PREPARED FOR SUBMISSION 2019.6.6 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 2 of 18 2 of KEY PROJECT TEAM MEMBER RESUMES KEY PROJECT SCOPE OF WORK RFQ Tidewater Farmhouse and Barn Farmhouse Tidewater SELECT CLIENT REFERENCES CLIENT SELECT 18 SELECT PROJECT PORTFOLIO PROJECT 6-7 SELECT 8-17 STATEMENT OF QUALIFICATIONS OF STATEMENT 4 5 FIRM INTRODUCTION FIRM 3 DESCRIPTION CONTENTS OF TABLE PAGE(S) 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 3 of 18 3 of Director of Design ServicesDirector Matthew Ahlberg . AIA Matthew Ahlberg Vice President . President Vice

firmly believe our approach to the redevelopment of the property will provide the best results for the Town of of for the Town the best results will provide of the property to the redevelopment believe our approach firmly Owner . Director of Construction ServicesOwner . Director S. Barrett Robert For Barrett Made, Barrett For Tidewater Farmhouse and Barn Farmhouse Tidewater Falmouth both presently and into the future. both presently Falmouth you soon. to hearing from look forward We Thank you again for your time and consideration. No single discipline alone can provide the level of combined creative and practical thinking that the Tidewater project requires requires project Farm that the Tidewater thinking and practical the level of combined creative provide No single discipline alone can and deserves. We process. The project offers so much opportunity for development potential in partnership with the community and private parties parties with the community and private so much opportunity for development potential in partnership offers The project process. and project to how we, together, develop scope of the overall a flexible approach requiring process for a complicated which makes outsider users/investors. the concepts to both the community and potential market project that can simultaneously address the many moving parts the Tidewater Farm re-imagining has. Because Tidewater Farm’s Farm’s Tidewater has. Because re-imagining Farm moving parts the Tidewater the many address simultaneously that can project stakeholders with key and programming schematic design help fast track at this point our team can undetermined use is largely in the redevelopment a role play that may pieces the various be used to prioritize pricing that can providing while simultaneously and insight on why we feel a design + build collaboration with Barrett Made can offer the town the best value in determining determining in offer the town the best value Made can with Barrett we feel a design + build collaboration and insight on why and builders Our team is comprised of architects, redevelopment. its future through the highest and best use for the property to the needs of your tailored delivery yields a project method that is uniquely our processes and as a result talented craftspeople processes. information some more while providing to answer all of the questions posed in the RFQ In the following submission we will attempt opportunity to lend our design + build process and expertise to a collaboration with the community that realizes the full potential the full potential with the community that realizes to a collaboration and expertise process opportunity to lend our design + build our unique design + build construction through time and money saving while maximizing the town’s investment by of the property to offer the community. We also understand the pragmatic challenges all of the moving parts present and why this project’s this project’s and why parts present challenges all of the moving the pragmatic also understand We to offer the community. discussions on how much interesting had several already have challenges. We some of its greatest opportunities also represent and would welcome the the site walkthough after the images from potential we feel the existing space has looking through We are very excited at the possibility of collaborating with the Town of Falmouth on the re-imagining of the Tidewater Farm Farm of the Tidewater on the re-imagining of Falmouth with the Town very at the possibility of collaborating are excited We has all of the potential the property see and could collectively the walkthrough both in attendance at and I were Rob property. Dear Mr. Poore, TOWN OF FALMOUTH TOWN ROAD 271 FALMOUTH 04105 MAINE FALMOUTH, ATTENTION: MANAGER TOWN POORE, NATHAN FIRM INTRODUCTION FIRM 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 4 of 18 4 of

