skm; city within Segregated

context increase with

tram. of interaction

traffic traffic,

interaction flow. Total

9

0

to

city

only

trams

were

flow

the

varying

Line

for

signal

reversing

restricting

junctions

junctions,

to

access

at

traffic

(a)

within

(b)

RPA

new

to

Green

by

except

6

movements

flows flow

modified

remaining

Luas

Veolia. banning

traffic

particularly

were

The required degrees. As

all adjusted

installations

centre. Traffic

the

traffic traffic

(c)

within

within

the

__

f

_

are

are

section.

%

70

section

.__...

Veolia

while

oTjunctions

integrated

%

route,

segregated

30

the

were

the

traffic

Capital

up"

the

advance,

sections.

of

with

in

in

"free

the

were

These

to

out

for

Highways

using

wnjundion

cartied undertaken

introduction

space

funding

tramway.

Complementary

schemes

"segregated"

2010

May

bus

issi~etl

-local

highways.

measures

new

2D10

new.

of

non

May

other

Report

were

way

t

25

by

onto

/restriction

above.

Interface

Phase

encourage

3

W

See

Yes

lane

traffic

junctions

255164!!l003;A

ficfivity

each

traffic

Highway

trafic

or

~~

of

'~

desuibed

within

and

corridor

routing

measures

proportion

re-

3:

junctions

complementary

tram

the

of

environments

the

any

are

Tramways

the

Activity

management

number

What

undertaken?

of

above? Were

along

introduced,

of

UKTram

Signing

_...

MacDonald

clearways

Mott Mott

..__.__~.__._ ..__.__~.__._

_

'1'~Yl

Stagecoach

.. ..

urban urban

_ _

_ _

_. _.

Also Also

._..._. ._..._.

_—

was

Full

at

does

max

made

The

for

the

and

Vack

limit)

though

short

on

stage,

would

all all

delays

highway

to to

between

no

treck treck

assuming

etc.

a a

was was

tram

Priority Priority

time. time.

numbers

at at

permitted

or or

engineering'

deceleration

priority

speed

priority priority

times times

system system

the the

absolute

the the

even even

the the

tram tram

with with

with with

of of

based based

speed

SYPTE SYPTE

if if

pedestrians,

assumed assumed

30mph 30mph

in in

design design

the the

varies varies

civil civil

run run

dwell dwell

to to

predicted, predicted,

max max

a a

crossings. crossings.

to to

the the

traffic traffic

tram tram

have have

stop stop

the the

was was

with with

it it

to to

then then

straight, straight,

passengers passengers

fixed fixed

design design

acceleretion acceleretion

maximum maximum

80k/hr 80k/hr

These These

due due

allowance allowance

any any

passenger passenger

speeds speeds

were were

treck'

assumption assumption

that that

curves curves

At At

follow follow

(sometimes (sometimes

not not

given given traffic traffic

degree degree

crossings.

road road

signalling signalling

The The

Crossing

Signalling Signalling

'men 'men

for

six

/

to

the

and

the

a a

all

onto

road

signals

at at

to to

Ciry

call

wave wave at at

trem

and

hom hom

TMM TMM

A454

flows flows

up up

light

traffic

approach

volumes

CENTRO

ring ring

to

above

– –

traffic traffic

the the

and and

traffic traffic

hurry hurry

crossings crossings

of of

any any

and and

and and

Green Green

trams trams

by by

response.

+as +as

headway

traffic traffic

refer refer

traffic traffic

of of

major major

controlled controlled

stop stop

priority priority

allow allow

A4023

routes routes

above

the the

enwuraging

WCC WCC

minute minute

priority.

Trem Trem

Royal Royal

otherjunctions otherjunctions

crossings crossings

inbound inbound

At At

crossing crossing

merges merges

platoon platoon

–none. –none.

which which As As

ahead ahead

Wolverhampton Wolverhampton

Traffic Traffic

platoon platoon

Please Please by by

Council Council

diversion diversion

other other

A463 A463

controlled controlled

reduce reduce

junctions junctions

and

by

of

traffic.

as

street

than

assumed

affected

have

other

NTC.

alignment

specific

on-

tramway.

as as

significant

regularly

was was

trams

route

including

for for

any any

the the

rather rather

moving moving

and

a a

the the

managed managed

removal removal

(except (except

two two

the the

NTC

are are

is is

results results

of of

as as

in in

by by

on on

with with

management) management)

gating

lead lead

was was

– –

issues issues

along along

the the

NCC NCC

above) above)

wntrol wntrol

this this

affect affect

to to

through through

priority priority

trams trams

for for

concam concam

capacity capacity

given given

priority

of of

queues queues

and and

design design

and and

(tre(fic (tre(fic

mixed mixed

tram tram

locations locations

traffic traffic

congestion congestion

the the

2 2

_._

designed designed

described described

Full Full

in in

Priority Priority

follow follow

by by

been been

traffic traffic

signal signal

traffic traffic

locations locations

provision provision

Congestion Congestion

TROs TROs

adversely adversely

Dispersal Dispersal

congeslion congeslion

restrictions restrictions

section, section,

In In

and and

-cause -cause

--

that

-

areas.

fact fact

_,_..

_ _

_ _

the the

would

some some

of of

transport,

commuters

RPA

in in

above.

__ __

congestion

(c) (c)

public public

4 4

_. _.

tramway tramway

See See

hence hence

increased increased

onto onto

Acceptance Acceptance

the the

encourage encourage

Veolia

the

has

much

out

of of

the

has

section

/traffic

city

meaning as as

however

stages

possible

There There

over over

–some

the the

tram tram

UTC UTC

taking taking

tram tram

as as

dialogue

some

to to

treffic treffic

by by

varied

fhe fhe

priority priority

the the

provide provide

At At

traffic traffic

short. short.

progression progression

to to

much much

through through

saving saving

Metrolink Metrolink

other other

movements movements

cut cut

the the

years years

between between

been been

centre.

needs. needs.

tram tram

time time

are are and and

Priorities Priorities

for for

absolute absolute

that that

according according

bus bus

remain.

junctions junctions

Generally Generally

general general

2C10

May May

Issued Issued

2010

problem. problem.

May May

Repotl Repotl

1 1

25 25

specific specific

priority.

a a

Phase Phase

Interface

3 3

Full Full

Not Not

Activ~ry Activ~ry

255164lfl0031A 255164lfl0031A

Highway Highway

levels levels

along along

101 101

what what

and and

with with

assumed?

existing existing

dealt dealt

design, design,

3:

were were

any any

the the

was was

corridoR corridoR

priority priority

Tramways Tramways

Within Within

of of

How How

Activity Activity

tram tram congestion congestion

of of

UKTram UKTram Signing Signing by

an

the

for

is

can

the

in

to

Red

be

50

be

traffic

On

most

the

a

line

major

and

and

actual

tram

illegal

parking

signs,

makes

tram

the Yellow

can

overtaken on

often

presence moderate

which

slippery

an

service

road,

sections

MacDoeald

Only,

or

would

sections

innovation

demark

the

more).

heavy

vehicles

or be

with

by

the

white

vehicles,

the

signs

congested

the

stop

the

to

without

other

bit cause

loading,

restrictions

but

a by

-rails

locations,

crowds

(actually

which

line.

large

cyclist

problem.

signs,

by

to

Mott

later

with

turns

buses,

a

or

Tram

light

on

chevron small

can't

20mph.

a

Stagecoach allow

yellow.

U

taxi

etc., and

approximately

Problems

down

key

'~1 rare

the

times

Also

path

running,

system

"slow levels

time.

weY'

to

within

plus

as

kerb,

white runs

with

at

is

at

waiting

the

standard Entry,

the

cyclists,

making

pass.

partiwlar

On of traffic moves, runs relatively unless used traffic. street worsened pedestrian significant and No tram broken of painted effort DKR paint

sections system disruption reflective occasionally

curves, Clearway some when This and advisory dots accompanied swept thick signs, chevrons the

false

total

model.

upon

of

assumed

track)

%

SYPTE

81

was

original

(based

the

priority

Approx route in

segregated

/

on

red;

aadt.

ring

and

assist lane

hour

+gy3;

kerb

City

A41

distance

TMM

traffic

to

swept

the

12

CENTRO

19000 Metro

aadt.

and

to

suit

as trief

(HMRI

60000

signage

signage

to

signs

953.1

route

hour

and

Surtace

to

surfacing

response

to

kerbs refer Road

dots

around

25000

the

kerb

island

drivers

clearance

+38Dmm) (prior

1048.2

attached

peak

WCC

Bilston

Along works

Please road

Council Treffic Wolverhampton

High aadt See

path markings Raised

and protection counts. approach

Prescribed

Prescribed Yellow requirement) directional Coloured coloured Signing

lane tram

(dke

a

to

/

been

of

has

to

rails.

and

give

for

road

straddle

surfacing

line

signage.

enforce

white where

Overall

replace

tram

to

areas

fencing Radford

path

re-

section

back

approach

to

face.

highway

only

on

system significant

road

solid

generally

NTC

to

signing

designed

difference

on

publicly

lines

traffic

solid

a

on

set

tramway

one

traffic:

other

kerb

swept

concrete

tram

differential

drive

vehicles

have designation

NCC on

level

road

case the which

with

lining

or

areas,

section

some

/stop areas

or

with

red,

signs

crossings,

of

to

blacktop

Hatching

standard

than rail

medium

running,

kerb

some

used

segregated

only

worst

white

lines

special

general

Degree

Road

No

intertaces Mostly

interacts

amount law, Normal In highway Fully been rather

ballasted

Warning markings guard restricted with accessible

Surfaced coloured offset way operation encourage appropriate,

failed lining.

surtaces, lines,

tram

the

have

dots

road

areas

on

signs

All

surtace

tram)

all

warning

and

red

sign)

cross

a

of

at

of

pedestrian

vehicles,

marking

indicate

symbol

markings

RPA

signs.

signs

Pedestrian to

pedestrian

have

use path

to

which

warning

includes

road

diamond

differential.

path

tram

and

lane

installed

line.

applicable.

swept

Not

been markings

yellow prohibition

prohibited Advance uncontrolled

signing crossings colour signs surfacing

Tram

tram

swept

for

junctions

(black

(yellow

Vedia

and

and

markings

markings

Road

Road

signage signage

2090

May

is

but

road

__

lane

on

_

little

paving

Issued

bus

text

2010

appropriate

signage

proportion

to

block

")

May

Re~~iort

with

in

and

relatively

1

high

25

highway

a

set

3/A

traffic.

Interface

that

street,

Phase

3

"Trambahn

bus

of

In markings,

Normal markings

None

Track

amendments

_..___

(

_

__

64///00

1

5 5 5

define:

Acuvlry

2

to

with?

Highway

treific

used

~~2

examine

wntroller

operation

and

parallel

interact

to

are

information

much

/bus

signal

3:

how

system

operation

required

tram

markings

running

Additional

the

segregated

be

/traffic

Tramways

general,

and

Activity

does may Note: Mixed Fully

In

highway

interface.

tram

Shared

of

signing

What

UKTram

Signing

on

by

the

~:;,

The

can

line,

skid

the

the

sign

also.

such

just just

seem

taking

be

picture

lanes

on on

active

more,

to to

based based

vehicles

effective. stop stop

and and

signage

avoid

be

to to

these these shown shown

by by

curves,

reduced

bit bit

is is

~~ ~~

is is

MacDonald

with with

is is

This

measures

it it

rails rails

a a

incidents,

cycle cycle

and and

areas areas

square square

and and

can can

maintain. maintain.

road road

rails rails

and and

". ".

height height

a a

painted painted

signs signs

have have

standard

but but

to to

the the

improvements

path path

-

key key

plus plus

TSRGD TSRGD

with with

Mott Mott

generous.

white white

~''Y'~

side side

contributed contributed

line other other

sometimes sometimes

the the

Sometimes Sometimes

enhanced, enhanced,

to to

paint paint

rail rail

aNhough aNhough

Stagecoach

dots dots

control control

non

signals signals

on on

soon.

too too

delineated delineated

as as

tram.

can can

of of

red red

is is

with with

DKE, DKE,

swept swept

have have

difficult difficult

a a

junctions junctions

be be

certain certain

straggle straggle

encourage encourage

"racing "racing

SW

black black

of of

sometimes sometimes

traffic traffic

Varies. Varies.

but but

fitted fitted

be be

illuminated illuminated

Standard Standard

and and

yellow yellow

to to

area area the the

tarmac, tarmac,

the the

At At as as

and and

will will

innovation innovation

resistance resistance

The The

confused confused

although although

appears appears

such such

a a crossing crossing

loss loss

to to

to to

favoured favoured

~ ~

SYPTE SYPTE

a a

~ ~

/

to

f-

/

779

to

traffic

box

signs signs

to to

yellow

TRAM TRAM

and and

TMM TMM

lines lines

response.

x CENTRO

surfacing

approach

772 772

yellow yellow

on on

1045

red red

place

stop stop

1048.2; 1048.2;

signals signals

543 543

in in

and and

markings markings

Wolverhampton

to to markings.

Council Council

and and

t

above

approaches approaches

WCC WCC

box box

As As

None

TraTfic TraTfic

City City

See See

marking marking

Signage Signage

1001 1001

None None

signals, signals,

on on

Signs Signs

BUS BUS Lane Lane

958 958

at

lane

height

traffic

fora

signs

NO

~

a

tram signs

tram

accesses

turn turn

section.

used

other

atone

some

continues

some

tram

wire wire

sign

signing signing

sign

features features

fhe

for for

no no

left left

within within

some

uses uses

divergence,

only only

some some

busy busy

signing signing

a a

entry entry

off off

Trams) Trams)

with with

tram tram

Have Have

NTC

in in

studs studs

roundel roundel

of of

signs, signs,

No No

used, used,

into into

the the

signage, signage,

crossings),

tram tram

signage, signage,

mark mark

signing signing

used used

tramway tramway

tramway tramway

signs, signs,

signing signing

road road

deterrent deterrent

NCC NCC

track

additional additional

blue blue

signs. signs.

to to

location location

no no

no no

highway highway

(Except (Except

into into

only only

junction, junction,

junction, junction,

blue blue

on on

number number

blue blue

only only

(level (level

been been

warning warning

signing signing

a a

where where

ahead ahead

divergence divergence

another another

for for

reflective reflective

warning warning

Majority Majority

location location

signal signal

Standard Standard

have have

ballasted ballasted

Majority Majority

Standard Standard

have have

pedestrian pedestrian

awareness Normal Normal

ENTRY ENTRY

tram tram

signs signs

highway

locations locations signal signal

have have

Tram Tram

White White

only only

exemptions. exemptions.

to

posts

1

have

and

/

symbol

tram

100mm

All

tram only

signing signing

Excepted

warning

to to

Type Type

Entry.

/deterrent

tram tram

with with

define

deflector deflector

tram tram

No No

each

with with

surfacing surfacing

Pedestrian

diamond

surfacing surfacing

crossings crossings

signs. signs.

define define

pedestrian

RPA

to to

to to

Trams Trams

posts posts

differential.

on on

to to

and and

includes includes

with with

red red

red red

(black (black Excepted Excepted

boxes boxes

entrance entrance

path path

and and

areas.

of of

of of

_._

Entry Entry

applicable

dots dots __

yellow yellow

colour colour

bollards bollards

No No

areas

Use Use

entrance entrance

signing signing

paving paving

define define only only

Use Use

/ /

Trams Trams

pedestrian pedestrian deflector deflector

prohibition prohibition

a a

approach. approach.

signs signs signing signing

shaped) shaped)

on on dia dia

signing signing

Yellow Yellow

swept swept

Not Not

-

_ _

_ _

_ _

Veolia Veolia

and

and

signals signals

markings markings

markings

road road

Signage, Signage,

Road Road

signage

__

Signage

2010

May May

track

when

the

or

blue

with

"tram

that

Entry

of of

(more

Issued Issued

with work work

signals

advanced

of

entry entry

all all

ballasted

signs

2010

sometimes

Way" Way"

"No "No

by by

section

swings swings

out out

ends ends

/white /white

signs signs

"No "No

__

block block

(not (not

entering: entering:

May May

and

Repovt Repovt

supplemented

length length

standard

but but

i i

"Give "Give

highway highway

blue blue

a a

Trams" Trams"

25 25

Both Both

intersection, intersection,

as as

reaching reaching trams" trams"

trams" trams"

signage, signage,

running running

when when

/white /white

only" only"

signing signing

and and

.

Phase Phase

red red

lnterFace lnterFace

3 3

~ ~

Uack,

before before

segregated segregated

None None traverse traverse

street street

leaving. leaving.

except except

supplementary supplementary

supplemented supplemented

"tram "tram

Standard Standard

highway highway

"Stop" "Stop"

"Beware appropriate

Treated Treated

tram tram

by by

TSRGD)

except except

successful successful only' only'

successful) successful)

Standard Standard

Activity Activity

255164ll003;A 255164ll003;A

Highway Highway

~3 ~3

~ ~

public

tram

~:.

tram

and and

/tram

~. ~.

3: 3:

/entering /entering

/entering /entering

controlled controlled

transport transport

Tramways Tramways

highway

Leaving Leaving

Leaving Leaving

crossings

crossings

Signal Signal

gateways

Public Public

Activity Activity

of of

UKTram UKTram Signing Signing is

or

et

the

to

a

and

dual

on

next

exit

will

not warning

a

open

the

allow there

I tram

has

signal

section

entry,

is

allow

LRT

points

the developing

MacOhnatld

Highways

minute,

on

junction it

To

entry for

points

has

non-

a

was

aspect depot no

information if

prepare

utilising

by

of

start

indicate

doors a and

trams,

it

indicator.

consultation last

over

depot

in

above

to

to

in

SCC

Moti

east

only

answer,

~1~ although

pre and

in with

pedestrians

for loops use

inbound

which

and

or

power

signals is

Stagecoach

approach

to

the

action

until

leave

further

with

points on tram

for

Also

by proceed

and

driver

junctions.

