SOUTH CAMBS 16Th

Total Page:16

File Type:pdf, Size:1020Kb

SOUTH CAMBS 16Th CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS 16th - 28th February 2018 For further information on the below please contact 0345 045 5212 Not all road works are included in the list below as some are issued at very short notice due to emergencies or very small works which don't require a long period of notice. The Police can also close roads for safety reasons. KEY: :denotes Road Closure Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date BT CAMBRIDGE ROAD BABRAHAM TWO-WAY 21-Feb-2018 23-Feb-2018 32 , 36 , 5 ,Install 1x 100m of fibre cable SIGNALS and sub-duct into duct,Provide 1 fibre joint in cable,Provide 16 fibre joint in cable,Provide 5 tube joint(s) in existing cable,Provide 7 cable joint(s),Test 5 cable in existing network VIRGIN MEDIA OATLANDS AVENUE BAR HILL SOME C/W 21-Feb-2018 23-Feb-2018 INTERIM TO PERM PROPOSE IN INCURSION CARRIAGEWAY ANGLIAN WATER RIDDY LANE BOURN ROAD 22-Feb-2018 22-Feb-2018 Excavate and reinstate to repair 2x CLOSURE manhole in carriageway BT ALMS HILL BOURN SOME C/W 28-Feb-2018 02-Mar-2018 Erect/Renew 1 PCP cabinet and base INCURSION (600mm x 300mm x 1000mm),Install 3m of 5 poly ducts in Verge,Provide 1 core drill(s) into jointbox or building Cambridge Water Company CLARE DRIVE CALDECOTE SOME C/W 21-Feb-2018 23-Feb-2018 Install site connection from 4" cast iron INCURSION main& lay 5m x 110mm HPPE Cambridge Water Company HIGHFIELDS ROAD CALDECOTE TWO-WAY 27-Feb-2018 06-Mar-2018 Mains connection onto 225mm HPPE SIGNALS main and 8m x 125mm HPPE in footway and carriageway ANGLIAN WATER SCHOOL LANE CAMBOURNE ROAD 18-Feb-2018 18-Feb-2018 Excavate and reinstate to repair 11x CLOSURE manhole in carriageway BT SCHOOL LANE CAMBOURNE SOME C/W 22-Feb-2018 26-Feb-2018 Install 2m of 1 way poly duct in INCURSION Verge,Install 5m of 1 way poly duct in Footway ANGLIAN WATER HIGH STREET CAMBOURNE MULTI-WAY 23-Feb-2018 23-Feb-2018 Excavate and reinstate to repair manhole SIGNALS in carriageway ANGLIAN WATER BROAD STREET CAMBOURNE MULTI-WAY 23-Feb-2018 23-Feb-2018 TM coordination purposes only - works SIGNALS carried out under AD041-S5436883. This permit for PTS use only Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date Cadent Gas Limited ST PETERS ROAD COTON SOME C/W 19-Feb-2018 30-Mar-2018 EAGA184088 Replacement of INCURSION approximately 400mtrs of 4"CI LP mainwith75/90mm LP PE main, using Insertion / open cut method, Replacement of 33 Services Cambridge Water Company TWENTYPENCE ROAD COTTENHAM SOME C/W 20-Feb-2018 22-Feb-2018 Install Meter in the verge INCURSION Cambridge Water Company ELLIS CLOSE COTTENHAM SOME C/W 20-Feb-2018 22-Feb-2018 Repair leak on outside stop tap in verge INCURSION CAMBRIDGESHIRE OAKINGTON ROAD DRY DRAYTON TWO-WAY 19-Feb-2018 23-Feb-2018 Hydro demolition works as part of the A14 SIGNALS Cambridge to Huntingdon Improvement Scheme Nigel Wilkes 07769 731716 BT PARK STREET DRY DRAYTON SOME C/W 27-Feb-2018 06-Mar-2018 1 concrete chamber 1220mm x 680mm x INCURSION 1665mm deep in Carriageway,Install 4m of 1 way poly duct in Carriageway Cambridge Water Company ROYSTON