DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

DATE: 10-26-2017 LOCATION RESTRICTION DATE CONTRACTOR COST PA 73 E & W (New State Rd.) Road Reconstruction: LANE CLOSURES between 10/21/17-10/28/17 Walsh Construction $212.3 million Levick St. & Cottman Ave. 9 AM - 3 PM Company

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between 10/22/17 H&K Group, Inc. $7.6 million Bucks County line & 9th St. 7 PM - 5 AM.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between 10/22/17-10/28/17 H&K Group, Inc. $7.6 million Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5 AM. *I-76 East Shielding: CLOSED & DETOURED between South St. 10/23/17-10/26/17 Buckley & Company, $103.5 million off Ramp & 676 Vine St. Expressway. 11 PM - 5 AM. Inc. DETOUR POSTED

*I-76 East Shielding: LEFT LANE CLOSURE between South St. 10/23/17-10/26/17 Buckley & Company, $103.5 million off Ramp & 676 Vine St. Expressway. 9 PM - 11 PM. Inc.

*I-76 East Shielding: CLOSURE & DETOUR between South St. 10/23/17-10/26/17 Buckley & Company, $103.5 million off Ramp & 676 Vine St. Expressway. 11 PM - 5AM. Inc. DETOUR POSTED

*US 1 N & S (Roosevelt Extension) Drain Cleaning/Debris Removal: INTERMITTENT 10/23/17-10/26/17 Maintenance LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM.

10/26/2017 Page 1 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT 10/23/17-10/26/17 Maintenance LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM.

*I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT 10/23/17-10/26/17 Maintenance LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

*I-76 E & W Drain Cleaning/Debris Removal: INTERMITTENT 10/23/17-10/26/17 Maintenance LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM.

US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between 10/23/17-10/26/17 Wampole-Miller, Inc. $15 million Byberry Rd. & Hornig Rd. 9 PM - 5 AM.

JFK Blvd. West Bridge Rehabilitation: CLOSED & DETOURED 10/23/17-10/27/17 Abbonizio $15.8 million between 20th St & Schuylkill Ave. DETOUR POSTED. Contractors, Inc. 24 HOUR DETOUR

Ridge Ave. Trench/Foundations: LANE CLOSURES between 16th 10/23/17-10/27/17 Armour and Sons $1,698,438.00 St. & Poplar St. 9 AM - 3 PM. Electric

Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. 10/23/17-10/27/17 Buckley & Company, $33.5 million Robert C. Donatuccu Memorial Bridge over Schuylkill Inc. River. 9 AM - 3 PM.

Walnut Lane Debris Removal & Concrete Repair: LANE 10/23/17-10/27/17 Buckley & Company, $14 million CLOSURES between Magdelena St. & Park Lane Inc. Drive. Weekdays. 9 A - 3 PM.

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between 10/23/17-10/27/17 James J. Anderson $869,700.00 Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED 10/23/17-10/27/17 Abbonizio $15.8 million between 20th St & Schuylkill Ave. DETOUR Contractors, Inc. POSTED. 24 HOUR DETOUR

Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N. 10/23/17-10/27/17 Tony DePaul & Son $8.8 million 52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.

10/26/2017 Page 2 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Delaware Ave. Milling & Paving: LANE RESTRICTIONS between 10/23/17-10/27/17 Tony DePaul & Son $550,000.00 Oregon Ave. & . 7 AM - 4 PM & 7 PM - 5 AM.

*I-95 North Paving & Line Striping: INTERMITTENT RIGHT & 10/23/17-10/27/17 Driscoll Construction $160.2 million LEFT LANE CLOSURES between Allegheny Ave. & Company, Bridge St. 8 PM - 5 AM. Inc./Richard E. Pierson Construction Company, Inc.

*I-95 South Paving & Line Striping: INTERMITTENT RIGHT & 10/23/17-10/27/17 Driscoll Construction $160.2 million LEFT LANE CLOSURES between Bridge St. & Company, Allegheny Ave. 8 PM - 5 AM. Inc./Richard E. Pierson Construction Company, Inc.

*I- 95 South ramp from Besty Ross Line Striping: INTERMITTEN RIGHT & LEFT LANE 10/23/17-10/27/17 Driscoll Construction $160.2 million Bridge CLOSURES on ramp. 8 PM- 5 AM Company, Inc./Richard E. Pierson Construction Company, Inc.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between 10/23/17-10/28/17 H&K Group, Inc. $7.6 million Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5 AM. Friday 7 PM - Saturday 9 AM. *I-95 North Bridge Inspection: LEFT LANE CLOSED between 10/25/17-10/26/17 Pickering, Corts & Enterprise Ave. & Broad St. (PA 611). 9 AM - 3 PM. Summerson

*I-95 N & S Installation of Overhead Sign Truss: RIGHT TWO 10/27/17-10/28/17 James J. Anderson $211 million LANES CLOSED WITH 15-MINUTE PERIODIC STOPPAGES between Allegheny Ave. & Girard Ave. 11 PM - 5 AM.

*I-95 South off-ramp to Paving: RAMP CLOSED & DETOURED. 8 PM - 5 10/27/17-10/28/17 Walsh Construction $212.3 million Bleigh/Cottman Ave. AM. DETOUR POSTED. Company

10/26/2017 Page 3 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 South Bridge Inspection: LEFT LANE CLOSED between 10/30/17-11/1/17 Pickering, Corts & Broad St. (PA 611) & Enterprise Ave. 9 AM - 3 PM. Summerson

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between 10/30/17-11/2/17 H&K Group, Inc. $7.6 million Bucks County line & 9th St. 9 AM - 3 PM & 7 PM - 5 AM. Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. 10/30/17-11/3/17 Buckley & Company, $33.5 million Robert C. Donatuccu Memorial Bridge over Schuylkill Inc. River. 9 AM - 3 PM.

Walnut Lane Debris Removal & Concrete Repair: LANE 10/30/17-11/3/17 Buckley & Company, $14 million CLOSURES between Magdelena St. & Park Lane Inc. Drive. Weekdays. 9 AM - 3 PM.

Parkside Ave. Milling & Paving: LANE RESTRICTIONS between N. 10/30/17-11/3/17 Tony DePaul & Son $8.8 million 52nd St. & Girard Ave. 9 AM - 3 PM & 7 PM - 6 AM.

Delaware Ave. Milling & Paving: LANE RESTRICTIONS between 10/30/17-11/3/17 Tony DePaul & Son $550,000.00 Oregon Ave. & Walt Whitman Bridge. 7 AM - 4 PM & 7 PM - 5 AM.

JFK Blvd. East Bridge Rehabilitation: CLOSED & DETOURED 10/30/17-11/3/17 Abbonizio $15.8 million between 20th St & Schuylkill Ave. DETOUR Contractors, Inc. POSTED. 24 HOUR DETOUR

Lewis St./Wheatsheaf Lane Shared Pathway: PARKING LANE CLOSED between 10/30/17-11/3/17 James J. Anderson $869,700.00 Aramingo Ave. & Delaware Ave. 7 AM - 4 PM.

Ridge Ave. Trench/Foundations: LANE CLOSURES between 17th 10/30/17-11/3/17 Armour and Sons $1,698,438.00 St. & Girard Ave. 9 AM - 3 PM. Electric

US 1 N & S (Roosevelt Blvd.) ITS Installation: LANE RESTRICTIONS between 10/30/17-11/3/17 Wampole-Miller, Inc. $15 million Byberry Rd. & Hornig Rd. 9 PM - 5 AM.

10/26/2017 Page 4 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 North Sign Installation: RIGHT LANE CLOSURES between 10/31/17-11/1/17 Driscoll Construction $160.2 million Allegheny Ave. & Bridge St. 8 PM - 5 AM. Company, Inc./Richard E. Pierson Construction Company, Inc.

*I-95 South Sign Removal: RIGHT LANE CLOSURES between 10/31/17-11/1/17 Driscoll Construction $160.2 million Bridge St. & Allegheny Ave. 8 PM - 5 AM. Company, Inc./Richard E. Pierson Construction Company, Inc.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: OUTER LANE CLOSURES between 11/3/17 H&K Group, Inc. $7.6 million Bucks County line & 9th St. 7 PM - 9 AM.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: LANE CLOSURES between Bucks 10/16/17-10/21/17 H&K Group, Inc. $7.6 million County line & 9th St. 9 AM - 3 PM & 7 PM - 9 AM.

Schuylkill Ave. Bridge Rehabilitation: TRAFFIC SWITCH WITH NO 8/28/17-12/31/17 Buckley & Company, $103 million RIGHT TURN at Walnut onto Schuylkill. 24-HOUR Inc. RESTRICTIONS.

Cheltenham Ave. Utility Installation: LANE RESTRICTIONS between 8/30/17-11/2/17 PECO Energy Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

Holme Ave. Bridge Repair: LANE CLOSURE between Longford St. 8/7/17-5/2018 Road-Con, Inc. $1.3 million & Arthur St. 24-HOUR RESTRICTIONS.

I-676 West Ramp to 22nd St. Bridge Construction: RAMP REDUCED TO ONE 7/21/17-10/31/17 Buckley & Company, $64.8 million LANE 24-HOUR Inc.

Roosevelt Blvd. Curb, Sidewalk, Bus Shelters & Pedestrian Lights: 7/31/17-10/25/17 A.P. Construction, LANE CLOSURES at Cottman Ave.; Rhawn St.; Inc. Welsh Rd.; Grant Ave. & Red Lion Rd. 6 AM - 4:30 PM.