LED

HMRI.

photos

depot

days. a

signs

LRT

off,

No

NOTE:

signs

difficult

gather

Red minimise SW and RTS

mainline SW prompt However, five Dept

set

Aufhorisatlon tram assist route with enable and The are detection signal time. demand oui6ound designed short approaches, indicator

approach,

inbound

jointly function,

SYPTE

/

as

at

of

to

keep

alert

20

tram

botlom

779

and

on

with to vehicles

Both

TMM

(sign

box

A)A

signs

to

"Stop

sign

notice

inside

CENTRO

signal

of

with

saying

operation.

signs

use and

or

Ettingshall

of

from

approx signs in

lines

Look

(red

advance

silhouette)

963.3 diamond

for

roads line,

for

976

yellow

bar

attempt

clear

cycleway

772

traffic

in

queue

warning

fo

Way' (prescribed

at

~ speed

and

inbound.

of Indicatore

Way at

to

tram also

7011

and

side

stop

not

midpoint

WCC

highway)

Signs Ways vertical

Tramway signage

Give route: Tram signs

with 976 crossings lines On to Wolverhampton signs tram marking background) response metres Do °Give diverge See queuing boK' Special

LEDs Point lights 8)Information edge the tertiary type

"Tramway

a

with

help

rails

way

tram

ways"

driver

of

sign

rather

rether

to

lines

signing

cyclists

the

would

cyclists vehicle

give

both

way tram

proceed.

allow

level signs

LED

a

overtake sign

on

mirrors

we

/cycle

if

white

stops

to

Ways

that

wntusion

to

warn

for

NTC

are

look

give

neM

roads

/tram

to

assist

highway

are

all

tram

which —

Give

control

warning

to

detect

NCC

side

but

surtace

at at

signals

tram

overtaking drivers

have

tram

mounted

prevent

prepare

e.g.

at

to

to

route

loose

Indicators

"Tramway

driver

bulb,

yellow, signals.

pole

standard

signs

other

supplementary

commenced

signs

Minors

LED

Slipper

judging

No

Blue N/A Pedestrian

Use

wntrolled signs

generally

and signing A. has Standard

signs prefer driver (Static) C. stationary manoeuvres.

and Point 8. and tram could along

than than in

tram Two

"tramtrecks"

a

/

the

in

white

to

/

are

road

each

at

point

/

Ways

The

stop

lit)

road

trem

lights

have

have

the

on

One

is

indicating

markings

when Other

block

posts

the

tram

the

red

Both

signs

generally

Voltage to surtacing

temporary

(signalised

Crossings

(Black

is

(750DC)

RPA

a

crossings __ road

markings Intelligent

yellow into

signs

successful

flash

unwntrolled

advises

include

contributed

incorporate

aspect

not

")

/signals

shaped)

of

incidents.

incidents.

High

/red

beyond

"Look

..

on

sign

box lines

( deflector

detailing

red

1

Lane

(flashing authorised.

been

which

also

crossings.

which

unsignalised)

_

of

Trams

permanent

junctions

pedestrian

Generally

generally Danger

power signed

surtacing

Signs All indicators,

diamond for

markings measures Type symbol and been yellow motorists approach. All

have

observed, installation bollards example use sign, reducing studs have tram line, surface reducing

traffic embedded

Tram

_

__

Veolia

are

are

The

and at

were

These

is

for

believe

for

other

6e

they

I

line

trams

by

the

particularly

tram

but

into

useful

signs remain and system. may

in

off.

level

for a

-wags

stop

limited.

liked

been

when

operation

a

the

set

is

sites,

wig

when

pedestrian

at

of

___

to .~

not

serve

systems,

_

Controlled

crossings

Many

Manchester

pedestrians UK Manchester visibility purpose,

have pedestrians where pedestrians unsure developed several generally tramway sitting orange

incorporated they

going

20'10

_...

at

all

A4ay

we

but

with

_

Way

are

road,

__

twa

street

as

most via

the

(HMRI

...

and

the

_

advance Tram

specially

trialling

signs"

reversing

both

an

fhe

trams"

on

but

signs Issued

they

Give

Entry

stop

signage

all

on

major

specific

with

erected

207q highway

_..._..._.._......

information

TSRGD;

Section

signs,

from

HMRI

"tramway

highway

locations

also

or

No

path

from treat

"look

by for

authorised,

the

Currently

perspective).

the

via M2y

junctions

Rrpori

(4or

effective

are

several

have

ways"

blue "except

two

way

~•

message

apart

es

authorised

coats t

type

of on

because

authorised

25

parallel insulators,

level

_...__

restriclions, Tramway

markings

Swept

we

signs

—not

"Attention"

are

with

indicators,

in

both

signs

signalled

have

give

-

'~

only

covered

Interface

Phase

3

Standard crossing tramstops. ground ways" plates. crossings look Non unnecessary crossings. warning points,

recommendation operational Coast Speed with point

section accompanying intersections approaches,

signs, not signage highway plates

tramway There but where

used authorised HMRI,

markings? Only also Insulator signs enforceability); seemingly

specially TSRGD

"variable

_..._.

Acuwiy

255164i;l003;A

Highway

signals?

104

compliant

tram

r

-

and

specific,

and

Way'

non

site

controlled

pedestrian

3:

and

highway"

signing

any

crossings

"Give

markings

priority

"off

highway

there

..

Tramways

Activity

Off

tramway

Other

operation

Other

Are authorised

signs,

junctions

signing

of

_

Innovative

UKTram

Signing

s.y

off

this

few

after

for

and

of

.- .-

m

will

was

on

no

1 1

you

must

Fitted

or

front

on

X

rails.

tram

start

without

white

the the

a a

If If

a a

depot

yellow

will

been

just just

red

partly partly

road

has

stopping

". ".

SCC

road

with

this this to to

as

"loss "loss

advisory

exactly.

".

signs signs

slippery

proceed.

a a

the the

pass pass

the the

to to

have have

points

in in

at

Believe Believe

of of

for for

SCC SCC

by by

and and

aspect aspect

MacDonald

align align

the the

the

trams trams

reinforce

location location

YeOow

by by

but but

standard

Fitted Fitted

SCC.

extinguishes

remind

between

(in (in

have have

why why

not not

". ".

where where

to to

points

can can

being being

a a

(often (often

points points

such such

to to

identity identity

lead lead

approval approval

X X

period period

ready ready

signal. signal.

tracks.

"rails "rails

and and

to to

oHen

by by

the the

to to

error error

and and

right right

which which

serious serious

a a

After After

X X

to to

Mott Mott

position position

sign

correct correct

you you

the the

at at

like like

and and

straddle straddle

~1

accidents

tarmac tarmac signs signs

fhe fhe

as as

request request message message

must must

any any

lines lines

for for

Stagecoach

of of

door door

received, received,

encourage encourage

sections sections

weY' weY'

Would Would

approved approved

a a

signs signs

facing facing

to to

first first

would would

above

instigated instigated

is is alongside alongside

to to

drivers drivers

the the

approval, approval,

"RTS" "RTS"

red red

platform. platform.

points points

tramstaps, tramstaps,

pass. pass.

rear rear

marker marker

control control

See See

after after

was was

warning warning

have have

when when triangle triangle

accompanied accompanied

HMRI.

20mph 20mph

Some Some

construction) construction)

consultation consultation

any any

Supertram Supertram

margin margin

position position

platforms platforms

or or

the the error error

a a

marker marker

drivers drivers

Also Also

line, line,

stopping stopping

function function

procedures, procedures,

segregated segregated

On On

without without

these these

Developed Developed

Certain Certain

traffic traffic

tram tram

Unclear Unclear

HMRI HMRI

lines lines

The The

"Trams "Trams

done. done.

construction.

When When

not not

illuminates illuminates

have have

and and

direction direction 6hOW.

elapsed, elapsed,

change, change,

entry entry

compliant compliant

"intergreen" "intergreen"

SYPTE SYPTE

/ /

yellow

TMM TMM

a a

CENTRO

merge merge

with with

o

ensure ensure

WCC WCC

marked marked

To To

~ ~

helps helps

and and

NTC NTC

priority priority

delay delay

NCC NCC

achieve achieve

Minimises Minimises

A) A)

tram tram

effective effective

and and

very very

signs signs

RPA RPA

are are

lane lane

markings markings

Tram Tram

Veolia Veolia

x~

- -

..

~r ~r

,; ,;

20'10

May May

,

Issued Issued

r~ r~

2010

May May

Report Report

, ,

t t

v v

25 25

~. ~.

above

;~t ;~t

Phase Phase

Interface

3 3

See See

Activity Activity

255164/N003/A 255164/N003/A

their their

Highway Highway

~5 ~5

for for

'~ '~

and and

effectiveness?

reasons reasons

the the

3:

~, ~,

their their

are are

and and

Tramways Tramways

use use

What What

Activity Activity

of of

UKTram UKTram Signing Signing all

to

driving

needed

affective

they

trams.

although

MacDonald

yes cars

relate

or

would

most

that,

issues

Mott

only

~1

Drohihit

the

signs

Stagecoach and

cases

discussion

situations

prevent

be

above.

means

tram

to

entry

specific

some

some

See

detailed

In No

might

on

vehicles

in This

therefore sign

_onto

SYPTE

of

/

the

to

well

lot

in

to a

the

at

for

of

to

will

a

when

present

/bus

after

TMM

at Metro

try

very

with

operation

for

mast

CEN7R0

wntrollers

traffic

of

time.

was

box

of

diverging

UTMC

given clear

This

upgrade

did

for

DfT

available

by

tram

on

unlike

in

approximately

use

signal

for

to

that

complement

controller

by

authorisation

yellow

Works

We

compa661e

approval

our

kept

yellow

to

lens known

LEDs

approval

Department

but SCOOT

future

is of

of

after

commitment

trem

need

years

tramway

WCC

box motorists

markings

Necessary respected

None. Wolverhampton.

trams. other

of refused `~hicles

the Special lights seek end considerable Trensport UTC lane

network near None require

"bus" replacement NO from we

10 Yes white replace

Yes incorporate standards.

time technology

if

/

to

to

this

of

rail

at

that

both

tram

/

data

used

been

This

not

the

of

the

traffic

no

other

tramway be

red

are

/signs

-

trams,

a

do

locations

have

by

confusion

Rail

issues

sign,

HMRI.

understood

non

use

Highways

presented

cross

NTC

nearside ownership

advice

beneficial

we

there

lights

movement

both.

to

to

cannot

a

location.

other

via

only

except

own

be

was

the

claim).

for

deemed (although

displays

better in

alleged utilise

this

NCC

has

Network

resolved

one

our

granted green

where

granted

of

to

signs

tram

not

plate

Dff

unable

this

in

use

Railtrack

be

compliance

or

would

through

to

crossings,

and

drivers

to

the

against

the

analysis

are

Cyclist

entry Camere

No

Yes

Yes

May

No

No

generally

B)

distinguish

C) riding

stop A. Dept B. NTC sign Due C. required was Authorisation because yellow signals We

level

alongside A. train risk No

A.

support with proven C.

option is

locations cannot

than

_

road

__

approval

T2nsport

of

for

of

and

RPA

observed.

improve

types

Authorities

paving

to

widely

Local

Department

and

Consultation

of and

Reviewing

vehicles

deterrent

effectiveness.

Veolia

2D~10

to

by

to

May

vnth

the see

a

not

in

sign

to

trams

plate

or

show

(not

by

except standard

sign,

than

issued

to

prohibition.

currently

appears

like

signed

seem

2010

ahead,

above

highway

a it

warning from

standard

be

"JCN"

except Entry

Only

metres

enforceable

signals

intersections

as

as

May

to

Report

with

in

would

the

the

No

agreement

improved

1

practice

effective

sign.

25

Entry

of

junction

Tram

to

we

motorists

traffic

be signage

derived

legally

— advance

comments

HMRI

No

a

Interface

highway

more

Phase

authority

Via

be

understand

which

highway priority

authorised, official the replacing not Yes necessary The distances

signs routinely). variant could

regard either for trams See TSRGD

Achvlty's

255764/;/003;A

Highway

why?

required

O6

~

and

/markings

and

used

required? process

further

signs

3:

be

the

any

any

authorisation?

was

cannot

there

there

Tramways

gain

Activity

What

ro

Are developments

that

Are

of

UKTram

Signing

µ

is

on

no

off

oft

no

20

into

they

sign

5

this

is is

in

no

City

the

20

and

to

to

Park

and

they

might

mins

service

traffic

mins mins

plate.

that that

but but

and and

mina mina

used used

tram

give give

only only

In

certain

service service

entry

to to

20 20

with with

several

City City

where

have have

a a

sign sign

there there

where where

10 10

peak peak

that that

Supertram

to to

MacDonald

10 10

be be

at at

between between

no no

routes.

or or

overlap overlap

rather

as as

Meadowhall.

PTE, PTE,

service service

tram tram

are are

off off

this this

problems problems

the the

meaning meaning

peak peak

:See

prevent prevent

a a

they they

Herdings Herdings

believe believe

sections, sections,

contentious.

peak, peak,

section section

can can

in in

used used

and and

be be

and and

to to

along along

I I

every every

relates relates

routes routes

Mott Mott

in in

on on

is is

to to

for for

fashion fashion

main main

and and

blue blue

the the

exemption exemption

used used

varies varies

but but

mins mins

Stagecoach Stagecoach

where where

'1~1

not not

routes routes

The The

There There

City City

ARE ARE

peak peak

cause cause

on on

route route

agreement. agreement.

signs signs

an an

be be

use use

paved paved main main

30 30

prosecution prosecution

used. used.

T

mins mins

peak

Hillsborough Hillsborough

mins mins

Gleadless

irregular irregular

mins mins

times times

~0 ~0 overlaps overlaps

Deak. Deak.

and and

two two

service service

HEADWAY HEADWAY

response response

These These

to to general general

off off

level level

comments comments

Generally Generally

each each

should should

their their

arise. arise.

highway, highway,

provision provision

danger, danger,

any any

have have

could could

signs signs

enforceable enforceable

locations locations

system system

only only

Instead, Instead,

continuing continuing

are are

entry entry

can't can't

segregated segregated

S` S`

20

City

City

Off

— —

Off

Off

Off

Centre

Centre

City

City

to to

City

City

City

City

to to

mins

to to

mins

mins

to to

to to

to to

mins

minx

mins

mins

to to

to to

mins

City City

mins mins

mins mins

Ciry Ciry

mins mins

mins mins

Peak Peak

LEVEL

Park Park

30 30

Park Park

Peak

30 30

to to

to to

30 30

— —

20 20

20 20

—15 —15

20 20

—15 —15

—15 —15

— —

—10 —10

—10 —10

SYPTE

-10 -10

— —

— —

Bridge Bridge

— — Off Off

— —

Bridge Bridge

mins mins

mins

Herdings Herdings

mins mins

Peak

Peak Peak

Centre Centre

Hallway Hallway

Meadowhall

—15 —15

Main Main

Peak

Peak Peak

Centre Centre

Peak

Interchange Interchange

Middlewood Middlewood

Peak Peak

Centre Centre

Peak

Herdings Herdings

HEADWAY

Peak Peak

Centre Centre

Meadowhall

Malin Malin Centre Centre

Halfway Halfway

Middlewood Middlewood

—10 —10

Centre

Interchange Interchange

Centre Centre

Centre Centre

FREQUNENCY

SERVICE SERVICE

12

/ /

at

~

11.30

or or

to to

10 10

day/

6

TMM TMM

10.00

service,

p.m.,

eMras

minutes

the the

6.30 6.30

8 8

hequency

hour hour

frequency frequency

supplemented

19:00, 19:00,

11.00 11.00

minute minute

— —

times

to to

Sundays Sundays

6 6

headways headways

peak peak

minute minute

WCC WCC

minutes minutes

minutes

min min

by by other other

give give

evening evening

p.m. p.m.

07:00 07:00

Weekdays Weekdays a.m. a.m. throughout throughout

8 8

frequency frequency

of

/

claim)

no

of

sought

situated

common

common

common

wmmon

service

service

service

red red

service

15

service

service

service

service

common

/signs

common

service

this this

common

service

common

common

contusion

not

because because

was

min min

min min

min min

min min

min min

min min

min min

min min

use use

min min

min min

min min

min min

min min

min min

min min

min min

min min

min min

min min

where where

will will

NTC

lights lights

15 15

location location

10 10

1 1

5 5

10 10

to to

10 10

15 15

5 5

5 5

6 6 30 30

10 10

(although (although

20 20

10 10

20 20

10 10

20 20

combination.

support support

DR DR

for for

potential potential

Friday

NCC NCC

to to

weekdays, weekdays,

analysis analysis

Railtrack Railtrack

Authorisation Authorisation

this this

green green

1700: 1700:

evenings

1100: 1100:

Levels:

1800: 1800:

0000: 0000:

090020 090020

1500:12 1500:12

unable unable

The The

0730: 0730:

drivers drivers

— —

highway

or or

— —

indicators indicators

— —

— —

— —

—0000: —0000:

—1830: —1830:

—1000: —1000:

— —

Dff Dff

branches, branches,

branches, branches,

branches, branches,

branches, branches,

/risk /risk

branches, branches,

branches, branches,

branches, branches,

branches, branches,

branches, branches,

granted granted

are are

alleged alleged

the the

train train

minutes minutes

1100 1100

corridor

wrndor

two two

1800 1800

Sunday

0800 0800

corridor

two two

cortidor.

two two

two two

Saturday

0900 0900

corridor

0600 0600

1830 1830 corridor

1500 1500

two two

Monday Monday

two two

corridor

1000 1000 corridor

two two

corridor

two two

minutes minutes

0730 0730

two two

0600 0600

Service Service

presented presented

yellow yellow

5 5

We We

points points data data

Note: Note:

means. means.

alongside alongside to to

the the

on on

and and

authorise authorise

RPA RPA

minutes minutes

5 5

— —

Veolia Veolia

hours hours

headways headways

Peak Peak

the

been

or

of of

/ /

has has

Hough)

sections

addressed

and and

copy copy

be be

two two

(a (a

Roger Roger

to to

to to

'i

next next

GMPTE GMPTE

by by

questionnaire questionnaire needs needs

GMUTC GMUTC

sent sent

The The

2010

May May

-7

and

to to

and

21 21

(07:00 (07:00

6.5

beyond

interval

issued issued

New

minute

the the

Arena Arena

2010

and and

minute minute

5 5

on on

branch branch

service service

street, street,

section, section,

headways headways

branch branch

May May

minute minute

RepoA RepoA

during during

branch.

'i 'i

Off Off

25 25

10 10

peak peak

between between

from from

Croydon Croydon

interval interval

average average

street street

/hour, /hour,

the the

Phase Phase

Wimbledon Wimbledon

Interface Interface

19:00). 19:00).

3 3

minute minute

Beckenham Beckenham

Addington Addington

central central

Arena, Arena,

on on interval interval

varying varying

>Sminutes >Sminutes

daytime, daytime,

daytime daytime

On On

trams trams

Activity Activity

255164/;/003;A 255164/;/003;A

Highway Highway

~7 ~7

~ ~

frequency,

and and

levels, levels,

3: 3:

service service

Tramways Tramways

headways

Tram Tram

Activity Activity

of of

Operation

System System

UKTram UKTram Signing Signing not

for

road

the

usage

MacDonald

for

priority

on

Supertram

top

VA

possible

passengers operator

full

S

Mott

~1

are

Stagecoach

from

where

million

junctions

rising.

facilitate

13.5

and known Ltd).