ROAD DUXFORD SOME C/W 19-Feb-2018 21-Feb-2018 Investigation of leak on 9" water main in INCURSION verge CAMBRIDGESHIRE A505 FROM DUXFORD MULTI-WAY 19-Feb-2018 09-Mar-2018 Replacement of traffic signal equipment. WHITTLESFORD TO SIGNALS Work will include new pole sockets and THRIPLOW associated duct work. ROUNDABOUT J10 CAMBRIDGESHIRE BLAKELAND HILL DUXFORD PRIORITY 20-Feb-2018 22-Feb-2018 Dropped Kerb - Mead Conbstruction - WORKING 01638742463/07774733728 CAMBRIDGESHIRE CROXTON ROAD ELTISLEY ROAD 19-Feb-2018 02-Mar-2018 Carriageway resurfacing CLOSURE ANGLIAN WATER DITTON LANE FEN DITTON SOME C/W 19-Feb-2018 21-Feb-2018 Global Surveys accessing public sewer INCURSION manholes to complete an asset survey. UK POWER NETWORKS COOTES LANE FEN DRAYTON GIVE & TAKE 16-Feb-2018 22-Feb-2018 Connections Small Service:Installation of EASTERN& LONDON a new electricity supply for a customer:22m public trench and joint hole for mains extension to meet customers trench for service cable installation Give& Take TM for works vehicle parking NETWORK RAIL - CAMBRIDGE ROAD FOXTON ROAD 20-Feb-2018 22-Feb-2018 Rail corrossion inspection through level PROMOTERS NATIONAL CLOSURE crossing - from 00.05 to 04.45 Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date NETWORK RAIL - ROYSTON ROAD FOXTON ROAD 20-Feb-2018 22-Feb-2018 Rail corrossion inspection through level PROMOTERS NATIONAL CLOSURE crossing FROM 00.05 - 04.45 CAMBRIDGESHIRE PIERCE LANE FULBOURN ROAD 19-Feb-2018 22-Feb-2018 Footway resurfacing CLOSURE Cadent Gas Limited DOGGET LANE FULBOURN MULTI-WAY 25-Feb-2018 25-Feb-2018 SELF DEFECT- DBM in Carriageway SIGNALS Cadent Gas Limited PIERCE LANE FULBOURN SOME C/W 26-Feb-2018 28-Feb-2018 SELF DEFECT- To rectify core failure in INCURSION Carriageway BT SCHOOL LANE FULBOURN SOME C/W 27-Feb-2018 01-Mar-2018 1 ,Erect 1 cabinet and base (600mm x INCURSION 300mm x 1000mm),Install 3m of 3 poly ducts in Verge Cadent Gas Limited FAIRFIELD GAMLINGAY GIVE & TAKE 27-Feb-2018 05-Mar-2018 LAY 9M NEW DOMESTIC SERVICE FROM THE MAIN IN THE FARSIDE FOOTWAY Cadent Gas Limited ST MARGARETS ROAD GIRTON SOME C/W 16-Feb-2018 22-Feb-2018 ALTER DOMESTIC SERVICE AND INCURSION RELAY WITH 2.6M IN PUBLIC FROM MAIN INNEARSIDE FOOTWAY Cadent Gas Limited DUCK END GIRTON SOME C/W 16-Feb-2018 22-Feb-2018 LAY 4M NEW DOMESTIC SERVICE INCURSION FROM THE MAIN IN THE NEARSIDE VERGE. CAMBRIDGESHIRE GREAT ABINGTON GREAT ABINGTON ROAD 25-Feb-2018 25-Feb-2018 Cambridge Matchless Motorcycle Club FOOTPATH 4 CLOSURE (10:30 - 15:00) CLOSURES - Linton Bridleway 7, Great Abington Footpath 4. BT HALL LANE GREAT CHISHILL TWO-WAY 22-Feb-2018 26-Feb-2018 CHRISHALL 465999 - Overlay - Lay SIGNALS approx 20m of Duct 54/56 in Verge/CW to link existing BT Boxes to facilitate spine cabling works. CAMBRIDGESHIRE WOOLLARDS LANE GREAT SHELFORD SOME C/W 16-Feb-2018 22-Feb-2018 Connections Highway Services:NEW INCURSION SERVICE: (APPROX DEPTH 450mm- 600mm):new service to belisha beacon BT BABRAHAM ROAD GREAT SHELFORD SOME C/W 22-Feb-2018 05-Mar-2018 Install 15m of 4 poly ducts in INCURSION Footway,Install 1m of 4 poly ducts in Verge,Provide 1 Cabinet and base (NGA cabinets) Cadent