10/26/2017 Page 5 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Aramingo Ave. Utility Installation: LANE CLOSURES between 7/20/17-4/1/18 A.P. Construction, $87 million Wheatsheaf Lane & I-95 interchange. 9 AM - 3 PM. Inc.

Palmer St. Overhead Bridge Construction: CLOSED & 6/15/16-5/1/18 James J. Anderson $211 million DETOURED between Wildey St. & Delaware Ave. 24- HOUR DETOUR. DETOUR POSTED. Montgomery Ave. Bridge Demoliltion: CLOSED & DETOURED between 6/15/17-5/1/18 James J. Anderson $211 million Wildy St. & Delaware Ave. 24-HOUR DETOUR. DETOUR POSTED. Columbia Ave. Bridge Demolition: CLOSED & DETOURED between 6/5/17-11/14/17 James J. Anderson $211 million Wildey St. & Delaware Ave. 24-HOUR DETOUR. DETOUR POSTED. 18th St. Roadwork: CLOSED & DETOURED between Vine St. 5/15/17-1/2018 Buckley & Company, $64.8 million Local E/B & Vine St. Local W/B. 24-HOUR Inc. CLOSURE. DETOUR POSTED.

22nd St. Bridge Construction: TRAFFIC PATTERN CHANGE 11/7/16-11/30/18 Buckley & Company, $64.8 million on bridge over I-676 between Ben Franklin Parkway & Inc. Race St. 21st St. Bridge Construction: TRAFFIC PATTERN CHANGE 11/7/16-11/30/18 Buckley & Company, $64.8 million on bridge over I-676 between Ben Franklin Parkway & Inc. Race St. Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St. 12/2/15-11/2017 Armour and Sons $4.7 million (PA 611) & Rising Sun Ave. 9 AM - 3 PM. Electric Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED.

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Somerset St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED.

10/26/2017 Page 6 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Girard Ave. on-ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED 12/16/15-10/20/17 James J. Anderson $211 million & DETOURED. 24-HOUR CLOSURE. DETOUR POSTED. Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between 4/1/15-10/2018 James J. Anderson $211.7 million Columbia Ave. & Aramingo Ave. 24-HOUR RESTRICTIONS. BUCKS COUNTY PA 13 (Bristol Pike), Bensalem Twp. ITS Foundation Work: RIGHT LANE CLOSED 10/23/17-10/25/17 Wampole-Miller, Inc. $15 million between Biddie Lane to Clarmont Ave. 9 AM - 3 PM.

PA 63 (Woodhaven Rd.) E & W, ITS Installation: LANE CLOSURES between I-95 & 10/23/17-10/26/17 Wampole-Miller, Inc. $15 million Bensalem Twp. Millbrook Rd. Interchanges. 9 PM - 5 AM.

US 1 N & S (Roosevelt Blvd.), ITS DMS Work: LANE CLOSURES between Lincoln 10/24/17-10/27/17 Wampole-Miller, Inc. $15 million Bensalem Twp. Hwy. & PA 132 (Street Rd.). 9 AM - 3 PM.

*I-95 North, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE 10/23/17-10/27/17 James J. Anderson $29,633,134 CLOSURES between New Falls Rd. & Newtown- Yardley Interchange. 7 PM - 5 AM. PA 611 South, Doylestown Twp., Line Painting: RIGHT LANE CLOSED between N. 10/23/17-10/27/17 Rohm and Haas Doylestown Bor. Broad St. & W. State St. 9 AM - 3 PM. Chemicals, LLC

PA 611 (Easton Rd.), Warrington Curb Ramp Installation: LANE CLOSURES at 10/23/17-10/27/17 James D. Morrissey $4.3 million Twp. Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol Rd.; Kelly Rd.; Freedoms Way/Oxford Drive; Doylestown Plaza. 9 AM - 3 PM. Durham Rd., Bensalem, Bristol twps. Bridge Beams: CLOSED & DETOURED between New 10/23/17-10/28/17 Pennsylvania $142 million Rodger Rd. & New Falls Rd. 7 AM - 3 PM & 8 PM - 5 Turnpike Commission AM. DETOUR POSTED.

East Park Ave., Sellersville Bor. Utility Installation: LANE RESTRICTIONS between 10/23/17-11/17/17 North Penn Water Main St & Herbert St. Weekdays. 9 AM - 3 PM. Authority

10/26/2017 Page 7 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Bath Rd., Bristol Twp. Utility Installation: LANE RESTRICTIONS between 10/23/17-11/30/17 PECO Energy Bayard St. & Lower Bucks Hospital Entrance. Weekdays. 9 AM - 3 PM. *US 1 North, Bensalem Twp. Running Wires for Cameras: RIGHT LANE CLOSED 10/25/17 Kuharchik at Bus. US 1. 9 AM - 3 PM.

Pennsylvania Ave., Morrisville Bor. Utility Installation: LANE CLOSURE between 10/25/17-11/1/17 PECO Energy Hendrickson St. & Franklin St. Weekdays. 9 AM - 3 PM. North Main St., New Hope Bor. Utility Installation: LANE RESTRICTIONS between 10/30/17 PECO Energy Parry St. & Division St. 9 AM - 3 PM.

*I-95 N & S, Middletown Twp. Traffic Marking Installation: INTERMITTENT LANE 10/30/17-11/3/17 James J. Anderson $29,633,134 CLOSURES between New Falls Rd. & Newtown- Yardley Interchange. 7 PM - 5 AM. PA 611 South, Doylestown Twp., Line Painting: RIGHT LANE CLOSED between N. 10/30/17-11/3/17 Rohm and Haas Doylestown Bor. Broad St. & W. State St. 9 AM - 3 PM. Chemicals, LLC

County Line Rd., Horsham Twp. Utility Installation: CLOSED & DETOURED between 10/30/17-11/30/17 Horsham Township Chestnut Lane & Keith Valley Rd. Weekdays. 9 PM - Water & Sewer 6 AM. DETOUR POSTED. Authority Marienstein Rd., Nockamixon, Patching, Milling & Overlay: LANE RESTRICTIONS 10/30/17-10/31/17 James D. Morrissey $3.2 million Bridgeton twps. between PA 611 (Easton Rd.) & PA 32 (River Rd.). 9 AM - 3 PM.

PA 132 (Street Rd.), Upper Curb Installation: LANE RESTRICTIONS between 10/31/17 & 11/7/17 J.Rapp, LLC Southampton Twp. Kutcher Rd. & Morning Glory Drive. Weekdays. 9 AM - 3 PM. Langhorne Yardley Rd., Lower Milling & Paving: LANE RESTRICTIONS between 10/31/17-11/17/17 Blooming Glen $4.4 million Makefield Twp. Stoney Hill Rd. & Yardley Newtown Rd. Weekdays. 7 Contractors, Inc. AM - 5 PM. Trumbauersville Rd., Milford Twp. Pipe Replacement: CLOSED & DETOURED between 11/6/17-11/7/17 Maintenance Creamery Rd. & Weisel Rd. 8 AM - 4 PM. DETOUR POSTED.

10/26/2017 Page 8 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST N. Pine St., Langhorne Bor. Utility Installation: LANE CLOSURE between E. 11/6/17-11/13/17 PECO Energy Winchester Ave. & Summit Ave. Weekdays. 9 AM - 3 PM.

W. State Rd., Doylestown Twp. Utility Installation: LANE CLOSURE between Franklin 11/9/17-11/16/17 PECO Energy St. & Clinton St. Weekdays. 9 AM - 3 PM.

*I-95 N & S, Middletown Twp. Bridge Dam and Traffic Marking Installation: 10/16/17-10/20/17 James J. Anderson $29,633,134 INTERMITTENT LANE CLOSURES between Newtown-Yardley Interchange and New Falls Rd. 7 PM - 6 AM. Kumry Rd., Milford Twp. Milling & Paving: LANE RESTRICTIONS between 10/16/17-11/17/17 Blooming Glen $3.7 million Sleepy Hollow Rd. & Creamery Rd. 7 AM - 5 PM. Contractors, Inc.

US 13 N & S (Bristol Pike), Bristol Storm Pipe Installation: LANE RESTRICTIONS 9/25/17-10/27/17 Bencardino $634,265.00 Twp. between Haunted Lane & Cedar Ave. Weekdays. 9 Excavating, Inc. AM - 3 PM.

Jacksonville Rd., Warminster, Milling & Paving: LANE RESTRICTIONS between 9/25/17-11/10/17 Blooming Glen $4.4 million Northampton twps., Ivyland Bor. County Line Rd. & Almshouse Rd. Weeknights. 7 PM Contractors, Inc. - 5 AM. N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between 9/25/17-11/15/17 Bencardino $155,000.00 Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3 Excavating, Inc. PM.

Walnut St., Perkasie Bor. Bridge Replacement: CLOSED & DETOURED 9/25/17-11/25/18 H&K Group, Inc. between PA 152 & Constitution Ave. 24-HOUR DETOUR. DETOUR POSTED.

Street Rd., New Hope Bor. Bridge Rehabilitation: CLOSED & DETOURED 9/25/17-11/30/17 Loftus Construction, $6.8 million between Atkinson Rd. & Windy Bush Rd. 24-HOUR Inc. DETOUR. DETOUR POSTED.

Sugan Rd., Solebury Twp. Bridge Rehabilitation: CLOSED & DETOURED 10/2/17-5/5/18 J.D. Eckman, Inc. $7,407,987.00 between Creamery Rd. & Paxson Rd. 24-HOUR CLOSURE. DETOUR POSTED.