Most

(Stagecoach

traffic

tramway To

trams

some

in

used,

Magnet

with

points

only

also

SYPTE

of

is

Loops.

this

but

aspects

VIS

connection switches

a

to

/

is

on

line

but

give

at

for

"on

of

tram

a

metric as

to

all

the

street

linked

stops

data

place

street

the TMM

highway

annum

as

system

—this 0.5

CENTRO

call

based

above,

single

for

at

trams

operate

in

off

throughout.

crossing

on

wntrol

best whole and

are with

30mph

on

system per West

of

Central give

as

circuits. on

sight

available

obtain -

50km/h

interlocking

taken

detection

hurry

the

max

fo

prepare,

sight

limit

lights

Vecom

section

is

to fitled

at

requirement

required

lights on

vehicle than

hours

!rant

Centro

/h

centre on

priority

already

of

treck

50kmlh

million

with

problems

trams SCOOT

explained

WCC

order

Need

Bromwich

no peak Drive

other

5.6 from

Line Railway tramway! kilometres other speedometers! with Speed taken tr4am UTC for priority UTC

approximately

70km UTC detection and traffic using As in

Considered Positive HMRI Philips VA facility full streeP' tram

trams throughout employed thiswas transponder

loops

/

for

is VA

or

still

the

exit

fixed

speed

loops

VA

day

UTC

are

common

common

sight,

service

to

street

section

journeys

per

UTC

Max

we not

of

deliver

use

street

call min tram

min

off

min

answer

is

NTC

line

to

by

off

50kph.

period.

line

7/8 15

to /h.

regard

30

million

hurry

restrictions

reasons

data

environments

-up

NCC operate

road

single

sight,

9.5

however,

with

50km

remaining

signalling.

passengers transponder

2300:

to

on other unable

of

using

TRTS

detected

ramp

/

usage

/h

is

SCATS

opportunity

the

branches,

branches,

year,

specific

line

street

tram

tram

the

locations

1700 per corridor

corridor 30,000 two

available. in two Currently Pedestrian Stop All BOkph,

15kph, by

site

access NTC on BOkm Tramsoperate UTC

priority

time question Best

Loops

on 2

Trams

at

12

peak

fhe

to

during

to

Red

minute

the

stopline

question

operate

~4(b)

Luas

15

the

decision

used

movements

generally

to

installation.

a

the

During

06:30

million

on

RPA

Lines.

are

outside 2005

with tram

frequency

rams

demand,

from

of

signal

clariy

22.2

generally

T

hours.

Authority

loops

Green

response

peak

clear

minute

each

Trams hours. months

passengers the operate

carried Please

and 5 00:30

frequency

Local See

Four prepare,

at and

--

-

detect

System

- /h

Automatic

to

operation

_

/h

in

50km

Veolia

used

30k

are

Location

70km

AVLS

million

Max

Urban

22 Average

Methods

SCATS

Vehicle

trams:

U

201

/h

May

as line

off

of

50km

loops

/h

stop

of

Issued

direction,

Junctions

junctions

Line

2~'IO

three

alignment.

80km

at

is

restrictions

maximum

May

for

Report

each

and

have

demand, 1

in

generally

25

loops

with

with

tramstops. exit

Interface operation

street

Phase

3

All necessary Sight,

No street,

speeds

on

normally

Vecom

and

advance

?

.and

Actimry 25516477l0031A

GPS

Highway

above,

/

in trams.

to

of

system?

~$

which

usage?

~

trams

various

lops

and

_

of

operating detect

the

stop

SCATS

to

within

described

which

methods

use

reference

choosing

3:

and

UTC

configuration

and

normal

and

for

used

and

with

through

or

under

VA

Tramways

Beacons

Activity

Patronage

control operate

Systems environments

including environments?

speeds

Are operation areas? Methods Reasons

Location

of

/

UKTram

Signing

of

and

to

will

to

a

most

no

time

tram

runs

line line

so so

applies

is is

full

At At

together

road

the

loop loop

although

and

junction

following

a a

except

signal signal

by by

This

a a

/

arriving

be

relays

movements

MacDonald

phase. phase.

loop

phase phase mainline

limited limited

at at

This This

exit exit

approaching

"windo~J'

exiting exiting

problems problems

with with

the the

this. this.

there there

had had

are are

cross cross

awareness delta delta

exit exit

a a

LRT LRT

previous

procedure procedure

by by

phase phase

can can

controller

an an

with with

cycle cycle

the the

segregated

and and

mainline, mainline,

but but

a a

trams trams

in in

by by

tram tram

tram tram

tram tram

this. this.

Moll Moll

a a

can can

the the

and and

traffic traffic

same same

conflict.

some some

~1

avoid avoid

have have

junctions junctions

-way -way

stopped. stopped.

Stagecoach

and and

meet, meet,

the the

depot depot

a a

conflict conflict

tram tram

3

by by

together together

with with

delaying delaying

wired wired

the the

1 1

priority priority

be be

window window

the the

most most

permit permit

the the

in in

bar, bar,

tram tram

Driver Driver

priority.

should should

change change training training

mainline mainline

detection detection

will will

junctions, junctions, causes causes

should should

has has

detection detection

prevent prevent detection detection

At At

entrances, entrances,

routes routes

sight sight

where where

at at

opposing opposing would would

opposing opposing with with

where where

to to

to to

extended extended

crossing crossing

the the or or

Opposing Opposing

close close

Hard Hard

Answered Answered

sections

points

SYPTE SYPTE

and and

wntrol wntrol

locking.

to

to

first

St

/ /

in

no

time

clear clear

or or

cycle

except except

setting

as as

St

wired wired

and and

wave

owned)

Priestfield

TMM TMM

and and

signal

junctions junctions

side

CENTRO

one one

signals

tram

response

usually

controller

Priestfield

same same

over over

opposite

hard hard

serve serve

connected connected

microsense

departure

otherwise otherwise

priority priority

at at

Royal Royal

from from

in in

green green

stop stop

is is

tram tram

road road

kept kept

can can

/diverge /diverge

Analogue

Road Road

and and

(Metro (Metro

between between

are are

first first

order order

up up

treific treific

call call

3 3

crossing

priority priority

Wolverhampton

this this

Council Council

outbound outbound

Ring Ring

Metro Metro

that that

WCC WCC

merge merge

Merge Merge

reverse reverse

Georges Georges

apart apart

signal signal

Trams Trams

Standard Standard

movements movements

direction direction

between between

functionality open open

has has

signals signals

come come

Georges, Georges,

tram tram

of of

Inbound Inbound

Band Band

WCC WCC

and and

cabinet cabinet

Loops Loops a a

Hurry Hurry

City City

at at

See See

in in

demand, demand,

/

via

held

to

100

tram tram

2nd

by

data data

so).

are are

signalled

for for

call call

2 2

wired wired

by

or or

and and

are are

but but

Tram

overwrite

trams trams

between between

following following

tram tram

NTC NTC

hard hard

if if

all all

priority priority

controlled controlled

250m 250m

st st

voice voice

will will

t t

moves moves

for for

—one —one

no no

locations locations

NCC NCC

one one

and and

via via

loops loops

for for

is is

but but

following following

(within (within

elsewhere

system

priority priority

certain certain

street street

Description Description

previous previous

close close

at at

Close Close

signalling signalling

rules rules

Conflicting Conflicting

on on

Vanes Vanes

tram

radio radio

Communication Communication

control control

controller

Full Full Inductive Inductive

locations locations

the

trams

each

panel

of of

traTfic

drivers

of of

is

within

proximity

by by

System)

are

within

or or

of of

room.

traffic

board board

radio

point

nature nature

status status

lines,

and and defining

/following /following

linear

system system

between between

by by

by by

RPA RPA

On On

and and

movements

occur occur

areas areas

driver driver

(Automatic

and and

control control

Location Location

up up

the the

with with

regulation regulation

This This

to to

the the

existing existing

depots, depots,

leading leading

AVLS AVLS

advises advises

Tram Tram

controls. controls.

!o !o

signals.

indicators indicators

controlled controlled

generally generally

unconnected unconnected

the the

Due Due

terminus terminus

aPPosing aPPosing

two two

backed backed

and and

interaction interaction

assists assists

tram. tram.

VehiGe VehiGe

An An

location location

is

not

sight

are

of of

case

either

(but (but

Driver Driver

help through

unique

in in

in in

trams trams

Open

line line

moves

in in

movements

console

i.e. i.e.

ways:

stop stop

with with

handbook

~

comms comms

using using

tram tram

tram tram

depot depot

Veolia Veolia

Radio- Radio-

performance

call

display— display—

channel

to to

and and

failure

tram tram

timetable.

dealt dealt

to to

following following

controllers

of of

emergency emergency

controller controller

with with

at at

different different

be be

rivate rivate

Whole Whole

gy gy

procedural, procedural,

radio radio

Via Via

Open Open

Digital Digital

Text Text

3 3

AVLS AVLS

P P

deal deal

Close Close

under under

instruction

3. 3.

situation

1, 1,

training training point point

2, 2,

Opposing Opposing of of

can can

broadcasts

of of

5) 5)

a a

4) 4)

3) 3)

against against channel channel

aware aware

1) 1)

2) 2)

__

20'10

AAay AAay

in

the

at

a

will

first

has

tram

TSC

route

loop loop

Vewm

by

local

an

voltage

the the

junction.

the the

issued issued

inputs inputs

first first

tram.

traffic

to to

tram tram

software

2010

the the

the the

exit exit

via via

demand, demand,

by by

each

transponder

the the

to to

movement

the the

until until

clear clear

the the

where

in in

separate

driven driven

first first

via via

controller controller

done

junctions, junctions,

IWS IWS

May May

the the

(generally

a a

Report Report

/ /

ideal).

is is

read read

will will

subsequent

1 1

that that

PLC PLC

demand demand

Intelligent

tram tram

treats treats

the the

25 25

as as

from from

priority

bespoke bespoke

all all

if if

loop loop

cleared cleared

hom hom

advance advance

some some

but but

controller controller

setting, setting,

(Not (Not

intelligent intelligent

direction direction

been been

included included

via via

at at

TSC TSC

contacts contacts

yet yet

an an

tram tram

/local /local

Phase Phase

previousjunctionj.

Vecom Vecom

Interface

3 3

Microsense Microsense

advance advance

ignore ignore

has has

that that

Provided Provided

as as

not not

directly directly

stage, stage,

direction direction

opposing opposing

The The

PLC. PLC.

Waystation Waystation

signal signal link link

free free

PLC PLC

Tram Tram

message message

to to

Full Full

Route Route

with, with,

prepare prepare

automatically automatically

applicable, applicable,

code code

derived derived

the the

Activity

25516A/:/003/A

with

with

Highway Highway

deal deal

above?

deal deal

~~9 ~~9

are

and and

trams?

systems

each

system system

movements?

/traffic

system system priority priority

described described

of of

the the

the the

3:

tram tram

within within

trams trams

following following

does does

levels levels

does does

Tramways Tramways

How How

close close

How How

opposing opposing

between between

controllers? Communication Communication

achieved achieved What What

environment environment

Activity Activity

of of

UKTram UKTram Signing Signing a

2

is

to

do

to

fhe

get

go

the

to

up

as

pass

t

we

used

in

held may

the

the for

cancel

has and to

traffic

be

tram

routes

was

not

one

due

cycle

they

order, A

it

tram phase

the

order

act

with

also the

be late

2

be

tram

if

normally, through

control

"miss" or

a

the

back

ask At

then

usually,

during

MacDonald

will

wrong

on

if

drivers this road tram

have

the

of

demand

a

will

next

junctions

later

too

the

if

to

will

above,

station trem

can

a

a This

wnhol ask

that

a

permitted cycle.

opposing

delay.

Uam

second

is

below) a

corcect wrong

although the

for

will

be

on

and

to

the

again,

(When

a approach

window,

for

slow.

the

so

through

Moti

ba

full

recognises trams and

detail call

~~1

~evertive

the

curser

tram UTC

loops

the

UTC,

aHer junction failure

following

move

is

of

the

the

because

and However,

input

caution.

a on

wad.

wait

in

because,

opened, in

that, may

the

room.

othenuise a (see

will

when

loop in

complex in

have

further

junctions, place

than

trams the

to

wde up.

it

will a

or

have 3-loop

loop

other

junction

in

phone

track

running

the

junction.

permft

complex controller some arrive if because through arrive Following cycles. priority

function tram many avoid have means passed,

following through arrives direction late, through back Usually

the extend The

(Gleadless) aspect

one passage permission the using

otherwise duplicate not is system control would Other to day, direction they also

a shows over authorised

to system e~Areme

so

-•

of

they

by

tram

will

tram

of

each

of

driver

over

then

a

route

stage

as

can

set

from

in

contact

Tram

when

again. is stage

demand

by

set

control phase

CCN

instruction

through

Metro

and They

—out

response

The

tram see

then

tram

p.m.

cleared centre

UTC Next

(again

time by —tram

trams

or

of

go soon

any

remote

following

controllers

there

Tram

new

stage

UTC

sequence space

to

can

SCOOT

demand

ended type) a

off. operation7.00

UTC lights

drivere of

down

wntrol

and

revertive Me

being

short

Wolverhampton

to7.00

Council (and

tram

cross

think

tram

DAIDLAND

above

leave

covered

wrong

phase

needs

detection Single

traffic sitting

Tram after close

junction, to separates City

have detected If See personnel first still

the Controllers hours

~nctionaliry. As UTC Requests

Aker Tram centre either People a.m.

through ~s situation COUf1CII Control) jntervention. demand Instruction

can force

(here

be

with

the

a

get

Line

from

close green

not

the

to

they

to

to

faults

NET

single

to

again,

—some

tram

dean

designed

require

link

demand

others

to

force

to

clear

Signals)

driver

would

the

before

are

used

to

(Single

TRT

line

access

ensure

room

8s

due

demand.

traffic.

loop,

would

respond the

be

grantedto to

location

depot.

for

from

demands,

access

to

to

Trems

tested

dedicated

by

direct

Without /stop stop

road to

not

hom procedures

trams

failures

wntrol

a

a

pressing

is demands

depot

gain

are out

for

reverted

NOTTINGHAM

is

have

is develop use

call

centre

intervention

back and

system

a

to

register

tram

signal

phase

Priority

requirement Missed

UTC Times require

following differently

give UTC some which UTC radio demands. There Trams able Operation

the would can leaving tram

There lines

for

a

is

of

within

for

including

control tram

level invoke

response

Vam Traffic

to

phase

priority LA

requesting

per

Trams

next

circumstance

detected

failure,

by

to

as

cycle.

red"

junction

following

not

CCR

signal

all

traffic. (CCR)

undetected

signal

neM

QTj)

close

e~reme

Vaffic

A demoted

the

clearing

road demoted Trams to

room The Signal In

overtidge communicates "long

(i.e,

LUAS

is

in

2

or

driver

of

trams

register

(same each

of

used

tram

is

missed

control

cannot

the

demands

minimum

of

between

a

bunching

wntrol

tram

radio

case

above)

the demand

minutes

When

occurs kept.

Radio

the cancelled uses

If a

as

1

PHASE

MANCHESTER

METROUNK

2010

is If

_._

the

(In

May

the

_

the first.

to

a the

the

same

up

not

by

going

from

a

to

that

the

tram

neM

safely

all

call

facility

directly,

as on a

line the

If been

demand

the

where

advance

manual

will

passed _.

TSC>

tha

to

easy

Issuetl

proceed.

tram

the

at

first

allow second

the

junctions 2010 Request.

is

can

tram

missed,

the stage, TRAMUNK lost,

before

request

stop

_.

tramway

input

has

a

the

it line.

with

have

the

the

to

loop;

distance

the

of

cancel

cancel

for it

provision

crossing

to

Vecom

be

May junction

the

the

Report

excellent instance,

but rewgnised

and

which

time tram

cleared

junction

a

some

driver exit service

pick i

line, being by

stop

no will

to

Phase

at

standard

is 25 a

until

the

via

an

some

proceed. is

it

stage

event

should first

the

following

has

to

as will

line, cancels the the will

the

is

effectively

fails,

a

sWp switches

equipped

not

Interface

CROYDON

the

the

Phase

is

If, however, when stop

tram

time already

TSC, minimum 3 cancel over this get back It the across

junction

TSC traffic In same manually, Remote demand TSC

generate demand. intentionally There fails, demand which In are key from Controller No demand

i.e. that equipment, theory,

fitted

junctions).

--

-

--

Acuvily

2553ti41/l003lA

with

with

does

modes

up

Highway

~

deal

deal

to

~

What demands?

~

back

and

Vams

priority

tram

of

to

a do?

system

system

other

3:

for

QUESTION the

the cancelled

demand?

any

driver

a

or

bunching

happens

does

does

there

inability tram

Tramways

_

_

Activity

What

when

occurs?

How missed

How

register

the

the

Are

of facilities?

UKTram

Signing

to

a

up

out

is

As

be We

to

we

1

the

a

is

have

UTC

the

long

far

out.

given

on

twice.

and

is is

of

caused

5

run run

have

a a

will will

down

m m

prepare

that that

priority

the

due due

45

back back

by by

will will

a

1 1

be be

crossed

where where

being

having having

or or

a

After After

a a

problem

the

of of

RTS

when

delay.

loops! loops!

to to

most

is is

4 4

the the

MacDonald

times times

not not

not not

as as

motorist

of of

occurs occurs

buses buses

input input

no no

delay delay

only only

delays delays

seconds. seconds.

