ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS 16th - 31st May 2020 For further information on the below please contact 0345 045 5212 Not all road works are included in the list below as some are issued at very short notice due to emergencies or very small works which don't require a long period of notice. The Police can also close roads for safety reasons. KEY: :denotes Road Closure Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Web Link Management Date Date CAMBRIDGESHIRE ROAD ROAD 26-May-2020 07-Aug-2020 Installation of new Toucan crossing https://one.network/?115711770 CLOSURE facility, resurfacing works site wide, kerbing alterations including amendments to existing bus stops/laybys, upgrade of street lighting equipment, install of permanent 50mph speed restriction, new traffic signs and road markings. Working hours 20:00 - 06:00.

CAMBRIDGESHIRE CAMBRIDGE ROAD BABRAHAM ROAD 26-May-2020 07-Aug-2020 Creation of bus lane on EB aproach to https://one.network/?115712392 CLOSURE A11, resurfacing works site wide, kerbing alterations including new traffic island in High Street, amendments to existing bus stops, installation of new uncontrolled pedestrian crossing east side of High Street, install of permanent 50mph speed restriction, new traffic signs and road markings. Working hours 20:00 - 06:00.

CAMBRIDGESHIRE CHALKY LANE BABRAHAM ROAD 26-May-2020 07-Aug-2020 Creation of bus lane on EB aproach to https://one.network/?115712396 CLOSURE A11, resurfacing works site wide, kerbing alterations including new traffic island in High Street, amendments to existing bus stops, installation of new uncontrolled pedestrian crossing east side of High Street, install of permanent 50mph speed restriction, new traffic signs and road markings. Working hours 20:00 - 06:00.

CAMBRIDGESHIRE HIGH STREET BABRAHAM ROAD 26-May-2020 07-Aug-2020 Creation of bus lane on EB aproach to https://one.network/?115713056 CLOSURE A11, resurfacing works site wide, kerbing alterations including new traffic island in High Street, amendments to existing bus stops, installation of new uncontrolled pedestrian crossing east side of High Street, install of permanent 50mph speed restriction, new traffic signs and road markings. Working hours 20:00 - 06:00.

CAMBRIDGESHIRE SAXON WAY BAR HILL ROAD 18-May-2020 21-May-2020 Resurfacing carriageway. https://one.network/?116232228 CLOSURE CAMBRIDGESHIRE CRAFTS WAY BAR HILL ROAD 18-May-2020 21-May-2020 Resurfacing carriageway. https://one.network/?116232227 CLOSURE CAMBRIDGESHIRE BACK LANE CAMBOURNE MULTI-WAY 18-May-2020 20-May-2020 LV electrical mains and associated works. https://one.network/?117092104 SIGNALS CAMBRIDGESHIRE DE LA WARR WAY CAMBOURNE MULTI-WAY 18-May-2020 20-May-2020 LV Electrical Main and associated works. https://one.network/?116789122 SIGNALS Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Web Link Management Date Date CAMBRIDGESHIRE BACK LANE CAMBOURNE MULTI-WAY 18-May-2020 20-May-2020 LV electrical mains and associated works. https://one.network/?116789121 SIGNALS ANGLIAN WATER SCHOOL LANE CAMBOURNE MULTI-WAY 28-May-2020 29-May-2020 S81 cover. Working hours 20:00 - 06:00. https://one.network/?116307982 SIGNALS ANGLIAN WATER WOODFIELD LANE CAMBOURNE MULTI-WAY 28-May-2020 29-May-2020 TM for works on School Lane. Working https://one.network/?116307990 SIGNALS hours 20:00 - 06:00. BT ST PETERS ROAD COTON SOME C/W 19-May-2020 21-May-2020 Renew / raise / lower frame and cover on https://one.network/?117251433 INCURSION footway / verge. BT OAKINGTON ROAD COTTENHAM TWO-WAY 18-May-2020 20-May-2020 Lay approx 30m of duct 54/56 in verge / https://one.network/?117225317 SIGNALS carriageway to link existing BT boxes to facilitate spine cabling works. Cambridge Water Company MARGETT STREET COTTENHAM GIVE & TAKE 19-May-2020 22-May-2020 8m X 20mm (25mm O.D) with a 15mm https://one.network/?117148926 meter connecting on to existing 2" CI main in Margett Street, Cambridge Water Company SEARLES MEADOW DRY DRAYTON MULTI-WAY 25-May-2020 04-Jun-2020 TM only - Works being undertaken on https://one.network/?117206254 SIGNALS High Street. Cambridge Water Company HIGH STREET DRY DRAYTON MULTI-WAY 25-May-2020 04-Jun-2020 Excavate and make coss connection from https://one.network/?117206250 SIGNALS 15" AC Main onto 4" AC Main with double linestop required on 4" AC Main.