Gas Limited ST NEOTS ROAD HARDWICK GIVE & TAKE 21-Feb-2018 27-Feb-2018 LAY NEW DOMESTIC SERVICE WITH 17M IN PUBLIC FROM MAIN IN FARSIDE FOOTWAY Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date BT BRAMLEY WAY HARDWICK SOME C/W 28-Feb-2018 02-Mar-2018 Install 1m of 1 way poly duct in INCURSION Footway,Provide 1 core drill(s) into jointbox or building CAMBRIDGESHIRE CANTELUPE ROAD HASLINGFIELD SOME C/W 27-Feb-2018 01-Mar-2018 Gully installation and carriageway INCURSION patching. CAMBRIDGESHIRE HILDERSHAM HILDERSHAM ROAD 25-Feb-2018 25-Feb-2018 Cambridge Matchless Motorcycle Club FOOTPATH 11 CLOSURE (10:30 - 15:00) CLOSURES - Linton Bridleway 7, Great Abington Footpath 4. CAMBRIDGESHIRE CAMBRIDGE ROAD HINXTON MULTI-WAY 20-Feb-2018 01-Mar-2018 Utility Survey (09.30-15.30) SIGNALS VIRGIN MEDIA HIGH STREET HISTON SOME C/W 21-Feb-2018 23-Feb-2018 INTERIM TO PERMENANT INCURSION REINSTATEMENT ANGLIAN WATER HORNINGSEA ROAD HORNINGSEA GIVE & TAKE 20-Feb-2018 22-Feb-2018 Global Surveys accessing public sewer (C210) manholes to complete an asset survey. Expected at each manhole for approx 1 hour. No excavations. Cadent Gas Limited MACFARLANE CLOSE IMPINGTON GIVE & TAKE 22-Feb-2018 28-Feb-2018 ALTER DOMESTIC SERVICE AND RELAY WITH 1.6M IN PUBLIC FROM MAIN INNEARSIDE FOOTWAY BT IMPINGTON BYWAY 3 IMPINGTON GIVE & TAKE 28-Feb-2018 02-Mar-2018 Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Install 55m of duct in existing trench Cambridge Water Company TINKERS LANE KINGSTON TWO-WAY 23-Feb-2018 27-Feb-2018 New connection to 4" main and lay supply SIGNALS in carriageway and verge Cambridge Water Company THE KNAPWELL WOOD KNAPWELL TWO-WAY 19-Feb-2018 23-Feb-2018 Investigation of possible leaks on water ROAD SIGNALS main in verge / carriageway BT ELY ROAD (A10) LANDBEACH TWO-WAY 19-Feb-2018 21-Feb-2018 Install 33x 100m of fibre cable and sub- SIGNALS duct into duct CAMBRIDGESHIRE THE WOODLANDS LINTON SOME C/W 19-Feb-2018 21-Feb-2018 Drainage works to prevent Flooding to INCURSION residents properties. CAMBRIDGESHIRE LINTON FOOTPATH 11 LINTON ROAD 25-Feb-2018 25-Feb-2018 Cambridge Matchless Motorcycle Club CLOSURE (10:30 - 15:00) CLOSURES - Linton Bridleway 7, Great Abington Footpath 4. Organisation/Contractor Road Locality Traffic Proposed Start Proposed End Works Description Management Date Date CAMBRIDGESHIRE LINTON BRIDLEWAY 7 LINTON ROAD 25-Feb-2018 25-Feb-2018 Cambridge Matchless Motorcycle Club CLOSURE (10:30 - 15:00) CLOSURES - Linton Bridleway 7, Great Abington Footpath 4. BT CHURCH STREET LITLINGTON MULTI-WAY 16-Feb-2018 23-Feb-2018 TM ONLY FOR SIGNAL HEAD (C271) SIGNALS BT LITLINGTON ROAD LITLINGTON MULTI-WAY 16-Feb-2018 23-Feb-2018 Build 1 concrete chamber 2315mm x SIGNALS 737mm x 1565mm deep in Footway,Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 10m of 4 poly ducts in Verge,Install 1m of 4 poly ducts in Carriageway,Install 1m of 7 poly ducts in Verge,Provide 4 core drill(s) into jointbox or building BT ABINGTON ROAD LITLINGTON MULTI-WAY 16-Feb-2018 23-Feb-2018 TM ONLY FOR SIGNAL HEAD SIGNALS CAMBRIDGESHIRE DELAMERE CLOSE LITTLE WILBRAHAM MULTI-WAY 22-Feb-2018 23-Feb-2018 Carriagway patching.
