Network RUS Alternative Solutions

Total Page:16

File Type:pdf, Size:1020Kb

Network RUS Alternative Solutions Network RUS: Alternative Solutions July 2013 Contents July 2013 Network RUS: Alternative Solutions 02 Foreword 03 Executive Summary 04 Chapter 1: Background 09 Chapter 2: Scope and policy context 11 Chapter 3: Drivers of change 15 Chapter 4: Baseline 21 Chapter 5: Gaps 64 Chapter 6: Options 68 Chapter 7: Consultation process 104 Chapter 8: Strategy 113 Appendix A: Tram and tram train in Great Britain 126 Appendix B: Tram train in Europe 128 Appendix C: Hybrid light rail 130 Appendix D: Community rail case studies 131 Appendix E: Community rail line infrastructure 140 enhancement case studies Appendix F: Bus rapid transit and guided bus case study 142 Appendix G: St Albans Abbey - Watford Junction: 149 Abbey Line Case Study Appendix H:Scoping document consultation summary 153 Appendix I: Summary of further alternative solutions 155 raised by consultees Appendix J: Glossary 159 Front cover image courtesy of Dr Robert Carroll (Stagecoach Supertram) Foreword July 2013 Network RUS: Alternative Solutions 03 Innovation is vital for the railway industry if it is to This Network RUS: Alternative Solutions complements and builds However, this RUS is not prescriptive. Each locality has its unique maximise value for money and will form an upon the Rail Technical Strategy published in 2012, to examine circumstances and solutions must be developed to meet specific solutions to challenges in the regional and rural markets. It local needs, working with rail industry partners and stakeholders to important element of economic and considers a number of areas where significantly different ways of achieve the most favourable outcome. doing things (the ‘alternative solutions’) could help the industry to environmental policy. As with each RUS, this strategy has been developed with the full achieve better outputs at lower cost. Equally importantly, the work input of the wider rail industry, including train operators as well as has also established circumstances where the solutions would not government and passenger representatives. It underwent two be a helpful option. It will help focus thinking more sharply on 60-day public consultations and I thank all who responded. solutions which could deliver benefit in a particular case whilst at Network Rail looks forward to working with the wider community to the same time minimising effort devoted to evaluating implement the recommendations of this strategy wherever clear inappropriate options benefit can be gained. The following main areas have been looked at: Paul Plummer • can the application of tram and tram train technologies deliver Group Strategy Director savings in capital, operating and maintenance costs whilst at the same time improving the offer to the travelling customer? • are there cheaper and more innovative ways of replacing diesel traction with electrically powered trains on low usage sections of track? • what is the role of Bus Rapid Transit (BRT) and guided bus systems? • does the Personal Rapid Transit (PRT) currently used in locations such as Heathrow Terminal 5 have wider applicability to increase access to the network? • to what extent could further development of community rail initiatives bring added value to local rail operations? Recent developments have assisted the study from the viewpoint of generating practical experience in a UK environment, for example • successful completion of the Paisley Canal electrification scheme, in which the use of extended neutral sections beneath bridges has substantially reduced cost and complexity • successful introduction of Class 139 vehicles on the Stourbridge Town branch • Government authority to proceed with the Rotherham – Sheffield tram train pilot, development of which is now under way. Executive summary July 2013 Network RUS: Alternative Solutions 04 The Network Route Utilisation Strategy (RUS) The Network RUS: Alternative Solutions has followed a remit which they can share tracks with other passenger and freight services. This forms an important part of the Long Term allowed it to think imaginatively about cost effective solutions for avoids the need to segregate the services or sever through journeys. accommodating growth and operating services more efficiently. A tram train pilot is being funded by the Government and will start Planning Process. It considers issues which are The solutions which are considered are generally over and above the operating in 2016 between Sheffield City Centre and Rotherham. It conventional solutions in the railway’s toolbox, such as existing railway network wide. Alongside the Network will seek to address questions about the engineering and cost of the types of rolling stock and 25kV AC overhead line electrification. RUS: Alternative Solutions, four elements of the technology in a UK situation. Subject to the outcome of that pilot, Network RUS have already been established, The document complements the Rail Technical Strategy (RTS), and the technology may then become part of a tool-kit for planning for namely: Network Rail’s Technical Strategy, by looking at the market needs major urban areas. and economic case for emerging solutions. Based on current technologies, tram train is not likely to have a • Scenarios and Long Distance Forecasts The RUS has looked at how future innovations could lead to efficient good value-for-money business case when it does not serve urban and effective accommodation of growth in accordance with areas. However, technological developments in this area should be • Electrification Network Rail’s Licence. It has considered passenger needs, monitored. The advantages come from the ability of tram trains to • Stations stakeholder aspirations