PMW Tutong District (DEC)

Total Page:16

File Type:pdf, Size:1020Kb

PMW Tutong District (DEC) English Section Listed below are the designated areas for the planned maintenance work as for December 2020: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday Kg Lubuk Pulau & Kg Bukit Sibut, 1 08:30 am to 04:30 pm Installation of 11kV Aerial Cable Works A part of Kg Lubuk Pulau & Kg Bukit Sibut Tutong 1st December 2020 Mukim Tanjong Maya Wednesday Kg Lubuk Pulau & Kg Bukit Sibut, 2 08:30 am to 04:30 pm Installation of 11kV Aerial Cable Works A part of Kg Lubuk Pulau & Kg Bukit Sibut Tutong 2nd December 2020 Mukim Tanjong Maya Thursday Kg Lubuk Pulau & Kg Bukit Sibut, 3 08:30 am to 04:30 pm Installation of 11kV Aerial Cable Works A part of Kg Lubuk Pulau & Kg Bukit Sibut Tutong 3rd December 2020 Mukim Tanjong Maya Saturday Kg Lubuk Pulau & Kg Bukit Sibut, 4 08:30 am to 04:30 pm Installation of 11kV Aerial Cable Works A part of Kg Lubuk Pulau & Kg Bukit Sibut Tutong 05th December 2020 Mukim Tanjong Maya Monday Kg Lubuk Pulau & Kg Bukit Sibut, 5 08:30 am to 04:30 pm Installation of 11kV Aerial Cable Works A part of Kg Lubuk Pulau & Kg Bukit Sibut Tutong 7th December 2020 Mukim Tanjong Maya Monday 6 08:30 am to 01:00 pm Kg Penanjong, Mukim Pekan Tutong Replacement of Low Voltage Overhead The Whole of Jalan Palu Kg Penanjong 7th December 2020 Monday A part of Kg Bukit Panggal, UNN Tower & Sekolah 7 08:30 am to 04:30 pm Kg Bukit Panggal, Mukim Keriam Replacement of Low Voltage Overhead 7th December 2020 Rendah Bukit Panggal Tutong A part of Kg Penanjong, Masjid Kg Penanjong, Tuesday 8 08:30 am to 04:30 pm Kg Penanjong, Mukim Pekan Tutong Replacement of Ring Main Unit Jalan Pantai Penanjong dan Jalan Padang 8th December 2020 Penanjong Wednesday 9 09:00 am to 04:30 pm Kg Sungai Kelugos, Mukim Keriam Replacement of Feeder Pillar A Part of Kg Sungai Kelugos Tutong 9th December 2020 Thursday 10 09:00 am to 04:30 pm Kg Sungai Kelugos, Mukim Keriam Replacement of Package Unit A Part of Kg Sungai Kelugos Tutong 10th December 2020 A part of Kg Biong, Lamunin Fire Station, Tuesday 11 09:00 am to 04:30 pm Kg Lamunin, Mukim Lamunin Replacement of Ring Main Unit Lamunin Religious School and Fire Station 22nd December 2020 Housing Page 1 Bahasa Melayu Tersenarai dibawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Disember 2020: Kawasan Yang Terjejas Gangguan Bekalan Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Elektrik Kampong Lubuk Pulau dan Selasa 1 08:30 pg hingga 04:30 ptg Kampong Bukit Sibut, Mukim Pemasangan Kerja-Kerja Aerial Cable 11kV Sebahagian Kg Lubuk Pulau & Kg Bukit Sibut 01hb Disember 2020 Tanjong Maya Kampong Lubuk Pulau dan Rabu 2 08:30 pg hingga 04:30 ptg Kampong Bukit Sibut, Mukim Pemasangan Kerja-Kerja Aerial Cable 11kV Sebahagian Kg Lubuk Pulau & Kg Bukit Sibut 02hb Disember 2020 Tanjong Maya Kampong Lubuk Pulau dan Khamis 3 08:30 pg hingga 04:30 ptg Kampong Bukit Sibut, Mukim Pemasangan Kerja-Kerja Aerial Cable 11kV Sebahagian Kg Lubuk Pulau & Kg Bukit Sibut 03hb Disember 2020 Tanjong Maya Kampong Lubuk Pulau dan