THE BARRET MADE TEAM IS WELL VERSED IN MANY DESIGN SOFTWARE PLATFORMS INCLUDING: AUTOCAD, REVIT, SKETCHUP, AND AND SKETCHUP, REVIT, AUTOCAD, INCLUDING: PLATFORMS IN MANY DESIGN SOFTWARE THE BARRET MADE TEAM IS WELL VERSED BARRETT MADE ALSO DOCUMENTATION, THE FORMAL CREATE ABILITIES TO WITH THE TECHNICAL SUITE. ALONG ADOBE CREATIVE TIME AND REAL REALITY VIRTUAL INTEGRATED WHICH INCLUDES IN 3-D RENDERING TECHNOLOGY UTILIZES THE LATEST MAKE THE DESIGN PROCESS TO GIVES US A UNIQUE ABILITY SKILLS THESE TECHNICAL MODELING. LEVERAGING WHILE MAKING THE 2-D DRAWINGS MORE CONVENTIONAL UNDERSTANDING APT TO BE AS NOT THOSE WHO MAY TO ACCESSIBLE ARE OUR ABILITIES DESIGN CAPABILITIES WITH OUR TECHNICAL PAIRED AND BEAUTIFUL. COMPELLING WE PRESENT CONCEPTS OF ADDED LEVELS WHICH PROVIDES OUR CLIENTS PLATFORM SOFTWARE MANAGEMENT OUR PROJECT TIE ALL OF THIS INTO TO BUDGETING ANALYSIS. AND PROJECT INFORMATION PATH TO PROJECT SUCCESS THAT BETTER ALIGNS ALL PROJECT STAKEHOLDER EXPECTATIONS WHICH ALLOWS EVERYONE TO MAKE MAKE TO EVERYONE WHICH ALLOWS EXPECTATIONS STAKEHOLDER BETTER ALIGNS ALL PROJECT SUCCESS THAT PROJECT TO PATH COSTS. TIME AND PROJECT WHILE SAVING THE WAY DECISIONS POSSIBLE ALONG INFORMED THE MOST COMMUNITY RELATIONS HAS BEEN KEY TO A PROJECT’S SUCCESS. OUR TEAM HAS ORGANIZED AND RUN DESIGN ORGANIZED AND RUN DESIGN SUCCESS. OUR TEAM HAS A PROJECT’S KEY TO BEEN HAS RELATIONS COMMUNITY COMMUNITY THE GREATER ENGAGE DESIGNED TO PROVIDING WORKSHOPS WHILE ALSO STAKEHOLDERS MEETINGS WITH PROJECT OF THE DESIGN TEAM. PART BE AN INTEGRAL THEM, IN A SENSE, TO ALLOWING WE SERVE BY THE CLIENTS TO BRING VALUE IS DESIGNED TO APPROACH DESIGN + BUILD AND INTEGRATED OUR COLLABORATIVE BUDGETING PROJECT THE DESIGN SERVICES. THIS INCLUDES SIMPLY NOT MAKE UP A PROJECT, THAT ALL ASPECTS COMBINING OF THE OF THE ENTIRETY POSSIBLE PICTURE THE BEST GIVE EVERYONE WITH THE DESIGN PROCESS TO RUNS IN TANDEM THAT ON A CLIENTS GUIDE OUR IN HAND, BARRETT MADE IS ABLE TO ANY GIVEN TIME. WITH THIS INFORMATION AT PROJECT HEALTHCARE AND RESIDENTIAL, AND RESIDENTIAL, HEALTHCARE 65 HANOVER STREET MAINE 04101 PORTLAND, SINCE IT’S FOUNDING AND ARCHITECTS. BUILDERS GROUP OF INNOVATIVE A IN 2015 AS FOUNDED BARRETT MADE WAS SERVICES, DESIGN + BUILD PROFESSIONAL ARCHITECTURAL FOR OF CLIENTS SERVED A WIDE VARIETY BARRETT MADE HAS SERVICES. MARKET MANAGEMENT AND CONSTRUCTION ESTIMATING SERVICES, COST CONSTRUCTION SERVICES GENERAL INSTITUTIONAL, COMMERCIAL, MUNICIPAL, INCLUDE DESIGN AND CONSTRUCTION BOTH SERVED FOR WE HAVE THAT SECTORS BARRETT MADE | PRINCIPAL PLACE OF BUSINESS PLACE BARRETT MADE | PRINCIPAL KEY MEMBERS OF THE BARRETT MADE TEAM HAVE WORKED ON PROJECTS OF ALL TYPES AND SIZES WHERE MANAGING AND SIZES WHERE MANAGING OF ALL TYPES WORKED ON PROJECTS HAVE KEY MEMBERS OF THE BARRETT MADE TEAM Tidewater Farmhouse and Barn Farmhouse Tidewater

HISTORY OF THE FIRM AND THE RANGE OF SERVICES OFFERED OF SERVICES AND THE RANGE OF THE FIRM HISTORY

FIRM TITLE AND PRINCIPAL PLACE OF BUSINESS PLACE FIRM TITLE AND PRINCIPAL PROJECTS OF THE HIGHEST QUALITY, WITH LASTING VALUE. WE HAVE ARCHITECTS AND BUILDERS ALL ON ONE ALL ON ONE AND BUILDERS ARCHITECTS WE HAVE LASTING VALUE. WITH QUALITY, OF THE HIGHEST PROJECTS TIME AND MONEY. OUR CLIENTS SAVING UNIT, EXECUTE PROJECTS AS A COHESIVE ABLE TO TEAM AND ARE BARRETT MADE IS A COMMERCIAL AND RESIDENTIAL DESIGN/BUILD CONSTRUCTION COMPANY BASED OUT OUT BASED COMPANY CONSTRUCTION DESIGN/BUILD AND RESIDENTIAL IS A COMMERCIAL MADE BARRETT CREATE CLIENTS TO OUR WITH COLLABORATION ON INNOVATIVE FOCUSED ARE WE MAINE. PORTLAND, OF STATEMENT OF QUALIFICATIONS OF STATEMENT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 5 of 18 5 of | [email protected]