and has examined a selection of emerging operate on both a tramway and heavy rail network, serving a technologies. Manufacturers, and those who are actively number of stops within dense urban areas beyond the terminal • Passenger Rolling Stock. considering the development of these technologies, have worked stations whilst retaining through operation to the existing rail alongside Network Rail to make sure that delivery issues are fully network. understood. A ‘Refresh’ of the Electrification Strategy is Tram A number of the solutions have been applied successfully on the rail Tram systems have experienced a resurgence over the last 20 years. currently being developed. network in other countries. That experience gives useful pointers to There are six systems operating in Great Britain’s cities, with one the circumstances in which they could usefully be applied on the under construction. Many of these systems make use of, or have network in Great Britain. been converted from, former heavy rail alignments. In Croydon and Tram train Manchester, services formerly operated by heavy rail rolling stock have been converted to segregated tramways. Tram systems A tram train vehicle is best defined as a tramcar capable of include an element of on-street running and it is this characteristic operating on both a street tramway and heavy rail networks. Tram that has opened up new markets and increased ridership. trains share similar market characteristics with trams. They are best suited to a medium to high level of demand for passengers requiring Trams operate most effectively in densely populated urban areas frequent but relatively short distance services. Unlike trams they do, when passengers require frequent services to cover short distances however, have the ability to operate on both heavy rail with convenient frequent stopping patterns. Their ability to run on infrastructure and an on-street tramway. This enables them to streets allows them to penetrate urban areas, bringing rail transport operate through services onto the national rail network. close to homes and work places. The vehicles’ quick acceleration facilitates frequent stops without a significant reduction in overall Although tram trains do not currently operate in Great Britain, their journey time. characteristics suggest that they have potential to provide a new opportunity to make better use of some existing heavy rail corridors which serve dense urban areas. Tram trains share the advantage of trams of being able to penetrate city centres beyond the existing terminal stations using a suitably equipped road network. They also have the advantage that Executive summary July 2013 Network RUS: Alternative Solutions 05 As such, they are most appropriate for providing connectivity to city Battery power will not be considered to be an appropriate option for centres. This enables the dispersal of passengers to their operation of vehicles on the network until battery technology is destinations beyond the city centre station by going on to an developed to a sufficient degree to provide value for money as an on-street tramway. Taking heavy rail trains out of city centre option for replacement of diesel units. stations can release capacity, addressing urban transport problems Our current understanding of the technology suggests that it is by providing a frequent high quality public transport corridor. To unlikely that battery technology will be appropriate on parts of the maximise the benefits to passengers it is important that good network which have a strong case for conventional overhead wire interchange facilities are provided to the heavy rail services. electrification where vehicles operate at more than 100mph, for Conversion of heavy rail infrastructure or service to operation by substantial distances or when there is limited recharge time tram is unlikely to have a good economic case when
Recommended publications
  • Manchester Metrolink Tram System
    Feature New Promise of LRT Systems Manchester Metrolink Tram System William Tyson Introduction to Greater city that could be used by local rail into the city centre either in tunnel or on Manchester services—taking them into the central the street. area—to complete closure and I carried out an appraisal of these options The City of Manchester (pop. 500,000) is replacement of the services by buses. Two and showed that closure of the lines had at the heart of the Greater Manchester options were to convert some heavy rail a negative benefit-to-cost ratio, and that— conurbation comprised of 10 lines to light rail (tram) and extend them at the very least—they should be kept municipalities that is home to 2.5 million people. The municipalities appoint a Passenger Transport Authority (PTA) for the Figure 1 Metrolink Future Network whole area to set policies and the Greater 1 Victoria Manchester Passenger Transport Executive 2 Shudehill 3 Market Street Rochdale Town Centre 4 Mosley Street (GMPTE) to implement them. Buses Newbold Manchester 5 Piccadilly Gardens Drake Street Piccadilly Kingsway Business Park 6 Rochdale provide most public transport. They are 7 St Peter's Square Railway Milnrow Station deregulated and can compete with each 8 G-Max (for Castlefield) Newhey London 9 Cornbrook other and with other modes. There is a 0 Pomona Bury - Exchange Quay local rail network serving Manchester, and = Salford Quays Buckley Wells ~ Anchorage ! Harbour City linking it with the surrounding areas and @ Broadway Shaw and Crompton # Langworthy also other regions of the country. Street $ Tradfford Bar trams vanished from Greater Manchester % Old Trafford Radcliffe ^ Wharfside* & Manchester United* in 1951, but returned in a very different * Imperial War Museum for the North* ( Lowry Centre form in 1992.
