Copy of Copy of PMW Tutong District (Press Release) Memo22

Total Page:16

File Type:pdf, Size:1020Kb

Copy of Copy of PMW Tutong District (Press Release) Memo22 English Section Listed below are the designated areas for the planned maintenance work as for September and October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday Maintenance works for low voltage overhead 1 18th Sept 2018 8.30 am to 04.30 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. A part of kampong Kuala Ungar and surrounding area. Tuesday Hj Hassbolah Building, 2 18th Sept 2018 8.30 am to 04.30 pm Kg Petani, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani. Wednesday Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal and A part 3 19th Sept 2018 8.30 am to 04.30 pm Mukim Tanjong Maya, Tutong Maintenance works for Distribution Transformer. of Kg sg Damit and surrounding areas Saturday Kampong Biong, 4 22th Sept 2018 8.30 am to 04.30 pm Mukim Lamunin, Tutong Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding area Monday 5 24th Sept 2018 8.30 am to 04.30 pm Kampong Long Mayan, Mukim Ukong , Tutong Maintenance works for Distribution Transformer. A part of Kampong Long Mayan and surrounding area Monday Kampong Merimbun, 6 24th Sept 2018 8.30 am to 04.30 pm Mukim Rambai, Tutong Maintenance works for Distribution Transformer. A part of Kampong Merimbun and surrounding area Kampong Lubuk Ubar, Monday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 7 24th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. A part of Kampong Lubuk Ubar and surrounding area. Kampong Lubuk Ubar, Tuesday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 8 25th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. A part of Kampong Lubuk Ubar and surronding areas. Kampong Pak Bidang, Tuesday Kampong Talad and Kampong Rampou, A part of kampong Pak Bidang, Kampong Talad Kampong 9 25th Sept 2018 8.30 am to 04.30 pm Mukim Ukong, Tutong. Maintenance works for Distribution Transformer. Rampou and surrounding area. Wednesday Kampong Sg Jambu and Sg Paku, Mukim A part of kampong Sg Jambu and Kampong Sg Paku, Telisai and 10 26th Sept 2018 8.30 am to 04.30 pm Telisai, Tutong. Maintenance works for Distribution Transformer. surrounding area. Wednesday 8.00 am to 11.30 am Kampong Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and surrounding 11 26th Sept 2018 2.00pm to 4.30 pm Rambai, Tutong. lines. area. Thursday 8.00 am to 11.30 am Kampong Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and surrounding 12 27th Sept 2018 2.00pm to 4.30 pm Rambai, Tutong. lines. area. Monday Kampong Biong and Kampong Panchong, A part of Kampong Biong , Kampong Panchong and surrounding 13 01st Oct 2018 8.30 am to 04.30 pm Mukim Lamunin, Tutong Maintenance works for Distribution Transformer. area. Monday 8.00 am to 12.00 noon Kampong Keranching and Kampong Belaban, Maintenance works for low voltage overhead A part of Kampong Keranching, Kampong Belaban and 14 01st Oct 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. surrounding area. Page 1 Tuesday 8.00 am to 12.00 noon Kampong Keranching and Kampong Belaban, Maintenance works for low voltage overhead A part of Kampong Keranching, Kampong Belaban and 15 02nd Oct 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. surrounding area. Kampung Pangkalan Tangsi, Kampung Bukit Tuesday Barun and Kampong Layong, Mukim Lamunin, A part of Kampong Pangkalan Tangsi, Kampong Bukit Barun, 16 02nd Oct 2018 8.30 am to 04.30 pm Tutong Maintenance works for Distribution Transformer. Kampong Layong and surrounding area. Wednesday Kampong Batang Mitus, Mukim Kiudang, 17 03rd Oct 2018 8.30 am to 04.30 pm Tutong. Maintenance works for Distribution Transformer. A part of PDS Abattoir Sdn Bhd Building and surrounding area. Wednesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part of Kampong Kuala Ungar, Jln Panchong and surrounding 18 03rd Oct 2018 2.00pm to 4.00 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. area Thursday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part of Kampong Kuala Ungar, Jln Panchong and surrounding 19 04th Oct 2018 2.00pm to 4.00 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. area. Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 20 08th Oct 2018 2.00pm to 4.00 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 21 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Tuesday Maintenance works for Distribution 22 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 23 09th Oct 2018 2.00pm to 4.00 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Wednesday Maintenance works for Distribution 24 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#2. Earth satellite Building and the surrounding area. Wednesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part Kampong Rambai, Jln Rambai/Bang Pangan and 25 10th Oct 2018 2.00pm to 4.00 pm Kampong Rambai, Mukim Rambai, Tutong, lines. surrounding area. Thursday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part Kampong Rambai, Jln Rambai/Bang Pangan and 26 11th Oct 2018 2.00pm to 4.00 pm Kampong Rambai, Mukim Rambai, Tutong, lines. surrounding area. Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan September dan Oktober, 2018: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik Selasa Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan 1 18hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Rambai,Tutong. rendah Sebahagiankampong Kuala Ungar dan kawasan sekitarnya. Hj Hassbolah Building, Selasa Kg Petani, 2 18hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Pekan Tutong Pemeliharaan "Distribution Transformer". Hj Hassbolah Building, Kg Petani. Rabu Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal dan 3 19hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Tanjong Maya, Tutong Pemeliharaan "Distribution Transformer". sebahagian Kg sg Damit dan kawasan sekitarnya. Sabtu Kampong Biong, 4 22hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Lamunin, Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Biong dan kawasan sekitarnya. Isnin Kampong Long Mayan, 5 24hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Ukong , Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Long Mayan dan kawasan sekitarnya. Isnin Kampong Merimbun, 6 24hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Rambai, Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Merimbun dan kawasan sekitarnya. Kampong Lubuk Ubar, Isnin 8.00 pagi hingga 11.30 pagi Jln Kuru-Benutan, Penyelenggaraan rangkaian Kawat atas voltan 7 24hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah Sebahagian Kampong Lubuk Ubar dan kawasan sekitarnya. Kampong Lubuk Ubar, Selasa 8.00 pagi hingga 11.30 pagi Jln Kuru-Benutan, Penyelenggaraan rangkaian Kawat atas voltan 8 25hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah Sebahagian Kampong Lubuk Ubar dan kawasan sekitarnya. Kampong Pak Bidang, Selasa Kampong Talad dan Kampong Rampou, Sebahagian kampong Pak Bidang, Kampong Talad Kampong 9 25hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Ukong, Tutong. Pemeliharaan "Distribution Transformer". Rampou dan kawasan sekitarnya. Rabu Kampong Sg Jambu dan Sebahagian kampong Sg Jambu dan Kampong Sg Paku, Telisai 10 26hb Sept 2018 8.30 pagi hingga 04.30 petang. Sg Paku, Mukim Telisai, Tutong. Pemeliharaan "Distribution Transformer". dan kawasan sekitarnya. Kampung Sengkuang, Rabu 8.00 pagi hingga 11.30 pagi Jln Benutan, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Sengkuang, 11 26hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong. rendah Jln Benutan dan kawasan sekitarnya. Page 3 Kampung Sengkuang, Khamis 8.00 pagi hingga 11.30 pagi Jln Benutan, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Sengkuang, 12 27hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong. rendah Jln Benutan dan kawasan sekitarnya. Isnin Kampong Biong dan Kampong Panchong, Sebahagian Kampong Biong , Kampong Panchong dan kawasan 13 01hb Okt 2018 8.30 pagi hingga 04.30 petang. Mukim Lamunin, Tutong Pemeliharaan "Distribution Transformer". sekitarnya. Isnin 8.00 pagi hingga 12.00 tenghari Kampong Keranching dan Kampong Belaban, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Keranching, Kampong Belaban dan 14 01hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah kawasan sekitarnya. Selasa 8.00 pagi hingga 12.00 tenghari Kampong Keranching dan Kampong Belaban, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Keranching, Kampong Belaban dan 15 02hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah kawasan sekitarnya. Kampung Pangkalan Tangsi, Kampung Bukit Selasa Barun dan Kampong Layong, Sebahagian Kampong Pangkalan Tangsi, Kampong Bukit Barun, 16 02hb Okt 2018 8.30 pagi hingga 04.30 petang.