Recommended publications
  • Witches and Witchcraft in Ely
    Witches and Witchcraft in Ely A HISTORY Francis Young Printed for the author by Cambridge Print Solutions Cambridge, 2013 Published by Francis Young © Francis Young 2013 Francis Young has asserted his moral right under the Copyright, Designs and Patents Act, 1988, to be identified as the author of this work. francisyoung.wordpress.com ISBN 978-0-9926404-0-8 Table of Contents Introduction 1 1. Hereward and the Witch 3 2. A Necromancer in the Lady Chapel 5 3. Witchcraft and the Reformation 9 4. Witchfinders in Ely 11 5. Witchcraft in Ely in Modern Times 15 Notes 20 Introduction The Cambridgeshire Fens are one of the last places in England where traditional belief in witchcraft was widespread. Until as late as the mid-twentieth century, Fenland communities were isolated, and their inhabitants were more vulnerable to environmental illnesses, such as malaria, than the rest of the population. A hard life, geographical isolation, close-knit communities and mistrust of outsiders may all have contributed to the Fenlanders’ abiding belief in the power of witchcraft. Ely’s place in the history of English witchcraft is a special one. As the cathedral city at the heart of the Fens, under the independent jurisdiction of the Bishop, Ely was the place where anyone locally accused of witchcraft would be brought to trial. The city was the hub from which John Stearne completed the last stage of Matthew Hopkins’s infamous witch-hunt in the 1640s, and Ely was the scene for the (quite literal) downfall of the first ‘witch’ to appear in English history.
    [Show full text]
  • Tower, Containing a Peal of Five Bells. in the Church Are Several
    254 CHILFORD HUNDRED. tower, containing a peal of five bells. In the church are several monuments of the families of Paris, Loan, Flack and Millicent, and an elegant mural monument of marble, by Wilton fm· Elizabeth, wife of Sir Thomas Sclater Bacon, of Catley Park, who died in 1726. This latter monument was erected by means of a bequest ·of £1000, left for the purpose by Peter Standley, Esq., to perpetuate his affection for his sister and benefactress. The living is a vicarage in the deanery of Camps, rated in the K.B., at £10. 13s. 4d., but now worth £204, nett per annum. The bishop of Ely is patron, and the Rev. Wm. Brett, :M.A., is the present vicar. Pembroke Hall possesses the irnpropriate rectory, which formerly belonged to the priory. The tithes were commuted in 1839 for £753. 18s. 6d., due to the society of Pembroke hall, and £259. Ss. 3d., to the vicar. T!te Independent Ckapel, a neat building, containing galleries all round and a good organ, will seat about 500 persons, and there is in connexion with it a school on the Briti87t and Foreign system, at which about 130 children attend. 1his chapel was founded in 1669, and re-built in 1818. The Rev. G. J. Hall is the minister. Plze National and Middle School, was founded in 1840 by the Rev. C. E. Ruck Keene, to whom the school buildings and spacious grounds belong, it contains two departments, in which 150 children are educated. The expenses of this institution are defrayed by annual subscribers assisted by the benevolent founder and patron.