315.813.2603 (c) Tidewater Farmhouse and Barn Farmhouse Tidewater BOTH THE COMMERCIAL AND RESIDENTIAL CATEGORIES. WORK BY MEMBERS OF OUR DESIGN TEAM HAS ALSO BEEN RECOGNIZED FOR FOR BEEN RECOGNIZED ALSO MEMBERS OF OUR DESIGN TEAM HAS WORK BY AND RESIDENTIAL CATEGORIES. THE COMMERCIAL BOTH AND LOCAL BOTH BY BEEN FEATURED HAS OUR WORK AIA CHAPTER OF NEW YORK. AND THE MAINE PRESERVATION BY EXCELLENCE DESIGN PUBLICATIONS. NATIONAL THE BARRETT MADE TEAM HAS MOST RECENTLY BEEN RECOGNIZED WITH TWO 2019 AIA MAINE AWARDS FOR DESIGN EXCELLENCE IN IN DESIGN EXCELLENCE FOR WITH TWO 2019 AIA MAINE AWARDS BEEN RECOGNIZED RECENTLY MOST THE BARRETT MADE TEAM HAS ARCHITECTURAL DESIGNER ARCHITECTURAL MAINE PORTLAND, PROJECTS. AND MUNICIPAL/GOVERNMENT INSTITUTIONAL DESIGNED AND MANAGED RECENT PRIOR WORK EXPERIENCE ENGINEERING COMPANY COLBY EDUCATION OF ARCHITECTURE BACHELOR | PROFESSIONAL OF TECHNOLOGY INSTITUTE NEW YORK MICHAEL BRUNO, RA – PROJECT ARCHITECT – PROJECT MICHAEL BRUNO, RA 207-210-4421 (w) | ARC 4813 MAINE LICENSED ARCHITECT DESIGNED AND MANAGED MUNICIPAL, COMMERCIAL, INSTITUTIONAL AND RESIDENTIAL PROJECTS. INSTITUTIONAL COMMERCIAL, MUNICIPAL, DESIGNED AND MANAGED SCOTT SIMONS ARCHITECTS SCOTT ARCHITECT/MANAGER PROJECT MAINE PORTLAND, SYRACUSE UNIVERSITY | SCHOOL OF ARCHITECTURE | PROFESSIONAL BACHELOR OF ARCHITECTURE | MAGNA CUM LAUDE | MAGNA OF ARCHITECTURE | PROFESSIONAL BACHELOR | SCHOOL OF ARCHITECTURE UNIVERSITY SYRACUSE RECENT PRIOR WORK EXPERIENCE NCARB, MAINE LICENSED ARCHITECT | ARC 4401 MAINE LICENSED ARCHITECT NCARB, OF ARCHITECTS INSTITUTE MEMBER OF THE AMERICAN EDUCATION MATTHEW AHLBERG, AIA – VICE PRESIDENT + DIRECTOR OF DESIGN SERVICES | [email protected] OF DESIGN SERVICES | + DIRECTOR AHLBERG, AIA – VICE PRESIDENT MATTHEW 207-210-4421 (w) 207.613.1230 (c) MANAGED CONSTRUCTION FOR COMMERCIAL PROJECTS. COMMERCIAL FOR CONSTRUCTION MANAGED WRIGHT RYAN CONSTRUCTION WRIGHT RYAN DIVISION PROJECTS . COMMERCIAL MANAGER GENERAL MAINE PORTLAND, EDUCATION MANAGEMENT IN CONSTRUCTION OF ENGINEERING OF SOUTHERN MAINE | BACHELOR UNIVERSITY EXPERIENCE RECENT PRIOR WORK ROBERT BARRETT - OWNER | [email protected] BARRETT ROBERT (c) (w) 207.838.6310 207-210-4421 KEY PROJECT TEAM MEMBER RESUMES MEMBER TEAM PROJECT KEY 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected]

6 of 18 6 of

PARKING

PARKING ACCESSIBLE STRUCTURES BY DASHED LINES DASHED BY INDICATED IN PURPLE INDICATED ARE INDICATED IN GREEN ARE INDICATED IN DIRECTION OF WATER VIEWS OF WATER IN DIRECTION RETAIN AND REHABILITATE EXISTING EXISTING AND REHABILITATE RETAIN HOW TO BEST STRATEGICALLY APPROACH THE DEVELOPMENT MOVING FORWARD. THE DEVELOPMENT APPROACH STRATEGICALLY BEST HOW TO AND DEVELOP WORK TO INPUT, WITH KEY SUBCONTRACTOR TEAMS WOULD, IN CONCERT OUR DESIGN AND CONSTRUCTION SUSTAINABLE. AND ENVIRONMENTALLY MARKETABLE ECONOMICAL, BOTH WAS THAT APPROACH TO SPACES GATHERING AND COMMUNITY CLASSROOMS, NATURE OFFICE SPACES, EVENT SPACE, MULTIPURPOSE INCLUDE MAY THIS ILLUSTRATES BELOW THE DIAGRAM OF THE PROPERTY. IS, IN OUR MINDS, THE KEY ASSET SITE ITSELF THE NAME A FEW. ON OFFICIALS WITH TOWN OUR CONVERSATIONS FOR POINT A STARTING BE USED AS TERMS AND WOULD IN BROADEST STRATEGY HISTORICALLY SIGNIFICANT THAN OTHERS, CERTAIN PORTIONS OF THE BUILDINGS WERE IN A MORE SEVERE STATE OF DISREPAIR. WERE IN A MORE SEVERE STATE OF THE BUILDINGS PORTIONS CERTAIN OTHERS, THAN SIGNIFICANT HISTORICALLY AND BARN BE THE FARMHOUSE OF PORTIONS SELECT THAT MADE TEAM WOULD RECOMMEND THE BARRETT A RESULT AS OF REHABILITATION FOR OF THE BUILDINGS IN SITU ALLOWING PORTIONS HISTORIC RETAIN REMOVED TO CAREFULLY THE ALLOW THESE THAT COMPLIMENT TO ADDITIONS SELECT FOR THE WAY WHILE PAVING COMPONENTS KEY HISTORIC THESE USES AND PRIVATE. MUNICIPAL BOTH THE NEEDS OF SPECIFIC GROUPS, TO AND ADAPTED BE MODERNIZED TO PROPERTY AS A JUMPING OFF POINT, OUR TEAM WOULD PROVIDE A FORMAL EXISTING CONDITIONS SURVEY CONSISTING OF PHOTOGRAPHS, OF PHOTOGRAPHS, SURVEY CONSISTING CONDITIONS EXISTING A FORMAL WOULD PROVIDE OUR TEAM POINT, A JUMPING OFF AS DEVELOPMENT THIS WILL AID IN FURTHER DOCUMENTS. CAD ELECTRONIC TO TRANSFER FOR CONDITIONS VIDEO AND EXISTING AND KEY THE COMMUNITY TO PRESENTATION PRICING FOR AND DESIGN PROGRAMMING SCHEMATIC INCLUDING OF CONCEPTS IN THE INITIAL SITE WALKTHROUGH IT WAS OBSERVED THAT