    [Show full text]
  • Responses to the Rail Strategy Consultation Page 1 West Anglia
    Responses to the Rail Strategy Consultation Appendix1 West Anglia Mainline Organisation Consultation Comments - WAML HCC Response Action for Rail Strategy Broxbourne 4-tracking & CR2 to be given higher profile - Include CR2 on page 14 but Borough Council e.g. on pages 4 & 32 & in figure 2.2 on page not on pages 4 & 32 as 14. Include Ambition Broxbourne's aspiration these figures list existing of Cheshunt as strategic hub with CR2, links services and lines. Include to Stratford, London & Stansted, and reference to Ambition significant development around the station Broxbourne's aspiration of associated with a potential redevelopment of Cheshunt as strategic hub, Delamare Road. Include lobbying for early and of lobbying for early safeguarding of regional CR2 route. CR2 safeguarding of regional route. Cambridgeshire Include addressing single track tunnel at Single track tunnel at None. County Council Stansted to improve journey times & capacity Stansted as constraint for all services, from the north & south. already included in Strategy. East Herts District Objects to wording on page 41 re - HCC not pursuing Hertford Council investigation into the implementation of East as CR2 terminus and development around Hertford East branch so text will be removed. stations. Serious constraints of implementing Amend text on page 40 re CR2 in East Herts should be recognised. Ware platform. There was never a second platform at Ware (page 40). Hertford Town Appropriate service mix with more semi-fasts - Include reference to semi- Council to London, and longer term to Liverpool St. fasts including to Liverpool St. Hertfordshire Lobby for Hertford East & Harlow as northern HCC not pursuing Hertford None.
    [Show full text]
  • Railfuture Response to National Infrastructure
    RAILFUTURE RESPONSE TO NATIONAL INFRASTRUCTURE COMMISSION RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH – CALL FOR EVIDENCE FOLLOWING INTERIM REPORT Contribution from Railfuture East Midlands Branch – August 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Interim report https://www.nic.org.uk/wp-content/uploads/RNA-Interim-Report-Final.pdf Introduction: The Railfuture response dated 29th May 2020 to the first round of this consultation https://www.railfuture.org.uk/display2324 placed considerable emphasis on freight. In contributing to the August call for evidence, we in East Midlands Branch: Re-submit our May 2020 Rf EM Branch submission for previous NIC RNA call for evidence. This is on pp6-15 below in red text with a few subsequent additions in blue. Attempt to answer the NIC’s broad questions Q1 to Q4 below. References are to the pages and tables in the NIC’s Interim Report (see header.) Prepared by: Steve Jones, Branch Secretary, Railfuture East Midlands Branch [email protected] including contributions from members of EM Branch. Question 1: Please provide specific sources for evidence that the Commission could use in estimating costs and the impact of proposals on journey time and capacity. For schemes already proposed other than by Railfuture, such as those listed on p36, much information is already available from Network Rail, SNTBs (TfN, Midlands Connect), local and combined authorities, TOCs, DfT. Campaign organisations. For additional schemes put forward by Railfuture, further work would need to be done, though campaign groups such as SENRUG, SELRAP, MEMRAP and CRIL may have initial estimates for specific lines or areas.