    [Show full text]
  • Annual Report 2018
    Red RGB:165-29-47 CMYK: 20-99-82-21 Gold RGB: 226-181-116 CMYK: 16-46-91-1 Blue RGB: 39-47-146 CMYK: 92-86-1-0 Annual Report 2018 Published 12 June 2019 Ely Diocesan Board of Finance We pray to be generous and visible people of Jesus Christ. Nurture a confident people of God Develop healthy churches Serve the community Re-imagine our buildings Target support to key areas TO ENGAGE FULLY AND COURAGEOUSLY WITH THE NEEDS OF OUR COMMUNITIES, LOCALLY AND GLOBALLY TO GROW GOD’S CHURCH BY FINDING DISCIPLES AND NURTURING LEADERS TO DEEPEN OUR COMMITMENT TO GOD THROUGH WORD, WORSHIP AND PRAYER. ENGAGE • GROW • DEEPEN | 3 Contents 04 Foreword from Bishop Stephen 05 Ely2025 – A Review 06 Safeguarding 09 Ministry 11 Mothers' Union 12 Mission 15 Retreat Centre 16 Church Buildings and Pastoral Department 20 Secretariat 21 Programme Management Office 23 Changing Market Towns 24 Parish Giving Scheme 25 Contactless Giving (Card Readers) 26 Communications and Database 29 Education 32 Finance 34 Houses Sub-Committee 35 Diocesan Assets Sub-Committee 37 Ministry Share Tables 4 | ENGAGE • GROW • DEEPEN Foreword from Bishop Stephen As a Diocese we are seeking to be People Fully Alive, as we One of the most important ways in which we serve our pray to be generous and visible people of Jesus Christ. We communities is through the Diocesan family of schools, as we are seeking to do this as we engage with our communities educate over 15,000 children. These are challenging times for locally and globally, as we grow in faith, and as we deepen in the education sector and especially for small and rural schools.
    [Show full text]
  • Appeal Decisions 4/11 Eagle Wing Temple Quay House Inquiry Held on 2-26 February and 2 the Square Temple Quay 6-15 September 2010 Bristol BS1 6PN
    The Planning Inspectorate Appeal Decisions 4/11 Eagle Wing Temple Quay House Inquiry held on 2-26 February and 2 The Square Temple Quay 6-15 September 2010 Bristol BS1 6PN Site visits made on 2-4 March and 0117 372 6372 9 and 22 September 2010 email:[email protected] ov.uk by Philip Major BA(Hons) DipTP MRTPI Decision date: an Inspector appointed by the Secretary of State for Communities and Local Government 27 October 2010 Appeal A: APP/W0530/A/09/2108277 Land at Little Linton Farm, south of Cambridge Road, Linton, Cambridgeshire • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a failure to give notice within the prescribed period of a decision on an application for planning permission. • The appeal is made by Enertrag UK Ltd against South Cambridgeshire District Council. • The application Ref S/0232/09/F, is dated 16 February 2009. • The development proposed is installation of seven wind turbines and associated infrastructure (to include access tracks, crane hardstandings, temporary construction compound, switch house and cables) on land to the south west of Linton, Cambridgeshire. Appeal B: APP/C1570/A/09/2108275 Land at Little Linton Farm, south of Cambridge Road, Linton, Cambridgeshire • The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to grant planning permission. • The appeal is made by Enertrag UK Ltd against the decision of Uttlesford District Council. • The application Ref UTT/0232/09/FUL, dated 16 February 2009, was refused by notice dated 25 June 2009.