10/26/2017 Page 9 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 North, Lower Makefield Twp. Roadwork: LANE CLOSURES between PA 332 9/16/17-Indef. Joint (Yardley-Newtown Rd.) & NJ state line. 24-HOUR Toll Bridge RESTRICTIONS POSSIBLE. Commission *I-95 South, Lower Makefield Twp. Roadwork: LANE CLOSURES between JJ state line & 9/16/17-Indef. Delaware River Joint PA 332 (Yardley-Newtown Rd.). 24-HOUR Toll Bridge RESTRICTIONS POSSIBLE. Commission

PA 32 (River Rd.), Lower Makefield Roadwork: LANE RESTRICTIONS between Woodside 9/16/17-Indef. Delaware River Joint Twp. Rd. & I-95. 24-HOUR RESTRICTIONS POSSIBLE. Toll Bridge Commission

Woodside Rd., Lower Makefield Roadwork: ALTERNATING TRAFFIC between River 9/16/17-Indef. Delaware River Joint Twp. Rd. & Mt. Eyre Rd. 24-HOUR RESTRICTIONS Toll Bridge POSSIBLE. Commission

Taylorsville Rd., Lower Makefield Roadwork: LANE CLOSURES between Woodside Rd. 9/16/17-Indef. Delaware River Joint Twp. & Highland Drive. 24-HOUR RESTRICTIONS Toll Bridge POSSIBLE. Commission

Brownsville Rd., Middletown Twp. Utility Installation: CLOSED & DETOURED between 9/13/17-10/10/17 PECO Energy Broadview Ave. & Old Lincoln Hwy. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Oxford Valley Rd., Falls Twp. Uitility Installation: LANE CLOSURE between Olds 10/4/17-11/1/17 Township of Falls Boulevard & Queen Anne Drive. Weekdays. 9 AM - 3 Authority PM. PA 413 (New Rodgers Rd.), Bristol Bridge Rehabilitation: CLOSED & DETOURED 8/20/17-11/10/17 Pennsylvania $142 million Twp. between Plumbridge Drive & Bath Rd./Durham Rd. 8 Turnpike Commission PM - 5 AM. DETOUR POSTED.

PA 413 (New Rodgers Rd.), Bristol Bridge Rehabilitation: LANE RESTRICTIONS & 15- 8/20/17-11/10/17 Pennsylvania $142 million Twp. MINUTE STOPPAGES between Plumbridge Drive & Turnpike Commission Bath Rd./Durham Rd. 7 AM - 3 PM & 8 PM - 5 AM.

Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 & 8/20/17-11/10/17 Pennsylvania $142 million New Falls Rd. 7 AM - 3 PM. Turnpike Commission

10/26/2017 Page 10 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413 8/20/17-11/10/17 Pennsylvania $142 million & New Falls Rd. 8 PM - 5 AM. DETOUR POSTED. Turnpike Commission

PA 611 (Easton Rd.), Warrington Utility Installation: LANE CLOSURE between Street 8/22/17-10/13/17 Warrington Township $29.13 million Twp. Rd. & Paul Valley Drive. Weekdays. 9 AM - 3 PM. Authority

Main St., Dublin Bor. ADA Ramp Installation: CURB LANE RESTRICTIONS 8/24/17-10/27/17 Dublin Borough $29.19 million between High St. & Manor Drive. 7 AM - 3 PM.

PA 263 (York Rd.), Warminster Twp. Milling & Paving: LANE CLOSURE between County 8/14/17-11/10/17 Blooming Glen $4.4 million Line Rd. & Tennyson Drive. Weeknights. 7 PM - 5 Contractors, Inc. AM.

Loux Covered Bridge over Cabin CLOSED & DETOURED INDEFINITELY: Due to 8/1/17-Indef. Run on Carver-Wismer Road, structural damage sustained from an oversized vehicle Bedminster Township DETOUR POSTED Steinsburg Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED 2/27/17-11/10/17 Pennsylvania $29.10 million between Hieter Rd. & Wentz Rd. 24-HOUR DETOUR. Turnpike Commission DETOUR POSTED. Trumbauersville Rd., Milford Twp. Bridge Replacement: CLOSED & DETOURED 2/27/17-11/10/17 Pennsylvania $29.10 million between Canary Rd. & Esten Rd. 24-HOUR Turnpike Commission DETOUR. DETOUR POSTED. County Line Rd., Warrington, Utility Installation: LANE RESTRICTIONS between 3/7/16-9/2018 James D. Morrissey, $14.8 million Horsham, Montgomery twps. East Kulp Rd. & Stump Rd. 7 AM - 3 PM. Inc.

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between 3/17/14-10/2017 J.D. Eckman, Inc. $31.6 million Bristol Rd. & Sugar Bottom Rd. 24-HOUR RESTRICTIONS. Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between 3/2/11-Indef. $29.2 million Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

CHESTER COUNTY Business US 30 (Lincon Hwy.), Caln Pavement Marking: LANE RESTRICTIONS between 10/22/17-10/26/17 Allan Myers $6.3 million Twp. Coatesville City Line & S. Bailey Rd. 7 PM - 5 AM.

10/26/2017 Page 11 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Sproul Rd., Springfield Twp., Pavement Marking: LANE RESTRICTIONS between 10/22/17-10/26/17 Allan Myers $6.3 million Swarthmore Bor. College Ave. & Woodland Ave. 7 PM - 5 AM.

PA 340 (Kings Hwy.), West Caln, Milling & Paving: LANE RESTRICTIONS between 10/22/17-10/26/17 Allan Myers $6.3 million West Brandywine, Caln, Valley twps. Compass Rd. & Lincoln Hwy. 7 PM - 5 AM.

Newark Rd., New Garden Twp. Shoulder Grading: SHOULDER RESTRICTIONS 10/22/17-10/29/17 Allan Myers, LP $1.4 million between New Garden Rd. & Gap-Newport Pike. 9 AM - 3 PM. Newark Rd., New Garden Twp. Milling & Paving: New Garden Rd. & Starr Rd. 6 PM - 10/22/17-10/29/17 Allan Myers, LP $1.4 million 6 AM.

Gap Newport Pike, New Garden Milling & Paving: Penn Green Rd. & New Garden Rd. 10/22/17-10/29/17 Allan Myers, LP $1.4 million Twp. 6 PM & 6 AM.

Westbourne Rd., Westtown Twp. Tree Removal: LANE RESTRICTIONS between PA 10/23/17-10/24/17 Knight Brothers 926 (Street Rd.) & Barnview Lane. 9 AM - 3 PM

Strasburg Rd., East Fallowfield Twp. Crack Sealing: LANE RESTRICTIONS between PA 10/23/17-10/25/17 Maintenance 372 (Valley Rd.) & PA 82 (Doe Run Rd.). 8:30 AM - 3 PM. Business US 30 (Lincon Hwy.), Caln Pavement Marking: LANE RESTRICTIONS between 10/23/17-10/27/17 Allan Myers $6.3 million Twp. Coatesville City Line & S. Bailey Rd. 9 AM - 3 PM.

Sproul Rd., Springfield Twp., Pavement Marking: LANE RESTRICTIONS between 10/23/17-10/27/17 Allan Myers $6.3 million Swarthmore Bor. College Ave. & Woodland Ave. 9 AM - 3 PM.

US 30 West Tree Removal: PERIODIC LEFT LANE CLOSURES 10/23/17-10/27/17 M & M Landscaping (Coatesville/Downingtown Bypass), between PA 340 & Boydes Corner Stockpile. 7 AM - Valley, Caln, Sadsbury twps. 11 AM.

10/26/2017 Page 12 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST US 30 East Tree Removal: PERIODIC LEFT LANE CLOSURES 10/23/17-10/27/17 M & M Landscaping (Coatesville/Downingtown Bypass), between PA 340 & Boydes Corner Stockpile. 11 AM - Valley, Caln, Sadsbury twps. 3 PM.

East Nottingham, West Nottingham, Line Painting: SLOW MOVING OPERATION TO 10/23/17-10/27/17 PennDOT $29.6 million Upper Oxford, Lower Oxford, New PAINT TRAFFIC LINES. MOTORISTS ARE London, Londonderry twps. ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM.

Devon State Rd., Easttown Twp. Utility Installation: LANE CLOSURE between 10/23/17-10/30/17 PECO Energy Conestoga Rd. & Old Lancaster Rd. Weekdays. 9 AM - 3 PM.

Lincoln Hwy., Coatesville City Utility Installation: LANE RESTRICTIONS between 10/23/17-12/15/17 Pennsylvania First Ave. & Church St. Weekdays. 9 AM - 3 PM. American Water Company PA 401 (Conastoga Rd.), East Tree Removal: LANE RESTRICTIONS between Mill 10/25/17 Knight Brothers Whiteland Twp. Lane & Valley Creek Rd. 9 AM - 3 PM.

Dorlins Mill Rd., Upper Uwchlan Drainage Pipe Replacement: CLOSED & DETOURED 10/25/17-10/26/17 Maintenance Twp. between Wallace Ave. & Shelmire Rd. 9 AM - 2 PM. DETOUR POSTED. Strasburg Rd., West Sadsbury Twp. Paving: LANE RESTRICTIONS between Limestone 10/25/17-10/27/17 Allan Myers $5.5 million Rd. & Lancaster County line. 9 AM - 3 PM.