NOT ONLY WERE CERTAIN PORTIONS OF THE BUILDINGS MORE BUILDINGS MORE OF THE PORTIONS WERE CERTAIN ONLY NOT THAT OBSERVED IT WAS WALKTHROUGH IN THE INITIAL SITE AREAS FOR ‘PERMANENT’ REMOVAL ARE ARE ‘PERMANENT’ REMOVAL FOR AREAS MAINTAIN CLEAR PUBLIC ACCESS THROUGH THROUGH CLEAR PUBLIC ACCESS MAINTAIN REMOVAL OF SELECT PORTIONS OF EXISTING OF EXISTING PORTIONS OF SELECT REMOVAL SITE AND PROVIDE MODERN PARKING AREAS AREAS SITE AND PROVIDE MODERN PARKING STANDARDS WHERE DEVELOPMENT REQUIRES WHERE DEVELOPMENT STANDARDS AREAS FOR POSSIBLE ADDITIONS TO PROVIDE PROVIDE POSSIBLE ADDITIONS TO FOR AREAS ACCESSIBILITY AND MODERN MULTI-USE SPACE SPACE AND MODERN MULTI-USE ACCESSIBILITY DEVELOPED IN ACCORDANCE WITH ACCESSIBILITY WITH ACCESSIBILITY IN ACCORDANCE DEVELOPED MAINTAIN VIEWSHEDS REPRESENTED BY ARROWS ARROWS VIEWSHEDS REPRESENTED BY MAINTAIN STRUCTURES (FARMHOUSE AND BARN) INDICATED AND BARN) INDICATED (FARMHOUSE STRUCTURES Tidewater Farmhouse and Barn Farmhouse Tidewater

WITH STANDARDS SET FORTH BY THE SECRETARY OF INTERIORS STANDARDS FOR REHABILITATION. FOR STANDARDS OF INTERIORS THE SECRETARY BY SET FORTH WITH STANDARDS STAKEHOLDERS. BE CONSISTENT ANY REHABILITATION THAT PREFERS THE TOWN THAT BUILDING NOTHING EACH OF MOVING AND RENOVATING FEASIBILITY

EVALUATION OF SIGNIFICANT ARCHITECTURAL BUILDING ELEMENTS, COMPLETION OF DOCUMENTATION PHOTOGRAPHY OF INTERIOR AND AND OF INTERIOR PHOTOGRAPHY DOCUMENTATION OF COMPLETION ELEMENTS, BUILDING ARCHITECTURAL SIGNIFICANT OF EVALUATION BUILDING. OF EACH BUILDING FEATURES EXTERIOR RFQ SCOPE OF WORK OF SCOPE RFQ 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 7 of 18 7 of OF SELECTIVE DEMOLITION. DEPENDING ON NEEDS AND USERS IDENTIFIED IN PHASES 1 AND 2 AND MARKETING EFFORTS, THE THE 1 AND 2 AND MARKETING EFFORTS, ON NEEDS AND USERS IDENTIFIED IN PHASES DEMOLITION. DEPENDING OF SELECTIVE DEPENDING ON FINAL SCOPE OF WORK A PRECISE ACCORDINGLY. BE TAILORED CAN PATH DESIGN + BUILD CONSTRUCTION THIS TIME. AT BE DEVELOPED TIME LINE CAN REHABILITATION FOR ADAPTIVE REUSE + SELECTIVE ADDITIONS/SITEWORK | THIS PHASE COULD COMMENCE UPON COMPLETION UPON COMPLETION COMMENCE COULD | THIS PHASE ADDITIONS/SITEWORK REUSE + SELECTIVE ADAPTIVE FOR REHABILITATION UPON THE COMPLETION OF THE FEASIBILITY STUDY PURSUANT TO THE PRIORITIES IDENTIFIED. THIS MAY INCLUDE INCLUDE IDENTIFIED. THIS MAY THE PRIORITIES PURSUANT TO STUDY OF THE FEASIBILITY UPON THE COMPLETION TIME OUR THE SAME AT REHABILITATION. FOR IN PREPARATION STRUCTURE OF THE EXISTING PORTIONS OF SELECT REMOVAL TO STUDIES ON PROGRAMMING SPACE OF THE REHABILITATED OCCUPANTS DESIGN TEAM WOULD BE WORKING WITH POTENTIAL USERS/INVESTORS. OUTSIDE TO MARKET THE SPACE TO PROCESSES AND WORKING WITH THE TOWN GUIDE THE CONSTRUCTION OF THE CREW AND MEMBERS OF THE COMMUNITY THE SAFETY ASSURE TO BE ‘MADE SAFE’ 1 THE SITE WOULD ALSO IN PHASE OF THE SITE. AREAS STRATEGIC TO ACCESS BE ALLOWED WHO WOULD STILL WITH FEES ALONG DEMOLITION AND DISPOSAL SELECTIVE OF WORK REQUIRED FOR WOULD CONSIST OF THIS PHASE THE COST CONSTRUCTION. FURTHER FOR AND PREPARE ‘MAKE SAFE’ SECURE THE BUILDINGS TO ANY WORK REQUIRED TO PHASE 2 PHASE COMMENCE COULD PHASE DEMOLITION | THIS - SELECTIVE STUDY FEASIBILITY FINDINGS OF THE PRECEEDING FORMAL ON BASED PHASE 1 PHASE SUCH ITEMS FOR IDEAS DEVELOP SCOPE AND FURTHER A POSSIBLE PROJECT INTO FURTHER LOOK TO STUDY FEASIBILITY FORMAL 160 WORKING OF APPROXIMATELY A TIME FRAME THIS WORK WE WOULD ANTICIPATE FOR BUDGETING, ETC. PROGRAMMING, AS PRICING OR RENDERINGS, BUDGET DESIGN DRAWINGS, INCLUDE MAY MEMBERS). DELIVERABLES HOURS (2 STAFF DEVELOPMENT. THE PROJECT’S FURTHER TO BEING CRITICAL THE GROUP AS ARE IDENTIFIED BY THAT DOCUMENTS ANY OTHER REHABILITATION OR WAIT FOR A FUTURE PHASE OF CONSTRUCTION. A FUTURE PHASE FOR OR WAIT REHABILITATION COST STAGE EARLY WITH OUR TEAM WOULD INCLUDE SCOPE. A COLLABORATION THE PROJECT IN DEVELOPING EFFORTS TO AND SHARED WITH ALL STAKEHOLDERS PRICING WILL BE REVISED SCOPE DEVELOPS THE PROJECT AND AS ESTIMATING ARE IN ALIGNMENT. EXPECTATIONS ALL PARTIES ASSURE TEAM IN COLLABORATION WITH THE TOWN STAKEHOLDERS WOULD CREATE A MARKETING PACKAGE TARGETING KEY POTENTIAL KEY