    [Show full text]
  • ECONOMY and ENVIRONMENT COMMITTEE Date:Thursday, 14
    ECONOMY AND ENVIRONMENT COMMITTEE Date:Thursday, 14 March 2019 Democratic and Members' Services Fiona McMillan Monitoring Officer 10:00hr Shire Hall Castle Hill Cambridge CB3 0AP Kreis Viersen Room Shire Hall, Castle Hill, Cambridge, CB3 0AP AGENDA Open to Public and Press 1. Apologies for absence and declarations of interest Guidance on declaring interests is available at http://tinyurl.com/ccc-conduct-code 2. Minutes 7th February 2019 Economy and Environment Committee 5 - 18 3. Minute Action Log update 19 - 24 4. Petitions and Public Questions DECISIONS 5. East West Rail Company Consultation on Route Options between 25 - 54 Bedford and Cambridge 6. North East Cambridge Area Action Plan - Issues and Options 55 - 62 Consultation 2 Page 1 of 260 7. Land North West of Spittals Way and Ermine Street Great Stukeley 63 - 94 Outline Planning Application - Consultation Response 8. Kennett Garden Village Outline Planning Application - 95 - 110 Consultation response 9. Wellcome Trust Genome Campus Outline Planning Application 111 - 174 10. Connecting Cambridgeshire Programme Full Fibre Target 175 - 196 INFORMATION AND MONITORING 11. Finance and Performance Report to end of January 2019 197 - 240 12. Agenda Plan, Training Plan and Appointments to Outside Bodies, 241 - 260 Partnershp, Liaison, Advisory Groups and Council Champions 13. Date of Next Meeting 23rd May 2019 Subject to the April meeting being cancelled. The Economy and Environment Committee comprises the following members: Councillor Ian Bates (Chairman) Councillor Tim Wotherspoon (Vice-Chairman)
    [Show full text]
  • Land Settlement Estate, Great Abington
    Great Abington Parish Council Land Settlement Estate, Great Abington Transport Statement February 2018 Project Code: 03197 Phil Jones Associates Ltd The Aquarium King Street Reading RG1 2AN philjonesassociates.co.uk Transport Statement Version Control and Approval Version Date Main Contributor Issued by Approved by A 31 January 2018 JH/MF JH CR B 07 February 2018 JH JH CR C 21 February 2018 JH JH CR Prepared for Bernie Talbot Chairman Great Abington Parish Council Great Abington Parish Council Land Settlement Estate, Great Abington Transport Statement Contents Section Page 1 Introduction 1 1.1 Background 1 1.2 Scoping Discussion 2 1.3 Scope of the Report 2 1.4 Aim and Purpose 2 1.5 Structure of the Report 3 2 Existing Conditions 4 2.1 Internal LSE Road Network 4 2.2 Surrounding Road Network 6 2.3 Sustainability 7 2.4 Pedestrian & Cycle Infrastructure 7 2.5 Public Transport 9 2.6 Road Safety 10 3 Travel Demand 11 3.2 Existing Traffic Patterns 11 3.3 Forecast Trip Generation 12 4 Traffic Impact Assessment 14 4.2 Committed Developments 14 4.3 Development Traffic Impact 15 5 Summary and Conclusion 25 Great Abington Parish Council Land Settlement Estate, Great Abington Transport Statement Appendices Appendix A Traffic Survey Results Appendix B TRICS Outputs Appendix C Granta Park Roundabout (Glenville Consultant TA) Land Settlement Estate, Great Abington Great Abington Parish Council Introduction 1 Introduction 1.1 Background 1.1.1 Phil Jones Associates (PJA) have been commissioned by Great Abington Parish Council to prepare a Transport Statement (TS) in support of the emerging Neighbourhood Plan for the Land Settlement Estate (LSE) located to the south of Great Abington, Cambridgeshire.
    [Show full text]
  • REACH Ely Case Study Series: Sawston Frre Church
    Cambridge Judge Business School 1 REACH Ely Case Study Series Reimagining Churches as Community Assets for the Common Good SAWSTON FREE CHURCH Text, design and photography REACH Ely (Reimagining Churches as 2 Dr Timur Alexandrov Community Assets for the Common Good) Cambridge Centre for Social Innovation is a multi-partner research project that Cambridge Judge Business School aims to help communities make fuller use of their churches. Editorial board The project is implemented by Dr Helen Haugh Centre for Social Innovation at Cambridge Centre for Social Innovation Cambridge Judge Business School Cambridge Judge Business School and the Diocese of Ely Geoffrey Hunter with the generous support of Allchurches Trust Diocese of Ely and Historic England www.reachely.org The challenges facing church communities and their buildings have been extensively studied in the light of declining church attendance in the United Kingdom over several decades. REACH Ely aims to address the less-well-understood opportunities for churches to engage and reconnect with the 97.7 per cent of the local communities in the Diocese of Ely who do not attend their parish churches. With the absence of universal determinants of success and failure of churches in the community engagement context, the REACH Ely project will provide an understanding of the relationship between communities and wider use of church buildings as well as the contribution that churches make to the common good. The project will determine community values, needs and opportunities that can be used in the most effective way to ensure a win-win outcome for communities and sustainable future of church buildings.
