Allied Painting Secures Delaware Memorial Bridge Contracts
Project Preview Allied Painting Secures Delaware MemorialBy Alyssa Gallagher, Paint Bridge BidTracker Contracts he Delaware River Gulf War. Allied secured a and Bay Authority contract of $951,800 to recoat T awarded two con- 603,000 square feet of steel on tracts with a combined value the First Structure of $2,853,600 to Allied (Northbound) and a contract Painting, Inc. (Franklinville, of $1,901,800 to recoat NJ), SSPC-QP 1 and QP 2 cer- 659,500 square feet of steel on tified, to clean and recoat steel the Second Structure surfaces on the west girder (Southbound). The steel, spans of the Delaware including the interior of piers, Memorial Bridge. The 10,765- platforms, and ladders, will be foot-long twin spans connect Photo courtesy of Delaware River and Bay Authority spot power-tool cleaned New Castle, DE, and Pennsville, NJ, over the Delaware River. (SSPC-SP 3), spot-primed, and coated with a 4-coat moisture- The bridge is dedicated to veterans who gave their lives in cured urethane system. The contractor will employ a third- World War II, the Korean War, the Vietnam War, and the party coatings inspector as part of the quality control plan. Click our Reader e-Card at paintsquare.com/ric www.paintsquare.com 70 JPCL July 2010 Crosno Construction to Rehabilitate Three Tanks Crosno Construction Inc. (San Luis Obispo, CA) secured a 100%-solids elastomeric polyurethane system. The project contract of $569,501.04 with the City of Sunnyvale, CA, to also includes the application of an epoxy-polyurethane sys- repair and reline three 60-foot-diameter by 24-foot-high steel tem to exterior surfaces.
[Show full text]