POTENTIAL TARGETING A MARKETING PACKAGE CREATE WOULD STAKEHOLDERS WITH THE TOWN TEAM IN COLLABORATION THIS THIS POINT IN TIME WE ANTICIPATE AND USE. AT THEIR OWN DEVELOPMENT FOR SPACE SEEKING PARTNERS PRIVATE WITH IN CONCERT CONSTRUCTION TO TRANSLATE WHICH MAY EFFORTS PLANNING WITH ALL DESIGN AND HAPPENING IN TANDEM BARRETT MADE WOULD PROPOSE FIRST REDEVELOPING EXISTING PORTIONS OF THE FARMHOUSE TO OFFICE SPACES SUITED FOR FOR SUITED SPACES OFFICE TO THE FARMHOUSE OF PORTIONS EXISTING REDEVELOPING WOULD PROPOSEBARRETT MADE FIRST IS A MANNER THAT WOULD BE DONE IN THESE FOR THE DESIGN AND CONSTRUCTION TRUST. LAND THE FALMOUTH USE BY AND LIFE SAFETY TO RELATED SHARE KEY COMPONENTS CAN THAT DEVELOPMENT ADJACENT MINDFUL OF ADDITIONAL REUSE THE BARRETT MADE ADAPTIVE FOR OF THESE PLANS IN THE PROCESS OF DEVELOPMENT REQUIREMENTS. ACCESSIBILITY PHASE 3 PHASE THE APPROXIMATE COST OF THIS INVESTMENT IN PROJECT PLANNING MAY RANGE FROM APPROXIMATELY $18,000-$25,000. FROM APPROXIMATELY RANGE MAY PLANNING IN PROJECT OF THIS INVESTMENT COST THE APPROXIMATE FEASIBILITY STUDY | THE BARRETT MADE TEAM IN CONJUNCTION WITH THE TOWN OF FALMOUTH WOULD PRODUCE A A WOULD PRODUCE OF FALMOUTH WITH THE TOWN | THE BARRETT MADE TEAM IN CONJUNCTION STUDY FEASIBILITY OUR DESIGN + BUILD APPROACH IS DEVELOPED TO PROVIDE DETAILED COST ESTIMATING SERVICES IN PARALLEL WITH OUR WITH OUR SERVICES IN PARALLEL ESTIMATING COST PROVIDE DETAILED TO IS DEVELOPED OUR DESIGN + BUILD APPROACH Tidewater Farmhouse and Barn Farmhouse Tidewater

TIME PERIOD(S) TO IMPLEMENT PROJECT SCOPE BEING PROPOSED IMPLEMENT PROJECT TIME PERIOD(S) TO

DEVELOPMENT OF ALL-INCLUSIVE COST ESTIMATES FOR PROJECT SCOPE. PROJECT FOR ESTIMATES COST ALL-INCLUSIVE OF DEVELOPMENT

DEVELOPMENT OF ADAPTIVE REUSE OPTIONS FOR BUILDINGS IN PLACE AND FUTURE ADDITIONS. OPTIONS REUSE PLACE BUILDINGS IN FOR OF ADAPTIVE DEVELOPMENT RFQ SCOPE OF WORK OF SCOPE RFQ 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 8 of 18 8 of ABOVE | RESTORED EAST ELEVATION OF OF ELEVATION EAST ABOVE | RESTORED , EL AND BARN OF BARN FACADE | RESTORED LEFT BELOW ELEVATION STREET | RESTORED RIGHT BELOW OF RESIDENCE Tidewater Farmhouse and Barn Farmhouse Tidewater The project was completed in the Spring of 2017. The project budget has been withheld at the owner’s request. budget has been withheld completed in the Spring of 2017. The project was The project When turned over to the Barrett Made Team, the residence was in a state of disrepair requiring significant interventions to both the interventions to both the significant requiring in a state of disrepair was the residence Made Team, When turned over to the Barrett while making provisions the space undertook the detailed task of renovating and finish aesthetics. The team carefully infrastructure compliance. and ADA building envelope upgrades systems, mechanical modernized for providing consistent with those that existed when Leon himself resided in the space as he launched what would come to be known as the in the space as he launched what would come to be known as the himself resided consistent with those that existed when Leon establishment. L.L. Bean retail current In the Summer of 2016 the Barrett Made Team was selected by L.L. Bean to restore and renovate the Leon L. Bean Residence just just L. Bean Residence the Leon and renovate L.L. Bean to restore selected by was Made Team In the Summer of 2016 the Barrett consisting multipurpose spaces for the company for the team to provide called Maine. The program in Freeport, off of Main Street the spaces finishes to a level spaces, and multipurpose spaces for business use(s) all while restoring meeting/display of archives, LEON LEONWOOD BEAN RESIDENCE | FREEPORT, MAINE LEON LEONWOOD BEAN RESIDENCE | FREEPORT, - 2017 REUSE | COMPLETED AND ADAPTIVE RESTORATION HISTORIC SELECT PROJECT PORTFOLIO | L.L. BEAN RESIDENCE BEAN L.L. | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 9 of 18 9 of Tidewater Farmhouse and Barn Farmhouse Tidewater BELOW | RESTORED RESIDENCE LIVING SPACE | RESTORED BELOW ABOVE LEFT | NEW INTERIOR STAIR WITH CONCEALED ADA LIFT ADJACENT ADA WITH CONCEALED ABOVE LEFT | NEW INTERIOR