    [Show full text]
  • Minutes Document for Devon and Exeter Rail Project Working Party, 15/07/2016 14:00
    1 CABINET DEVON AND EXETER RAIL PROJECT WORKING PARTY- 15/07/16 DEVON AND EXETER RAIL PROJECT WORKING PARTY 15 July 2016 Present:- Devon County Council: Councillors Ball, Biederman, Bowden, Eastman, Julian, Mathews, Sellis, Way, Westlake and Younger-Ross Exeter City Council Councillors Sutton, Wardle and Leadbetter East Devon District Council Councillors Bailey and Longhurst Mid Devon District Council Councillor Snow Teignbridge District Councill Councillors Goodey and Prowse Torbay Councill Councillors Doggett and Manning Members attending in accordance with Standing Order 25: Councillor Greenslade Apologies: Councillors Hughes, Squires, Flynn, Deed and Luggar 9 Minutes RESOLVED that the minutes of the meeting held on 19 February 2016 be signed as a correct record. 10 Update from Great Western Railway (Councillor Greenslade attended in accordance with Standing Order 25(2) and spoke to this item). Mr L Ward, Regional Development Planning and Programme Manager, gave a presentation which covered: passenger growth performance fleet update speed to the West stations investment depot investment community rail Matters discussed by Members with Mr Ward included: the Tarka line - Barnstaple growth; the need for early train to Exeter St David’s; and increased passenger capacity to be resolved by expansion; 2 CABINET DEVON AND EXETER RAIL PROJECT WORKING PARTY- 15/07/16 the use of Class 143s on the Exeter – Okehampton Sunday Rover service when available; new developments leading to population growth at Exminster and Bideford; lack of
    [Show full text]
  • Light Rail and Tram Statistics, England: 2017/18
    Statistical Release 28 June 2018 Light Rail and Tram Statistics, England: 2017/18 About this release This statistical release presents the latest annual information on light rail and tram systems in England during the 2017/18 covers light rail and tram use, infrastructure, revenue and passenger experience. This publication covers eight urban systems that are predominantly surface-running (see table 1 for a list of systems covered). Smaller systems, e.g. heritage railway and airport transit systems, are not included. London and Glasgow undergrounds and Edinburgh Trams are also excluded but statistics for these systems are However, outside London passenger journeys increased available online. by 2.4%. There were 267.2 million passengers journeys In this made on the eight light rail and tram systems in publication England, a 0.2% (416,000 passenger journeys) 3 passenger journeys decrease compared with the previous year. Passenger journeys 4 0.2% Concessionary journeys 6 decreased since 2009/10. since 2016/17 Vehicle mileage 7 Infrastructure 7 Despite this, passenger journeys on Blackpool Revenue 8 Tramway, Manchester Metrolink and Nottingham Express Transit increased when compared to the 45% Vehicle occupancy 9 previous year. of passenger Passenger satisfaction 9 journeys are by Docklands Contextual information 11 Almost half (45%) of journeys in 2017/18 Light Railway 12 consisted of those made on Docklands Light Background 15 Railway. RESPONSIBLE STATISTICIAN: Claire Pini AUTHOR: Fazeen Khamkar FURTHER INFORMATION: Media: 020 7944 3066 Public: 020 7944 3094 [email protected] Light Rail and Tram Factsheet Passenger journeys Concessionary journeys 15.4 passenger journeys passenger journeys passenger journeys per head 12% of all light rail passenger journeys were Passenger journeys decreased by 0.2% in 2017/18.