NETWORK RAIL - CAMBRIDGE ROAD FOXTON ROAD 17-May-2020 17-May-2020 Rail corrosion treatment. Working hours https://one.network/?116109497 PROMOTERS NATIONAL (A10) CLOSURE 01:00 - 06:30. Cambridge Water Company SHEPRETH ROAD FOXTON TWO-WAY 28-May-2020 29-May-2020 Carry out 1 x Trial Hole. https://one.network/?117242025 SIGNALS CAMBRIDGESHIRE GIRTON ROAD GIRTON MULTI-WAY 26-May-2020 27-Jul-2020 TM Only. Working hours 09:30 - 15:30. https://one.network/?116068488 SIGNALS CAMBRIDGESHIRE HUNTINGDON ROAD GIRTON MULTI-WAY 26-May-2020 27-Jul-2020 Signals upgrade & toucon crossing. https://one.network/?116068486 SIGNALS Working hours 09:30 - 15:30. CAMBRIDGESHIRE GRANHAMS ROAD GREAT SHELFORD SOME C/W 20-May-2020 23-May-2020 Section 184 - Drop kerb. https://one.network/?117108081 INCURSION Cambridge Water Company ST NEOTS ROAD HARDWICK SOME C/W 22-May-2020 27-May-2020 Trial hole for suspected leak in verge. https://one.network/?117234528 INCURSION CAMBRIDGESHIRE CHURCH ROAD HAUXTON SOME C/W 18-May-2020 22-May-2020 Section 184 - Drop kerb. https://one.network/?117187186 INCURSION Cadent Gas Limited MANOR PARK HISTON GIVE & TAKE 18-May-2020 22-May-2020 Trial holes / camera survey https://one.network/?117145493

BT COTTENHAM ROAD HISTON SOME C/W 19-May-2020 21-May-2020 Renew / raise / lower frame and cover in https://one.network/?117251435 INCURSION footway. CAMBRIDGESHIRE HAVERHILL ROAD STOP/GO 26-May-2020 28-May-2020 Hang repeater signs. Working hours 09:30 https://one.network/?116542730 (A1307) BOARDS - 15:30. CAMBRIDGESHIRE HOWARDS LANE HORSEHEATH STOP/GO 26-May-2020 28-May-2020 Hang repeater signs. https://one.network/?116542729 BOARDS CAMBRIDGESHIRE HORSEHEATH BYPASS HORSEHEATH STOP/GO 26-May-2020 28-May-2020 Hang repeater signs. Working hours 09:30 https://one.network/?116542056 BOARDS - 15:30. CAMBRIDGESHIRE A1307 FROM LINTON HORSEHEATH STOP/GO 26-May-2020 28-May-2020 Hang repeater signs along A1307. https://one.network/?116540310 TO HORSEHEATH BOARDS Working hours 09:30 - 15:30. BYPASS SINGLE CARRIAGEWAY SECTION CAMBRIDGESHIRE LINTON ROAD HORSEHEATH STOP/GO 26-May-2020 28-May-2020 Hang repeater signs. https://one.network/?116542063 BOARDS CAMBRIDGESHIRE HAVERHILL ROAD HORSEHEATH STOP/GO 26-May-2020 28-May-2020 Hang repeater signs. https://one.network/?116542055 BOARDS Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Web Link Management Date Date BT ICKLETON ROAD ICKLETON STOP/GO 18-May-2020 22-May-2020 To rod rope and test, and install https://one.network/?117138589 BOARDS approximately 1000m of cable, sorting any associated blockages in footway / carriageway / verge. Working hours 08:00 - 18:00. BT FROGGE STREET ICKLETON TWO-WAY 18-May-2020 22-May-2020 To rod rope and test, and install https://one.network/?117138943 SIGNALS approximately 1000m of cable, sorting any associated blockages in footway / carriageway / verge. Working hours 08:00 - 18:00. Cadent Gas Limited ABBEY STREET (C284) ICKLETON GIVE & TAKE 26-May-2020 01-Jun-2020 Lay new domestic service from main in https://one.network/?117218736 farside footway. BT IMPINGTON LANE IMPINGTON SOME C/W 20-May-2020 22-May-2020 To build new joint box and lay approx https://one.network/?117185827 INCURSION 15m of duct 54/56 in footway. Cambridge Water Company THE WOODLANDS LINTON SOME C/W 20-May-2020 22-May-2020 Repair leak on ferrule in footway. https://one.network/?117208459 INCURSION BT ROYSTON ROAD LITLINGTON GIVE & TAKE 19-May-2020 21-May-2020 Lay approx 90m of Duct 54/56 in footway / https://one.network/?117235061 verge to link existing BT boxes to facilitate spine cabling works.