Corner Corner

the the

about about

At At

system.

up up

reversion reversion

then

junctions, junctions, delayed delayed

on on

ademand ademand

that that

broken broken

lack lack

again again

Delays Delays

a a

worstrzse

driver driver

to to

to to

proceed proceed

RTS RTS

opportunity opportunity

This This

enters enters

seen. seen.

to to

requests requests

A A

of of

is is

has has

junctions junctions

but but

"shadovJ'

Mott Mott

and and

this this

are are

so so

and and congestion congestion

the the

or or

in in

few few

it it

~Y7

junctions junctions

is is

above, above,

will will

aspect aspect

overshooting overshooting

RTS RTS

and and

Stagecoach

have have

for for

the the

all all

loop. loop.

conyesUon conyesUon

a a

cause cause

enforcement enforcement

the the

seen seen

input input

due due

of of

but but

regulations.

delay, delay,

next next

anyway anyway

trem trem

at at

to to

tram tram

is is

of of

is is

loop loop

and and

have have

to to

biggest, biggest,

insignificant insignificant 2m 2m

control control

exit exit

traffic traffic

delay delay

the the

save save

trams trams

the the

vehicles vehicles

obstn~ction obstn~ction

Traffic Traffic

the the

maximum maximum

by by

traffic traffic

are are

merely merely

compared compared

lack lack

signals signals

scenarios. scenarios.

seconds seconds no no

detailed detailed

Hillsborough Hillsborough

some some

Almost Almost

complex complex

minute minute

This This

abuse abuse

given given

call call

demand.

largest largest

now now

to to

used used

demand demand

proceed proceed

demands. demands.

tremstop, tremstop,

able able

tram tram

and and

ourloops ourloops

RTS RTS

if if

loop loop

proceed proceed

of of

Also, Also,

when when At At the the

approach approach

demands. demands.

locations, locations,

signal, signal,

SYPTE

to

/ /

90

then

lights

Ring

Ring

Royal

20

Bilston

heavy

Green

safe safe

cycle

all

Row

light

approx

a a

St

Control

time time

by

and and

TMM TMM

the the

is is

of of

the the

detailed

CENTRO

closing

largest

the the

causation

it it

police

Road

await await

signals

very very

the

works

at at

stage

time time

if if

long

to to

—main

as as

when when

6om 6om

from from

procedure

traffic traffic

is is

is is

cycle cycle

the the

to to

start start

Pipers Pipers

a a

awaiting

temporary temporary

wmputer

is is

delay delay

caused caused

similarly similarly

when when

oui) oui)

of of

due due

at at

link link

inbound inbound

fixed fixed

little

except except

traffic traffic

little little

delay delay

crossing crossing

!Ring !Ring

observation observation

secs secs

so so

UTC UTC

similar similar

WCC WCC

problem problem

incidents incidents

traffic traffic

Very Very

single single pedestrian pedestrian

although although

Very Very

Road Road

equipment equipment

failure failure

after after

delay delay

wave wave

down down

awaiting awaiting

Road Road

secs), secs),

secs secs

Georges Georges

departure departure

By By

20 20

Direct Direct

(daytime (daytime

approved approved

or or Road Road

~ntro~, ~ntro~, do do

Island Island

to to

failed failed

(lights (lights

and and

to

of

traffic traffic

use

hours

not

but

result result

related related

regularly

UTC

is

can can

a a

however,

do do

a a

response response

UTC UTC

staffed.

services

as as

park park

NTC

a a

we we

time time

of of

they they

Chrisknes Chrisknes

related) related)

not not

targets targets

have have

exist, exist,

for for

out out

is is

many many

and and

pre pre

NCC NCC

information information

delays delays

delay delay

ups ups

which which

99

traffic traffic

does does

call call

room room

UTC UTC

direct direct

back back

radio radio

turning turning

congestion(car congestion(car

Seasonal Seasonal

affecting affecting

minimised minimised

pertormance pertormance

No No

Junction Junction

achieve achieve

encounter encounter

junctions

No No

control control

when when

Control Control

terminal terminal

a a

the

by by

(120

can

of of

tram

delays delays

with

fhe fhe

plus

phase

longest

priority

high

time time

is

occasional occasional

of of

Junctions

the the

priority priority

Rules Rules

tram tram

with with

and and

junctions junctions

normal normal

phase phase

as as

RPA

cyGe cyGe

signals) signals)

delay delay

proceed proceed

of of

caution.

~ ~

box box

no no

full full

apply apply

minus minus

long long

treffic treffic

and and

traffic traffic

intergreen.

traffic traffic

medium medium

occupation occupation

be be

as as

junctions junctions

yellow yellow

road road

Causes Causes are are

plus plus

priority priority

be be

secs) secs)

with with

road road

can can

Low Low intergreen.

At At

enwuntered. enwuntered.

Road Road

drivers drivers

road road extreme extreme

-3

2

none,

have have

VBOIie VBOIie

can can

junctions junctions

minutes

others others

Some Some

out

little

box

very very

carried carried

buses

with with

yellow yellow

and and

.~

blocking blocking

Traffic Traffic

enforcement enforcement

junctions, junctions,

20'10

May May

in

are

to

a

a

the

loop

if

5

i.e. i.e.

may

town

box

one

traffic

traffic,

is is

ignore is is

one

in in

system

cyGe,

of

aspeIX

or or

has has

Issueu Issueu

which which

following

to to

to

a

and and

the the

lose lose

will will

but but

party

2010

failed failed

than than

aspects

be

close

least least

latter latter

to to

tum tum

a a

group, group,

when when

fixed fixed

around around

due due

tram tram

blocked blocked

a a

at at

May May

red red

or or

a a

traffic

prone prone

/pedestrian

Report Report

its its

third third

tramway tramway

can can

number number

when when

buses, buses,

on on

easily easily

proceed proceed

The The

state" state"

more more

if if

'I 'I

event.

as as

for for

25 25

on on

~•

a a

problem problem

delay delay

a a

linked linked

more more

junctions, junctions,

the the

Delay Delay

out" out"

controller controller

loop.

miss miss

can can

of of

is is

or or

travelling travelling

be be

tram tram

•• ••

Phase Phase

InterFace

/DO's;A /DO's;A

"steady "steady

3 3

behaviour, behaviour,

congestion) congestion)

Passenger Passenger

across across

common common

junctions); junctions);

cycle. cycle.

through through

also also occasions occasions

the the

significant significant

signal signal

particularly particularly

problems problems

frequently frequently

generic generic

together. together.

either either

there there

tram tram

mins mins

Minimal Minimal

sequence, sequence, Certain Certain

operated operated

centre centre

in in

orjunction orjunction

trams trams

event event

"timing "timing

Aciiviry~ Aciiviry~

255164;!

do

Highway Highway

~ ~ ~ ~ ~ ~

normal normal

delay delay

disruptions disruptions

junctions? junctions?

~ ~

with

of of

and and

at at

environments

and and

junction junction

service service

3:

causes causes

to to

w w

above

links links

and and

the the

encounteR encounteR

much much

Tramways Tramways

along along

delay delay

What What

defined defined

How How

reference reference

trams trams

Activity Activity

of of

Pertormance

System System

UKTram UKTram Signing Signing UKTram Activity 3: ~~1 Signing of Tramways and Highway interface Moti MacDonald

~ r •r R s ~ -•

Veolia RPA NCC NTC WCC TMM / SYPTE Stagecoach _ . - --__~_____.~_.___...... __...__._ CENTRO incidents. by police (new powers - - - ~ - encroachment into defined The primary cause of delay is below - ~ - of fuel, then badly parked will be available to Vam lane. trams being caught in traffic vehicles and loading along Highway Authorities to Blocked box unctions, queues with minor RTAs, usually ~ address this in due Majority crossing the due to cars overshooting sometimes by buses, are purse). ring road __~ _, not infrequent give way lines. How does the actual level of Actual priority level quite Significangy greater Pertormance was as expeared It was felt there was The priority of signalling is priorities provided on street close to assumptions when degree of priority has based on HA involvement in little corcelation. As as we would wish. The compare with those assumed everything running resulted compared to what the traffic signal junction design implementation involve other causes of delay, during the design and smoothly, had been anticipated process a design and build especially traffic, were not modelling process9 during the design process. contract, the design accounted for. evolved and changed Actual level of priorities ~9ht up to construction matches those assumed during one junction for design —much attention was instance was radically paid to this during altered in the commissioning and trail running LOnstruction stage (one of the reasons this period (Steelhouse Lane) should not be shortened). including the loss of cross traffic movement to give greater flexibility for tram stage to be called

Pertortnance that matches the Concession deed regime tends to the view that it is reasonably good. Failures are the real problem. _ -- Whatregarding the typical (Don't understand the Please clarity the question Flows low to moderate, traffic Maximum traffic is Generally good bui traffic volumes and vehicle mix question) mainly private vehicles about boot vehicles per has problems with when running with other daytime hour with about identified congestion traffic??) 12% heavy vehiGes bottlenecks Typical vehicle with which including buses trams mix would be cars and buses See Wolverhampton _. _ _. City Council response How does the assumed tram Not well, as the original Presume this relates to Not known From day one of Comparable It depends which model we run times compare with modelling significantly actual run times rather running it was clear that are considering. As modelled run times? underestimated the than assumed run times. projected tram run times mentioned above, initial tramstop dwell times by not Run times during the peak Actual run time is 30 seconds Were a little optimistic. models assume perfect allowing for door delays in periods are slightly longer over the contracted and at least Street running section conditions and particular. The result is that than modelled due to a minute in excess of that projected at 4.5 minutes unachievable speeds. there is no margin for congestion at intersections model. ac1 ua 1 5 5 menut es. Th'is However, I believe that our maintaining the schedule with road traffic in a was in the main not average speed compares without (a) all-out running congested city centre. through increased very favourably with other and (b) cuAailed layovers at junction delays but (in particular European) termini. through the way the tramways with similar actual track was laid. mixed running. Model alignment and actual construction were different.

Achieves them How does the system cope with Badly —town centre prone Where there are Please clarify the question. Not an issue to date, further Traffic growth on Gets caught up in increasing traffic flows: to "gridlocking" increasing traffic flows, traffic gating could be corridor estimated at congestion traffic can still have priority employed 2.5%from 1999 to by the local council 2004. However, tram Croydon has a particular service can be severely (but not unique) problem System will struggle to cope disrupted and can be __

2551fiA/;;D037A 25 May 2010 ~ ~ 2 Activity 3 Hhase 1 Report issi.ied May 2010

of

for

of

are

not

and

and

and

be

tram

they

type, a

traffic and

and

off

tram

____..

-

Trams

a a

just

as

dawn

may may

as as

usually

a

will will

which

when

figures

and and

the

cycling

strict strict

us us

other

non police

and and

ped

short

unaware unaware

during

is is

capacity

_..._. _..._.

unaware.

-tram

patters

hour" hour"

than than

structures

in in

shift

is is

anyone, anyone,

use use

MacDonald

rewrd rewrd

or or

Recording Recording

to to

reporting reporting

times times

be be

type type

latter latter

unless unless

helps. helps.

packed packed

be be

wllecting

location, location,

are, are,

to to

NM

requirement requirement

vague vague

be be

or or

times, times,

trams trams

a a

-paid -paid

even even

_. _.

catch catch

there there

requirements requirements

conductors

during during

route route

but but by by

is is

more more

to to

ofnon

"rush "rush

to to

but but will will

stead stead

etc. etc.

–we –we

needed.

The The

Mott Mott

etc., etc.,

Accident Accident

concern concern

unless unless

Similarly Similarly

t0 t0

close close

pre

on on

of of

often often

they they

~1

collision, collision,

control control

conductor

A A

on on

Stagecoach

hours, hours,

busy busy

if if

be be

loading loading

eulre eulre

report report

not not

accidents accidents

of of

revenue revenue

span span

hit. hit.

will will

use use

often often

reported reported

now now

_. _.

statutory statutory

to to

dificult dificult

_ _

vague. vague.

be be

recording recording

vicinity. vicinity.

happens happens

even even

traffic traffic hours

accidents, accidents,

are are

accidents accidents

us us

We We

we we

no no

loss loss

may may

operators, operators,

accidents accidents

recording recording

vehicle vehicle

Database Database

severity, severity,

thorough, thorough,

collision, collision,

might might

tram tram

rethink rethink

now now

traditional traditional

possible possible

some some

riders. riders.

during during

are are

tram tram

towards towards

second second

revenue revenue is is

keeps keeps

Systems, Systems,

compared compared

The The

..

Peak

at at

into

__.._.. __.._..

SYPTE

capacity capacity

various

Segmented Segmented

High High

Times

by

by

3

if

of

as

is

of

/

injury

2/3

the

The

there

usual

the

-.

m

more

is

and

and and

Bilston to

Since

known

at at

in

street

and and

can

for

on on

one

keep

traffic

such

appears

TMM TMM

Lane

the the

under

reported reported

with with

required required

the the

CENTRO time corridor,

minimum slight

Road

1998, 1998, closure closure

of of

trams. trams.

Sandwell

Road Road

service service

forms.

on on

Priestfield Priestfield

within within began began

tram

only only

frequencies

personal personal 9

perceived perceived

frequency frequency

delays delays

involving

diversionary

as as

these. these.

across across

traffic traffic

on on

injury injury

be be

backs

—__._ at at

are are

database

major major

section section

running running

Metro Metro

affecting affecting

conflicting

the the

19 19

of of

at at

the the

a a

Swan Swan

Rin Rin

motorway motorway

capacity capacity

issue

Road Road

not not

is is

(fixed (fixed

tail tail

The The

/ /

demand

cause cause

increasing increasing

been been

service service

are are

as as

current current

incidents incidents

may may

in in

Police Police

minute minute

HMRI.

Bilston Bilston

the the

an an

year

M6 M6

_..___.

be be

problem problem

6 6

WCC WCC

RIDDOR

_. _.

Internal Internal

categorised categorised

Wolverhampton Wolverhampton

on on

running running

has has

monitors monitors

accident accident

recorded recorded

junction junction

Wolverhampton

September September

operation operation

personal personal highway highway

the the

Midland Midland STATS STATS

Incidents Incidents

incidents incidents

the the

records records

Road Road

likely likely

Again Again

a a

Island Island

signals)

demands demands ry~equent ry~equent

additional additional

Not Not of of

Built Built

tram tram

increasing increasing they they

per per

from from

currently currently

to to

route. route.

usual usual

such such

seen seen

Bilston Bilston

A41 A41

issues issues

the the

trepping trepping

cause cause excessive excessive

there there

cuAai~ed cuAai~ed incidents incidents

19

3

Vows

12

terms

of

trams.

Stets Stets

in in

Brake

without

the

traffic traffic

service

month: month:

meet

service

and and

in in

month: month:

on on

been

to to

NTC

per per

redesign redesign

per per

capacity capacity

additional additional

?? ??

_

have have

demand demand

effect effect

at at

repoAs repoAs

NCC NCC

Emergency Emergency

RTA RTA

infrastructure

additional additional

increase increase

is is

/Saturday /Saturday

and and

require require

any any

peak peak

?increased

Average Average

applications applications

Average Average

returns

Operates Operates

would would

of of highway highway

system system

levels levels

System System

Headways Headways passenger passenger

significant significant

?

with with

-~_

-

to

on

with

-

with

that

-

use). for

Road

times.

We

reports

length length

Collision

extend

as: as:

inseAion

monthly

Driver,

Cope Cope

_.__--

to to

individual

are

Passenger

a a

peak peak

Collision Collision

.. ..

from from

tram tram

Handle

Brake

the the

Tramway

occurrences

trams

by by

required required

at at

by by

Accident,

improper improper

occurtences.

on on

service

RPA

/incidents /incidents

and and

of of

Line Line

by by

indicating

enhancement enhancement

Vandalism,

operating operating

are are

30m 30m

Accident, Accident,

These These

length. length.

Red Red

Person, Person,

in in

categorised categorised

received received

additional additional

Activation Activation

Emergency Emergency

Application Application

Derailment, Derailment, Emergency Emergency

Operating Operating

Cyclist, Cyclist,

Numbers Numbers

with with

(including (including

Traffic Traffic

significant significant

week. week. are are

repoAs repoAs

confirmed confirmed

accidents accidents

Weekty Weekty summary summary

operator operator

are are

particularly particularly

Luas Luas

of of

demands demands

existing existing

increasing increasing

Capacity Capacity

40m 40m

_~_.._._.A. _~_.._._.A.

for for

in

Uams Uams

by

emend emend

sections sections

to to

extra extra

40m

planning planning

shuttle shuttle

in in

busy busy

to to

increase increase

f f

Veolia Veolia regulation regulation

plans plans

for for

trams trams

adding adding

events events

required required

_..__..____._._.._--

controller controller big big

frequency

30m 30m

services services

4.Future 4.Future 6.Tighter 6.Tighter

3.Advanced 3.Advanced

2,Operating 2,Operating 1.By 1.By

as as

._...._.

there

are

take

to

two

and

them

Safety

GMPTE,

analysed

to to

the the

...... _ ...... _

and and

discuss

whether whether

and and

~--

and and

sessions sessions

meetlngs meetlngs

to to

Collisions Collisions

up up

pattern pattern

between between

.~

(Manchester (Manchester

these these

any any

picked picked

determine determine

at at

is is

Has Has

Metrolink Metrolink Operational Operational

place place

Salford) Salford)

issues. issues.

Regular Regular

2010

------

May May

/

put

the

and

into

/

into

the

of

to

on

As

as

back

three

was was

close

traffic

peak

nal nal

are

was eculiarfy

control

to

Iss~,~ed Iss~,~ed

time time

high high

small

work

info

9

part part

no

P

at at

reports reports

feed feed

at at

junctions

si si

route

2010

to to

liable liable

parks, parks,

be be

is is

with with

the the

entered entered block block

originated

specific

old old

incidents well well

blockages.

is is

has has

etc.

roads roads

statue).

even even

(It (It

become

at at

a a

capacity capacity Pflay Pflay

system system

to to

car car

Report Report

services services

junction. junction.

filtered filtered

roads roads

"one "one

can can

is is

centre centre

the the

1 1

principle principle

disturbance disturbance

into into

2S 2S

periodic periodic

and and

wnfigured.

that that

road road

through through

centre centre

database, database,

might might

also also

in in

the the

details details

the the

operating operating

reported reported

one one

having having

tramway.

major major

and and

saturation saturation

HMRI HMRI

if if

traffic traffic

graphs graphs

is is

so so

public public

flows flows

of of

town town

use, use,

to to tram" tram"

small small the the

this this

Phase Phase

the the

main main

accidents/ accidents/

junction junction

main main

-... town town

/0031A /0031A

all all

maximum maximum

3 3

Interface

produce produce

Access Access

sorted sorted

All All initially initially trend trend

centre, centre,

Manchester Manchester

British, British, within within

into into

But But

better better

foundation foundation abandoned. abandoned.

one one

Most Most

currently currently

to to already already

major major

into into cause cause

the the

traffic traffic

any any

this this

problem problem

magnified magnified

through through

the the

as as

There There

the the

disturbances disturbances

near near

times, times,

that that

_ _

_

/

Activity Activity

25516AN

and

with

users

3 3

system

Highway Highway

levels levels

incident

braking

~'~ ~'~

cope cope

involving

road road

collated?

opening opening

accidents

tram tram

and and

and and

.

service service

operator

_. _.

system system

with with

reports reports

since since

or or

include: include:

tram tram emergency emergency

3:

the the

vulnerable vulnerable

and and

~ ~

accident accident

etc

construction construction

are are

trams trams

does does

tramway, tramway,

Tramways Tramways

reports, reports,

incidents; incidents;

Examples Examples

with with

during during

infrasirudure, infrasirudure,

involving involving

How How

statistics statistics

the the

demands?

How How

increasing increasing

Activity Activity

/Incidents:

of of

_.....___..._. _.....___..._.

_. _.

Accidents Accidents

UKTram UKTram Signing Signing in

a

is

are

and

users

effect there

to

Act

etc.

brake

of

This

failing

room

a

use relating

fhe

or

believe

our

situation

drivers

there

be

repoHed. RAIB

brake

all

some

due

is

driving

at

in

mixed

road and

its

MacDonald

or

route

be

company

occurtence

Works

be

believe

of

atfrequent

They

-laws

and

party.