West Uchlan Ave., East Caln Twp. Utility Installation: LANE RESTRICTIONS between 10/25/17-11/1/17 Aqua Pennsylvania Garris Rd. & Winding Way. Weekdays. 9 AM - 3 PM.

W. Lancaster Ave., Downingtown Utility Installation: LANE CLOSURE between Stuart 10/25/17-11/1/17 PECO Energy Bor. Ave. & Hunt Ave. Weekdays. 9 AM - 3 PM.

Leopard Rd. Easttown Twp. Utility Installation: LANE CLOSURE between Potter 10/27/17-11/3/17 PECO Energy Ave. & Sheffield Dr. 9 AM - 3 PM

10/26/2017 Page 13 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Rock Raymond Rd., East Crack Sealing: LANE RESTRICTIONS between US 10/30/17-10/31/17 Maintenance Brandywine Twp. 322 (Horseshoe Pike) & Dowling Forge Rd. 9 AM - 3 PM. Kennett, New Garden, Caln, West Line Painting: SLOW MOVING OPERATION TO 10/30/17-11/3/17 PennDOT $29.6 million Goshen, Charlestown, Schuylkill, PAINT TRAFFIC LINES. MOTORISTS ARE Tredyffrin twps. ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM.

Darby Rd., Tredyffrin Twp. Utility Installation: LANE CLOSURE between Craig 11/13/17-11/20/17 PECO Energy Ave. & Woodland Terrace. Weekdays. 9 AM - 3 PM.

Westbourne Rd., Westtown Twp. Utility Installation: LANE CLOSURE between Street 11/13/17-11/20/17 PECO Energy Rd. & Barnview Rd. Weekdays. 9 AM - 3 PM.

Ridge Rd., East Coventry Twp. Utility Installation: LANE CLOSURE between Fulmer 11/13/17-11/20/17 PECO Energy Rd. & Porters Mill Rd. Weekdays. 9 AM - 3 PM.

Newtown Rd., Easttown Twp. Utility Installation: CLOSED & DETOURED between 11/13/17-12/9/17 PECO Energy Sugartown Rd. & Waterloo Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED. Kings Hwy, West Caln, West Milling: LANE RESTRICTIONS between Compass Rd. 10/15/17-10/20/17 Allan Myers $6.3 million Brandywine, Caln, Valley twps. & Lincoln Hwy. 7 PM - 5 AM & 9 AM - 3 PM

U.S. 202 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between 10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM

U.S. 422 N & S, Tredyffrin Twp. Large Sign Maintenance: ROAD CLOSURES between 10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million U.S. 202 & PA 23 Valley Forge Rd). 8 PM - 5 AM

Business U.S. 30 W (Lincoln Utility Installation: LANE RESTRICTIONS between 10/16/17-12/15/17 Pennslyvania Highway), Coatesville City First Ave & Church St. 9 AM - 3 PM. American Water Co.

PA 724 (Sckuylkill Rd), North Utility Installation: LANE CLOSURE between Park Ave 10/17/17-10/24/17 PECO Energy Coventry Twp. & Vaughn Rd. 9 AM - 3 PM

10/26/2017 Page 14 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Lochwood Ln, East Goshen Twp Uitility Installation: LANE CLOSURE between 10/19/17-10/26/17 PECO Energy Lochwood Ln. & Strasburg Ln. Weekdays. 9 AM - 3 PM Newark Rd., New Garden Twp. Widening: LANE RESTRICTIONS between New 9/25/17-10/30/17 Allan Myers, LP $1.4 million Garden Rd. & PA 41 (Gap Newport Pike). 9 AM - 3 PM. Woodview Rd., London Grove Twp. Bridge Replacement: CLOSED & DETOURED 9/25/17-12/2/17 Walsh Construction $29.2 million between Ewing Rd. & W. Woodview Rd. 24-HOUR Company DETOUR. DETOUR POSTED.

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between Boot 10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million Rd. & Kind Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday 7 AM - 5 PM. Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURE between King 10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million Rd. & Constitution Drive. Mon. thru Fri. 9 AM - 3 PM. Saturday 7 AM - 5 PM. Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURE between US 10/2/17-11/1/17 Sunoco Pipeline L.P. $29.1 million 202 & Ship Rd. Mon. thru Fri. 9 AM - 3 PM. Saturday 7 AM - 5 PM. PA 29 (Morehall Rd.), East Widening: LANE RESTRICTIONS at Great Valley 10/2/17-11/3/17 Liberty Property, LLC $29.3 million Whiteland Twp. Parkway. Weekdays. 9 AM - 3 PM.

PA 724 (Schuylkill Rd.), East Utility Installation: LANE RESTRICTIONS at Ridge Rd. 10/9/17-10/27/17 & PECO Energy Pikeland Twp. Weekdays. 9 AM - 3 PM. 11/6/17-11/7/17

West Evergreen St., West Grove Sidewalk Replacement: LANE RESTRICTIONS 10/10/17-10/24/17 Flyway Excavating Bor. between Oakland Ave. & Prospect Ave. Weekdays 9 AM - 3 PM.

Business US 30 West, City of Utility Installation: LANE RESTRICTIONS between 10/10/17-12/15/17 Pennsylvania Coatesville First Ave. & Church St. Weekdays. 9 AM - 3 PM. American Water Company

PA 282 (Wallace Ave.), Sidewalk Installation: LANE SHIFT between 9/11/17-11/30/17 Downingtown Downingtown Bor. Pennsylvania Ave. & US 30 (Lancaster Ave.). Borough Weekdays. 9 AM - 3 PM.

10/26/2017 Page 15 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST US 1 North, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between PA 9/6/17-11/7/17 Loftus Construction, $5.5 million 41 (Gap Newport Pike) & Newark Rd. 24-HOUR Inc. RESTRICTIONS. US 1 South, New Garden Twp. Bridge Rehabilitation: LANE CLOSURE between 8/7/17-11/7/17 Loftus Construction, $5.5 million Newark Rd. & PA 41 (Gap Newport Pike). 24-HOUR Inc. RESTRICTIONS. West Baltimore Pike, Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between 7/31/17-12/31/17 Ply-Mar Construction $830,403.50 Penns Manor Rd. & Mill St. Weekdays. 8 AM - 4 PM. Co., Inc.

West Cypress St., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between 7/31/17-12/31/17 Ply-Mar Construction $830,403.50 Scarlett Rd. & Mill St. Weekdays. 8 AM - 4 PM. Co., Inc.

Rosedale Rd., Kennett Twp. Curb/Sidewalk Installation: LANE CLOSURE between 7/31/17-12/31/17 Ply-Mar Construction $830,403.00 Walnut St. & MacFarlan Rd. Weekdays. 8 AM - 4 Co., Inc. PM. PA 23 (Ridge Rd.), East Pikeland Utility Installation: CLOSED & DETOURED between 5/15/17-11/15/17 Toll Brothers $29.15 million Twp. Hares Hill Rd. & PA 724 (Schuylkill Rd.). 24-HOUR DETOUR. DETOUR POSTED.

PA 352 (Chester Rd.), East Goshen Pipe Installation: TRUCK DETOUR at Boot Rd. 24- 5/15/17-11/17/17 Sunoco Pipeline L.P. $29.17 million Twp. HOUR CLOSURE. DETOUR POSTED.

Brandywine Creek Rd., Newlin Twp. Barrier Installation: LANE CLOSURE between Green 3/3/17-Indef. Maintenance $29.3 million Valley Rd. & Powell Rd. 24-HOUR RESTRICTIONS.

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES 12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 9 AM - 2 PM & 5 PM - 5 AM. *US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES 12/23/16-12/29/17 J.D. Eckman, Inc. $73.3 million between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. Hollow Rd., West Vincent, East Bridge Damage: CLOSED & DETOURED between 11/20/16-Indef. PennDOT Vincent twps. French Creek Rd. & Pughtown Rd. 24-HOUR DETOUR. DETOUR POSTED.

10/26/2017 Page 16 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Ross Fording Rd., West Fallowfield Bridge Damage: CLOSED & DETOURED between 7/2/15-Indef. PennDOT $29.2 million Twp. Creek Rd. & Bryson Rd. 24-HOUR DETOUR. DETOUR POSTED.

PA 724 ramp to US 422 East, East Ramp/Bridge Construction: RAMP CLOSED & 5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million Coventry Twp. DETOURED. DETOUR POSTED.

*US 422 E & W, North Coventry Bridge Construction: REDUCED TO ONE LANE 11/27/14-9/2018 J.D. Eckman, Inc. $36 million Twp. between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. *US 422 E & W, North Coventry Road Construction: TRAFFIC PATTERN SHIFT 2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million Twp. between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 24-HOUR PATTERN.

DELAWARE COUNTY *I-95 N & S, Upper Chichester Twp. Overpass Construction: SINGLE LANE CLOSURE 10/20/17 Chester Water between Chichester Ave. & PA Welcome Center. 10 Authority PM - 12 AM.

S. Wayne Ave., Radnor Twp. Sink Hole Repair: CLOSED & DETOURED between 10/20/17-10/23/17 Highway Materials, $2.5 million School Lane & Runnymede Ave. Friday 10 PM thru Inc. Monday 5 AM. DETOUR POSTED.

*I-95 N & S, Upper Chichester Twp. Overpass Construction: DOUBLE LANE CLOSURE 10/21/17 Chester Water between Chichester Ave. & PA Welcome Center. 12 Authority AM - 5 AM.