Sabtu 4 08:30 pg hingga 04:30 ptg Kampong Bukit Sibut, Mukim Pemasangan Kerja-Kerja Aerial Cable 11kV Sebahagian Kg Lubuk Pulau & Kg Bukit Sibut 05hb Disember 2020 Tanjong Maya Kampong Lubuk Pulau dan Isnin 5 08:30 pg hingga 04:30 ptg Kampong Bukit Sibut, Mukim Pemasangan Kerja-Kerja Aerial Cable 11kV Sebahagian Kg Lubuk Pulau & Kg Bukit Sibut 07hb Disember 2020 Tanjong Maya Isnin 6 08:30 pg hingga 01:00 ptg Kg Penanjong, Mukim Pekan Tutong Penggantian Overhed Voltan Rendah Keseluruhan Jalan Palu, Kg Penanjong 07hb Disember 2020 Isnin Sebahagian Kg Bukit Panggal, UNN Tower dan 7 08:30 pg hingga 04:30 ptg Kg Bukit Panggal, Mukim Keriam Penggantian Overhed Voltan Rendah 07hb Disember 2020 Sekolah Rendah Bukit Panggal Tutong Sebahagian Kg Penanjong, Masjid Kg Penanjong, Selasa 8 08:30 pg hingga 04:30 ptg Kg Penanjong, Mukim Pekan Tutong Penggantian Ring Main Unit Jalan Pantai Penanjong dan Jalan Padang 08hb Disember 2020 Penanjong Rabu 9 09:00 pg hingga 04:30 ptg Kg Sungai Kelugos, Mukim Keriam Penggantian Feeder Pillar Sebahagian Kg Sungai Kelugos Tutong 09hb Disember 2020 Khamis 10 09:00 pg hingga 04:30 ptg Kg Sungai Kelugos, Mukim Keriam Penggantian Package Unit Sebahagian Kg Sungai Kelugos Tutong 10hb Disember 2020 Keseluruhan Balai Bomba Lamunin, Perumahan Selasa 11 09:00 pg hingga 04:30 ptg Kg Lamunin, Mukim Lamunin Penggantian Ring Main Unit Balai Bomba Lamunin, Sekolah Ugama Lamunin 22hb Disember 2020 dan Sebahagian Kg Biong Page 2.
Recommended publications
  • Preliminary Report of BPP 2011
    ! ! ! Kerajaan!Kebawah!Duli!Yang!Maha!Mulia!Paduka!Seri!Baginda!Sultan!dan!Yang!Di8Pertuan! Negara! Brunei! Darussalam! melalui! Jabatan! Perancangan! dan! Kemajuan! Ekonomi! (JPKE),! Jabatan!Perdana!Menteri,!telah!mengendalikan!Banci!Penduduk!dan!Perumahan!(BPP)!pada! tahun! 2011.! BPP! 2011! merupakan! banci! kelima! seumpamanya! dikendalikan! di! negara! ini.! Banci!terdahulu!telah!dijalankan!pada!tahun!1971,!1981,!1991!dan!2001.! ! Laporan! Awal! Banci! Penduduk! dan! Perumahan! 2011! ini! merupakan! penerbitan! pertama! dalam! siri! laporan8laporan! banci! yang! akan! dikeluarkan! secara! berperingkat8peringkat.! Laporan! ini! memberikan! data! awal! mengenai! jumlah! penduduk,! isi! rumah! dan! tempat! kediaman!serta!taburan!dan!pertumbuhan!mengikut!daerah.!! ! Saya! berharap! penerbitan! ini! dan! laporan8laporan! seterusnya! akan! dapat! memenuhi! keperluan! pelbagai! pengguna! di! negara! ini! bagi! maksud! perancangan,! penyelidikan,! penyediaan!dasar!dan!sebagai!bahan!rujukan!awam.! ! Saya! sukacita! merakamkan! setinggi8tinggi! penghargaan! dan! terima! kasih! kepada! Penerusi! dan! ahli8ahli! Komiti! Penyelarasan! Kebangsaan! BPP! 2011,! kementerian8kementerian,! jabatan8jabatan! dan! sektor! swasta! yang! telah! memberikan! bantuan! dan! kerjasama! yang! diperlukan! kepada! Jabatan! ini! semasa! banci! dijalankan.! Seterusnya! saya! juga! sukacita! mengucapkan! terima! kasih! kepada! rakyat! dan! penduduk! di! negara! ini! di! atas! kerjasama! dalam! memberikan! maklumat! yang! dikehendaki! kepada! pegawai8pegawai! banci!