Act

a

unless

drivers

to

brake

there

would

to

the

by

other

falls

require

reporting in

hazard collision

emergency

Motf

and

consider

require

normal

to.

looking

incidents.

actions.

complaint

level

emergency

rail

reporting

of

a

could

Stagecoach

towards

/

other

not

'W7

be

meetings. we they

the

in

Traffic

be

common

our

this

-miss

reason

to

believe

reviewed

do

improvement

any

blocking

use

report

tram

Road

use

near passenger Supertram brake

are

We quite

revocable We applications currently where of Transport careless safety difference to

atlitude

any

operators applications that could controversial With traffic, on expected onerous requirements. defence

emergency

to to tramway

for

Act

SYPTE

Parliament

of

Railways

Acts

/

1989

1989

BTC

highway

their

involving TMM

Act

Act

respond

the

mainly CENTRO

of

cover

They

Metro

Metro

Act

General

to

employ

incidents

all

WCC

Metro

Midland

Midland

ROTS Police

Private

to

trams.

PaAiament—

system.

are

the

Act

normal

have

has

traffic

police

the

above

for

under

GNLRT

section

NTC

legislation. answered.

and

moving

questions

operator

away

the

parking

powers,

this

provided

for

the

over

NCC

been

The

in tow

to

Act

static

of

under

highway

undertaken

out

has

powers

powers

HA

offences. responsible

enforcement normal previously

HA Set

Answers

~ntained

GNLRT

TROs

framework

Act

to

(a)

to

on

the

and

and

for

inquiry

an

of

Luas

ticket

Minster

Safety

by

Railway

(as

Transport

fines

is

the

Green

trespass

public

approvals

consultation

the

valid

of

the

directed

a

the

the

RPA

submitted

a

empowered

by

Order who

sections

submitted

(b)

by

railway

Infrastructure)

Luas

as

by

by

chaired

of

for

A

public

Commission

are

was

is

and

was

standard

and

statutory

lack

Transport

Railway

prohibited

which

process,

appointed

Veolia

Lines. Red

trevel

accepted the Inspector,

directed entails Safety

issue granted A

construction Case

The

2001)

followed for

(Railway

--

-

-_

Veolia

-

-

--

and

Act

Road

-..._..-----

and

required

--

Highways

including

etc

Act. changes

s. _ Transit

GMP

were

OHLE,

city,

etc.

Roads

Authority

Authority

Authority

Act

Manchester

and

Regulation

Works

proposed

Rapid

the

__

New

the

_

powers

materials, Highway

platforms

Highway

within

Planning

infrastructure

Street Greater System) approvals

Traffic

to

Act.

(Light

20'i0

by

May

_

et

Act

in

Bye-

for

street,

ROTS

There

to

U

powers

Off

Issued

Highway

the

accorded

Undertaker

2U'I

a

powers

working

Croydon

&Works

is

7994.

traffic

Tramlink

provided

under

was

access

May

the

Report

under

those and

maintenance,

matter.

to

Act 1

hours.

25

by

_

to

specific

Statutory

apply,

than

system

HMRI,

no

Croydon

Transport highway,

Interface

Phase

any

regard

3

Authority Regulations

1992.

unsocial

On are

regard

apparetus Via enforcement the laws

Tramlink in granted the

constructed other

to

The

__

ArUViry

255764U1D03;A

and

Highway

used tram

or

/

114

operation

the

process9

were

and

of

highway

and

enforcement

associated

of

the

the

3:

powers

approvals

on

authorities?

network?

and

construction,

powers

legislative

maintenance

used

the

Tramways

!Compliance:

Activity

What

highway

tramway

Statutory What

regulatory

are and

system

for

of

Enforcement

Legislation.

UKTram

Signing

as

of

and

the

lay-

as

/

non-

big

than

slots,

illegal

etc.

in in

with

tretfic

to

a a

feel

enforce

or or

leading

u-tums

be

don't

individual

bus bus

collision.

to

to to

sections,

answer answer

such such

problems.

parking parking

to to

not not

increased

will will

buses

cash cash

lacking,

MacDonald

motorists.

rather rather

they they

and and

parking parking

police police

is is

problems

of of

to to

due due

to to

will will

after after

each each

loading loading

for for

leading leading

leads leads

police police

by by

clearNay

abuse, abuse,

abuse

enforcement enforcement

tend tend

offence offence

by by

staff staff

very very

on on

increased increased

this this

us.

but but

certain certain

blocking blocking

IVlott IVlott

due due

of of

taxi taxi

abuse abuse

is is

themselves themselves

the the

where where

signage signage

and and

Supertram

illegal illegal

offences offences

minor minor '~''1

Stagecoach moves moves

gate gate

tight tight

stops stops

On On

leading leading to to

gates gates

but but

clear clear

type type

vasUy vasUy

whole.

-laws -laws

blatant blatant

Tram Tram

due due

collisions, collisions,

prosecution prosecution fo fo

Illegal Illegal

sometimes sometimes

Read Read

blocking blocking

bys, bys,

perhaps perhaps sometimes sometimes

Short Short problem problem

awareness awareness

although although

Enforcement Enforcement

loading loading

Not Not

question question

a a

moves, moves,

by

regular regular able. able.

encountered encountered

loading, loading,

moving moving

parking parking

past past

operations operations

abuse. abuse.

this this

concern concern

Occasional Occasional

tram tram

SYPTE SYPTE

.

in

a

in

any

the

high

I

of

Act

a

as as

tram

the

in in

case

the

Act

should

road

after

a a

be

that

for for

very

is is

needs

have

Home

on on

be be

and

public

more

Road

covered

the the

breeds breeds

of

the

Health

TMM TMM

is is work

involved involved

of

trams trams

problems.

give

the the

Work Work

congested

CENTRO

clear clear

to to

and and

priority priority

is is

is is

with with

can can

—Tred

the

of of

of of

Midlands

believe

to to

first first

far far

in in

that that

at at

Therefore Therefore

There There

public

there there

vehicles vehicles

and and

locally,

I I

in in

with with

section section

That That

—there —there

obstruction

reaped reaped

design design

primary

shops shops

there there

to to

general

unless

than than

list. list.

segregated

acts acts

vehiGe vehiGe

police police

Regulation Regulation

Act Act

Force Force

West West

a a

action

Wolverhampton's

little little

Absence Absence

world. world.

incidence incidence

incident incident

Safety Safety

new new

include include

significant significant

Highway

Highway Highway

assumed assumed

the the

incident incident

the the

be be

-street -street the the

WCC WCC

healthy healthy

negligence negligence

shown. shown.

wrong wrong

is is

other other

an an

Holland Holland

vehicles vehicles

in in

priority priority

be be recognised recognised

transport transport

traffic traffic

legislation legislation

car car

recognition recognition

increasingly increasingly

nationally nationally

importance importance

however, however,

transport transport

to to

Very Very

Noticeable Noticeable

quickly quickly

No No

on on

section.

an an

on

Office Office

perspective

litlle litlle

tramway tramway

Well. Well. ensured ensured

From From

tramway tramway arrangements arrangements

Off Off

and and

frontage frontage

On On

by by

Treffic Treffic

Traffic Traffic

Police Police

scene scene

enforcement enforcement

~n ~n

by

of

is

with

when

so

only

laws

in

them

to

parties,

unit.

have

the

to

authority

within

potential

are

and and

offences

by by

has

by by

to

if

a

better

that that

stated

Moving

still

significant

is is

this this

majority majority

traffic

priority.

to to

and and

traffic

date

enforced enforced

dealing dealing

"delegated

not not

power power

since since

effective

enTorcement,

franc franc

a a

local local

vehicles

Constabulary

Police Police

traffic traffic

seen seen

enforcement

wncerns wncerns

Chief

is is

are are

Police.

in in

to to

Wardens, Wardens,

patchy patchy

powers powers

enforcement,

_

failing failing

NTC

relevant relevant

design design

the the

consequences

the the

low low

and and

but but

is is

issues, issues,

offences offences

changes changes

not not

is is

them them

and and

upon upon

publicly publicly

the the

have have self self

by by

the the

-- --

tramway

and and

— —

as as

traffic traffic

fair fair

under under

main main

decriminalised decriminalised

NCC NCC

issue issue

of of

obtained obtained

Nottinghamshire

traffic traffic

-

by by

on on

moving moving

Traffic Traffic

however however

remove remove

efficiently efficiently

be be

crime crime

Centre

the the

Attendants. Attendants.

is is

date

traffic traffic

good good

—poor —poor

have have

dedicated dedicated

system system

holding holding

control control

assist assist our our

Offences Offences

tramway tramway

Authority Authority

to to

difficulties difficulties

to to

economic economic

few few

public) public)

have have

of of

can can

understanding understanding

no no

City City

the the

.. ..

undertake undertake

My My we we

Constable" Constable"

authority authority

those those

management management

the the

serious serious

prioritise prioritise Police Police

however however

their their understood understood

would would

operate operate

of of

crowd crowd

Locat Locat

management management

The The

(and (and

address address

Nottinghamshire Nottinghamshire

Enforcement Enforcement

one one

commenting commenting Nottinghamshire Nottinghamshire

__ __

moving moving

the the

has has

Nottingham Nottingham

enforced enforced decriminalisation

very very

Parking Parking

TraTlc TraTlc

Parking Parking criminal, criminal,

Moving Moving

Overall Overall

issue issue Obstruction Obstruction

significant significant

focussed focussed

Static— Static—

blocking blocking

NTC NTC

obstruction obstruction

6y

of

Rai

the

or

The

rate

Road

% %

Ireland

by by

are

a

trespass

related

20 20

includes

tickets

card card

if if

Light Light

in in

high

the the

The The

issued,

who

trevelling

dedicated

No No

Customer

a a

rail.

Notices

ticket. ticket.

Local

ID ID

hours.

street

Tor Tor

rates rates

issues

a a

in in

38 38

about about

an an

which which

on on

been been

Traffic Traffic

Garcla

or or

with

under under

RPA

the the

continuously continuously

false

enforced enforced

issued issued

light light

Fare Fare system system

valid valid

found found

paid.

of of

survey. survey.

of of

checking checking

Officers Officers

of of

a a

is is

have have

unit unit

service service

are are

are are

Acts Acts

and and

have have

by by

evasion evasion

are are

regulations

resulted resulted

acceptable. acceptable.

responsibility responsibility

enforcement enforcement

resources resources

traffic traffic

Increased Increased

measured measured

RPA RPA

is is Fare Fare

postcode postcode

has has

number number

addressed; addressed;

fines fines

without without

SFN SFN

person person

absence absence

during during

Standard Standard Veolia Veolia

Service Service

operate operate

new new

running running addressing addressing

Authorities Authorities

alignment. alignment.

Traffic Traffic

Garda Garda

issues issues

(SFN) (SFN)

Veolia Veolia

on

for

at

lanes,

come

be

lwo

limited limited

bus bus

will will

they they

powers powers

ne~R ne~R

decriminalised

very very

so.

turns turns

when when is is

the the

boxes, boxes,

or or

enforcement enforcement

matters

over over

years years

helpful helpful

banned banned

yellow yellow

in in

Additional Additional

enforcement enforcement

present present

traffic traffic

Police Police

20'10

',

May May

' '

path

-tram

(and

penalty

on

of of

Issued Issued

PAUNk PAUNk

evidence

swept swept

2010

of of

fixed fixed

as as

use use

of of

"PR "PR

May May

use use

Report Report

1 1

25 25

for for

wider wider

images images

distinctive) distinctive)

31A 31A

Phase Phase

issuance issuance

Interface

7 7

~ROVD291~

markings

more more

notices; notices;

4///00 4///00

CCN CCN

Process Process

for for

_ _

16 16

5 5

5 5

or

Activity Activity

2 2

are

~J ~J

done done

Highway Highway

more

i.e.

~ ~ ~ ~

be be

vehiGe

for for

to to

and and

effectiveness?

enrorcement enrorcement

moving moving

need need

provide provide

of of

3:

their their

to to

enforcement enforcement

4UE$Tf4N 4UE$Tf4N

and and

'~ '~

would would

levels levels

and and

Tramways Tramways

parking parking

What What

offences?

effective effective

changed changed

What What

there there

Activity Activity

of of

UKTram UKTram Signing Signing UKTram Activity 3: ~~1 Signing of Tramways and Highway interface Mo[t MacDonald

Veoiia R PA NCC NTC WCC TMM / SYPTE Stagecoach CENTRO for a specific road junction and trams and buses — on the whole o~ that route perhaps improved something lacking in for a mile either side of the empowerment oFtramway this country. Such a gate is a massive problem operators would be a sensible move could also and virtually not enforced. way forvvard, obviously caveats simplify traffic conUol, would have to be put in place to signing, lining and Decriminalisation of the prevent misuse. protective measures for offence is supposed to help trams. Also legislation enforcement by agencies for motorists to give way other than the Police, but to buses or trams constantly delayed while pulling away from stops waiting for type approval of would help ensure cameras etc. greater public Vansport effectiveness, efficiencies and safety. LeYS have a UK Tram campaign on such issues!

Nothing required Practicalities of implementing systems This would be better Another one for GMUTC addressed to TfL (Streets) as the designers. -- — ____ What have been the difficulties An inability of the Design of three levels of No significant issues, common The main issue for No great technical of integrating the tram systems Microsense TSC to reliably priority understanding of objectives development, difficulties, other than the with existing traffic control handle trams at close and implications between configuretion and now lack of full priority at a few systems? headways different design and approval maintenance is complexjunctions. All discipline is essential understanding the tram done by hard wire and detection Vecom relays to RTC therefore equipment. Midland nothing complex. Any difficulties we have had Metro contrect out of have been mainly as a result of the maintenance of the differing perceptions and signalling detection to priorities of stakeholders and WCC traffic signal competing pressures on the maintenance teams. Highway Authority. City Council ~ilst this provides full policy can occasionally conflict integration for problem with the best interests of the solving WCC has had to tramway, particularly when train staff in the working trying to please all parties. and fault finding of the Vcom equipment—as it is a small part of the signalling operation retaining expertise is difficult and can prolong some repairs

See Wolverhampton City Council response How much effort /time was Modifications and Modelling prior to on site A lot — Wolverhampton Avery large amount iniiialiy required to design, configure enhancements took place installation using the Siemens was and still is at construction. All RTGs and carry out modifications to over a period of two years. system allowed productive enthusiastic over the had to be replaced with the existing systems in order to identification of issues prior to provision of the tram more intelligent ones. integrate the tram system? site testing. Few further service and this has amendments were required on enabled resources to be site. Most signal junctions provided for full commissioned prior to tram trial involvement in tl~e running design and approval of the system. Without this we would not have safe reliable system we have today

25516d/l/003/A 25 May 2010 116 Activity 3 Phase 1 Report IssueA May 20'IO

of

to

were

new

ever

rapid

have

signal.

signal

days,

due due

of of

signalling

fairly fairly

MacDonald

say

LRT LRT

numbers

early early

or

would would

tweaks tweaks

to to

regeneration regeneration

_.

junctions junctions

new new

altered,

the the

otherwise otherwise

car car

anyway anyway

and and

tuning tuning

the the

-

Mott Mott

that that

of of

all all

~1

in in

Stagecoach

fine

entire entire

diffiwH diffiwH

general general

ongoing ongoing

City.

above.

happened happened

and and the the

because because

increasing increasing

changes changes

Much Much

Very Very

with with

since.

No

timings timings

controllers controllers

reconstructed reconstructed

equipment, equipment,

significantly significantly

including including

Some Some

See See

SYPTE SYPTE

3

of

to

of

/ /

but but

This

and

sets

to

(6

re-

traffic

for

traffic

itself

aadt rest rest

signals

system

rest rest

unpaid

took

the

curtent

become

and

the

for

to

TMM TMM

400m

for

of of

centre centre

service

in in

control

and

has

Georges

and and alone

not

CENTRO

was

the the

orts orts

to to

dual

involving involving

19,000

the the

years years

priority

connected

The The

added

f f

equipment

St St

for for

set set

2 2

at at

estimate estimate

of of

even even

different different

the the

City City

and and

buses buses

capacity capacity

junctions junctions

services services

reduced reduced

250000 250000

that that

during during

was was

controller. controller.

length length

bus bus

of of

3 3

to to

conVollers conVollers

years) years)

commonality.

wave wave

of of

stand stand

for for

in in

returned returned

were were

about about

This This

during

of of

half half

no no

bus bus

used used

signal signal

systems systems

site site

Wolverhampton

above

above

above

above

new new

above

new new

consultants consultants

WCC WCC

never never

aadt!

construction construction

Construction Construction

flows flows

flows flows

cortidor cortidor

out. As As

flows flows

Green Green

optimised optimised

conditions. conditions.

with with

the the

additional additional

As As

inbound inbound

approximately approximately

allow allow

the the

routed routed

cartiageway cartiageway

stop. stop.

expansion.

Yes Yes

ensured ensured

modified modified

network network

journey journey systems systems As As

development development affected affected

testing testing

new new

was was the the

to to

ensured ensured

ensure ensure

person person

people people

These These

SCOOT SCOOT

All All

As As DiTficult DiTficult

Wolverhampton Wolverhampton

estimated estimated

completion completion

of of

through through

As As

on

use

to

this

was

traffic

to

of of

of

a

for

city

services

cortidor

and and

and and

—some

as as

been

minor

bus

significant

use use

tram

most

planned

projects projects

stop

had had

efficiency

other

the the

terms terms

to to

the the

locations

as as

through through

the the

interchange

in in

has has

the the

in in

with with

bus bus

and and

has has

NTC NTC

feeder feeder

on on

amendments

equipment equipment

in in

by by

overall overall

major major

approach approach

to to

undertaken undertaken

provide

litlle litlle

of of

network, network,

priority

continuity continuity

improve improve

better better

subject subject

works works

NCC NCC

to to

undertaken undertaken

isolated isolated

above above

The The

remove remove

implications implications

to to

minor minor

for for

effect effect

were were

routes routes

impacts impacts

operated operated

very very

to to

tram tram

transport transport

wider wider

been been

was was

changed changed

complemented complemented

bus bus

majority majority

only only

adjustments adjustments

direct direct

the the

has has

capacity. capacity.

centre centre

positive positive

public public

significant significant Minimal Minimal

implementing_ implementing_

have have

improvements improvements

Overall Overall

changes changes

changed, changed,

hacilities hacilities

Na Na

were were

operators operators

and and

complementary complementary

encourage encourage

enhancement enhancement

The The

replaced replaced

enable enable

with with

Work Work

systems systems

described described testing.

and and

to

to

of of

and

bus

in

on-

to

work,

The

of of

fitted

due due

signal

opening

whilst

system.

the the

EPROM EPROM

of of

installed

junction

SCATS

km km

Line

of of

1 1

Line

were were

controllere

the the

complex complex

ongoing

for for

significant

tram tram

2004

since since

was was

new new

accompanied

facilities

piece piece

of of

RPA RPA

congestion congestion

newjunction

in in

Red Red

enhancements enhancements

removed removed

resources resources

dabbling, dabbling,

Green Green

was was

and and

length length

Improvement Improvement

12 12

6 6

posts, posts,

lane lane

installations. installations.

section.

installations installations

was was

tertitory tertitory

new new

Luas Luas

junctions junctions

streetscape.

design design

required required

adjacent adjacent

major major

Luas Luas

system system

trem trem

pedestrian pedestrian

by by

the the

places. places.