Sweetwater Rd., Thornbury, Base Repair & Paving: LANE RESTRICTIONS 10/22/17-10/26/17 Allan Myers $4.1 million Edgemont twps. between Valley Rd. & Creek Rd. 6 PM - 6 AM.

Springfield Rd., Upper Darby, Milling & Paving: LANE RESTRICTIONS between 10/22/17-10/26/17 Highway Materials, $2.5 million Springfield twps.; Collingdale, Aldan MacDade Blvd. & Netherwood Drive. 7 PM - 5 AM and Inc. Clifton Heights bors. 9 AM - 3 PM

*I-95 North, Ridley Twp. Tree Removal: RIGHT LANE CLOSURE on the ramp 10/23/17-10/24/17 Knight Brothers from I-95 North to I-475 North. 9 AM - 3 PM.

10/26/2017 Page 17 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 North, City of Chester Tree Removal: RIGHT LANE CLOSURE between PA 10/23/17-10/24/17 Knight Brothers 452 (Market St.) & US 322 (Commodore Barry Bridge) interchanges. 9 AM - 3 PM.

*US 1 North (Media Bypass), Upper Tree Removal: RIGHT LANE CLOSURE between PA 10/23/17-10/24/17 Knight Brothers Providence Twp. 352 (Middletown Rd.) & PA 252 (Providence Rd.). 9 AM - 3 PM.

*I-476 North, Upper Providence Twp. Tree Removal: RIGHT LANE CLOSED between 10/23/17-10/24/17 Knight Brothers Media/Swarthmore & US 1 Interchanges. 9 AM - 3 PM.

Providence Rd., Upper Providence, Pave-High Friction Surface Treatment: LANE 10/23/17-10/26/17 Allan Myers $4.1 million Edgemont twps. RESTRICTIONS between PA 252 (Palmers Mill Rd.) & Chester County line. 9 AM - 3 PM. Township Line Rd., Upper Darby, Pave-High Friction Surface Treatment: LANE 10/23/17-10/26/17 Allan Myers $1 million Haverford twps. RESTRICTIONS between State Rd. & Harding Drive. 9 AM - 3 PM. Upland Ave./22nd St., Upland Bor., Asphalt Paving Adjustments: LANE RESTRICTIONS 10/23/17-10/27/17 Allan Myers $7.2 million Chester City between Howard St. & Melrose St. 9 AM - 3 PM.

Radnor, Haverford, Upper Darby, Line Painting: SLOW MOVING OPERATION TO 10/23/17-10/27/17 PennDOT Springfield, Marple, Newtown twps. PAINT TRAFFIC LINES. MOTORISTS ARE ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM.

*I-95 South on-ramp from Edgmont Painting/Inspection: CLOSE I-95 SB ON RAMP 10/23/17-10/27/17 South State, Inc. $16.6 million Ave between Edgemont Ave & I-95 9 AM to 3 PM

*I-476 N & S, Radnor, Haverford, ITS Conduit & Fiber Installation: RIGHT SHOULDER 10/23/17-10/27/17 Wampole-Miller, Inc. $15 million Marple twps. CLOSED between I-76 & I-95. 9 AM - 3 PM.

*US 30 E & W (Lancaster Ave.), Pedestrian Bridge Construction: LANE CLOSURES 10/2317-10/27/17 Neshaminy $3.7 million Radnor Twp. between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM - Constructors, Inc. 3 PM

10/26/2017 Page 18 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER 10/23/17-10/27/17 South State, Inc. $16.6 million CLOSURES between I-476 & PA 352/320. 10 PM - 5 AM. PA 3 (West Chester Pike), Curb Ramp Reconstruction: LANE CLOSURE at Brief 10/23/17-10/27/17 L.C. Costa $5.9 million Haverford, Upper Darby twps. Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal Contractors, Inc. Square & Pennock Ave. 9 AM - 3 PM.

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at 10/23/17-10/27/17 L.C. Costa $5.9 million Chatham Rd.; Forge Rd.; Copley Rd.; Terminal Contractors, Inc. Square & Millbourne Ave. 9 AM - 3 PM.

E. Baltimore Ave., Lansdowne Bor. ADA Curb Ramp Replacement: LANE CLOSURE at 10/23/17-10/27/17 L.C. Costa $7.2 million 1st St.; 2nd St.; Baltimore St. & E. Baltimore St.; Contractors, Inc. Rigby St.; Lexington Ave.; Wildwood Ave.; Melrose Ave.; Hirst Ave.; Maple Ave.; Legion Ter.; Lewis Ave. & Third St. 9 AM - 3 PM.

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at 10/23/17-10/27/17 L.C. Costa $4.1 million Diamond St.; Madison St.; Woodlawn Ave.; Clifton Contractors, Inc. Ave. & Broadway Ave. 9 AM - 3 PM. US 1 (Baltimore Ave.), Clifton Curb Ramp Reconstruction: LANE CLOSURES at 10/23/17-10/27/17 L.C. Costa $4.1 million Heights Bor. Church St.; Marple Ave.; Jackson Ave.; Springfield Contractors, Inc. Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM. Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at 10/23/17-10/27/17 Lenni Electric $4.1 million Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

Baltimore Ave., Upper Darby Twp., Traffic Signal Upgrade: LANE RESTRICTIONS 10/23/17-10/27/17 Lenni Electric $4.1 million Lansdowne Bor. between Lansdowne Ave.; Penn Blvd./4th St.; Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church Lane. 9 AM - 3 PM.

Baltimore Ave., Clifton Heights Bor., Road Widening: LANE RESTRICTIONS at Springfield 10/23/17-10/27/17 Lenni Electric $4.1 million Upper Darby Twp. Rd.; Church Lane; Delmar Drive; Diamond St. & Home Depot Drive. 9 AM - 3 PM.

10/26/2017 Page 19 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *I-476 N & S, Radnor, Haverford, ITS Fiber Installation & Splicing: RIGHT SHOULDER 10/23/17-10/27/17 Wampole-Miller, Inc. $15 million twps. CLOSED between I-76 & I-95. 9 AM - 3 PM.

*I-95 N & S, Lower Chichester, Large Sign Maintenance: LANE CLOSURES between 10/23/17-10/28/17 Carr & Duff, Inc. $2.1 million Upper Chichester, Chester, Upland, PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5 Ridley, Tinicum twps. Chester City AM.

*US 322 E & W (Conchester Hwy.), Reconstruction & Road Widening: PERIODIC LANE 10/23/17-10/28/17 J.D. Eckman, Inc. $62.7 million Concord Twp. RESTRICTIONS between US 1 (Baltimore Pike) & PA 261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM Saturday

*US 30 E & W (Lancaster Ave.), Pedestrian Bridge Construction: LANE CLOSURES 10/23/17-10/28/17 Neshaminy $3.7 million Radnor Twp. between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM - Constructors, Inc. 3 PM

PA 291 (Industrial Hwy.), Ridley Twp. Utility Installation: LANE RESTRICTIONS between 10/23/17-11/3/17 Boeing Company Seaknight St. & Stewart Ave. Weekdays. 9 AM - 3 PM.

*US 30 E & W (Lancaster Ave.), Conduit Installation: LANE RESTRICTIONS between 10/23/17-11/3/17 Verizon Radnor Twp. Banbury Way & Radnor Chester Rd. 9 AM - 3 PM.

*US 202 South, Concord Twp. Median & Curb Replacement: LANE RESTRICTIONS 10/23/17-11/3/17 Metro at Pyle Rd. Weekdays. 9 AM - 3 PM. Storage/Chaddsford LLC Kirk Lane, Upper Providence Twp. Utility Installation: LANE RESTRICTIONS at Oakcrest 10/23/17-11/17/17 Aqua Pennsylvania Lane, Willowbrook Lane & W. 3rd St. Weekdays. 9 AM - 3 PM. Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between 10/23/17-11/24/17 PECO Energy South Devon Ave. & Lenoir Ave. Weekdays. 9 AM - 3 PM. DETOUR POSTED. *I-476 South, Haverford Twp. Tree Removal: RIGHT LANE CLOSURE between US 10/24/17-10/26/17 Knight Brothers 30 & PA 3 (West Chester Pike) Interchanges. 9 AM - 3 PM.

10/26/2017 Page 20 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Bryn Mawr Ave., Radnor Twp. Utility Installation: LANE RESTRICTIONS at Wootton 10/25/17-10/27/17 Aqua Pennsylvania Rd. 9 AM - 3 PM.

Meetinghouse Rd., Upper Chichester Utility Installation: LANE RESTRICTIONS between 10/25/17-11/25/17 Chester Water Twp. Locust St. & Friends Way. Weekdays. 9 AM - 3 PM. Authority

Providence Rd., Upper Darby Twp. Traffic Signal Upgrade: LANE RESTRICTIONS at 10/26/17-10/27/17 SEPTA South Ave. 9 AM - 3 PM.

Chichester Ave., Lower Chichester Utility Installation: LANE CLOSURE between Market 10/26/17-11/2/17 PECO Energy Twp. St. & Ward St. Weekdays. 9 AM - 3 PM.