Recommended publications
  • Preliminary Report of BPP 2011
    ! ! ! Kerajaan!Kebawah!Duli!Yang!Maha!Mulia!Paduka!Seri!Baginda!Sultan!dan!Yang!Di8Pertuan! Negara! Brunei! Darussalam! melalui! Jabatan! Perancangan! dan! Kemajuan! Ekonomi! (JPKE),! Jabatan!Perdana!Menteri,!telah!mengendalikan!Banci!Penduduk!dan!Perumahan!(BPP)!pada! tahun! 2011.! BPP! 2011! merupakan! banci! kelima! seumpamanya! dikendalikan! di! negara! ini.! Banci!terdahulu!telah!dijalankan!pada!tahun!1971,!1981,!1991!dan!2001.! ! Laporan! Awal! Banci! Penduduk! dan! Perumahan! 2011! ini! merupakan! penerbitan! pertama! dalam! siri! laporan8laporan! banci! yang! akan! dikeluarkan! secara! berperingkat8peringkat.! Laporan! ini! memberikan! data! awal! mengenai! jumlah! penduduk,! isi! rumah! dan! tempat! kediaman!serta!taburan!dan!pertumbuhan!mengikut!daerah.!! ! Saya! berharap! penerbitan! ini! dan! laporan8laporan! seterusnya! akan! dapat! memenuhi! keperluan! pelbagai! pengguna! di! negara! ini! bagi! maksud! perancangan,! penyelidikan,! penyediaan!dasar!dan!sebagai!bahan!rujukan!awam.! ! Saya! sukacita! merakamkan! setinggi8tinggi! penghargaan! dan! terima! kasih! kepada! Penerusi! dan! ahli8ahli! Komiti! Penyelarasan! Kebangsaan! BPP! 2011,! kementerian8kementerian,! jabatan8jabatan! dan! sektor! swasta! yang! telah! memberikan! bantuan! dan! kerjasama! yang! diperlukan! kepada! Jabatan! ini! semasa! banci! dijalankan.! Seterusnya! saya! juga! sukacita! mengucapkan! terima! kasih! kepada! rakyat! dan! penduduk! di! negara! ini! di! atas! kerjasama! dalam! memberikan! maklumat! yang! dikehendaki! kepada! pegawai8pegawai! banci!
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • Perlaksanaan Pengurusan Jenazah Di
    مﺳﺑ ﷲ نﻣﺣرﻟا مﯾﺣرﻟا PELAKSANAAN PENYEMPURNAAN JENAZAH DI MASJID-MASJID Rabu, 02 Muharram 1443H bersamaan 11 Ogos 2021M- Merujuk Sidang Media Kementerian Kesihatan pada hari Isnin, 29 Zulhijjah 1442 bersamaan dengan 09 Ogos 2021, bahawa sebagai langkah berjaga-jaga dan seterusnya bagi membantu pihak kerajaan untuk mengawal penularan wabak Covid-19 di Negara Brunei Darussalam. Sehubungan dengan itu Kementerian Hal Ehwal Ugama melalui Jabatan Hal Ehwal Masjid memaklumkan bagi mana-mana pihak yang berhajat untuk menyempurnakan jenazah biasa(bukan dari pesakit COVID-19) bolehlah dibuat di masjid-masjid terpilih seluruh negara seperti berikut; Daerah Brunei dan Muara: BIL NAMA MASJID 1 Jame’ ‘ Asr Hassanil Bolkiah, Kampong Kiarong 2 Masjid Hassanal Bolkiah, Kampong Mentiri 3 Masjid Al-Ameerah Al-Hajjah Maryam, Kampong Jerudong 4 Masjid RPN Kampong Lambak Kanan 5 Masjid Kampong Pulaie 6 Masjid STKRJ Kampong Lambak Kiri 7 Masjid Setia Ali Pekan Muara 8 Masjid Sultan Sharif Ali, Sengkurong 9 Masjid Pehin Khatib Abdullah, Kampong Kulapis 10 Masjid Duli Raja Isteri Pengiran Anak Damit, Kampong Bebatik Kilanas 11 Masjid Pengiran Muda Abdul Malik, Kampong Tungku Katok 12 Masjid Al-Muhtadee Billah, Kampong Sungai Kebun 13 Masjid Yayasan Sultan Haji Hassanal Bolkiah, Kampong Bolkiah A 14 Masjid