STAIR WOOD FROM RESIDENCE WITH RECLAIMED SPACE ABOVE RIGHT | ARCHIVES DISPLAY SELECT PROJECT PORTFOLIO | L.L. BEAN RESIDENCE BEAN L.L. | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 10 of 18 10 of ABOVE | CONSTRUCTION PROGRESS IMAGE ILLUSTRATING ILLUSTRATING PROGRESS IMAGE ABOVE | CONSTRUCTION REUSE AS FOR BARN ADAPTED INTERIOR OF HISTORIC CUSTOMER WITH OFFICE SPACE MARKETING AND SALES ‘SHOWROOM’ BELOW RENDERING OF BARN/FARMHOUSE LEFT | CONCEPT RENOVATIONS Tidewater Farmhouse and Barn Farmhouse Tidewater The project was completed in May of 2019 with an approximate budget of $1,500,000. of 2019 with an approximate completed in May was The project The Barrett Made team provided full architectural and interior design services along with construction services while collaborating and interior design services with construction services along while collaborating full architectural Made team provided The Barrett of the interesting that took full advantage value the client an extraordinary to provide with their select design + build subcontractors and even a pig farm. warehouses manufacturing, used for light/heavy quality of the space previously barn, farmhouse and several warehouses for the consolidation of Revision Energy’s various departments that have previously been been previously departments that have various Energy’s for the consolidation of Revision warehouses barn, farmhouse and several area. the Portland throughout buildings different inside of several separated Revision Energy approached the Barrett Made design and construction team with a proposition for a design + build collaboration that that for a design + build collaboration design and construction team with a proposition Made the Barrett approached Energy Revision Maine for their new HQ in South Portland, of a 27,000sf building bank financing for the purchase helped our clients secure initially an existing 19th century the design team to rennovate challenged full design and construction services.followed by The program REVISION ENERGY HQ | PORTLAND, MAINE | PORTLAND, HQ REVISION ENERGY SPRING 2019 REUSE | COMPLETED AND ADAPTIVE RENOVATION SELECT PROJECT PORTFOLIO | REVISION ENERGY HQ ENERGY REVISION | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 11 of 18 11 of RENDERED VIEW | ENTRY LOBBY AND WINGS LOBBY RENDERED VIEW | ENTRY Tidewater Farmhouse and Barn Farmhouse Tidewater Currently the project is slated for completion in September of 2019 with a budget of approximately $3,750,000. The project is is $3,750,000. The project is slated for completion in September of 2019 with a budget of approximately the project Currently ahead of schedule and under budget. trending currently efficiency of the proposed solar array while allowing the potential for the town to easily add additional programmed space in the space in the add additional programmed while allowing the potential for the town to easily solar array of the proposed efficiency for the town to add Made team has identified multiple areas the Barrett the design + build construction process Through future. to the initial budget. during construction while maintaining adherence on existing conditions revealed based additional space/value Ultimately the project will result in a multipurpose community center comprised of meeting rooms, storage spaces, a stage, spaces, a stage, storage in a multipurpose community center comprised of meeting rooms, will result the project Ultimately the that optimizes 20,000 sf. The building is sited in way that is roughly lobby kitchen and a large gymnasium, warming/catering building. Upon the completion of pricing and engineering the town made the decision to pursue construction with the Barrett Made Made construction with the Barrett decision to pursue building. Upon the completion of pricing and engineering the town made the Construction commenced in the early presented. efficiencies that the design + build approach through cost savings team to realize fall of 2018. largely lost when the original Wescustogo was destroyed. destroyed. Hall was lost when the original Wescustogo largely to determine pricing exercises began + build team immediately