Eagle Rd./Glendale Rd., Springfield, Milling & Paving: LANE RESTRICTIONS between 10/29/17-11/3/17 Highway Materials, $2.5 million Haverford, Marple twps. Springfield Rd. & PA 3 (West Chester Pike). 7 PM - 5 Inc. AM. *I-95 N & S, City of Chester Painting/Inspection & Repair: SHOULDER 10/30/17-11/3/17 South State, Inc. $16.6 million CLOSURES between I-476 & PA 352/320. 7 AM - 4 PM. Providence Rd., Upper Darby Twp. Install Pedestrian Crosswalk Button: LANE 10/30/17-11/3/17 SEPTA RESTRICTIONS between South Ave. & S. Bishop Ave. 9 AM - 3 PM. *I-476 N & S, Radnor, Haverford, ITS Conduit & Fiber Installation: RIGHT SHOULDER 10/30/17-11/3/17 Wampole-Miller, Inc. $15 million Marple twps. CLOSED between I-76 & I-95. 9 AM - 3 PM.

*I-95 N & S, Lower Chichester, Large Sign Maintenance: LANE CLOSURES between 10/30/17-11/4/17 Carr & Duff, Inc. $2.1 million Upper Chichester, Chester, Upland, PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5 Ridley, Tinicum twps. Chester City AM.

*US 322 E & W (Conchester Hwy.), Reconstruction & Road Widening: PERIODIC LANE 10/30/17-11/4/17 J.D. Eckman, Inc. $62.7 million Concord Twp. RESTRICTIONS between US 1 (Baltimore Pike) & PA 261 (Foulk Rd). 9 AM - 3 PM & Possible 7 AM - 7 PM Saturday

10/26/2017 Page 21 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *US 30 E & W (Lancaster Ave.), Pedestrian Bridge Construction: LANE CLOSURES 10/30/17-11/4/17 Neshaminy $3.7 million Radnor Twp. between PA 320 (Spring Mill Rd.) & Ithan Ave. 9 AM - Constructors, Inc. 3 PM. Oak Lane, Aldan Bor. Utility Installation: LANE CLOSURE between Patricia 10/31/17-11/8/17 PECO Energy Lane & Magnolia Ave. Weekdays. 9 AM - 3 PM.

Swarthmore Ave., Swarthmore Bor. Utility Installation: LANE CLOSURE between Cedar 11/3/17-11/10/17 PECO Energy Lane & Chester Rd. Weekdays. 9 AM - 3 PM.

MacDade Blvd., Darby Bor. Utility Installaltion: LANE CLOSURE between Main st. 11/7/17-11/14/17 PECO Energy & Ridge Ave. Weekdays. 9 AM - 3 PM.

*I-95 N & S, Lower Chichester, Large Sign Maintenance: LANE CLOSURES between 10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million Upper Chichester, Chester, Upland, PA 491 (Naamans Rd.) & Bartram Ave. 8 PM - 5 AM Ridley, Tinicum twps. Chester City

*US 30 E & W (Lancaster Ave.), Pedestrian Bridge Construction: SIDEWALK CLOSED 10/2/17-12/6/17 Neshaminy $3.7 million Radnor Twp. between PA 320 (Spring Mill Rd.) & Ithan Ave. 24 hour Constructors, Inc. Closure

Bethel Rd., Concord Twp. Curb Installation: LANE RESTRICTIONS between 10/5/17-11/17/17 Valley Point Church Smithbridge Rd. & Featherbed Lane. Weekdays. 9 AM - 3 PM.

Sugartown Rd., Radnor Twp. Utility Installation: LANE RESTRICTIONS between 9/25/17-10/27/17 Aqua Pennsylvania Poplar Ave. & Longwood Drive. Weekdays. 9 AM - 3 PM. Conestoga Rd., Radnor Twp. Utility Installation: CLOSED & DETOURED between S. 9/25/17-11/24/17 PECO Energy Devon Ave. & Lenoir Ave. 9 AM - 3 PM. DETOUR POSTED. Chestnut St., City of Chester Bridge Deck Reconstruction: CLOSED & DETOURED 9/25/17-1/11/18 South State, Inc. $16.8 million between 12th St. & 13th. DETOURED POSTED.

Burmont Rd., Haverford Twp. Utility Installation: LANE RESTRICTIOMS between 9/5/17-12/8/17 Aqua Pennsylvania Glendale Rd. & Township Line 9 AM - 3 PM Weekdays

10/26/2017 Page 22 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST S. Oak Ave., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between 9/11/17-11/17/17 Aqua Pennsylvania Baltimore Pike & Providence Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Garrett Rd., Upper Darby Twp. Utility Installation: CLOSED & DETOURED between 9/11/17-11/17/17 Aqua Pennsylvania Lansdowne Ave. & PA 3 (West Chester Pike). Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Fairview Rd., Ridley Twp. Utility Installation: CLOSED & DETOURED between 8/22/17-11/24/17 Aqua Pennsylvania MacDade Blvd. & PA 13 (Chester Pike). Weekdays. 9 AM - 3 PM. DETOUR POSTED. Potter St., City of Chester Deck Replacement: CLOSED & DETOURED between 8/14/17-2/14/18 South State, Inc. $16.6 million 13th St. & 12th St. 24-HOUR DETOUR. DETOUR POSTED. Station Rd., Concord Twp. Road Construction: CLOSED & DETOURED between 8/7/17-10/20/18 Road-Con, Inc. $29.20 million Concord Rd. & PA 322 (Conchester Hwy.). 24-HOUR DETOUR. DETOUR POSTED. Creek Rd., Middletown Twp. Pipe Installation: LANE CLOSURE between Duttons 8/1/17-10/15/17 Sunoco Pipeline L.P. $29.15 million Mill Rd. & W. Knowlton Rd. 24-HOUR RESTRICTIONS. Rd., Middletown Utility Installation: CLOSED & DETOURED between 7/12/17-12/31/17 Middletown Township $29.31 million Twp., Brookhaven Bor. Dutton Mill Rd. & Bridgewater Rd. Weekdays. 7 AM - Sewer Authority 5 PM. DETOUR POSTED.

Morton Ave., City of Chester Road/Curb Reconstruction: CLOSED & DETOURED 6/20/17-12/27/17 South State, Inc. $16.6 million between US 13 (E. 9th St.) & PA 291 (E. 4th St.). 24- HOUR DETOUR. DETOUR POSTED.

Baltimore Pike, Springfield Twp. Utility Installation: LANE RESTRICTIONS between 6/12/17-12/8/17 Aqua Pennsylvania Thomson Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

S. Bryn Mawr Ave., Radnor Twp. Bridge Reconstruction: LANE WIDTHS NARROWED 5/30/17-12/15/17 Loftus Construction, $7.5 million between PA 320 (Sproul Rd.) & S. Ithan Ave. Inc.

Creek Rd., Middletown Twp., Pipe Installation: CLOSED & DETOURED between 5/15/17-12/31/17 Middletown Township Brookhaven Bor. Bridgewater Rd. & Dutton Mill Rd. Weekdays. 7 AM - Sewer Authority 5 PM. DETOUR POSTED.

10/26/2017 Page 23 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Crosby St., City of Chester Pedestrian Bridge Rehabilitation: Between 13th St. & 3/27/17-11/29/17 South State, Inc. $16.6 million 12th St.

*US 322 E & W (Conchester Hwy.), Reconstruction & Road Widening: PERIODIC LANE 3/20/17-10/20/17 J.D. Eckman, Inc. $62.7 million Concord Twp. RESTRICTIONS between US 1 (Baltimore Pike) & Clayton Park Drive. Weekdays. 9 AM - 3 PM & 7 PM - 6 AM.

College Ave., Haverford Twp. Bridge Construction: CLOSED & DETOURED 11/29/16-5/2018 Road-Con, Inc. $5.2 million between Spring Mill Rd. & Haverford Rd. 24-HOUR DETOUR. DETOUR POSTED. MONTGOMERY COUNTY *I-76 E & W, West Conshohocken Concrete Patching: LANE CLOSURES between US 10/20/17-10/21/17 J.D. Eckman, Inc. $21.1 million Bor., Upper Merion, Lower Merion 202 & US 1 (City Ave.) 9 PM - 9 AM. twps.

Bridge Rd., Perkiomen, Skippack Base Repair: CLOSED & DETOURED between PA 29 10/22/17-10/23/17 Maintenance twps. (Gravel Pike) & Skippack Pike. 8 PM - 5 AM. DETOUR POSTED.

PA 611 (Old York Rd.), Abington Bridge Work: LANE RESTRICTIONS between Jericho 10/22/17-10/27/17 J.D. Eckman, Inc. $3.6 million Twp. Rd. & Hamilton Ave. 9 PM - 5 AM

*I-76 E & W, Upper Merion, Lower Concrete Patching: LANE CLOSURES between US 10/22/17-10/28/17 J.D. Eckman, Inc. $21.1 million Merion twps. 202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM (weekends)

Main St., Royersford Bor. Curb, Sidewalk Installation: LANE CLOSURE between 10/23/17-10/24/17 Borough of 3rd Ave & 4th Ave. 6 AM - 4 PM Royersford

*US 422 West, Lower Pottsgrove Sign Installation: RIGHT LANE CLOSED between 10/23/17-10/24/17 J.D. Eckman, Inc. $73.3 million Twp. Sanatoga & PA 724 (Schuylkill Rd.) exits. 7 AM - 1 PM. Conshocken State Rd., Lower Bridge work: LANE RESTRICTION at Mill Creek Rd. 9 10/23/17-10/25/17 Montgomery County Merion Twp. AM - 3 PM

10/26/2017 Page 24 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST *US 422 E & W, Lower Providence, Litter & Debris Removal & Sweeping: MOVING 10/23/17-10/26/17 Maintenance Upper Providence, Limerick, Lower OPERATION between PA 100 (Pottstown Pike) & PA Pottsgrove, North Coventry twps. 363 (Trooper Rd.). 9 AM - 3 PM.