Kampong Pintu Malim 15 Masjid Perdana Wangsa Haji Mohammad, Kampong Setia A 16 Masjid Raja Isteri Pengiran Anak Hajah Saleha, Kampong Rimba 17 Masjid Pengiran Muda Abdul Mateen, Kampong Mulaut 18 Balai Ibadat Kampong Mata-Mata Daerah Tutong: BIL NAMA MASJID 1 Masjid Hassanal Bolkiah, Pekan Tutong 2 Masjid Pengiran Muda Abdul Wakeel, Mukim Kiudang 3 Masjid Ar-Rahim, Kampong Bukit Penggal 4 Masjid RPN Kampong Bukit Beruang 5 Masjid Kampong Sinaut 6 Balai Ibadat Hajah Aminah, Kampong Long Mayan M.S: 1 - 2 _ BAHAGIAN PERHUBUNGAN AWAM, KEMENTERIAN HAL EHWAL UGAMA, JALAN DEWAN MAJLIS, BERAKAS, BB3910, NEGARA BRUNEI DARUSSALAM.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • Senarai Ppbt
    SENARAI PUSAT PENYEMBELIHAN BINATANG TEMPATAN YANG AKTIF Jenis Daging Tarikh Tarikh Bil. Nama Syarikat & Alamat Sembelihan Kebenaran Mansuh Daerah Brunei Muara Syarikat Penternak Hj Bakri dan Anak-Anak 1 Ayam 8-Dec-20 7-Dec-21 Lot 107, Ladang komersial Luahan Jerudong, Negara Brunei Darussalam. Syarikat Yana Agriculture Farm 2 Ayam 8-Dec-20 7-Dec-21 Lot 37 & 38, Simpang 525-149, Kg Batumpu Masin, Negara Brunei Darussalam. Syarikat Perusahaan Mazlan bin Hj Maidin 3 Tapak Lot 68, Kawasan Kemajuan Pertanian Batumpu, Kg. Masin, Mukim Puyuh 11-Jan-21 10-Jan-22 Pengkalan Baty, Negara Brunei Darussalam. Syarikat BHB Ayam, Ayam 4 Lot 102, Kawasan Kemajuan Pertanian Luahan, Simpang 544-46, Jalan Pulau Kampong, Itik, 11-Jan-21 10-Jan-22 Kubu, Jerudong, Negara Brunei Darussalam. Patu/Angsa Sykt Golden Chicks Sdn Bhd 5 Plot 43 & 44, Jalan Kulapis, Panchur Murai, Kg. Pengkalan Batu, Negara Brunei Ayam 18-Jan-21 17-Jan-22 Darussalam. Sykt Hj Jamahat Hj Liman Abattoir 6 Simpang 362, Kawasan Kemajuan Pertanian Limpaki, Jalan Mulaut/Limau Ayam 19-May-21 18-May-22 Manis, Negara Brunei Darussalam. Syarikat Norfaidzal & Anak-Anak Kerbau, Lembu, 7 Lot G, Simpang 31, Projek Ladaing Pertanian Lampaki, Negara Brunei 9-Jun-21 8-Jun-22 Darussalam. Kambing Syarikat Siti Nogayah & Anak-Anak 8 No.17, Simpang 432, Kampong Lambak 'B', Jalan Berakas BB1714, Negara Ayam, Puyuh 9-Jun-21 8-Jun-22 Brunei Darussalam. Syarikat Ayamku Slaughterhouse Sdn Bhd 9 Lot 62459, Simpang 362, Kawasan Kemajuan Pertanian, Kg Limpaki, Jalan Ayam 6-Aug-20 5-Aug-21 Mulaut, Negara Brunei Darussalam.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Tutong Agricultural Extension Unit
    TUTONG AGRICULTURAL EXTENSION UNIT Tutong Agricultural Extension is the main communication center for farmers and the department subject matter specialists for effective transfer of knowledge and technology as well as providing advisory services and monitor farmers’ progress and activities. The unit also responsible for delivering support services and facilitating the distribution of Agriculture and Agrifood Incentive Scheme (SIPA) especially to small and medium enterprise farmers who undertake crops, livestock and poultry farm in Tutong District. Unit Functions: 1. Delivering advisory services and transfer agricultural technologies 2. As SIPA distribution