English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019:
No. Day & Date Time Location Work Description Affected Areas for Outages
Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Monday 8.30 am to 11.30 am Kampong Padnunok, A part of Jalan Kecil Padnunok and its 8 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Kiudang surrounding areas.
Tuesday 8.30 am to 11.30 am Kampong Rambai, 9 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 10 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Wednesday 8.30 am to 11.30 am Kampong Rambai, 11 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Page 1 Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 12 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Wednesday 8.30 am to 11.30 am Kampong Rambai, 13 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 14 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas.
Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 15 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Thursday 8.30 am to 11.30 am Kampong Rambai, 16 Wayleave clearing A part of Kg Rambai and its surrounding areas 28th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 17 Wayleave clearing 30th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas
Saturday 8.30 am to 11.30 am Kampong Rambai, 18 Wayleave clearing A part of Kg Rambai and its surrounding areas 30th November 2019 1.30 pm to 4.30 pm Mukim Rambai
Saturday 9.00 am to 9.00 pm Kampong Keriam, 19 Wayleave clearing Along Jalan Pengkalan Anjong, Kg Keriam 30th November 2019 Mukim Keriam
Monday 8.00 am to 11.30 am Kampong Bukit Udal, Spg 509 to Spg 509-100 Jln Nong Janang and its 20 Wayleave clearing 02nd December 2019 1.30 pm to 4.00 pm Mukim Tanjong Maya surrounding areas
Monday 8.00 am to 11.30 am Kampong Ukong, A part of kg Sg Damit from Spg 574 to 590 and 21 Wayleave clearing 02nd December 2019 1.30 pm to 4.00 pm Mukim Ukong from Sg 653 to Spg 592 and its surrounding areas
Tuesday 8.00 am to 11.30 am Kampong Telisai, Replacement of Ring Main Unit at substation Overall Spg Sg Lalit and a part of Kg Keramut and 22 03rd December 2019 1.30 pm to 4.00 pm Mukim Telisai Permit Telisai Kg Telisai
Tuesday 8.00 am to 11.30 am Kampong Ukong, A part of kg Sg Damit from Spg 574 to 590 and 23 Wayleave clearing 03rd December 2019 1.30 pm to 4.00 pm Mukim Ukong from Sg 653 to Spg 592 and its surrounding areas
Tuesday 8.00 am to 11.30 am Kampong Ukong, A part of Kg Ukong from Spg 800 to Spg 912 and 24 Wayleave clearing 03rd December 2019 1.30 pm to 4.00 pm Mukim Ukong its surrounding areas
Wednesday 8.00 am to 11.30 am Kampong Ukong, A part of Kg Ukong from Spg 800 to Spg 912 and 25 Wayleave clearing 04th December 2019 1.30 pm to 4.00 pm Mukim Ukong its surrounding areas
Thursday 8.00 am to 11.30 am Kampong Ukong, A part of Kg Ukong, Spg 3 Nong Anggeh to Jln 26 Wayleave clearing 05th December 2019 1.30 pm to 4.00 pm Mukim Ukong Piton Nambang and its surrounding areas
Page 2 Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 10 to Spg 118 Kg Ukong, a part of Kg 27 Wayleave clearing 05th December 2019 1.30 pm to 4.00 pm Mukim Ukong pengkalan Ra'an and its surrounding areas
Monday 8.00 am to 11.30 am Kampong Ukong, Spg 1200 to Spg 1084 Jln Piton Nambang, Spg 28 Wayleave clearing 09th December 2019 1.30 pm to 4.00 pm Mukim Ukong 1212 Kg Pak Bidang and its surrounding areas
Tuesday 8.00 am to 11.30 am Kampong Bukit Panggal, Replacement of Ring Main Unit at substation A part of Kg bukit Panggal and its surrounding 29 10th December 2019 1.30 pm to 4.00 pm Mukim Keriam Sekolah Rendah Bukit Panggal areas
A part of Kg Rambai, Spg 18 to Spg 25 Kg Rambai Tuesday 8.00 am to 11.30 am Kampong Rambai, 30 Wayleave clearing and a part of Kg Kuala Ungar Jln Merimbun Spg 10th December 2019 1.30 pm to 4.00 pm Mukim Rambai 177 to Spg 282
A part of Kg Rambai, Spg 18 to Spg 25 Kg Rambai Wednesday 8.00 am to 11.30 am Kampong Rambai, 31 Wayleave clearing and a part of Kg Kuala Ungar Jln Merimbun Spg 11th December 2019 1.30 pm to 4.00 pm Mukim Rambai 177 to Spg 282
A part of Kg Rambai, Spg 18 to Spg 25 Kg Rambai Thursday 8.00 am to 11.30 am Kampong Rambai, 32 Wayleave clearing and a part of Kg Kuala Ungar Jln Merimbun Spg 12th December 2019 1.30 pm to 4.00 pm Mukim Rambai 177 to Spg 282
