English Section

Listed below are the designated areas for the planned maintenance work as for September and October , 2018:

No. Day & Date Time Location Work Description Affected Areas for Outages

Tuesday Maintenance works for low voltage overhead 1 18th Sept 2018 8.30 am to 04.30 pm Kampong Kuala Ungar, ,. lines. A part of kampong Kuala Ungar and surrounding area.

Tuesday Hj Hassbolah Building, 2 18th Sept 2018 8.30 am to 04.30 pm Kg , Mukim Pekan Tutong Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani.

Wednesday Kampong , Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal and A part 3 19th Sept 2018 8.30 am to 04.30 pm , Tutong Maintenance works for Distribution Transformer. of Kg sg Damit and surrounding areas

Saturday Kampong Biong, 4 22th Sept 2018 8.30 am to 04.30 pm Mukim , Tutong Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding area

Monday 5 24th Sept 2018 8.30 am to 04.30 pm Kampong Long Mayan, Mukim Ukong , Tutong Maintenance works for Distribution Transformer. A part of Kampong Long Mayan and surrounding area

Monday Kampong Merimbun, 6 24th Sept 2018 8.30 am to 04.30 pm Mukim Rambai, Tutong Maintenance works for Distribution Transformer. A part of Kampong Merimbun and surrounding area

Kampong Lubuk Ubar, Monday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 7 24th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. A part of Kampong Lubuk Ubar and surrounding area.

Kampong Lubuk Ubar, Tuesday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 8 25th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. A part of Kampong Lubuk Ubar and surronding areas. Kampong Pak Bidang, Tuesday Kampong Talad and Kampong Rampou, A part of kampong Pak Bidang, Kampong Talad Kampong 9 25th Sept 2018 8.30 am to 04.30 pm Mukim Ukong, Tutong. Maintenance works for Distribution Transformer. Rampou and surrounding area.

Wednesday Kampong Sg Jambu and Sg Paku, Mukim A part of kampong Sg Jambu and Kampong Sg Paku, and 10 26th Sept 2018 8.30 am to 04.30 pm Telisai, Tutong. Maintenance works for Distribution Transformer. surrounding area.

Wednesday 8.00 am to 11.30 am Kampong Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and surrounding 11 26th Sept 2018 2.00pm to 4.30 pm Rambai, Tutong. lines. area.

Thursday 8.00 am to 11.30 am Kampong Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and surrounding 12 27th Sept 2018 2.00pm to 4.30 pm Rambai, Tutong. lines. area.

Monday Kampong Biong and Kampong Panchong, A part of Kampong Biong , Kampong Panchong and surrounding 13 01st Oct 2018 8.30 am to 04.30 pm , Tutong Maintenance works for Distribution Transformer. area.

Monday 8.00 am to 12.00 noon Kampong Keranching and Kampong Belaban, Maintenance works for low voltage overhead A part of Kampong Keranching, Kampong Belaban and 14 01st Oct 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. surrounding area.

Page 1 Tuesday 8.00 am to 12.00 noon Kampong Keranching and Kampong Belaban, Maintenance works for low voltage overhead A part of Kampong Keranching, Kampong Belaban and 15 02nd Oct 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. surrounding area. Kampung Pangkalan Tangsi, Kampung Bukit Tuesday Barun and , Mukim Lamunin, A part of Kampong Pangkalan Tangsi, Barun, 16 02nd Oct 2018 8.30 am to 04.30 pm Tutong Maintenance works for Distribution Transformer. Kampong Layong and surrounding area.

Wednesday Kampong Batang Mitus, , 17 03rd Oct 2018 8.30 am to 04.30 pm Tutong. Maintenance works for Distribution Transformer. A part of PDS Abattoir Sdn Bhd Building and surrounding area.

Wednesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part of Kampong Kuala Ungar, Jln Panchong and surrounding 18 03rd Oct 2018 2.00pm to 4.00 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. area

Thursday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part of Kampong Kuala Ungar, Jln Panchong and surrounding 19 04th Oct 2018 2.00pm to 4.00 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. area.

Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 20 08th Oct 2018 2.00pm to 4.00 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area.

Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 21 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area.

Tuesday Maintenance works for Distribution 22 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area.

Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 23 09th Oct 2018 2.00pm to 4.00 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas.

Wednesday Maintenance works for Distribution 24 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#2. Earth satellite Building and the surrounding area.

Wednesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part , Jln Rambai/Bang Pangan and 25 10th Oct 2018 2.00pm to 4.00 pm Kampong Rambai, Mukim Rambai, Tutong, lines. surrounding area.

Thursday 8.00 am to 12.00 noon Maintenance works for low voltage overhead A part Kampong Rambai, Jln Rambai/Bang Pangan and 26 11th Oct 2018 2.00pm to 4.00 pm Kampong Rambai, Mukim Rambai, Tutong, lines. surrounding area.

Page 2 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan September dan Oktober, 2018:

Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik

Selasa Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan 1 18hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Rambai,Tutong. rendah Sebahagiankampong Kuala Ungar dan kawasan sekitarnya. Hj Hassbolah Building, Selasa Kg Petani, 2 18hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Pekan Tutong Pemeliharaan "Distribution Transformer". Hj Hassbolah Building, Kg Petani.