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • Perlaksanaan Pengurusan Jenazah Di
    مﺳﺑ ﷲ نﻣﺣرﻟا مﯾﺣرﻟا PELAKSANAAN PENYEMPURNAAN JENAZAH DI MASJID-MASJID Rabu, 02 Muharram 1443H bersamaan 11 Ogos 2021M- Merujuk Sidang Media Kementerian Kesihatan pada hari Isnin, 29 Zulhijjah 1442 bersamaan dengan 09 Ogos 2021, bahawa sebagai langkah berjaga-jaga dan seterusnya bagi membantu pihak kerajaan untuk mengawal penularan wabak Covid-19 di Negara Brunei Darussalam. Sehubungan dengan itu Kementerian Hal Ehwal Ugama melalui Jabatan Hal Ehwal Masjid memaklumkan bagi mana-mana pihak yang berhajat untuk menyempurnakan jenazah biasa(bukan dari pesakit COVID-19) bolehlah dibuat di masjid-masjid terpilih seluruh negara seperti berikut; Daerah Brunei dan Muara: BIL NAMA MASJID 1 Jame’ ‘ Asr Hassanil Bolkiah, Kampong Kiarong 2 Masjid Hassanal Bolkiah, Kampong Mentiri 3 Masjid Al-Ameerah Al-Hajjah Maryam, Kampong Jerudong 4 Masjid RPN Kampong Lambak Kanan 5 Masjid Kampong Pulaie 6 Masjid STKRJ Kampong Lambak Kiri 7 Masjid Setia Ali Pekan Muara 8 Masjid Sultan Sharif Ali, Sengkurong 9 Masjid Pehin Khatib Abdullah, Kampong Kulapis 10 Masjid Duli Raja Isteri Pengiran Anak Damit, Kampong Bebatik Kilanas 11 Masjid Pengiran Muda Abdul Malik, Kampong Tungku Katok 12 Masjid Al-Muhtadee Billah, Kampong Sungai Kebun 13 Masjid Yayasan Sultan Haji Hassanal Bolkiah, Kampong Bolkiah A 14 Masjid Kampong Pintu Malim 15 Masjid Perdana Wangsa Haji Mohammad, Kampong Setia A 16 Masjid Raja Isteri Pengiran Anak Hajah Saleha, Kampong Rimba 17 Masjid Pengiran Muda Abdul Mateen, Kampong Mulaut 18 Balai Ibadat Kampong Mata-Mata Daerah Tutong: BIL NAMA MASJID 1 Masjid Hassanal Bolkiah, Pekan Tutong 2 Masjid Pengiran Muda Abdul Wakeel, Mukim Kiudang 3 Masjid Ar-Rahim, Kampong Bukit Penggal 4 Masjid RPN Kampong Bukit Beruang 5 Masjid Kampong Sinaut 6 Balai Ibadat Hajah Aminah, Kampong Long Mayan M.S: 1 - 2 _ BAHAGIAN PERHUBUNGAN AWAM, KEMENTERIAN HAL EHWAL UGAMA, JALAN DEWAN MAJLIS, BERAKAS, BB3910, NEGARA BRUNEI DARUSSALAM.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) 4Wk July18
    English Section Listed below are the designated areas for the planned maintenance work as for July and August, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 02.00 pm Saturday Kampong Bukit Panggal, Mukim Keriam, Replacement of Distribution Feeder Pillar Spg 8, 1 Spg 8, Kampong Bukit Panggal , Mukim Keriam, Tutong. 21th July 2018 Tutong. Kampong Bukit Panggal , Tutong. 