    [Show full text]
  • Derwent Valley Line
    Prices correct at November 2018 November at correct Prices (Newark) – Nottingham – Derby – Matlock – Derby – Nottingham – (Newark) derbyshire.gov.uk/bline long as one end of your journey is in Derbyshire. in is journey your of end one as long © Matt Jones Matt © . Receive 25% off local train fares as as fares train local off 25% Receive 01629 533190 01629 Derbyshire Call Derbyshire b_line Card Holders Holders Card b_line Derbyshire This publication is available in other formats from from formats other in available is publication This most local bus services (Wayfarer cannot be purchased on the train). the on purchased be cannot (Wayfarer services bus local most eastmidlandstrains.co.uk/derwentvalleyline and other staffed stations, from Tourist Information Centres and on on and Centres Information Tourist from stations, staffed other and 01629 538062 538062 01629 for seniors or child. Tickets can be purchased at Derby, Long Eaton Eaton Long Derby, at purchased be can Tickets child. or seniors for Hall Matlock DE4 3AG. 3AG. DE4 Matlock Hall except on Sundays. Adult tickets £13.00 including one child, £6.50 £6.50 child, one including £13.00 tickets Adult Sundays. on except Council, Economy, Transport and Communities Department, County County Department, Communities and Transport Economy, Council, travel before 0900 Monday to Saturday or on the Transpeak bus bus Transpeak the on or Saturday to Monday 0900 before travel Derwent Valley Line Community Rail Partnership, Derbyshire County County Derbyshire Partnership, Rail Community Line Valley Derwent train services in Derbyshire and the Peak District. Not valid for rail rail for valid Not District. Peak the and Derbyshire in services train day rover tickets are valid on most bus and and bus most on valid are tickets rover day Derbyshire Wayfarer Derbyshire tourism and railway organisations.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Derailment of a tram at Pomona, Manchester 17 January 2007 Report 09/2008 April 2008 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2008 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Derailment of a tram at Pomona, Manchester 17 January 2007 Contents Introduction 4 Summary of the report 5 Key facts about the accident 5 Identification of immediate cause, causal and contributory factors and underlying causes 6 Recommendations 6 The Accident 7 Summary of the accident 7 The parties involved 8 Location 9 The tram 9 Events during the accident 9 Events following the accident 10 The Investigation 11 Sources of
    [Show full text]
  • Watford Character of Area Study
    Character Area 18 Period Generally 1930s. Includes 1900s – 1950s. Heights Predominantly two storeys. Some bungalows. Urban grain Intermediate form. Block size / structure Regular pattern of blocks varying in size (450m x 80m). Generally larger block sub-division than Victorian/Edwardian development. Plot sizes Typically 8m x 40m. Gaps between buildings of 4m- 5m. Streetscene Suburban streetscene. Wide carriageways (6-7m for total), with pavements of 2.5-3.5m widths – some of which feature street trees. Limited street furniture. Building lines Generally consistent building lines behind front gardens. Front boundaries Marked by hedges of varying heights, brick walls or timber fences. Many original hedges / walls are now open frontages to allow car access. Roof forms Generally hipped tile roofs, with brick chimneys. Windows Originally metal or timber framed windows. These have generally been replaced since with various types of uPVC windows. Projecting two storey bay windows are common. Materials Materials include variety of brick types, render and mock-Tudor style timbering. Tile roofs. Car parking Large proportion of houses have garages as later additions to the side. Majority of parking is accommodated in front drives. Some on-street parking. Landscaping Front gardens typically 6m deep. Rear gardens typically 15m-25m deep. Hedges are relatively common in rear gardens, but less so in front gardens. Street tree planting along some pavements. Limited green space outside of gardens and formal parkland/playing fields/allotments. No grass verges between carriageways and pavements 103 Character Area 18A 104 Area 18A Summary This residential character area is located on the eastern side of the Borough, at the border with Hertsmere.
    [Show full text]
  • Paris: Trams Key to Multi-Modal Success
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com JANUARY 2016 NO. 937 PARIS: TRAMS KEY TO MULTI-MODAL SUCCESS Innsbruck tramway enjoys upgrades and expansion Bombardier sells rail division stake Brussels: EUR5.2bn investment plan First UK Citylink tram-train arrives ISSN 1460-8324 £4.25 Sound Transit Swift Rail 01 Seattle ‘goes large’ A new approach for with light rail plans UK suburban lines 9 771460 832043 For booking and sponsorship opportunities please call +44 (0) 1733 367600 or visit www.mainspring.co.uk 27-28 July 2016 Conference Aston, Birmingham, UK The 11th Annual UK Light Rail Conference and exhibition brings together over 250 decision-makers for two days of open debate covering all aspects of light rail operations and development. Delegates can explore the latest industry innovation within the event’s exhibition area and examine LRT’s role in alleviating congestion in our towns and cities and its potential for driving economic growth. VVoices from the industry… “On behalf of UKTram specifically “We are really pleased to have and the industry as a whole I send “Thank you for a brilliant welcomed the conference to the my sincere thanks for such a great conference. The dinner was really city and to help to grow it over the event. Everything about it oozed enjoyable and I just wanted to thank last two years. It’s been a pleasure quality. I think that such an event you and your team for all your hard to partner with you and the team, shows any doubters that light rail work in making the event a success.