centre for small and medium enterprise farmers 3. Processing the application and registration of Paddy Buy Back Scheme to farmers 4. Monitoring farm development of Agricultural Development Areas (ADAs) 5. Data collection for national agricultural production statistic 6. Monitoring farm produce safety program and sampling of crops commodities for pesticide residue analysis 7. Member for technical committee for monitoring and accreditation Brunei Good Agricultural Practices (Brunei GAP) 8. Monitoring and evaluating the requirement foreign labour for of agricultural activities Address: Pejabat Unit Pengembangan Pertanian Daerah Tutong Kampong Bukit Bendera, Tutong TA1141 Negara Brunei Darussalam Agriculture and Agrifood Incentive Scheme (SIPA) Distribution Centre Address Stesen Pengembangan Pertanian Tutong, Kg. Birau, Jalan Kuala Abang , Tutong TE2143 Negara Brunei Darussalam Business hours: Monday to Thursday: 8.00 – 11.00 am Saturday : Closed List Of Services Provided Bil Type of Services Form Price TPOR ($) (Working Days) Registration Application For Paddy Subsidised Price 1. 1.00 2 Scheme 2. Buy Back For Paddy Subsidised Price Scheme Free 5 3. Application for Wild Boar Control Services 1.00 14 4.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Senarai Kilang Dan Pembuat Makanan Yang Telah Mendapat Sijil Halal
    SENARAI KILANG DAN PEMBUAT MAKANAN YANG TELAH MENDAPAT SIJIL HALAL DAERAH NO KILANG / PEMBUAT MAKANAN Belait 1. Ferre Cake House Block 4B, 100:5 Kompleks Perindusterian Jalan Setia Diraja, Kuala Belait. Negara Brunei Darussalam No Senarai 1 ponge Cake 2 ed Bean B skuit 3 ed Bean Mini Bun 4 utter Mini Bun 5 uger Bun 6 ot Dog Bun 7 ta Bread 8 offee Meal Bread 9 andwich Loaf 10 Keropok Lekor 11 urry Puff Pastry 12 Curry Puff Filling 13 onut 14 oty B oy/ R oti Boy 15 Noty Boy/ Roti Boy Topping 16 eropok Lekor kering 17 os K eropok Lekor 18 heese Bun Jumlah Produk : 18 2. Perusahaan Shida Dan Keluarga Block 4, B2 Light Industry, Kuala Belait KA 1931 Negara Brunei Darussalam No Senarai 1 Mee Kuning 2 Kolo Mee 3 Kuew Tiau 4 Tauhu Jumlah Produk : 4 Hak Milik Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam 26 August, 2014 Page 1 of 47 DAERAH NO KILANG / PEMBUAT MAKANAN 3. Syarikat Hajah Saibah Haji Hassan Dan Anak-Anak Block 4 No B6 Kompleks Perindustrian Pekan Belait,Kuala Belait Negara Brunei Darussalam No Senarai 1 Mee Kuning 2 Kuew Teow 3 Kolo Mee Jumlah Produk : 3 4. Syarikat Hajah Saibah Haji Hassan Dan Anak-Anak Block 4B No 6 Tingkat Bawah,Kompleks Perindustrian Pekan Belait,Kuala Belait, Negara Brunei Darussalam No Senarai 1 Karipap Ayam 2 Karipap Daging 3 Karipap Sayur 4 Popia Ayam 5 Popia Daging 6 Popia Sayur 7 Samosa Ayam 8 Samosa Daging 9 Samosa Sayur 10 Onde Onde 11 Pulut Panggang Udang 12 Pulut Panggang Daging 13 Kelupis Kosong Jumlah Produk : 13 Brunei-Muara Hak Milik Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam 26 August, 2014 Page 2 of 47 DAERAH NO KILANG / PEMBUAT MAKANAN 1.
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]