08.30 am to 11.30 am Tuesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 2 1.30 pm to 05.00pm 24th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Wednesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 3 1.30 pm to 05.00pm 25th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Kampong Keranching, Kampong Wednesday Belaban, Kampong Benutan and Replacement of Ring Main Unit at substation Kampong Keranching, Kampong Belaban, Kampong Benutan and 4 1.30 pm to 05.00pm 25th July 2018 (For info: Department of Electrical Service will supply temporary electricity Kampong Lubuk Ubar, Mukim Rambai, Benutan #1, Tutong. apart of Kampong Lubuk Ubar, Mukim Rambai, Tutong. to the affected areas through mobile generator service at the substation) Tutong. Thursday 08.30 am to 02.00 pm Kampong Suran dan Kampong Panchor Replacement of Distribution Feeder Pillar at Kampong Suran and apart of kampong Panchor Dulit, Mukim 5 26th July 2018 Dulit, Mukim Pekan Tutong. Kampong Suran.
    [Show full text]
  • 2/22/2014 Pelitabrunei PB 22 Februari 2014 Pelita1
    PETIKAN TITAH MANISNYA IMAN “RAKYAT jelata yang “IKUTLAH wahai manusia sensitif lagi patriotik apa yang telah diturunkan sangatlah diperlukan oleh negara terutama mereka kepada kamu dari yang dari kalangan generasi Tuhan kamu dan muda serta para belia kerana janganlah kamu mengikut mereka itu adalah pewaris pemimpin-pemimpin masa depan kita.” selainnya. Sedikit benar - Titah Sempena Menyambut Ulang Tahun kamu mengambilperingatan.” Hari Kebangsaan Negara - (Firman Allah Subhanahu Brunei Darussalam pada Wata'ala dalam Surah 22 Februari 2013 Masihi. Al A’raaf ayat 3). TAHUN 59 / BILANGAN 23 22 FEBRUARI 2014 / 1435 22 JABATAN PENERANGAN EDISI SABTU / PERCUMA Menerima mengadap Presiden Universiti Al-Azhar 1 Hari Lagi 'Generasi Berwawasan' miliki nilai KEBAWAH Duli Yang Maha Mulia Paduka Seri Baginda Sultan Haji Hassanal Bolkiah Mu’izzaddin Waddaulah ibni Al-Marhum Sultan Haji Omar 'Ali Saifuddien Sa’adul Khairi Waddien, Sultan dan Yang Di-Pertuan Negara Brunei Darussalam berkenan menerima mengadap Presiden Universiti Al-Azhar, Republik Arab Mesir, Tuan Yang Terutama Profesor Dr. Usamah Mohamed bin Mohamed Hassan Elabed. jati diri Mengiringi Tuan Yang Terutama pada Majlis Mengadap tersebut Oleh : Nooratini Haji Abas ialah Naib Presiden Universiti Al-Azhar bagi Pendidikan dan Hal Oleh : Aimi Sani, Norrasidah Jumat Foto : Mohd. Zul-Izzi Haji Duraman Ehwal Pelajar, Dr. Ibrahim Salah Elsayed Soliman Elhodhod; Naib Presiden Universiti Al-Azhar bagi Pengajian Lepasan Ijazah dan BANDAR SERI BEGAWAN, Rabu, 19 Februari. - Kebawah Duli Penyelidikan,
    [Show full text]