Increased Increased

throughout throughout

Regular Regular

optimisation optimisation

of of

Approximately Approximately

A A

lane lane

sUeet sUeet

heads, heads, the the

overthe overthe

new new

with with

etc.

New New

required required

required required

the the

signal signal

signal signal

The The

configure

and and

specialist specialist

specialised specialised

software software

The The

Veolia Veolia

20'10

May May

Issued Issued

2010

May May

Repnrt Repnrt

i i

25 25

.

__. __.

Phase Phase

Interface

3 3

Activity Activity

on

2351fi4:l:D031A 2351fi4:l:D031A

of

out

used

tram

/tram

Highway Highway

be

was

tram

public

because

effects effects

the the

117 117

system system

to to

the the

traffic traffic

configure

of of

carried carried

and and

the the

facilities facilities

/time /time

other other

signal

tram tram

needed?

system

highway

street

with with

new new

was was

of of

needed needed

the the

been been

removed removed

any any

on-

new new

the the

design, design,

was was

effort effort

3:

the the

priority priority

or or

of of to to

that that

-- --

systems?

have have

introduction introduction

there there

much much

much much

much much

achieved?

rest rest

install install

the the

conjunction conjunction

Tramways Tramways

network?

What What

the the

performance performance

introducing introducing

How How optimisation optimisation

and and

modified modified

of of

Were Were

in in

system?

system system

transport transport

Activity Activity

How How

How How

wntrol wntrol

equipment equipment

required required

and and

of of

UKTram UKTram Signing Signing with

make

-day

high

to

7

questlon

of

MacDonald

CCN

the

speed,

looking

Mott

~'Y'~'"~

-tram

Stagecoach

what

on

improvement.

frame

introduction

asking

Unsure

is

high

Constantly

quality

The

fuRher

next

of

being

the

well

system

far

mode

undergoing

programme

SYPTE

very

whole

years

popular

refresh

The works

Presently

a

scheduled

a

two

to

/

and

to

to

very TWA

rate

-•

were

our

the

good

to

Centre

a

During

signal

heads

CC

as

major

are

and

2006

relation

lights

TMM

6

and

access

cameras

Metro

though

enough

CENTRO adequate

and

a

regime.

fhe

stage.

equipment

WCC

Other

described

in

our

there

more

be City

1

proved

as

failure

bulb

link.

Metro

system,

i

tram

in

May

knowledge

forms

understand

an

above,

of

fhe

as

signal

to

achieved

sound

subcontractors

every

it

maintain

that

spot

traffic

Hill.

with

been

to

centre

high

Line

issue

give

have

bulb

diction

to

planned

weak

receive

paA

~

due

street

fretted

a

tram

extensions

wnsequently

require

Wednesbury

effect been

to

cover

an

between

has

operation

above

many

be

on

WCC

the

CCN

Basically

months

Nowever,

Not maintenance

As described ability

Wolverhampton

Vcom

and didn't heads elsewhere have replacements Brierley

construction Birmingham

is being and however has will Co- route

implementation Slight involved and out

so LED

changes to Control operation training

development and

issue that

small emend eMensions

frequent Yes completed to Two

5

of

in

with

new

NET

and

closely

known

NET

of

to

details

Secretary

has

of

not

happy

more

design

the

extent

consultation

NTC

are

are

good

extremely

relationship

management

however

with

network

delivery is

extension

we

signal

etc.,

NCC

/and

very

an

following

the

for

and

~

working

for

for

system

been

1

proactive

highway

curcently design

procurement,

operation,

NTC

State

used

Has

changed

process

its

This the

the reliable

line Plans

its to

equipment

are Close of

by

been

the the

contract has

back

Green

monitored

Veolia

contract

curcently

that

maintained

is

the

proposed

to

the

additional

is

RPA

a

Information

are

of feed

This

under

Order

public

to

~

signature.

for

to

suggest

Three

on

novated

system

Alstom

Veolia.

Railway

RPA manually, by

was

Availability

Passenger Line. infrastructure The Passenger A would

to

subject granted

extension

extensions consultation.

extend

system

to

the

Veotla

plans

are

enhance

and

There

--

-

-

that

the

Phase

-

all

the

one

-

it

of

wrt

3b

reliability

give

the

----

can

makes

details

Phase

.~

frequency

and

-

IC

Generally service

and

3a

GMPTE

curzent

2Q

May

------

Issued

_--

2010

May

RepoA

1

~•

25

••

Interface

Phase

..------

3

~—

planned

Activiy

25516d//10037A

that

Highway

~—

present

extend,

__.

118

to

systems

the

and

well?

of

system

otherwise,

service

plans

systems,

of

or

modiy

3:

w

and

any

any

or

particularly

there

there

development

Tramways

I

well?

Activity

Maintenance

reliability? operation

vrork

Are

Are

enhance conventional

system?

of

work

works

Further

What

UKTram

Signing UKTram Activity 3: '1'Y> Signing of Tramways and Highway Interface Moti MacDonald

,,:. .:..:s ~~::.:.. Veolia RPA NCC NTC WCC TMM/ SYPTE Stagecoach CENTRO _ ___ the public are happy to Display (PID) is very well implementation, followed early Travel Midland Metro to transport and memory and good use received. On board CCN workshops to explore ensure that the service patronage is growing. definition has been of major has proven very effective requirements and critical issues keeps running The public cleaAy benefit. This includes front in the prosecution of proactive communications considers the tram to and rear cameras for crimes wmmitted on be a vastly superior accident investigation and involving all parties had a huge Nothing that seems board. impact in promoting community mode of transport 6 internal cameras for particularly worth when compared to security. The external acceptance and ownership of raising, other than the the tram other modes, in cameras provide examples shared contract for particular bus. Modal for driver training and Close relationship with maintenance with switch is much more evidence and data for Operator and Highway Wolverhampton UTC likely from car to ram formulating improvements. Authority who undertake cross than it is from car to Promoter! Public Transport district and cross bus. Authority /Highway Authority functional maintenance. and Planning Authority had common objectives for on street sections and were all part of the same organisation (City Council)

Tramway priority and phasing works well, and changes / faults are obvious if and when they occur. What doesn't work well and requires change or improvement? __ __ -- -- _--_ _ _ Is there any aspect of the In this context, the The high floor chosen for Ticket Vending Machines Conhactual issues effectively Yes we are particularly Definitely "On road The air wn units, system that has failed to generation of traffic signal Metrolink Phase 1 (for will have to be improved fixed the level of priority to the disappointed with the Running". The ventilation and demisting of pertorm to expectations and demands via an indirect 5nancial reasons) has for visibility in sunlight. capabilities of the equipment service life of the tram bogies! We are the tram cabs is woefully that will need to be improved or route through both the made it less flexible for Emergency Help Points provided, higher levels could traffic signal heads on having problems with inadequate and difficult to re-designed? Vecom waystation and the later phases involving have been the subject of have been achieved. At street. There is a high Siemens regarding the improve. local PLC in turn wntinues streetrunning —the serious quality problems. present this is not a significant rate of bulb failures and drive couplings. The high level of issue need frequent bulb to cause reliability platforms needed are a Some slight Greater opportunity existed problems. A direct link significant intrusion into pertormance monitoring replacements to ensure modifications to called for in the ops and at least 3 bulbs are lit at at design and construction between the waystation and the highway. This is Overheads Anti- to avoid bottlenecks, pass changed maintenance contracts is Priority at all junctions. any one time. We are to the traffic signal controller unlikely to be Chatter Clips traffic queues using a short would have been more because of the cost very time consuming to try LEDs now white Extended the skids on implement and has limited ones have DfT section of segregated or reliable, as might more implications. Improved gating arrangements the section insulators available road width to effect. approval. use basis methods such as the to reflect actual new traffic flow (makes smoother segregate tramway. The use of OHLE contacts Por trams, rather than Some of the materials as a result of running on chosen routes will always tram detection. It is also relying on estimates of design. Any queries about this pantograph) be a matter ofi contention considered that some of the used in the street 5+ of Phase (Design is always years out report or for fudher Technology has and opinion varies. The traffic signalled junctions running section current 1 are beginning to fail of data under information, contact: advanced and most effective corcidors and would benefit from being procurement timescales). improved routes might not have been that more and are not too easy to redesigned so chosen. than one tram can be maintain under a live Greater Automation system. The hanges on Richard Robson passed on the same phase Use of Cat's Eyes in addition to to several sections of reil The decision put Qust as with standard bus white lining would, we believe, conductors onto the priority). Road vehicle on the tight bends have be beneficial as lining can be Service Development wom away already. tram has greatly transgression contlnues to hard to make out during wet Manager improved the human be a problem which has led dark conditions. Swept path Regeneretion and interface and reduced to the installation of The OHLE in the city markers, in particular are very Environment the revenue collection standard No Entry signage centre is very intrusive useful when determining problems. whether a tram may safely Wolverhampton City at two locations in addition (probably over Council to the standard tram only designed). Most pass a car, which has pulled over the Give way lines. Heantun House sign (which e believe most tramways around the motorists are ignorant off. of far (Trams constantly having to Salop Street world make use effectively more building fixings stop and Give Way Wolverhampton encourages this): (even to listed buildings) W V3 OSQ or joint use poles.

Tel: 01902 555731 Free trips on the city centre section could help Fax: 01902 555467 to reduce the number of buses also running_. on.

255164/;/003lA 25 May 2010 119 Actlmty 3 Phase 1 Report Issue6 hAay 2d 10 UKTram Activity 3: ~1 Signing of Tramways and Highway Interface Mott MacDonald

QUESTION CROYDON 7RAMLINK MANCHESTER LUAS NOTT3NGHAM NET MIDLAND MEFRQ SY SUPERTRAM METROLINK PkASE i

'~ the same streets. E-mail: Integrated ticketing on Richard.robson~ the various travel modes has to ba implemented wolverham pton.g ov. uk one day — it works in cities all over the world, There is a need for why not here? significant improvements in quality control on installation. Poor build quality has lead to most of our

255164/;/003/A ?5 May 2070 X20 Activity 3 Phase 1 Report Issued May 'LQ'IC

lay-

don't

in in

the

Note

line

to

way'

good

for

error.

of of

to to

drivers.

MacDonald

for for

not not

others others

driver

loading loading

plate plate

warning

a'give a'give

manual. manual.

tram tram

but but

tramway tramway

room room

Motl Motl

to to

advance advance

only only

~1

platforms platforms

on on

standardisation.

have have

have have

marking marking

with'I' with'I'

in in

varying varying

plate, plate,

on on

drivers drivers

no no

users:

to to

limited limited

line' line'

line

tram tram

as as

tram tram

turnbacks turnbacks

due due

insulator.

road road

drivers:

marks marks

markings markings

clearways, clearways,

diamond diamond

junctions junctions

junctions junctions

crossing' crossing'

to to

'stop 'stop

way way

up, up,

with with

of of

apparently apparently

other other

Tram Tram

bys.

heights.

sign sign

trams trams

Tram Tram

Refer Refer

enough enough

Yellow Yellow

indicate indicate

use use

tram tram

'give 'give

section section

For For

=Some =Some

For For

•Urban •Urban

•Some •Some

•Yellow •Yellow

as

in

the

gateway

stop

End

some

where

and

to to

stopping

the the

In In

markings.

signs signs

have have

at at

no no

line line

sign.

tramway

deterrent deterrent

sections:

a'Dead a'Dead

a a

markings.

the the

even even

with with

corners corners

provided provided

Trams Trams

as as

signs signs

plate.

rails.

loading' loading'

racing racing

on on

ahead' ahead'

on on

path path

sections:

are are

-8pm.

or or

don't don't

the the

only only

the the

Zone' Zone'

Only Only

Except Except

unenforceable. unenforceable.

Sam

on on

Trams' Trams' bays bays

divergence divergence but but

segregated segregated

Trams Trams

they they

swept swept

running running

to to

Tram Tram

are are

surfacing surfacing

taking taking

surfacing surfacing

-Sat -Sat

stopping stopping

Entry Entry

street street

Red Red

places places

places, places,

No No

Blue Blue

Except Except

Prior Prior

Mon

they they

Yellow Yellow

skidding skidding

necessary.

Parking Parking

cars cars

'Except 'Except

'Controlled 'Controlled

'No 'No

~ ~

- -

- -

-

• •

On-

-Red -Red

Shared Shared

• •

. .

dots

path path

swept swept

..

•Yellow •Yellow

lane.

tram

the the

tram tram

markings.

markings.

sections:

the the

on on

dots

sections: sections:

between between

lane.

street street

a a

loading' loading'

loading' loading'

path path

line line

on-

or or

or or

street street

written written

tram tram

lanes.

on-

the the

white white

Responses

swept swept

Only' Only'

in in

tratfic tratfic

stopping stopping

stopping stopping

segregated segregated

shared shared

Even Even

and and

'No 'No

'Tram 'Tram

'No 'No

~ ~

For For

For For

•Yellow •Yellow

,Double ,Double

• •

as

loading

goods

markings markings

#ionnaire #ionnaire

for for

limited limited

dots

routes.

a a

bays bays

loading loading

red red

with with

-pads -pads

or or

of of

only only

.

Ques

loading loading

use use

swept

as as

stopping stopping

2010

Responses

vehicles vehicles

No No

time. Well Well

Special Special

-~ -~

•Yellow •Yellow

May May

in

of

Issued Issued

the

of

two

tram

with:

2D10

many

set

(tram

LUAS

24hrs) 24hrs)

Tramway Tramway

surfacing

not not

with'lana

is is

the the

in in

space

treated treated

junctions

type type

signs

May May

of of

is is

prevented

the the

a a

Report Report

mark mark

badge

is is

lane, lane,

at at

sections sections

1 1

lane lane

2S 2S

on on

to to

type type

between between

face face

bus bus

(usually (usually

lane' lane'

road

path.

between between

a a

or or

another another

having having

provided provided

markings markings

in in

used used

Phase Phase

the the

tramway tramway

disabled disabled

kerb kerb

intertace intertace

as as

tramway tramway

special special

signs signs

3 3

'tram 'tram

are are

especially especially

and and

on on

higher).

a a

kerb kerb

are are

most most

swept swept

the the

for for

instances instances

lane- lane-

the the

the the

segregated segregated

buses).

colour colour

Operational Operational

blue blue

of of

no no

bays bays

the the

difference difference

with with

dots dots

Acllvity Acllvity

255164/Il003;A 255164/Il003;A

trams trams

manner manner

paths, paths,

splay splay

thick thick

on on

where where

of of

written written

Supplementary Supplementary

(e.g. (e.g.

usually usually

street street

clearway clearway

a a

are are

where where

for for

level level

different different

Highway Highway

on-

tramway, tramway,

D.1. D.1.

holders. places places

with with Blocking Blocking

specifically specifically

and and with with

loading loading

edge edge

Yellow Yellow

mite mite

swept swept

A A

A A

White White

tram' tram'

lane lane

similar similar

'~2~ '~2~

vehicle vehicle

= =

apart apart

system system

There There

A A

a a

For For

the the

and and

d. d.

do

3: 3:

other

on-

lines lines

tram

for for

and and

tramways

and and

standard

for for

users)?

Tramways Tramways

use use

-•

Activity Activity

of of

w w

you you

road road

drivers drivers

street street

UVhat UVhat

signs signs

(both (both

a a

7 7

UKTram UKTram

Signing Signing Appendix Appendix UKTram Activity 3: ~''~''~''~ Signing of Tramways and Highway Interface Mott MacDonald

,, . ~° ,,. ;: ar, . ; ~ .:, b What standard Some kind of marker post in ~ -Give way or stop signs with the tram ~- Warning —trams crossing ahead in 'Give way' signs with fhe tram plate - 'Warning Trams crossing' signs on ~ Blue'tram only' sign &plate signs and lines do between the two tracks— either verge plate. advance of the junction beneath. some approaches with a'Look right Yellow painted tramway surtace you use in places markers, sentinel plastic bollards or ~yaming —trams crossing ahead on o 'Stop' or'Give Way' signs with a •Yellow boxes with swept path plate on the centre loop. Also, 'Look where a Reflective verge-marker style posts concrete bollards with reflective side roads tram plate and sometimes arrows markers Right Trams' written on the road. segregated includin one each side in the swe t rings. indicating which way the tramway 'Tram Only written on the tramway (~ 9 P tramwa y crosses u Wamin g overhead lines, with a a glue'tram onl y' si g ns on the s path, as theyre passive) with'ahead • Red surfacing on the tramway, runs. the highway at clearance plate tramway branches e Red paving on fhe tramway. only' written on We road. accompanied by, or neM ta, special Yellow box markings grade (both Tor Caving in the forth of cobbles, sharks .Yellow box 1unctions with cameras — ~ m 'Tram onlY' written on the tramwaY~ •Arrows on the carria9 ewa Y directin9 tram drivers and teeth or ribbed concrete. not very well enforce, only = 'Warnin tram crossin ahead' si ns. motorists along road. other road users ? occasional prosecutions g 9 9 •Sections of'plinth track' before UVhere a se9 re 9 ated track begins, ballasted sections. - Yellow'beware trams' plates added no-entry signs are sometimes placed to other signs. either side of the righbhand track (as 'Warning, trams ahead' sign Tor in the manner of a dual motorists. carriageway). Thus the sign is legally • In some places the cyclist warning placed (the trams aren't ignoring it) sign'slippery rails', but the sign in the centre looks like it • Yellow boxjunction markings — could be applied to the left hand these are not very well enforced for track and deters motorists from the majority of the year, but from the turning into it. beginning of December to the end of ti 'Sound warning' signs are not placed the January sales the Gardai police at everyjundio~, only where junctions for operation free-flout. pedestrians approaching are walking Road-works are also prohibited with their back to the tramway or during this time. there is very poor visibility. Drivers are taught to use their discretion when sounding warnings generally. The bell is usually used for most warnings both for motorists and pedestrians, as the horn is a full- blown train hom. c How do you mark As in (a) or (b). Blue'tram only' signs (coupled with Blue tram only' signs (or'Tram and y Blue'tram only' signs with Various Ways: Specially laid block paving the boundary a'bus/taxis/cyGes only' sign where Bus Only') accompanying'no pedestrian W Blue Tram Only signs at the gateway Ideas for where a segregated tramway between street- relevant) ~ 'Tram Only written on the tram lane. access' signs, be ins: running and .'No motor vehicles' signs 9 m Sometimes'no entry' signs with > 'Tram only' wNtlen on the tramway. segregated .Traffic lights permanently on red. 'excepttrams' plate (but not in areas ` No Entry ExceP t Trams si9 ns in sections of the •Different coloured/textured surfacing Active sign saying trams only owned by the LA), unenforceabdetenent as tramway? hley are • 'Tram only' written on the road. Ateunctions where the tramway continues streit ahead, traffic signals which only have a filter. 2 a How many on- About 33 28 17 7, with 1 pelican cros8ing 11 About 70. street signalled junctions are there on the tramway? What standard As compliant with the Tragic Signs • Mostly no signs, Just treat it as a 'Warning Trams Crossing Ahead' on For motorists: y Yellow box markings for junction signs and lines do Manual Ireland Chapter 8 and an normal road junction. some signal poles, but mostly just treat Blue tram only signs with enforcement. These have been well you use typically at accompanying Guidance • 'Tramway, look both ways' attached it as a road junction. accompanying'no pedestrian enforced lately, which has lead to a these junctions Document written specially for LUAS. to signal poles to aid pedestrians at access' signs. drop in incidents. (both for tram some junctions. a 'Tram only' wriNen on the tramway. The 'electrified cable overhead' drivers and other warning sign is used as appropriate road users)? • Some traffic signals have an ahead u 'Warning tram crossing ahead' signs. arrow as the green aspect, with an even in segregated sections, as ahead only sign beside them to For tram drivers: these may be accessed by the reduce confusion to road users. • Diamond'Information'signwith'TC' emergency services. plate to warn drivers of crossing (with TC.end the other side of the crossing).