Monday 8.00 am to 11.30 am Kampong Rambai, A part of Kg Kuala Ungar Spg 1072 to Spg 1234 33 Wayleave clearing 16th December 2019 1.30 pm to 4.00 pm Mukim Rambai Jln Kuala Ungar and its surrounding areas
Tuesday 8.00 am to 11.30 am Kampong Rambai, A part of Kg Kuala Ungar Spg 1072 to Spg 1234 34 Wayleave clearing 17th December 2019 1.30 pm to 4.00 pm Mukim Rambai Jln Kuala Ungar and its surrounding areas
Wednesday 8.00 am to 11.30 am Kampong Rambai, A part of Kg Kuala Ungar Spg 1072 to Spg 1234 35 Wayleave clearing 18th December 2019 1.30 pm to 4.00 pm Mukim Rambai Jln Kuala Ungar and its surrounding areas
Thursday 8.00 am to 11.30 am Kampong Rambai, A part of Kg Kuala Ungar Spg 1072 to Spg 1234 36 Wayleave clearing 19th December 2019 1.30 pm to 4.00 pm Mukim Rambai Jln Kuala Ungar and its surrounding areas
Page 3 Bahasa Melayu
Tersenarai dibawah adalah kawasanyang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan November dan Disember, 2019
Kawasan Yang Terjejas Gangguan Bekalan Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Elektrik
Rabu 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 hingga Spg 450 Kg Bebuloh dan kawasan 1 Pembersihan laluan rangkaian kawat atas 20hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. sekitarnya
Khamis 8.30pg hingga 11.30 pg Kampong Rambai, 2 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 21hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Khamis 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 hingga Spg 450 Kg Bebuloh dan kawasan 3 Pembersihan laluan rangkaian kawat atas 21hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. sekitarnya
Sabtu 8.30pg hingga 11.30 pg Kampong Rambai, 4 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 23hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Sabtu 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 hingga Spg 450 Kg Bebuloh dan kawasan 5 Pembersihan laluan rangkaaian kawat atas 23hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. sekitarnya
Isnin 8.30pg hingga 11.30 pg Kampong Rambai, 6 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 25hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Isnin 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 hingga Spg 450 Kg Bebuloh dan kawasan 7 Pembersihan laluan rangkaaian kawat atas 25hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. sekitarnya
Isnin 8.30pg hingga 11.30 pg Kampong Padnunok, Sebahagian Jln Kecil Kg Padnunok dan kawasan 8 Pembersihan laluan rangkaian kawat atas 25hb November 2019 1.30ptg hingga 4.30ptg Mukim Kiudang sekitarnya
Selasa 8.30pg hingga 11.30 pg Kampong Rambai, 9 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 26hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Selasa 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 sehingga Spg 450 Kg Bebuloh dan 10 Pembersihan laluan rangkaian kawat atas 26hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. kawasan sekitarnya
Rabu 8.30pg hingga 11.30 pg Kampong Rambai, 11 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 27hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Rabu 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 sehingga Spg 450 Kg Bebuloh dan 12 Pembersihan laluan rangkaian kawat atas 27hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. kawasan sekitarnya
Page 4 Rabu 8.30pg hingga 11.30 pg Kampong Rambai, 13 Pembersihan laluan rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 27hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Rabu 8.30pg hingga 11.30 pg Kampong Luagan Duduk, Penggantian "Ring Main Unit" di stesen Sebahagian Kg Luagan Duduk dan kawasan 14 27hb November 2019 1.30ptg hingga 4.30ptg Mukim Keriam Elektrik Masjid Abdul Azim. sekitarnya
Khamis 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 sehingga Spg 450 Kg Bebuloh dan 15 Penggantian rangkaian kawat atas 28hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. kawasan sekitarnya
Khamis 8.30pg hingga 11.30 pg Kampong Rambai, 16 Penggantian rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 28hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Sabtu 8.30pg hingga 11.30 pg Kampong Bebuloh, Spg 604 sehingga Spg 450 Kg Bebuloh dan 17 Penggantian rangkaian kawat atas 30hb November 2019 1.30ptg hingga 4.30ptg Mukim Pangkalan Batu. kawasan sekitarnya
Sabtu 8.30pg hingga 11.30 pg Kampong Rambai, 18 Penggantian rangkaian kawat atas Sebahagian Kg Rambai dan kawasan sekitarnya 30hb November 2019 1.30ptg hingga 4.30ptg Mukim Rambai