PA 309 North, Montgomery, Lower Litter & Debris Removal & Sweeping: MOVING 10/23/17-10/26/17 Maintenance Gwynedd, Upper Dublin, Cheltenham OPERATION between County Line Rd. & Cheltenham twps. Ave. 9 AM - 3 PM.

*I-76 E & W, Upper Merion, Lower Litter & Debris Removal & Sweeping: MOVING 10/23/17-10/26/17 Maintenance Merion twps., West Conshohocken OPERATION WITH LANE CLOSURES between I-276 Bor. (PA turnpike) & US 1 (City Ave.) 9 AM - 3 PM.

*I-476 N & S, Plymouth, Lower Litter & Debris Removal & Sweeping: MOVING 10/23/17-10/26/17 Maintenance Merion twps., West Conshohocken OPERATION WITH LANE CLOSURES between Bor. Turnpike/I-276 Interchange & County Line Rd. 9 AM - 3 PM.

Evansburg Rd., Skippack Twp. Utility Installation: LANE RESTRICTIONS between 10/23/17-10/27/17 North Penn Water Township Line Rd. & Reagan Drive. 9 AM - 3 PM. Authority

PA 611 (Old York Rd.), Abington Bridge Work: LANE RESTRICTIONS between Jericho 10/23/17-10/27/17 J.D. Eckman, Inc. $3.6 million Twp. Rd. & Hamilton Ave. 9 AM - 3 PM.

Meyers Rd., Perkiomen Twp. Grading and Subbase: LANE RESTRICTIONS 10/23/17-10/27/17 H&K Group, Inc. $11.3 million between Seitz Rd. & Miller Rd. 9 AM - 3 PM.

PA 29 (Gravel Pike), Perkiomen Pole Relocations: LANE RESTRICTIONS between 10/23/17-10/27/17 H&K Group, Inc. $11.3 million Twp. Miller Rd. & Harrison Ave. 9 AM - 3 PM.

US 202 N & S (DeKalb Pike), Utility Installation: CLOSED & DETOURED between 10/23/17-10/27/17 PECO Energy Norristown Lafayette St. & Schuylkill Ave. 8 PM - 6 AM. DETOUR POSTED.

10/26/2017 Page 25 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Norristown, Upper Providence, Line Painting: SLOW MOVING OPERATION TO 10/23/17-10/27/17 PennDOT $29.6 million Lower Providence, Limerick, PAINT TRAFFIC LINES. MOTORISTS ARE Whitemarsh twps. ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 3 PM. *I-476 N & S, Lower Merion Twp., ITS Conduit & Fiber Installation: RIGHT SHOULDER 10/23/17-10/27/17 Wampole-Miller, Inc. $15 million West Conshohocken Bor. CLOSED between I-76 & I-95. 9 AM - 3 PM.

Flint Hill Rd., Upper Merion Twp. Sidewalk Installation: LANE CLOSURE between 10/23/17-10/27/17 GEI Enterprises Inc. Brentwood Court & Hertzog Blvd. 9 AM - 3 PM.

*I-476 N & S, West Conshohocken ITS Fiber Installation & Splicing: RIGHT SHOULDER 10/23/17-10/27/17 Wampole-Miller, Inc. $15 million Bor. CLOSED between I-76 & I-95. 9 AM - 3 PM.

Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between 10/23/17-11/16/17 Pennsylvania Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3 American Water PM. Company PA 113 (Harleysville Pike), Lower Utility Installation: LANE RESTRICTIONS between PA 10/23/17-11/30/17 PECO Energy Salford Twp. 63 (Sumneytown Pike) & Oak Drive. Weekdays. 9 AM - 3 PM. Greenwood Ave., Perkiomen, Upper Base Repair: CLOSED & DETOURED between 10/24/17-10/25/17 Maintenance Providence twps. Wartman Rd. & Ridge Pike/Main St. 8 PM - 5 AM. DETOUR POSTED. Limerick Center Rd., Limerick Twp. Milling: LANE RESTRICTIONS between Linfield Rd. & 10/24/17-10/26/17 Allen Myers $6.7 million Laurel Rd. 6 PM - 6 AM.

Norristown Rd., Upper Dublin Twp. Paving: LANE SHIFT between Carpenter Lane & Tally 10/25/17 PECO Energy Ho Drive. 9 AM - 3 PM.

Dreshertown Rd., Ft. Washington Trench Restoration: LANE RESTRICTIONS between 10/25/17 PECO Energy Twp. Caras Court & Crestview Drive. 9 AM - 3 PM.

Bleim Rd., Lower Pottsgrove Twp. Utility Installation: CLOSED & DETOURED between 10/25/17-11/30/17 Borough of Pottstown New Hanover Square Rd. & Pleasantview Rd. 9 AM - 3 PM. Saturdays. 7 AM - 7 PM. DETOUR POSTED.

10/26/2017 Page 26 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Neiffer Rd., Limerick Twp. Base Repair: CLOSED & DETOURED between Ridge 10/26/17 Maintenance Pike & Game Farm Rd. 8 PM - 5 AM . DETOUR POSTED. Sproul Rd., Lower Merion Twp. Trench Restoration: LANE RESTRICTIONS between 10/27/17 PECO Energy Clyde Rd. & Godfrey Rd. 9 AM - 3 PM.

E. Linfield Trappe Rd., Upper Utility Installation: LANE CLOSURE between 10/27/17-11/3/17 PECO Energy Providence Twp. Township Line Rd. & Kline Rd. Weekdays. 9 AM - 3 PM. *I-76 E & W, Upper Merion, Lower Concrete Patching: LANE CLOSURES between US 10/29/17-11/4/17 J.D. Eckman, Inc. $21.1 million Merion twps. 202 & US 1 (City Ave.) 9 PM - 5 AM & 9 PM - 9 AM (weekends)

*US 422 E & W, Lower Providence, Litter & Debris Removal & Sweeping: MOVING 10/30/17-11/2/17 Maintenance Upper Providence, Limerick, Lower OPERATION between PA 100 (Pottstown Pike) & PA Pottsgrove, North Coventry twps. 363 (Trooper Rd.). 9 AM - 3 PM.

PA 309 North, Montgomery, Lower Litter & Debris Removal & Sweeping: MOVING 10/30/17-11/2/17 Maintenance Gwynedd, Upper Dublin, Cheltenham OPERATION between County Line Rd. & Cheltenham twps. Ave. 9 AM - 3 PM.

*I-76 E & W, Upper Merion, Lower Litter & Debris Removal & Sweeping: MOVING 10/30/17-11/2/17 Maintenance Merion twps., West Conshohocken OPERATION WITH LANE CLOSURES between I-276 Bor. (PA turnpike) & US 1 (City Ave.) 9 AM - 3 PM.

*I-476 N & S, Plymouth, Lower Litter & Debris Removal & Sweeping: MOVING 10/30/17-11/2/17 Maintenance Merion twps., West Conshohocken OPERATION WITH LANE CLOSURES between Bor. Turnpike/I-276 Interchange & County Line Rd. 9 AM - 3 PM.

PA 611 (Old York Rd.), Abington Bridge Work: LANE RESTRICTIONS between Jericho 10/30/17-11/3/17 J.D. Eckman, Inc. $3.6 million Twp. Rd. & Hamilton Ave. 9 AM - 3 PM.

Meyers Rd., Perkiomen Twp. Grading and Subbase: LANE RESTRICTIONS 10/30/17-11/3/17 H&K Group, Inc. $11.3 million between Seitz Rd. & Miller Rd. 9 AM - 3 PM.

10/26/2017 Page 27 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST PA 29 (Gravel Pike), Perkiomen Pole Relocations: LANE RESTRICTIONS between 10/30/17-11/3/17 H&K Group, Inc. $11.3 million Twp. Miller Rd. & Harrison Ave. 9 AM - 3 PM.

*US 202 (DeKalb St.), Norristown Utility Installation: LANE RESTRICTIONS between 10/30/17-11/3/17 PECO Energy Schuylkill Ave. & Main St. 8 PM - 6 AM.

*I-476 N & S, Lower Merion Twp., ITS Conduit & Fiber Installation: RIGHT SHOULDER 10/30/17-11/3/17 Wampole-Miller, Inc. $15 million West Conshohocken Bor. CLOSED between I-76 & I-95. 9 AM - 3 PM.

High St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Adams 10/30/17-11/3/17 Road-Con, Inc. $13.3 million St.; Franklin St.; Charlotte St.; Penn St.; Evans St.; Madison St.& Washington St. 9 AM - 3 PM.

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at 10/30/17-11/3/17 Road-Con, Inc. $13.3 million Washington St. 9 AM - 3 PM.

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at 10/30/17-11/3/17 Road-Con, Inc. $13.3 million Madison St. 9 AM - 3 PM.

N. Adams St., Pottstown Bor. ADA Ramp Construction: LANE CLOSURE at Franklin 10/30/17-11/3/17 Road-Con, Inc. $13.3 million St. 9 AM - 3 PM.

PA 73 Skippack Pike), Skippack Utility Installation: LANE RESTRICTIONS between 10/30/17-11/17/17 Skippack Township Twp. Collegeville Rd. & Od Forty Foot Rd. Weekdays. 9 Sewer Authority AM - 3 PM.