255164/J/003/A 25 May 2010 22 AciNity 3 Phase 1 RepaA issued May 2Q10 UKTram Activity 3 Signing of Tramways and Highway Interface Mott MacDonald

3 a Do you use any Refer to driver manual and Light Rait - Considered introducing adiamond -Signs telling the drivers to switch No No No non-standard signs guidance Document.(needed because sign for the approach to a set of between'Street Running Mode' to convey of the lack of specified signs in the points, but decided against it as no (line-of-sight using tramway signals) information to tram 'Traffic Signs Manual'). clear sign could be found. and'Segregated Running Mode' (using railway signals) drivers? Some peculiarities of the system: d yellow poles to indicate fouling y The operator sometimes puts up points. •Point Position Indicators which are temporary signs which are black on not dog-legs. a yellow background, which is not + 'Possible leaf fall' signs where there acceptable to RPA –too similar to may be railhead slippery conditions Irish warning signs. which will not affect road vehicles. • As well as the usual speed limit LRV signs to indicate where one or signs, the design speed of some two car trams need to stop to sections (e.g. carves) is highlighted change direction to go over a set of by the observe instruction' sign with crossover points. a plate giving the design speed limit. The'sound warning' for the trams has a specific pattern which has been reinforced through a public information campaign: m Bell –tram coming up behind you (e.g. a warning for pedestrians approaching crossing points) . Horn –get out of the way (e.g. a cyclist riding dangerously in the tram lane) Then the emergency brake is applied

4 a Do you use any "Traffic Signs Manual in Rol. No WolverhampWn city council wanted the .The slippery cyGist sign was No 'skiddy cyclisP sign after a claim was invented here. signs not shown in The cyclist warning sign'slippery rails'. more TSRGD'to convey lodged. There haven't been any 'Caution Tram Track' plates on'right since, so this may have been information to claims turn only' signs. These are actually other road users? successful. left over from when the tramway was Please provide first wnstructed! diagrams or White'Keep Clear' markings on the photos. road instead of yellow boxes.

5 a Do you use any 'No Entry' with an'except trams' plate • 'No entry except trams' which Is • 'No pedestrians' sign but with a red No No Entry Except Trams signs in . q'warning slippery road ahead' sign signs from TSRGD has been authorised under the revised unenforceable. line through it places, but only as a deterrent as they with non-standard plate'Rails are unenforceable. In some places slippery when weP. This is in anon-prescribed Road Traffic Parking and Signing • Various signs to indicate exclude they don't even have the'Except sometimes also accompanied by an manner(e.g. 'No Regulations 2004 –used to all combinations of vehicles using a cyclists Trams' plate. advisory speed limit plate. Entry' with an other traffic including lane, e.g. tram/bus/taxi/cycle lane. p 9 'ExceP t Trams' The'no edestrians' si non its own – In Middlesbrough, a special sign was plate)T strictly speaking, in order to use it the initially used to indicate traffic by-law has to be written out in full allowed down a particular lane. This underneath – a problem as iPs quite showed that the lane was for trams, long and should be written in Gaelic cycles, motorbikes, taxis & too. IYs often used without. authorised vehicles using a mixture of white pictures and text on a blue background. After a motorist was prosecuted, he successfully appealed on the grounds that it should have been written on the road as well. This forced a re-think on the sign, and trams and taxis were incorporated into'authorised traffic. _-_----. _._--'__.__._._._._..___~__Y..~ .__... .____.. _.. _ _. __._.—.__..... _ __ ...... _ _ ~.____. ~---- 6 a Do you use any There are no on-street pedestrianised Not innovative –just use a sliyht level 'Look' written on the crossing points Not applicable No non-standard or sections of the tramway. difference and surtacing contrast to innovative ~n the depot white chevrons are highlight the swept path of the tram. markings for on- painted on the pavement at crossovers street, to indicate the area that must be kept pedestrianised clear whilst another tram is in it. sections of the tramway?

25S16411/003/A 25 May 2010 123 Aciiviry 3 Phase t Report Issued May 2010 UKTram Activity 3: '~~'7 Signing of Tramways and Highway Interface Mott MacDanald

,, wt's ~ ~~_ ... .. _ „_„~-.,, .. ,. ,;, , .,z r ~ ... " _.. s s. ;, r ~, b Do you use any IVot markings, but flashing road studs No Traffic signals with a green arrow only No - Red cats-eyes across tram gates. .Red surfacing ai the carriageway non-standard or have been installed in some places. to remind traffic not to turn into the edges to discourage cars from taking - White'Keep Clear markings on the innovative These are to try to reinforce the red tramway. road instead of yellow boxes. the racing line across the rails markings at light at signalised junctions, b Yeligw painted tramway surface to junctions involving indicate swept path. the tramway and highway? ~ At pedestrian crossings, 'look both ways' is written on the road as this has been found to be more effective than the blue signs saying the same thing, BUT all tram stops have blue 'look both ways' signs. 7 a Approximately how » On average about 28 RTAs annually 1 serious RTA in 8 or 8 years On average 30 near misses a year(but About 5 reportable incidents per year 2'1 accidents, none fatal. Collisions: on average 25-35 per are (3 misses 2 actuals). many incidents do (taken from last 3 years). a About 30 instances a year of tram only 8 in 2008 — numbers falling near and year, inGuding minor (e.g. door you have involving ., About 232 emergency brake damage (both major and minor) Year on year) knocked off car). motor vehicles, on Average RTCs: 14. This has stayed applications up to September 2008, o Tramway blocked about 8 limes a - Out of that, there are about 24 average, per year pretly steady over the years. year serious RTCs a year (e.g, red light (e.g. illegal turns jump) into tram only sections, give-way ~ About 6 illegal turns which block the line overshoot, loss track per year, but this is reducing of control)? (although there was one during the interview!) b Are there any • Queen Street > Sandilands * Nicholas StreeUMosely street • On the gyratory The Asda rar park exit onto Radford Road. areas of the • Blackhall Place • Reeves Corner Exchange Quay/Ordsall Lane New Swan Lane crossing, near the system where Black Lake tram stop. there are, or have s Busaras previously been, . Wolfetone St particular problems? Please James St identify the areas. Abbey St Lower. c If yes, can you -~ Red light running Driving on to the ballasted track. These Nicholas Street: The lane markings on the gyratory People are still acting with the'shopper Were contusing, so motorists were too mentality' when they exit, not expecting identiTy what the • Failure to obey stop signs are the boundaries between the on- Issues are that traffic approaches a problems are and and off-street sections. In both cases, give way line to cross atram/bus only busy watching them to watch the tram trams to be sharing the road. ~~ Veering into tram lanes what maybe the tramway is strait ahead and the lane. The art gallery wall on one too. causing them? road diverges to the lek. corner, plus pedestrian activity causes At New Swan Lane, there were several cars to ease forn~ard into the outbound instances of care fuming onto the track tram/bus lane whist looking left for by mistake. traffic on the inbound tram/bus lane. Some traffic ignores the give way line as they think Mosley Street has very IitUe traffic, only to pass into the path of a tram. Exchange Quay: A tourist sign is located beyond the signalised junction with the tramway, so motorists are too busy trying to read the sign to notice the signals. d Have any A combination of measures, including: Arrows and writlng on the road The problem at Exchange quay has Wolverhampton CC re-did the lane 'Warning Trams' signs with high identified, sign markings on the gyratory to improve measures involving • Road studs flashing red when the d 'No entry' signs where the road only recently been so visibility backing boards. signs, might take place. their sense. This has reduced markings traffic light is red — to reinforce diverges from the tramway at re-location 'Look Right Trams' written on the incidents. and signals been signals. Sandilands. road. tried to reduce the The New Swan Lane crossing is now High friction surfacing at the 'Trams' written between the rails number of 'No entry except trams' at Reeves signalised, double high level junctions to reduce skidding onto the with opposite the entrance. incidents, and how Corner. repeaters. The speed limit of the road tracks. successful have Still have some incidents at these has also been reduced. Since the they been? ~~ Raised studs in the tram lane edge areas. introduction of these measures, there line, to reinforce when it has been have been no more instances of cars crossed. turning onW the track. .. Additional LED traffic lights or signal hoods and louvers to ensure they can be clearly seen. Many of these are only recently installed so IPs is hard tojudge their success.

255164//l003/A 25 May ?010 124 AcUVity 3 phase 1 Report issued May 20'10 UKTram Activity 3: '~(1 Signing of Tramways and Highway interface MoEt MacDonald

8 a Are there arses of Problem Areas: No particular areas. There is a general •Piccadilly Undercroft Problem areas: ~ Radford Road the system where ~ Marys Abbey at Cepel Street problem, mostly with buses) .Aytoun StraeUAubum Street ~ Ettinshaw Road =The Lace Market trams are delayed by motor vehicles Busaras • Aytoun StreeU o The Royal •Where Gregory Boulevard crosses the on Noel Street (e.g. junction Jamea Street tramway blocking, illegal m Harcourt Street use of tram lanes)? Please ideMiy the areas. ~_ _ _. b If yes, can you • Rat running - man cases [na prooiem is iramc Heavy franc prevents trams leaving • Radford Road: Traffic backing up, This is a problem as a large blocking yellow boxes, as junctions are the segregated section onto the holding up the trams in the shared proportion of the tramway is shared identify what the • Illegal queuing on tracks problems are and in close proximky to one another. highway on Bilston Road at the running section and blocking the running with traffic, but it has what may be Exit from major bus station junction with Ettinshaw Road. fuming into Wilkinson Street improved recently due to relief and causing them9 Delays caused by shared running d There have been taro incidents • Lace Market: vehicles blocking ring roads diverting traffic elsewhere. Taxis parking in the tram lanes where cars have driven into the short junctions. a There is a massive problem with outside nightclubs segregated section containing The • Gregory Boulevard: there is no right taxis making U-turns and other Royal tram stop and caused delays. sudden manoeuvres across the • Dublin buses blocking yellow boxes. turn lane far vehicles wanting to turn When the M6 is closed, increase in into Noel Street, so the . Supertram is trying to build up traffic causes severe delays. across the junction becomes a rapport with the taxi companies to blocked. reduce this. • Yellow box abuse by buses is also common.

c Have any At Busaras, current measures (studs in Yellow boxes are used at some The traffic light phases have been Not really. Radford road:At busier times, ask No measures involving the tram lane line, yellow swept path junctions, but are rarely enforced. adjusted (in consultation with the the UTC to e#end the green phase. signs, markings markings) have been unsuccessful. UTC). > Lace Market: ask the police to clear and signals been Buses still overhang tram lanes and yellow box junction. tried to reduce the side-swipe trams on turning. Gregory Boulevard: No measures problem, and how a successful have taken. they been? 9 a Approximately how Not that much of a problem on the About l5 About 1 a year. About 3 There were 15 in 2008. Very rare, as there are few signalled many incidents of main system —more incidents in the sections. SPAS do you depot. have, on average, Point indicators are always'dog-leg' per yeaR b Are there any No partiwlar areas, apart from the No real problem areas, though termini No. Two identifiable problem areas are the Most have been caused by driver ~= Depot exiUentrance a problem, as problem areas, depot. seem to be the most regular spots for signal by Wednesbury depot, and the behaviour, but one problem area is the mainline signal is always set to go, and can you SPAS incidents. approach to the Swan Lane Crossing. Bulwell Forest Crossing, where there is except when a tram is trying to exit identify what may To prevent SPAS: Both are caused by the anticipation of a level crossing for both from the depot. As the signal rarely be causing them? a proceed aspect. and the tramway. Because fhe signal is has to be noted, drivers forc~et it is • Signs saying check signal' at tram controlled by Network Rail, it there. Ablack-back- board has been stops. sometimes changes from proceed to put on the signal to improve the High contrast backing boards for stop at the last minute if a train has contrast. but iYs too early to tell if this point-dependent signals. only just passed over the crossing. has improved matters as, even in this'hot-spoP, incidents are relatively rare. r Also, some tram signals being used as points indicators. This means that when the points are set'streit ahead' the points indicator looks identical to the'procaed' aspect of tram signals, causing confusion.

10 a Approximately how There was one, in 2007 when a Since fhe tramway opened: .gbout 12 near misses a year. None so far-1 minor injury caused by 2 major injuries (one trapped leg and About 1 or 2 a year one pedestrian struck at 18kph) and many serious pedestrian trespassed a section of off- a 6 pedestrian fatalities .About 6 minor incidents a year. someone running for a tram. injury or fatal street segregated ireck. one fatal accident (pedestrian under collisions with w 4 of which were suicides. 1 or 2 death or serious injury the influence was clipped by the tram pedestrians occur, incidents a year. and fell hard, hitting head on the on average, per tarmac) in the life of the tramway. year?

255164ll0031A 25 May 2010 ~ 2~J Activity 3 Phase 1 Report issued May 2010 UKTram Activity 3: Signing of Tramways and Highway Interface Mo~i ma~o

b Are there any =Anti-social behaviour in Ballymoun[ -The top of George Street where it A narrow pavement adjacent to the N/A ~ Not really. •Problems are experienced where a areas otthe „Naas Road crosses Wellesley Road, possibly outbound track opposite the segregated tremway runs alongside system where because pedestrians have to cross a Bridgewater Hall at G-Mex. A fatality a two-way road. The crossing there are, or have ~~ Pedestrian trespass between two-way road then a tramway and was caused by roaches picking staggers on the centre) reservations previously been, Cherlemant and Miltown get confused about which way to up/dropping off at this point. A girl was aren't standardised, causing some particular look. killed when she stepped backward into confusion. problems? the path of a tram whilst waving to a The biggest danger is actually to friend on a coach ~ Another fatality at ibis spot was caused of ncdents whereepassengers have by a pedestrian walking into the path of been injured to sudden a tram whilst talking on a mobile braking/acceleration. phone. c Have any No pedestrian' signs e Reducing the speed from 50 to 20 Coaches have now been banned from Near misses were mostly at stops. »Enhancing the white line on the At a pedestrian crossing of a road measures have Deterrent paving kph. This has been fairly successful. dropping off at this point. Platform widening has been carried out platform edge. alongside the tramway in the centre of been tried to at West Bromwich Central to allow - Installing foam paving around the city a recorded voice repeats'two- reduce the number These have had a medium level of passengers to pass more easily. obstructions. way treffic, look both ways'. This was of incidents, and success an accident black spot possibly due to how successTul the pedestrians having just crossed the have they been? tramway and reached a refuge, inclining them to look only one way. 11 a What signs, .Red blister tactile paving at •Blister tactile paving at all crossings, •Lozenge tactiles on all platform Tactile paving: Lozenges on all Tactile Paving: ~ Lozenge tactile paving used to mark markings and signalised crossing points — though .Lozenge tactile paving at the edges edges. platforms and blister paving of some Lozenges on all platforms the platform edge and corduroy special pavements problems with wntinui~g tactiles of on-street tram stop platforms. Blister tactiles at most on-and off- crossings, paving the Position oT the doors. do you use to •Blisters at crossings. onto service covers. street crossings of the tramway. ~ guide the - In-line blister tactile paving at the Blister tactiles used to mark tramway g Lozenge tactiles for the edge of on- ~ Corduroy at the bottom of ramps, disabled? edges of off-street tram stop crossin oints in all cases. street platforms. both Tor on-and off-street platForms 9 P platforms In pedestrianised areas, the swept Corduroy hazard tactiles at the path of the tram is marked with a bottom of all ramps to on-street Disabled pictogram on paving to very small dropped kerb, block platforms. indicate where the wheelchair area is paving of a different colour /texture • Some buff blister tactiles at on the tram. /shape to the surrounding area and a unmarked crossings, but this is a line of red blocks highlighting the rerity. kerb line. 12 a Approximately how •About6 minor cycle injuries, ~ About 1 accident a year < 2 near misses in 2008 and 4 in 2007, None so far No serious accidents. There has only been one in the history many serious generally wheels caught in rails. This ,Only 1 fatal accident in the life of the but none in 2006 and 2005. 1 in of the tramway. injury or fatal isn't very accurate however, as tramway. 2004. collisions with accidents are generally only known o No minor injuries to cyclist until cyclists occur, on about if a tram driver is present. 2007, when there were 3, then 2 in average, per yeaR RPA liaise with the Dublin City 2008. Cycling Campaign. No death or fatal injuries so far. b Are there any r James HospiPal Everywhere. No N/A Several people have fallen off their The incident occurred where a areas of the Steevens lane bikes, but always in'no cycling' areas. segregated tramway runs alongside system where the road. there are, or have previously been, particular ... _...... problems? c If yes, can you Cyclists failing to use facilities ~ ~~! Some junctions with cycle lanes have N/A Non compliance. In this case there was no particular identity what the provided and so crossing at an acute signals specifcally for cyclists. design flaw. The cyclist was caught on problems are and angle CCN cycling along the road before what may be • Cyclists using tram-only sections of suddenly swerving to cross the tracks. causing them? the track. __ _.._ d Have any • Improvement in signage •Cyclist education leaflet No N/A • Public awareness campaigns There is no way of recording minor measures have • Public awareness campaigns a Occasionally stationing people at injuries to cyclists (although drivers are been tried to Problem crossings, asking them to encouraged to make a report if they reduce the number Supplying high-vis jackets to cyclists. dismount. witness an incident) therefore it is of incidents, and These have had a medium level of difficult to know where hot-spots are in how successful success. b 'Cyclist dismounP signs order to reduce incidents. have they been? Footpath re-alignment and staggered barriers.