    [Show full text]
  • The Rail User Express. We Continue with the Usual Roundup of News Items from Groups Around the UK. Please Keep Your C
    September 2019 Welcome to the Rail User Express. RUX is published around the middle of each month. It may be forwarded, or items reproduced in another newsletter (quoting sources). Anyone may request RUX as an email attachment, or opt to be notified when it is posted on the Railfuture (Rf) website. There is no charge for either service. Following GDPR, Railfuture Membership now maintains both lists. Please advise if you no longer wish to receive the newsletter or link, or if you know of anyone who would like to be added. For further details of any of the stories mentioned, please consult the relevant website, or ask the editor for the source material. RUX congratulates Network Rail (NR) for delivering £98million of vital improvements over the late August Bank Holiday weekend. Blessed with fine albeit very hot weather, a 10,500 strong team worked round the clock to finish 448 projects on time, allowing a normal service to resume on the Tuesday. Some projects such as track renewal and the transfer of signalling control will have an immediate benefit; some will enable an improved timetable in December, while others have laid the ground for future developments. But all contribute to the Rf aim of a better railway. Well done! Roger Smith We continue with the usual roundup of news items from groups around the UK. Please keep your contributions coming: they are all gratefully received. Friends of the Far North Line FoFNL is still awaiting news of any improvements, which seems to extend back at least a couple of years.
    [Show full text]
  • South Western Franchise Agreement
    _____ September 2006 THE SECRETARY OF STATE FOR TRANSPORT and STAGECOACH SOUTH WESTERN TRAINS LIMITED SOUTH WESTERN FRANCHISE AGREEMENT incorporating by reference the National Rail Franchise Terms (Second Edition) CONTENTS CLAUSE PAGE 1. INTERPRETATION AND DEFINITIONS ............................................................................. 4 2. COMMENCEMENT .......................................................................................................... 5 3. TERM 5 4. GENERAL OBLIGATIONS ................................................................................................ 6 5. SPECIFIC OBLIGATIONS ................................................................................................. 6 6. COMMITTED OBLIGATIONS ......................................................................................... 48 7. SUPPLEMENTAL TERMS ............................................................................................... 48 8. RECALIBRATION OF THE BENCHMARKS ...................................................................... 49 9. DOCUMENTS IN THE AGREED TERMS .......................................................................... 49 10. ENTIRE AGREEMENT ................................................................................................... 49 APPENDIX 1 ........................................................................................................................... 52 Secretary of State Risk Assumptions (Clause 5.1(y)) ................................................. 52 APPENDIX
    [Show full text]
  • Rail Strategy 2006-2011 and Beyond Now We’Removing Informing, Engaging and Inspiring Foreword Essex Rail Strategy – 2006-2011 and Beyond
    Essex Rail Strategy 2006-2011 and Beyond now we’removing informing, engaging and inspiring Foreword Essex Rail Strategy – 2006-2011 and Beyond ‘I cannot think of a higher priority for the County Council than for it to strive to achieve a first class highways and transportation system for all who live in, work in or visit the county of Essex. The challenges in front of us are enormous. Over 130,000 new homes are being proposed for Essex and its borders with surrounding authorities, the travel needs of which will have a direct impact on the transport network in Essex. All aspects of passenger transport will play a key role in delivering this vision. The County Council has therefore produced three daughter strategies to support the Local Transport Plan, focusing on how passenger transport will contribute towards a fully integrated transport network. The Road Passenger Transport, Bus Information and Rail Strategies outline the ways in which we intend to improve the lives of Essex people by addressing traffic growth, road congestion and improving public transport. They contain measures aimed at improving options for travel and access to services to develop a more effective transport network. To produce the strategies the County Council has consulted widely at regional, district and parish level, with key service providers, a wide range of user groups and the general public so that collectively they represent a tangible commitment by Essex County Council to make our County a better place to live and work and to support a decent public transport network. I am committed to delivering a transport system that meets the challenges we face in Essex and look forward to working in partnership with stakeholders to bring about the transformation we now need.’ Councillor Rodney L.
    [Show full text]