*US 422 East, Lower Pottsgrove Construction Stage Change: ALTERNATING RIGHT & 10/31/17-11/1/17 J.D. Eckman, Inc. $73.3 million Twp. LEFT LANE CLOSURES between Keim St. & Armand Hammer Blvd. exits. 9 AM - 10 PM.

*I-76 E & W, West Conshohocken Concrete Patching: LANE CLOSURES between US 11/3/17-11/4/17 J.D. Eckman, Inc. $21.1 million Bor., Upper Merion, Lower Merion 202 & US 1 (City Ave.) 9 PM - 9 AM. twps.

Troxel Rd., Towamencin Twp. Utility Installation: LANE CLOSURE at Musket Circle. 11/9/17-11/16/17 PECO Energy Weekdays. 9 AM - 3 PM.

10/26/2017 Page 28 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST US 422 East, Upper Merion, West Bridge Steel Erection & Bridge Demolition: SINGLE 10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million Norriton twps. LEFT/RIGHT LANE CLOSURES & 15-MINUTE STOPPAGES between US 202 & Trooper Rd. Interchanges. 7 PM - 5 AM.

US 422 West, Upper Merion, West Bridge Steel Erection & Bridge Demolition: SINGLE 10/15/17-10/20/17 J.D. Eckman, Inc. $97.4 million Norriton twps. LEFT/RIGHT LANE COSURES & 15-MINUTE STOPPAGES between US 202 & Trooper Rd. Interchanges. 9 PM - 6 AM.

*I-76 E & W, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between 10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million PA 320 (Swedeland Rd.) & PA Turnpike 8 PM - 5 AM

Layfayette Ave., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between 10/16/17-11/30/17 Ambler Borough Layfayette Ave. Connector & PA 73 (Skippack Pike). Water Department Weekdays. 9 AM - 3 PM.

U.S. 202 N & S, Upper Merion Twp. Large Sign Maintenance: LANE CLOSURES between 10/16/17-10/21/17 Carr & Duff, Inc. $2.1 million Chesterbrook Blvd. & Allendale Rd. 8 PM - 5 AM

PA 663 (King St.), Pottstown Bor, Railroad Crossing Replacement: CLOSED AND 10/20/17-10/23/17 Colebrookdale DETOURED between PA 100 (Pottstown Pike) & Railroad Manatawny St. 24 HOUR CLOSURE PA 309 (Bethlehem Pike), Colmar Curb & Inlet Work: RIGHT LANE CLOSED between 10/20/17-11/3/17 A. Amsterdam Twp. Hilltown Pike & Triwigtown Rd. Weekdays. 9 AM - 3 PM. Old Forty Foot Rd., Lower Salford Bridge Rehabilitation: CLOSED AND DETOURED 10/30/17-6/2/18 J.D. Eckman, Inc. $7.4 million Twp. between Township Line Road & Kober Road WEEKDAYS 7 AM - 4 PM Harriton Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS at Gatemore 11/2/17-11/10/17 Aqua Pennsylvania Drive. Weekdays. 9 AM - 3 PM.

Sandy Hill Rd., Plymouth Twp. Milling and Paving: LANE RESTRICTIONS between 10/2/17- 10/27/17 Glasgow, Inc. $4.5 million Fairfield Rd. & Rollin Hill Dr. Weekdays 7 PM - 5 AM

10/26/2017 Page 29 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Egypt Rd., Upper Providence Twp. Utility Installation: LANE RESTRICTIONS between 10/2/17-11/16/17 Pennsylvania Green Tree Rd. & Page Lane. Weekdays. 9 AM - 3 American Water PM. Company

Gypsy Lane, Upper Merion Twp. Bridge Deck Reconstruction: CLOSED & DETOURED 10/2/17-11/15/17 Loftus Construction, $5.5 million between South Gulph Rd. & Hughes Rd. Weekdays. Inc. 24-HOUR DETOUR. DETOUR POSTED.

Cowpath Rd., Telford Bor. Bridge Rehabilitation: CLOSED & DETOURED 10/4/17-11/3/17 Loftus Construction, $5.5 million between Hollow Rd. & Barndt Rd. 24-HOUR Inc. CLOSURE. DETOUR POSTED.

N. Broad St., Hatfield Twp. Sidewalk Installation: LANE RESTRICTIONS between 9/27/17-11/15/17 Bencardino $155,000.00 Montgomery St. & Lynwood Rd. Weekdays. 9 AM - 3 Excavating, Inc. PM.

Argyle Rd., Lower Merion Twp. Utility Installation: LANE RESTRICTIONS between 9/26/17-11/30/17 Aqua Pennsylvania Chatham Rd. & Wynnewood Rd. Weekdays. 9 AM - 3 PM.

Church Rd., Upper Merion Twp. Utility Installation: CLOSED & DETOURED between 9/11/17-10/31/17 Aqua Pennsylvania Gulph Ridge Rd. & Henderson Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Cheltenham Ave., Cheltenham Twp. Utility Installation: LANE RESTRICTIONS between 8/30/17-11/2/17 PECO Energy Lanfair Rd. & Rowland Ave. Weekdays. 9 AM - 3 PM.

Church Rd., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between 8/24/17-12/29/17 Aqua Pennsylvania Washington Lane & York Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

PA 363 (Trooper Rd.), Lower Road Widening & Utility Installation: LANE 7/17/17-11/30/17 Forge 20 LLC Providence Twp. RESTRICTIONS between Eisenhower Ave. & Shannondell Blvd. Weeknights. 7 PM - 5 AM. Matsonford Rd., Upper Merion, Bridge Repair: CLOSED & DETOURED between 7/10/17-10/27/17 SEPTA Lower Merion twps. Montgomery Ave. & Old Gulph Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

10/26/2017 Page 30 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST PA 23 ramp to US 422 East, Upper Ramp Reconstruction: RAMP CLOSED & 7/10/17-11/2017 J.D. Eckman, Inc. $97.4 million Merion, West Norriton twps. DETOURED. 24-HOUR DETOUR. DETOUR POSTED. W. Wynnewood Rd, Lower Merion Utility Installation: LANE RESTRICTIONS between E. 6/5/17-12/8/17 Aqua Pennsylvania Twp. County Line Rd. & Ballytore Rd. Weekdays. 9 AM - 3 PM. Buchert Rd., Pottsgrove Twp. Curb Ramp Construction: LANE CLOSURE at 5/30/17-1/3/17 Highway Materials, $4.8 million Pleasantview Rd.; N. Washington St. & Mervine St. 9 Inc. AM - 3 PM. Mervine St., Lower Pottsgrove Twp, Curb Ramp Construction: LANE CLOSURE at N. 5/30/17-11/3/17 Highway Materials, $4.8 million Pottstown Bor. Franklin St. 9 AM - 3:30 PM. Inc.

Plank Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED 5/2/17-11/30/17 H&K Group, Inc. $11.3 million between PA 29 (Gravel Pike) & PA 73 (Skippack Pike). 24-HOUR DETOUR. DETOUR POSTED.

Otts Rd., Perkiomen Twp. Excavation/Grading/Paving: CLOSED & DETOURED 5/2/17-5/2019 H&K Group, Inc. $11.3 million between Miller Rd. & PA 29 (Gravel Pike). 24-HOUR DETOUR. DETOUR POSTED. PA 63 (Main St.), Lower Salford Twp. Roadway & Culvert Widening: LANE RESTRICTIONS 3/15/17-11/1/17 Lower Salford $29.1 million between PA 113 (Harleysville Pike) & Carrie Lane. Township Weekdays. 9 AM - 3 PM. *US 422 East, Lower Pottsgrove Road & Bridge Construction: LANE CLOSURES 1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million Twp. between PA 724 (Schuylkill Rd.) & Sanatoga Interchanges. 5 PM - 5 AM. *US 422 West, Lower Pottsgrove Road & Bridge Construction: WEEKEND LANE 1/23/17-11/29/17 J.D. Eckman, Inc. $73.3 million Twp. CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM. Edge Hill Rd., Abington Twp. Bridge Rehabilitation: CLOSED & DETOURED 1/9/17-11/10/17 J.D. Eckman, Inc. $3.6 million between Ferndale Ave. & Hamilton Ave. 24-HOUR DETOUR. DETOUR POSTED.

County Line Rd., Warrington, Utility Installation: LANE RESTRICTIONS between 3/7/16-9/2018 James D. Morrissey, $14.8 million Horsham, Montgomery twps. Kulp Rd. & Stump Rd. 7 AM - 3 PM. Inc.

10/26/2017 Page 31 of 32 LOCATION RESTRICTION DATE CONTRACTOR COST Baligomingo Rd., West Slope Stabilization: CLOSED & DETOURED between 6/27/15-Indef. $29.27 million Conshohocken Bor. PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR. DETOUR POSTED. PA 724 ramp to US 422 East, Lower Roadwork: RAMP CLOSED & DETOURED. 24- 5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million Pottsgrove Twp. HOUR CLOSURE. DETOUR POSTED.

*US 422 E & W, Lower Pottsgrove Road Construction: TRAFFIC PATTERN SHIFT 2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million Twp. between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 24-HOUR PATTERN.

*US 422 E & W, West Pottsgrove Bridge Construction: REDUCED TO ONE LANE 11/27/14-9/2018 J.D. Eckman, Inc. $36 million Twp. between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS 5/9/14-12/29/17 Valley Forge National $29.29 million between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM Historical Park Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

10/26/2017 Page 32 of 32