Made design Barrett the finalized, After was the scope of the project in a net-zero/net-positive and methods resulting sustainable building systems with integrating costs in conjunction the project renovating and adapting the uses of existing portions of the middle school building would yield the highest possible value for the for the of the middle school building would yield the highest possible value and adapting the uses of existing portions renovating their sense of community that was much needed space for the town to reinvent and provide town’s investment in the building project the town’s select board and presented to the community at large, a site was chosen that housed an existing decommissioned middle middle chosen that housed an existing decommissioned a site was to the community at large, and presented the town’s select board and workshops with the community of the chosen site studies, conversations 51. Further MSAD occupied by school previously team determined that uses for the new building. The design programmed the initial and beyond a need above was that there revealed To begin, the design team was tasked with analyzing two potential sites and making a final recommendation to the community based based to the community two potential sites and making a final recommendation with analyzing tasked the design team was begin, To expansion/ future needs and possible given the town’s current appropriate more determine which was needs to on the programming committee, to the design and construction development of a new building. After in-depth studies had been completed, presented In the Summer of 2016 the Barrett Made team was selected by the Town of North Yarmouth and the North Yarmouth Design and Design and the North Yarmouth and of North Yarmouth the Town selected by Made team was In the Summer of 2016 the Barrett hall and ad-hoc community Hall, a grange of Wescustogo design services for the reinvention Construction Committee to provide in 2013. fire by destroyed center which was WESCUSTOGO HALL AND NORTH YARMOUTH COMMUNITY CENTER | NORTH YARMOUTH, MAINE YARMOUTH, CENTER | NORTH COMMUNITY YARMOUTH HALL AND NORTH WESCUSTOGO - SEPTEMBER 2019 COMPLETION | ANTICIPATED REUSE | 20,000sf AND ADAPTIVE RENOVATION SELECT PROJECT PORTFOLIO | WESCUSTOGO HALL/NYCC WESCUSTOGO | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 12 of 18 12 of 6 6 5 6 5 5 5 10 9 8 7 1 5 2 3 6 COMMUNITY FORUM COMMUNITY COMMUNITY FORUM COMMUNITY 6 15 . FEBRUARY . 2018 15 . FEBRUARY 4 15 . FEBRUARY . 2018 15 . FEBRUARY 7 LOBBY RECEPTION/OFFICE CHECK COAT HALL WESCUSTOGO STORAGE BATHROOM MECHANICAL KITCHEN GYM ROOM COMMUNITY 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. LEGEND: Tidewater Farmhouse and Barn Farmhouse Tidewater ABOVE | STILL IMAGE FROM VIRTUAL REALITY WALKTHROUGH FOR COMMUNITY PRESENTATION COMMUNITY FOR WALKTHROUGH REALITY FROM VIRTUAL IMAGE ABOVE | STILL ABOVE | PROPOSED FLOORPLAN CONCEPT PROGRESS SELECT PROJECT PORTFOLIO | WESCUSTOGO HALL/NYCC WESCUSTOGO | PORTFOLIO PROJECT SELECT INTERIOR RENDERING: MAIN HALL 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 13 of 18 13 of NEW ADDITION RENOVATED SPACE RENOVATED Tidewater Farmhouse and Barn Farmhouse Tidewater ABOVE |PROGRESS IMAGE WITH PROPOSED VIEW ABOVE |PROGRESS IMAGE SPACES NEW AND EXISTING CONNECTING LOBBY OF ENTRY SELECT PROJECT PORTFOLIO | WESCUSTOGO HALL/NYCC WESCUSTOGO | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 14 of 18 14 of Tidewater Farmhouse and Barn Farmhouse Tidewater manufacturing industry on both the interior and exterior of the building. and is on display completed with a budget of $850,000. were feet. Renovations 14,000 square completed in 2018 and is approximately was The project ceilings were left largely intact to provide the building a weathered industrial feel consistent with prior use while integrating new new industrial feel consistent with prior use while integrating the building a weathered intact to provide leftceilings were largely efficient, sustainable the spaces more in an effort to make systems modernized and incorporating finish materials in select locations for its connection to Maine’s