Cambridge Water Company HIGH STREET LONGSTANTON MULTI-WAY 18-May-2020 20-May-2020 Relay lead CP. https://one.network/?116806708 SIGNALS BT WHITECROFT ROAD MELDRETH TWO-WAY 18-May-2020 22-May-2020 To build new modular joint box and lay https://one.network/?117159409 (C270) SIGNALS approx 29m of Duct 54/56 in footway. NETWORK RAIL - FEN ROAD MILTON ROAD 17-May-2020 17-May-2020 Rail corrosion inspection. Working hours https://one.network/?116203869 PROMOTERS NATIONAL CLOSURE 00:30 - 08:30. VIRGIN MEDIA THE OAKS MILTON SOME C/W 19-May-2020 21-May-2020 Lay duct and fit tee in the footway for https://one.network/?117246974 INCURSION broadband provision and network capacity increase that is essential. Working hours 08:00 - 18:00. UK POWER NETWORKS MILTON BYPASS MILTON TWO-WAY 26-May-2020 26-May-2020 Network Operations Maintenance: https://one.network/?116202355 EASTERN& LONDON SIGNALS Maintenance / Renewal of overhead service lines to ensure safe and reliable power supplies: Overhead line upgrade and pole replacement. UK POWER NETWORKS ELY ROAD (C282) MILTON ROAD 26-May-2020 26-May-2020 Network Operations Maintenance: https://one.network/?116202351 EASTERN& LONDON CLOSURE Maintenance / Renewal of overhead mains lines to ensure safe and reliable power supplies: Overhead line upgrade. Working hours 10:00 - 14:00.

Cadent Gas Limited MEADOW LANE OVER SOME C/W 22-May-2020 29-May-2020 Lay new service from main 1m in nearside https://one.network/?117242497 INCURSION footway. CAMBRIDGESHIRE LONDON ROAD PAMPISFORD ROAD 26-May-2020 08-Jun-2020 S278 footpath works for the new Unity https://one.network/?117232046 CLOSURE Campus Development. CAMBRIDGESHIRE HIGH STREET SWAVESEY SOME C/W 18-May-2020 19-May-2020 Section 278 works. New bus stop kerbline https://one.network/?117173793 INCURSION and footpath. CAMBRIDGESHIRE SCHOOL LANE SWAVESEY ROAD 26-May-2020 05-Jun-2020 Section 278 works - Footway and Raised https://one.network/?116411912 CLOSURE Junction. CAMBRIDGESHIRE GIBRALTAR LANE SWAVESEY ROAD 26-May-2020 05-Jun-2020 Section 278 works - Footway and Raised https://one.network/?116411914 CLOSURE Junction. CAMBRIDGESHIRE FEN DRAYTON ROAD SWAVESEY ROAD 26-May-2020 12-Jun-2020 Section 278 works - Footway and Raised https://one.network/?116410344 CLOSURE Junction. CAMBRIDGESHIRE NEWMARKET ROAD TEVERSHAM MULTI-WAY 20-May-2020 20-May-2020 Permanent signals to be switched off and https://one.network/?117247886 SIGNALS temporary signals to be put in place to facilitate the temporary removal of a traffic signal pole to allow an abnormal load (large boat) to pass through. Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Web Link Management Date Date Cadent Gas Limited BURGESS ROAD WATERBEACH SOME C/W 18-May-2020 22-May-2020 Lay new domestic service 6m from main https://one.network/?117105810 INCURSION in farside carriageway. Cambridge Water Company CLAYHITHE ROAD WATERBEACH ROAD 26-May-2020 28-May-2020 Trial hales to be undertaken X 4. https://one.network/?116684542 CLOSURE Cambridge Water Company STATION ROAD WATERBEACH ROAD 26-May-2020 28-May-2020 Trial holes to be undertaken. https://one.network/?116684540 CLOSURE VIRGIN MEDIA STATION ROAD WILLINGHAM TWO-WAY 26-May-2020 28-May-2020 Install new footway chamber to allow https://one.network/?116945539 SIGNALS customer connections. Working hours 09:30 - 15:00.