    [Show full text]
  • PAMPISFORD PARISH COUNCIL DRAFT MINUTES: 13Th November 2014
    PAMPISFORD PARISH COUNCIL DRAFT MINUTES: 13th November 2014 Chairman: Aureole Wragg Clerk: Anna Lovewell, Tel: 01223 835050 Present: Aureole Wragg, Graham Berridge, Peter Draper, Justin Marsh, Anne Judd, Nigel Upton, Heather Fordham, Tony Orgee (SouthCambs), Peter Topping, (CCC) Open Forum 7:00pm-7:30pm: Keeley Russell, Head of Client Liaison from Balfour Beatty regarding changes in Pampisford Street Lighting. Attended by 3 residents. Information: Work will start on the 17th November with planting of the new columns. The project will take about 6 weeks to complete. BB have been contracted to provide lighting to British Safety Standards S5 Class. There is a need for evenly spaced columns and positions that do not interfere with overhead power lines as the new lights are much taller. The lights will be dimmed from 10pm-6am. Residents with problems with light entering their property can request BB to install a front or a back baffle to the light, which can be fitted retrospectively. There is potential for the lights to be turned off completely after midnight from April 2015, but the decision has not been yet finalised. Residents with issues after this meeting can contact BB directly on Freephone: 0800 7838 247 or www.lightingcambridgeshire.com Residents’ concerns: Concerns over low light levels on Beech Lane. Light CC10 agreed to be moved further down towards Beech Lane. Lights cannot be installed beyond this point as it is not in the contract. Lights are being reduced from 3-2 on the meeting point between Glebe Crescent and Town lane. Residents are concerned about pedestrians, often pensioners, crossing over the Chequers etc.
    [Show full text]
  • Diocese of Ely Directory
    Diocese of Ely Directory Published: 12 February 2021 For comments, corrections or suggestions please email Jackie Williamson on [email protected] Introduction This directory has been ordered alphabetically by Archdeaconry > Deanery > Benefice - and then Church/Parish. For each Church/Parish, the names and contact details (email and telephone) have been included for the Licensed Clergy and Churchwardens. Where known a website and “A Church Near You” link have also been included. Towards the back of the directory, details have also been included that include, where known, the following contact details: • Rural Deans (name, number and email) • Clergy (name, number and email) • Clergy with Permission to Officiate (name, number and email) • General Synod Members from the Diocese of Ely - (name only) • Bishops Council (name only) • Diocesan Synod Members (Ely) (name only) • Assistant Bishops (name only) • Surrogates (name only) • Bishop’s and Archdeacons Office, Ely Diocesan Board of Finance staff, Cathedral Staff How to update or amend details If your details are inaccurate, or you would prefer a change to what is included, please direct your query as follows: • Licensed Clergy: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Clergy with PTO: Please contact the Bishop’s Office (https://www.elydiocese.org/about/contact-us/) • Churchwardens: Please contact the Archdeacon’s Office (https://www.elydiocese.org/about/contact-us/) • PCC Roles: [email protected] • Deanery/Benefice/Parish/Church names: DAC Office on [email protected] Data Protection The Ely Diocesan Board of Finance considers there to be a legitimate justification for publishing the contact details for Licensed Clergy (including those with PTO), Churchwardens and Diocesan staff (including those in the Archdeacons’ and Bishops’ offices) and key staff in Ely Cathedral in this Directory and on occasion the Diocesan website.