2551fi4/1fOQ37A 25 May 201U ~ 2~ ,4ctimty 3 Phase t Report Issued AAay 20'10

or

the

they

and

by

as

are

their

on,

they

to but

is is

enable

brake,

regard

these

past past

and and

as as

an an

to to to

is

cyclists

taught

every

At

in in

it it

it it

much much

warn

the

contact

to

with with

closely closely

MacDonald

drivers drivers

are are

ahead' ahead'

stop.

on on

to to

slipping slipping

trams.

safety.

any

as as

used used

trams trams

his his

but but

rails. rails.

feel feel

where where

report report

it it

drivers drivers

too too

of of

to to

maintained maintained

groups groups

anyway anyway

campaign, campaign,

let let

a a

present present

way way

encouraged encouraged regard regard

are are

road road

Mott Mott

to to

tram tram

emergency emergency

with with

the the

given given

~1

use use

they they

a a

cyclist cyclist drivers drivers

given given

well well

file file

is is

if if in, in,

street, street,

are are

are are

into into

the the

to to

down down

him him

with with

routes routes

occurs occurs

complaints complaints

tramways, tramways,

to to

cyclists cyclists

cycling cycling

better better

sign.

has has

and and

dangers dangers

on-

interface.

bell bell

use use

a a

fairly fairly

and and

lanes lanes

feedback feedback

information information

is is

the the

caught caught

pulling pulling

training, training,

local local

recordings recordings

some some

training training

the the

follow follow

Cyclists Cyclists

conflict conflict

contact contact

slowing slowing

the'slippery the'slippery

of of

trams trams

/tram /tram

they they

different different

to to

of of

expected expected

required required

to to

Skirrow Skirrow

to to

approaching approaching

cycle cycle

use use

available available

seeking seeking

formal formal

pedestrian pedestrian

performance performance

provide provide

necessary.

not not are are

CCN CCN

necessary.

lots lots

During During

cycle

time time

not not

to to

getting getting

No No

balance balance

are are

cyclists cyclists

used used delay delay trams trams

areas. areas.

Some Some

.• .•

.Unlike .Unlike

No No

to to

details details

Dave Dave

comments comments

them them

present present

only only

or or

cyclists cyclists Still Still

None

~ ~

- -

to

were

off off

poor

don't

cycle

design

ahead'

routes

they they

produced

cycling'

the the

fallen fallen

on on

often often

road road -play

avoid

CCTV

re

investigations investigations

were were

to to

cyclist cyclist

in'no in'no

have have

they they

crosscity crosscity

the the

to to

during during

a a

highlighting highlighting

routes routes

training.

to to

slippery slippery

see see

brake brake

new new

leaflets leaflets

always always

people people

policy policy

cycle cycle

CCN CCN

driver driver

tramway tramway

the the

drivers, drivers, they they

close close

instance, instance,

but but

to to

the the

to to

Cycle Cycle

For For

until until

how how

to to

-board -board

provide provide

several several

further further

emergency emergency

on

bikes, bikes,

guide guide

to to

overriding overriding

a a

Use Use

guide guide

Use Use

realise realise

driving driving

footage.

driving. driving.

incidents incidents

sign.

Cyclist'Warning, Cyclist'Warning,

areas.

parallel parallel

their their

Again, Again,

routes.

conflicts. conflicts. as as

was was

The The

to

of of

re-

local

of of

life life

sections

had

cars.

with with

on on driver

iYs iYs

cycle cycle

retrofitted retrofitted

whole whole

ii ii

specifically

with with

parked parked

the the

cyclists cyclists

been been

sure sure

been been

in in

with with

helps helps

relationship relationship

Not Not

poor!

has has

have have

our our

lined lined

training.

which which

overtake overtake

incident incident

quite quite

comprehensive comprehensive

CCN CCN

leaflet. leaflet.

to to a a

particular. particular.

is is

track track

effect, effect,

to to

drivers drivers

in in

not not

trams, trams,

system. system.

the the

reported reported

of of

told told

Also, Also,

awareness awareness

There's There's

training. training. the the

much much

Refer Refer

cyclists cyclists

None None

1 1

N/A N/A

the the

cycle:

of of

running running

taught.

shared shared

driving driving

no no

is is

trams.

Defensive Defensive

No

None

1

with with

There There

training.

perception perception

2U'10

Hazard Hazard

No

None

Afiay Afiay

no

on

Issued Issued

— —

are are

a

been been

2010

cycling

ahead' ahead'

local

where

gauge

introduce

Training

with with

has has

May May

allowed allowed

Report Report

to to

the the

there there

to to

road road

1 1

success success

25 25

is.

to to

route route

but but

as as

are are

hard hard

Driver Driver

trams trams

up up

plans plans

Phase Phase

iPs iPs

only, only,

lane

bikes bikes

the the

record record

no no

slippery slippery

3 3

with with

Interface

frequency.

Medium Medium

the the

into into occurring, occurring,

are are

alternative alternative

actually actually

again again

cycle cycle

-time -time

implemenUmanage implemenUmanage

available

folding folding

an an

Activity Activity

25516d/;l0037A 25516d/;l0037A

iPs iPs

still still

but but

leaflet. leaflet.

fo fo

is is

interface interface

reduced reduced

There There

to to

4, 4,

only only

periods.

atpeak

accurate accurate

Highway Highway

2~ 2~

'~ '~

space space

Terminate Terminate

manual.

Cyclist Cyclist

incorporated incorporated

Refer Refer

greatly greatly

incidents incidents

Cyclist'Warning, Cyclist'Warning,

sign.

Note: Note:

how how

LUAS. LUAS.

quiet quiet About About

~ ~

However, However, authority authority

them them

facilities.

,provide ,provide

and and

to

to

last

how

do

the

how

been

lane

you

a

3:

by

and

in

or

rails?

the

which

trams

and

the the

and

stop?

the

prevent

of of

on-

the

of of

used used

of of

do do

in in

give

give

on on

part part

the

to to

of of

with with

have have

into

cycle cycle

and and

an an

between

of

of

warn

information

training

a a

accidents accidents

signs signs

improve improve

tram tram

a a

methods methods

you you

you you

caused caused

have have

Tramways Tramways

to to

use use

to to

Activity Activity

of of

pedestrians pedestrians

around around

cyclists cyclists

tramway?

plays plays

safety safety

improving improving

driver driver

pedestrians pedestrians

Can Can

examples examples

cyclists? public public

you you

safely safely

try try

presence presence

markings markings

campaigns campaigns

Can Can

rails?

use use

examples examples

What What

cyclists cyclists

many many

year year wming wming

contact contact

recorded recorded

cyclists cyclists

Approximately Approximately

passes passes

when when

you you street street

What What

cyclists cyclists

conflict conflict

a a

a a

b b

a a

a a

16

15

14

13

UKTram UKTram Signing Signing of

low

to

so

reduce

areas

but

base

to

cow-

tramway

MacDonald

-spots

the

the

the

at

hot

concrete,

Mott

particular

as

in

unevenly,

'YY1

under

no

roughened

used

crosses

laid

is

laid

as

are

pass

are

tell

road

to

identified

a

to

kerbs

rails

cobbles

concrete

OLE.

with.

been

hard

Use

The where Trief catcher. all enough the

skidding.

had

start IPs

from

the

on

place

places

into

for

in

and

turn

was

sections.

it

highlight

might

as

to

accident,

tell,

by

to

vehicles

segregated

surtacing

hard

beginning.

Red

where

tramway street

bit

-.

A

the

the

Royal

on

concrete

the

also

employed

is

between

island,

road

pavement. surtacing

ring

reservation

the

sure.

Not

Coloured

deterrent

central and

to

s

g

adjacent

deterrent

street

crossin

boundary

off-

the

pyramid

deterrent

at

-and

or

edestrian

on

slat

used

roblem

paving

between

P P

tramways.

20'10

'Keycheck'

.

.Wooden

May

the

to

block

to

on

Issued

the

is

least

places

2010

contrast

coloured

by

onto

line.

tramway

highlight

the

-like

different

in

least

has

discourage

to

the

where

corduroy-

most

This

access

pavement

May

happy

of

to

seams

Report

to

the

as

than

gauged

the

a

1

and

hated

the

and

25

also

using

is

racing

access

deter

perception.

with

are

road

corduroy

by

are are

paving.

but

been

prevent

to

the

rather

roadway

effect,

crossings

Interface

Phase

deterrent

to

the

surfacing

surtacing and

preventing otherwise but

3

has

cobbles

the

of

of

teeth

crossings.

/motorists.

blocks

in

or

concrete

/motorist

taking some

junction

shaped

blocks

on

atjunctions,

cobbles

teeth'

a

intrusive

Paving:

achieved

concrete.

rians

coloured

edge

AcUairy

?5576a///003;A types

is

had

paving

sf

coloured

coloured

surrounding uneven

rutted

sharks

paving

feedback

suRacing: surtacing:

-skid

tramway,

the Highway

success

paving

motorists

Rutted pedestrian

pede have visually Red medium. usually Red

architects.

White with contrasting tramway. effective.

Specially coloured at

like Anti surtacing. The tramway the there The

successful

'Sharks

X28

..

used: ~--

Various public Deterrent

Other

Other

special

The

°Uneven

.The

and

on

any

3:

(e.g.

Please

paving,

surfacing,

special

utilise

paving

types.

been?

successful

Tramways

skid)?

the

system

you

-

Activity

of

Do

How deterrent anti

the coloured paving

special has

specify

b

a

7

t

UKTram

Signing UKTram Activity 3: Signing of Tramways and Highway Interface Mott MacDonald

D.2. ~ Non-operational Tramway Responses

1 a When is the tramline due to be 2011/2012 opened? _. c What is the tram service level / ~ 6 trams per hour initial timetable headway planned to be? a 8 trams per hour during morning and evening peak 16 trams per hour on the shared section 2 a Who owns, maintains and is +Owned by Transport Edinburgh Ltd.(TEL), a council company responsible for the tram system ~ To be built and maintained by Infraco generally? b Who owns, operates and maintains a Highway Equipment owned by City of Edinburgh Council (CEC) the signal junction equipment? ~ Tramway Equipment owned by TEL and maintained by Infraco c Who will be responsible for highway CEC —but not completely settled. operation generally? d Who will be responsible for tramway TEL— but not completely settled. operation? 3 a Are any complimentary traffic E.g. Ocean Terminal: management measures to be ~ Designing a new parallel road for general traffic. introduced (e.g. re-routing of traffic, and taxi plaza for interchange with the park &ride)? e Creating a public transport trams. Leith Walk/Great Junction Street: Short sections of Bus lane on the approaches to the junctions to allow them to jump the queue and to allow buses to stop (interchanging with Foot of the Walk tram stop) without blocking traffic. One way for traffic with atwo-way tramway. Side roads changed to left-in left-out. A Worked with the cycle group to identify a parallel cycle route.

4 a What powers of enforcement are Edinburgh Tram (Line One) Act 2006 available to be used on the highway Edinburgh Tram (Line Two)Act 2006 and tramway? Road traffic Act 1988 Roads (Scotland) Act 1984 New Roads and Streetworks 1991 Bylaws yet to be developed (under power of the Tram Acts above) 5 a What length of the system consists of 7.2km on-street running? b What level of segregation exists for A range of segregation, from completely shared running, through to fully on-street running (e.g. tram only segregated. This includes some areas of bus, tram and taxi lanes. lanes, tram and bus lanes) and how long is each section? c What length of the system consists of 11.6km fully segregated running?

2551 S4/!1003/A 25 ivlay 2010 129 k Aciivity 3 Phase 1 ft~port Issued May 2010 UKTram Activity 3: Signing of Tramways and Highway interface Mott MaeDonald

~r~ - y9,4," '4 xa ^ ~.V" 'I' `';~` ~ ve'l~` `a;~ "`4'4~~ ap C ~&'"2s P"Y's; ~ '~i ~''r 5 k~ ~'~LK~ m.;za'~~~~Ta' i~ <,~.wx.~ '~`~!.~Y -~*~. ~~r ~i3.,~~~~r z~. -~-~ ~.

6 a What standard signs and lines are to ~ 1001 Stop Line be used for on- street tramways (both „ 1001.1 Tram Stop Line for tram drivers and other road users)? * 1001.2 Cycle Advanced Stop Line * 1004 Urban Lane Line • 1010 Edge of Carriageway used by Trams • Text'Tram Only' etc. * Yellow Box Markings with swept path gaps. This will not be camera enforced. 976 Tram Speed Limit 1066 Yellow Swept Path dots Buff surfacing Loading bays provided with the relevant signs, as the shared section is `No Waiting or Loading at Any Time'

b What standard signs and lines are to ~ 1001 Stop Line be used in places where a segregated ,,, 1001.2 Cycle Advance Stop Line tramway crosses the highway at grade (both for tram drivers and other road 4 1004 Urban Lane Line users)? 1010 Edge of Carriageway used by Trams •Text `Tram Only' etc. • Yeliow Box Markings (with swept path gaps) • 976 Tram Speed Limit • 1066 Yellow Swept Path dots c How is the boundary between street- `No Entry' with `Except Trams' Plates running and segregated sections of 1049 Tram Lane Boundary Line across the entrance the tramway to be marked? Also, 1018.1 double yellow lines across the entrance. 7 a How many on-street signalled About 46 (not including pedestrian crossings) junctions are there on the tramway? b What standard signs and lines are to ~~~ 1001 Stop Line be typically used at these junctions 1001.2 Cycle Advance Stop Line (both for tram drivers and other road users)? ~ 1004 Urban Lane Line 1010 Edge of Carriageway used by Trams 9 Text `Tram Only etc. Yellow Box Markings (with swept path gaps) ~• 976 Tram Speed Limit fi 1066 Yellow Swept Path dots 612!613 Banned Turn A 616 No Entry 614 No U-turns 8 a Are any non-standard signs to be This is yet to be confirmed, but so far: used to convey information to tram a, Speed limits will be in km drivers? Please provide diagrams or photos. 3 Point indicators will be dog-leg, with a horizontal bar to indicate no detection _= On-street tram signal aspects will incorporate a cluster which represents the amber phase.

9 2~5164///003/A 25 Ulay 2010 130 ;Activity 3 Phase 1 Re~o~# issued flay 2010 UKTram Activity 3: Signing of Tramways and Highway Interface Mott MacDonald

b If yes, why was it necessary to use N/A non-standard signs? 9 a Are any signs not shown in TSRGD to Yes, however, these are usually a combination of elements which by be used to convey information to other themselves are in the TSRGD. See 10a for examples. road users? Please provide diagrams or photos. b If yes, what was the reason for using Existing signs do not exactly provide the correct message. However, by these signs? utilising existing plates, etc. the symbols are familiar and easily recognised. ______10 a Are any signs from TSRGD to be used 3 Sign 557 'Slippery Road Ahead' with a plate saying 'Tram Tracks'. in anon-prescribed manner (e.g.'No a Sign 616 `No Entry' with various non-standard plates ('Except Trams', Entry' with an 'Except Trams' plate)? Except Taxis &Cycles', `Except Trams, Buses, Taxis &Cycles Loading permitted 8 pm – 7 am') Replacing the 'Turn Left' text under arrow markings on roads with the text `And Buses' • Varying 1048.4 road marking to `Tram Bus Taxi (Cycle Symbol) Only' • Varying sign 958 to include pictograms for bikes and taxis __- ---- _._.—.—___~_~._T~--.. ____. __ __.._ ___. ______.__. b If yes, what is the reason for their As 9b use? 11 a Are any non-standard or innovative There are no pedestrianised sections. markings to be used for on-street, pedestrianised sections of the tramway? b Are any non-standard or innovative Non-standard Yellow boxes markings to be used at junctions involving the tramway and highway? c If yes, what is the reason for their To ensure clearway for tram trying to avoid traffic queuing back across use? its path. _ __ 12 a What particular signs and markings Yellow sign with black writing `Pedestrians Cross on Green Man Only' are to be used to aid the safety of The council are pushing for signalised pedestrian crossings across a pedestrians on and around the tram only section at Newhaven, as it is near a signalised pedestrian system? crossing of the road. This is being resisted. In fact, the design at present has many more signalised crossings of the tramway than other UK ______Tramways. 13 a What signs, markings and special ~ Lozenge tactiles on all platform edges pavements are to be used to guide the ;: glisters for all pedestrian crossings disabled (e.g. in pedestrianised areas, symbol to indicate where at segregated crossing points)? ~ Corduroy tiles on platforms with a disabled the doors are Due to the World Heritage Status of the area, contrasting grey units will be utilised, rather than the buff/red normally specified. Contrast platform edging 14 a What particular signs and markings Generally, cyclists will be encouraged to utilise alternative routes (with are to be used to aid the safety of additional signage and publication of relevant information). However, cyclists on and around the system? there will also be hazard signs such as the `Slippery Road Ahead' sign with a 'Tram Tracks' plate. Markings to guide cyclists to cross at preferred angles are being considered at signalised junctions. ______

255164///003/A 25 iliiay 2010 ~ 3~ 1 Activity 3 Phase 1 Report Issued flay 2010 UKTram Activity 3: ~1n Signing of Tramways and Highway interface Mott MacDonald

15 a What methods are to be used to There will be no marked cycle lanes passing on-street tram stops prevent conflict between cyclists and trams when a cycle lane passes an on-street Uam stop? 16 a Are any public information campaigns Yes, via Spokes (the Lothian Cycle Campaign)and local schools planned to try to improve the safety of pedestrians or cyclists prior to the opening of the system? 17 a Is pedestrian and cyclist safety Yes(Transdev to confirm) intended to form part of driver training?

18 a Is special paving to be used on the s Imprinted asphalt system (e.g. coloured surfacing, ,Anti-ski paving at junctions (including some upgrading of areas deterrent paving, anti-skid)? Please covered) specify types. Buff coloured surfacing for tram only lanes. b Pyramid deterrent paving b Why was special paving chosen for Achieving Safety requirements, both to comply with the Road Safety these areas? Audit findings and also to comply with ORR guidelines Achieving planning approvals. To stop pedestrians using pinch points

i 255154///003/A 25 tNay 2D10 132 j activity s Prase 1 Report issued May 2010