Rabu Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal dan 3 19hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Tanjong Maya, Tutong Pemeliharaan "Distribution Transformer". sebahagian Kg sg Damit dan kawasan sekitarnya.

Sabtu Kampong Biong, 4 22hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Lamunin, Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Biong dan kawasan sekitarnya.

Isnin Kampong Long Mayan, 5 24hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Ukong , Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Long Mayan dan kawasan sekitarnya.

Isnin Kampong Merimbun, 6 24hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Rambai, Tutong Pemeliharaan "Distribution Transformer". Sebahagian Kampong Merimbun dan kawasan sekitarnya.

Kampong Lubuk Ubar, Isnin 8.00 pagi hingga 11.30 pagi Jln Kuru-Benutan, Penyelenggaraan rangkaian Kawat atas voltan 7 24hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah Sebahagian Kampong Lubuk Ubar dan kawasan sekitarnya.

Kampong Lubuk Ubar, Selasa 8.00 pagi hingga 11.30 pagi Jln Kuru-Benutan, Penyelenggaraan rangkaian Kawat atas voltan 8 25hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah Sebahagian Kampong Lubuk Ubar dan kawasan sekitarnya.

Kampong Pak Bidang, Selasa Kampong Talad dan Kampong Rampou, Sebahagian kampong Pak Bidang, Kampong Talad Kampong 9 25hb Sept 2018 8.30 pagi hingga 04.30 petang. Mukim Ukong, Tutong. Pemeliharaan "Distribution Transformer". Rampou dan kawasan sekitarnya.

Rabu Kampong Sg Jambu dan Sebahagian kampong Sg Jambu dan Kampong Sg Paku, Telisai 10 26hb Sept 2018 8.30 pagi hingga 04.30 petang. Sg Paku, Mukim Telisai, Tutong. Pemeliharaan "Distribution Transformer". dan kawasan sekitarnya.

Kampung Sengkuang, Rabu 8.00 pagi hingga 11.30 pagi Jln Benutan, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Sengkuang, 11 26hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong. rendah Jln Benutan dan kawasan sekitarnya.

Page 3 Kampung Sengkuang, Khamis 8.00 pagi hingga 11.30 pagi Jln Benutan, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Sengkuang, 12 27hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong. rendah Jln Benutan dan kawasan sekitarnya.

Isnin Kampong Biong dan Kampong Panchong, Sebahagian Kampong Biong , Kampong Panchong dan kawasan 13 01hb Okt 2018 8.30 pagi hingga 04.30 petang. Mukim Lamunin, Tutong Pemeliharaan "Distribution Transformer". sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Kampong Keranching dan Kampong Belaban, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Keranching, Kampong Belaban dan 14 01hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Kampong Keranching dan Kampong Belaban, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Keranching, Kampong Belaban dan 15 02hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong rendah kawasan sekitarnya.

Kampung Pangkalan Tangsi, Kampung Bukit Selasa Barun dan Kampong Layong, Sebahagian Kampong Pangkalan Tangsi, Kampong Bukit Barun, 16 02hb Okt 2018 8.30 pagi hingga 04.30 petang. Mukim Lamunin, Tutong Pemeliharaan "Distribution Transformer". Kampong Layong dan kawasan sekitarnya.

Rabu Kampung Batang Mitus, Sebahagian PDS Abattoir Sdn Bhd Building dan kawasan 17 03hb Okt 2018 8.30 pagi hingga 04.30 petang. Mukim Kiudang, Tutong. Pemeliharaan "Distribution Transformer". sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Kuala Ungar, Jln Panchong dan kawasan 18 03hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai,Tutong. rendah sekitarnya.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Kuala Ungar, Jln Panchong dan kawasan 19 04hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai,Tutong. rendah sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Kampong Padnunuk, Penyelenggaraan rangkaian Kawat atas voltan Jln Andaru, Sebahagian Jln Kecil Padnunuk dan kawasan 20 08hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Kiudang, Tutong rendah sekitarnya.

Isnin Hospital Pengiran Muda Mahkota Pengiran Muda 21 08hb Okt 2018 8.30 pagi hingga 04.30 petang. Haji Al-Muhtadee Billah, Tutong. Pemeliharaan "Distribution Transformer". Sebahagian Bangunan Hospital PMMPMHAMB, Tutong.

Selasa 22 09hb Okt 2018 8.30 pagi hingga 04.30 petang. Earth Satellite, Telisai, Tutong. Pemeliharaan "Distribution Transformer"#1. Bangunan Earth Satellite dan kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Kampong Padnunuk, Penyelenggaraan rangkaian Kawat atas voltan Jln Andaru, Sebahagian Jln Kecil Padnunuk dan kawasan 23 09hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Kiudang, Tutong, rendah sekitarnya. Rabu 24 10hb Okt 2018 8.30 pagi hingga 04.30 petang. Earth Satellite, Telisai, Tutong. Pemeliharaan "Distribution Transformer"#2. Bangunan Earth satellite, Telisai dan kawasan sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Rambai, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Rambai, Jln Rambai/Bang Pangan dan 25 10hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong, rendah kawasan sekitarnya.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Rambai, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Rambai, Jln Rambai/Bang Pangan dan 26 11hb Okt 2018 2.00 petang hingga 4.30 petang Mukim Rambai, Tutong, rendah kawasan sekitarnya.

Page 4