    [Show full text]
  • Index of Great Abington Site Assessment Proforma
    South Cambridgeshire Strategic Housing Land Availability Assessment (SHLAA) Report August 2013 Appendix 7i: Assessment of 2011 'Call for Sites' SHLAA sites Index of Great Abington Site Assessment Proforma Site Site Address Site Capacity Page Number Land east of Great Abington (land east of 17 Site 027 236 dwellings 1698 Pampisford Road, Great Abington) Land at Pampisford Road / High Street, Site 211 82 dwellings 1707 Great Abington Site 293 104 High Street, Great Abington 19 dwellings 1715 SHLAA (August 2013) Appendix 7i: Assessment of 2011 'Call for Sites' SHLAA sites Group Village Great Abington Page 1697 South Cambridgeshire Local Development Framework Strategic Housing Land Availability Assessment (SHLAA) Site Assessment Proforma Proforma July 2012 Created Proforma Last July 2012 Updated Location Great Abington Site name / Land east of Great Abington (land east of 17 Pampisford Road) address Category of A village extension i.e. a development adjoining the existing village site: development framework boundary Description of 284 dwellings with public open space and a local centre promoter’s accommodating small scale community facilities such as a doctors proposal surgery and shops Site area 15.71ha (hectares) Site Number 027 The site is on the eastern edge of Great Abington. It adjoins residential to the west. To the north, south and east is open Site description countryside. & context The site is an arable field enclosed by hedges. Current or last Arable land use of the site Is the site Previously No Developed Land? Allocated for a non-residential use in the No current development plan? Planning No history Source of site Site suggested through call for sites SHLAA (August 2013) Appendix 7i: Assessment of 2011 'Call for Sites' SHLAA sites Group Village Page 1698 Site 027 Land east of Great Abington Tier 1: Strategic Considerations Green Belt The site is not within the Green Belt.
    [Show full text]
  • Cambridgeshire
    Mortlocks in Cambridgeshire Besides the Banking family, there were other unrelated families of Mortlocks in Cambridgeshire. Most of the main records for the county, apart from those of the banking family, find a place in one of the Suffolk trees - particularly the blacksmiths of Cheveley, Chippenham and Woodditton. The ‘China’ Mortlocks of Meldreth and Melbourn have their own section, and the Cherry Hinton and Cambridge family of William the Chapel Clerk also has a Suffolk descent, from Hundon. What are left are strays, or descents which petered out in the male line. West Wratting I have included some PR and other records for West Wratting but how they relate to other Mortlock families remains unresolved. There may be a connection with Brinkley (below). Attention should be paid to the clusters of Mortlocks just over the border in Suffolk. William and Elizabeth's family of seven children (including a rare Timothy) had as its senior son Fincham who married in St Clements, Cambridge in 1760. The only earlier Timothy Mortlock(1655-1669) was born in Denham, Suffolk, but that family, almost uniquely among Mortlocks,does not appear to use the name William. Weston Colville The Robert and the Peter who left Ely wills in Weston Colville in 1746 and 1764 respectively appear to have been father and son, Robert probably hailed from Hundon, Suffolk where he had a brother Richard. Robert was done for pound-breaking in 1739. For carpenter John, who married in Weston Colville but whose three children were all baptised inBrinkley, see the previous China Mortlock part of this study.
    [Show full text]
  • Duxford Scrapbook 1897 to 1990 by Mike Petty
    Duxford Scrapbook 1897 to 1990 by Mike Petty Duxford Scrapbook 1897 to 1990 Facts, Features and (occasional) Fallacies reported in Cambridge Newspapers summarised by Mike Petty Most of these stories originally appeared in the Cambridge Daily/Evening/News or the Cambridgeshire Weekly News, its sister title. They are supplemented by some articles published in the Cambridge Independent Press or Cambridge Chronicle Most were featured in my ‘Looking Back’ column in the Cambridge News from 1996-2014 The complete ‘Cambridgeshire Scrapbook’ of which this is a small section is published online at bit.ly/CambsCollection I have digital and other copies of most of the stories summarised. I hope to publish these online one day. If you would like them in the meantime then please get in touch. The original volumes are housed in the Cambridgeshire Collection at Cambridge Central Library where there are many other indexes dating back to 1770. They also have detailed newspaper cuttings files on over 750 topics that have been compiled since the 1960s. Newspapers sometimes get things wrong. I copy things out incorrectly. Do check There are a multitude of spelling and layout errors. Please forgive or correct them News never stops but this file was finished on 31 August 2016. I will maintain supplements and corrections – contact me for anything you need Please make what use of these notes that you may. Kindly remember where they came from See my website – www.mikepetty.org.uk for further notes. Mike Petty, Stretham 2017 www.mikepetty.org.uk bit.ly/CambsCollection Duxford Scrapbook 1897 to 1990 by Mike Petty 1904 02 11 Police told Linton magistrates that most public houses were satisfactorily conducted.
    [Show full text]