lumber used specifically pine and cedar cladding was sourced and comfortable for occupants. Locally back to the building’s pragmatic past as a municipal facility. Materials were, wherever possible, repurposed for use in the new for use in the new possible, repurposed wherever facility. Materials were, past as a municipal back to the building’s pragmatic and rooms for conference windows as transom repurposed that were spaces . Examples of this include existing half lite office and wood Existing masonry walls for additional office space and meeting areas. mezzanines of existing industrial storage the reuse and custom millwork and a multipurpose event space used to host a variety of event types ranging from ping pong tournaments to ping pong tournaments to from of event types ranging and custom millwork and a multipurpose event space used to host a variety weddings. that harken similar design characteristics its occupants, all spaces have While each of the spaces is distinct in how it is used by story brick building previously used as one of Portland’s municipal public works facilities into a vibrant hub of creative energy. energy. hub of creative municipal public works facilities into a vibrant used as one of Portland’s story brick building previously studios for furniture suites, coworking studio spaces/offices, fabrication office spaces consist of private programmed The various THE PUBLIC WORKS | PORTLAND, MAINE | PORTLAND, THE PUBLIC WORKS 2018 REUSE | COMPLETED AND ADAPTIVE RENOVATION a single conceived with a design intended to transform was Works Public The neighborhood of Portland, in the Bayside Located PORTLAND VEHICLE MAINTENANCE SHOP PORTLAND ABOVE | COWORKING STUDIO SPACE WITH CONSTRUCTION CONSTRUCTION WITH SPACE STUDIO ABOVE | COWORKING OF CITY USED FOR PREVIOUSLY SPACE OF PROGRESS IMAGE SELECT PROJECT PORTFOLIO | THE PUBLIC WORKS PUBLIC THE | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 15 of 18 15 of Tidewater Farmhouse and Barn Farmhouse Tidewater ABOVE | COWORKING/SHARED CONFERENCE SPACE WITH BEFORE IMAGE ILLUSTRATING ITS PREVIOUS USE AS THE THE PREVIOUS USE AS ITS ILLUSTRATING IMAGE WITH BEFORE SPACE CONFERENCE ABOVE | COWORKING/SHARED BUILDING’S BOILER ROOM SELECT PROJECT PORTFOLIO | THE PUBLIC WORKS PUBLIC THE | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 16 of 18 16 of Tidewater Farmhouse and Barn Farmhouse Tidewater DESIGN COMPANY ABOVE LEFT | PREVIOUS SIGN SHOP MEZZANINE SPACE ADAPTED FOR REUSE AS PRIVATE OFFICES/BUSINESS OFFICES/BUSINESS PRIVATE REUSE AS FOR ADAPTED ABOVE LEFT | PREVIOUS SIGN SHOP MEZZANINE SPACE SPACES INCUBATOR FURNITURE A STARTUP FOR A OFFICE/SHOP SPACE AS REUSE FOR SHOP ADAPTED PAINT ABOVE RIGHT | PREVIOUS CITY SELECT PROJECT PORTFOLIO | THE PUBLIC WORKS PUBLIC THE | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 17 of 18 17 of Tidewater Farmhouse and Barn Farmhouse Tidewater ABOVE | COLLABORATIVE DESIGN STUDIO SPACE WITH CONSTRUCTION PROGRESS IMAGE DEPICTING AREAS THAT WERE WERE THAT AREAS DEPICTING IMAGE PROGRESS WITH CONSTRUCTION SPACE DESIGN STUDIO ABOVE | COLLABORATIVE AND MAINTENANCE SIGN SHOP FABRICATION OF PORTLAND CENTER AND CITY CONTROL TRAFFIC USED AS PREVIOUSLY SELECT PROJECT PORTFOLIO | THE PUBLIC WORKS PUBLIC THE | PORTFOLIO PROJECT SELECT 65 Hanover Street | Portland, Maine | 04101 | 207.210.4421 | [email protected] 18 of 18 18 of THE PUBLIC WORKS LL BEAN, INC. REVISION ENERGY NORTH YARMOUTH, MAINE YARMOUTH, NORTH Tidewater Farmhouse and Barn Farmhouse Tidewater THE PUBLIC WORKS CO-WORKING/STUDIO SPACE CO-WORKING/STUDIO THE PUBLIC WORKS [email protected] 207-210-3401 207-752-6358 . AND BUSINESS DEVELOPMENT OF OPERATIONS LITTLEFIELD | DIRECTOR MAUREEN FORTUNAT MUELLER | CO-FOUNDER . MUELLER | CO-FOUNDER FORTUNAT HEADQUARTERS REVISION HEADQUARTERS [email protected] WESCUSTOGO HALL AND NORTH YARMOUTH COMMUNITY CENTER COMMUNITY YARMOUTH AND NORTH HALL WESCUSTOGO [email protected] 207.829.3705 207.552.4156 . MANAGER | TOWN ROY ROSEMARY PAT SKALL | FACILITIES PLANNING AND MANAGEMENT . . AND MANAGEMENT PLANNING SKALL | FACILITIES PAT BEAN RESIDENCE LEON LEONWOOD [email protected] SELECT CLIENT REFERENCES CLIENT SELECT