Sabtu Kampong Keriam, Keseluruhan Jln Pengkalan Anjong dan kawasan 19 9.00pg hingga 5.00ptg Penggantian rangkaian kawat atas 30hb November 2019 Mukim Keriam sekitarnya
Isnin 8.00pg hingga 11.30 pg Kampong Bukit Udal, Spg 509 sehingga Spg 509-100 Jln Nong Janang 20 Penggantian rangkaian kawat atas 02hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Tanjong Maya dan kawasan sekitarnya
Sebahagian kg Sg Damit dari Spg 574 sehingga Isnin 8.00pg hingga 11.30 pg Kampong Ukong, 21 Penggantian rangkaian kawat atas 590 dan dari Sg 653 sehingga Spg 592 dan 02hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong kawasan sekitarnya
Selasa 8.00pg hingga 11.30 pg Kampong Telisai, Penggantian "Ring Main Unit" di stesen Keseluruhan Spg Sg Lalit dan sebahagian Kg 22 03hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Telisai Permit Telisai Keramut dan Kg Telisai
Sebahagian kg Sg Damit dari Spg 574 sehingga Selasa 8.00pg hingga 11.30 pg Kampong Ukong, 23 Pembersihan laluan rangkaaian kawat atas 590 dan dari Sg 653 sehingga Spg 592 dan 03hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong kawasan sekitarnya
Selasa 8.00pg hingga 11.30 pg Kampong Ukong, Sebahagian Kg Ukong dari Spg 800 sehingga Spg 24 Pembersihan laluan rangkaian kawat atas 03rd Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong 912 dan kawasan sekitarnya
Page 5 Rabu 8.00pg hingga 11.30 pg Kampong Ukong, Sebahagian Kg Ukong dari Spg 800 sehingga Spg 25 Pembersihan laluan rangkaaian kawat atas 04hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong 912 dan kawasan sekitarnya
Sebahagian Kg Ukong, Spg 3 Nong Anggeh Khamis 8.00pg hingga 11.30 pg Kampong Ukong, 26 Pembersihan laluan rangkaian kawat atas sehingga Jln Piton Nambang dan kawasan 05hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong sekitarnya
Khamis 8.00pg hingga 11.30 pg Kampong Ukong, Spg 10 sehingga Spg 118 Kg Ukong, sebahagian 27 Pembersihan laluan rangkaaian kawat atas 05hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong Kg pengkalan Ra'an dan kawasan sekitarnya
Isnin 8.00pg hingga 11.30 pg Kampong Ukong, Spg 1200 sehingga Spg 1084 Jln Piton Nambang, 28 Pembersihan laluan rangkaian kawat atas 09hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Ukong Spg 1212 Kg Pak Bidang dan kawasan sekitarnya
Selasa 8.00pg hingga 11.30 pg Kampong Bukit Panggal, Penggantian "Ring Main Unit" di stesen Sebahagian Kg Bukit Panggal dan kawasan 29 10hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Keriam Sekolah Rendah Bukit Panggal sekitarnya
Sebahagian Kg Rambai, Spg 18 sehingga Spg 25 Selasa 8.00pg hingga 11.30 pg Kampong Rambai, 30 Pembersihan laluan rangkaian kawat atas Kg Rambai and sebahagian Kg Kuala Ungar Jln 10hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Merimbun Spg 177 sehingga Spg 282
Sebahagian Kg Rambai, Spg 18 sehingga Spg 25 Rabu 8.00pg hingga 11.30 pg Kampong Rambai, 31 Pembersihan laluan rangkaian kawat atas Kg Rambai dan sebahagian Kg Kuala Ungar Jln 11hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Merimbun Spg 177 sehingga Spg 282
Sebahagian Kg Rambai, Spg 18 sehingga Spg 25 Khamis 8.00pg hingga 11.30 pg Kampong Rambai, 32 Pembersihan laluan rangkaian kawat atas Kg Rambai and sebahagian Kg Kuala Ungar Jln 12hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Merimbun Spg 177 sehingga Spg 282
Isnin 8.00pg hingga 11.30 pg Kampong Rambai, Sebahagian Kg Kuala Ungar Spg 1072 sehingga 33 Pembersihan laluan rangkaian kawat atas 16hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Spg 1234 Jln Kuala Ungar dan kawasan sekitarnya
Selasa 8.00pg hingga 11.30 pg Kampong Rambai, Sebahagian Kg Kuala Ungar Spg 1072 sehingga 34 Pembersihan laluan rangkaian kawat atas 17hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Spg 1234 Jln Kuala Ungar dan kawasan sekitarnya
Rabu 8.00pg hingga 11.30 pg Kampong Rambai, Sebahagian Kg Kuala Ungar Spg 1072 sehingga 35 Pembersihan laluan rangkaian kawat atas 18hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Spg 1234 Jln Kuala Ungar dan kawasan sekitarnya
Khamis 8.00pg hingga 11.30 pg Kampong Rambai, Sebahagian Kg Kuala Ungar Spg 1072 sehingga 36 Pembersihan laluan rangkaian kawat atas 19hb Disember 2019 1.30ptg hingga 4.00ptg Mukim Rambai Spg 1234 Jln Kuala Ungar dan kawasan sekitarnya