Copy of Copy of PMW Tutong District (Press Release) 4Wk July18 English Section Listed below are the designated areas for the planned maintenance work as for July and August, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 02.00 pm Saturday Kampong Bukit Panggal, Mukim Keriam, Replacement of Distribution Feeder Pillar Spg 8, 1 Spg 8, Kampong Bukit Panggal , Mukim Keriam, Tutong. 21th July 2018 Tutong. Kampong Bukit Panggal , Tutong. 08.30 am to 11.30 am Tuesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 2 1.30 pm to 05.00pm 24th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Wednesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 3 1.30 pm to 05.00pm 25th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Kampong Keranching, Kampong Wednesday Belaban, Kampong Benutan and Replacement of Ring Main Unit at substation Kampong Keranching, Kampong Belaban, Kampong Benutan and 4 1.30 pm to 05.00pm 25th July 2018 (For info: Department of Electrical Service will supply temporary electricity Kampong Lubuk Ubar, Mukim Rambai, Benutan #1, Tutong. apart of Kampong Lubuk Ubar, Mukim Rambai, Tutong. to the affected areas through mobile generator service at the substation) Tutong. Thursday 08.30 am to 02.00 pm Kampong Suran dan Kampong Panchor Replacement of Distribution Feeder Pillar at Kampong Suran and apart of kampong Panchor Dulit, Mukim 5 26th July 2018 Dulit, Mukim Pekan Tutong. Kampong Suran. Tutong. Pekan Tutong. Saturday 08.30 am to 02.00 pm Kampong Serambangun, Mukim Pekan Replacement of Distribution Feeder Pillar at 6 Spg 189,Kampong Serambangun , Mukim Pekan Tutong, Tutong. 28th July 2018 Tutong. substation Kampong Serambangun. Tutong. Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 7 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 8 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 9 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 10 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 11 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Page 1 Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 12 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 13 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 14 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 14th August 2018 lines Wednesday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 15 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 15th August 2018 lines Thursday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 16 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 16th August 2018 lines Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Julai , 2018: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik 08.30 pagi to 02.00 petang Sabtu Kampong Bukit Panggal, Mukim Keriam, Penggantian " Distribution Feeder Pillar" Spg 1 Spg 8, Kampong Bukit Panggal , Mukim Keriam, Tutong. 21hb Julai 2018 Tutong. 8, Kampong Bukit Panggal , Tutong. 08.30 pagi hingga 11.30 pagi Selesa Kampong Sengkarai, Mukim Pekan Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 2 1.30 petang to 05.00 petang Pemeliharan rangkaian kawat atas voltan rendah. 24hb Julai 2018 Tutong. Tutong. 08.30 pagi to 11.30 pagi Rabu Kampong Sengkarai, Mukim Pekan Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 3 1.30 pagi to 05.00 pagi Pemeliharan rangkaian kawat atas voltan rendah. 25hb Julai 2018 Tutong. Tutong. 08.30 pagi hingga 11.30 pagi Kampong Keranching, Kampong Rabu 1.30 petang hingga 05.00 petang Belaban, Kampong Benutan and Penggantian peralatan Pensuisan " Ring Main Kampong Keranching, Kampong Belaban, Kampong Benutan dan 4 25hb Julai 2018 (Untuk makluman, JPE akan membekal sementara bekalan tenaga elektrik Kampong Lubuk Ubar, Mukim Rambai, Unit" di substation Benutan #1, Tutong. sebahagian Kampong Lubuk Ubar, Mukim Rambai, Tutong. ke kawasan yang terlibat melalui perkhidmatan Janakuasa Bergerak [Genset] distesen Elektrik yang di maksud.) Tutong. Khamis 08.30 pagi to 02.00 petang Kampong Suran dan Kampong Panchor Penggantian " Distribution Feeder Pillar" Kampong Suran dan sebahagian kampong Panchor Dulit, Mukim 5 26hb Julai 2018 Dulit, Mukim Pekan Tutong. di Kampong Suran. Tutong. Pekan Tutong. Sabtu 08.30 pagi hingga 02.00 petang Kampong Serambangun, Mukim Pekan Penggantian "Distribution Feeder Pillar" di 6 Spg 189,Kampong Serambangun , Mukim Pekan Tutong, Tutong. 28hb Julai 2018 Tutong. substation Kampong Serambangun. Tutong. Khamis 08.30 pagi hingga 02.30 petang Kampong Kiudang, Mukim Kiudang, Spg 860 Kg Kiudang, Mukim Kiudang 7 Pemeliharan rangkaian kawat atas voltan rendah. 02hb Ogos 2018 Tutong dan sekitarnya Sabtu 08.30 pagi hingga 12.30 tenghari Kampong Sg Kelugos, Mukim Keriam, Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong dan 8 Pemeliharan rangkaian kawat atas voltan rendah. 04hb Ogos 2018 Tutong sekitarnya Isnin 9 08.30 pagi hingga 4.00 petang Kampong Birau, Mukim Kiudang, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Jln Kecil Kg Birau , Mukim Kiudang dan sekitarnya 06hb Ogos 2018 Selesa 08.30 pagi hingga 4.00 petang Kampong Kupang, Mukim Keriam, 10 Pemeliharan rangkaian kawat atas voltan rendah. Spg 554 Kg Kupang, Mukim Keriam dan sekitarnya 07hb Ogos 2018 Tutong. Rabu Kampong Lamunin, Mukim Lamunin, 11 08.30 pagi hingga 12.00 tenghari Pemeliharan rangkaian kawat atas voltan rendah. Sebahagian kampong Lamunin, Tutong. 08hb Ogos 2018 Tutong Page 3 Khamis 08.30 pagi hingga 4.00 petang 12 Kampong Telamba, Mukim Telisai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Sebahagian Kampong Telamba, Mukim Telisai,Tutong. 09hb Ogos 2018 Isnin 08.30 pagi hingga 4.30 petang 13 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 13hb Ogos 2018 Selesa 08.30 pagi hingga 4.30 petang 14 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 14hb Ogos 2018 Rabu 08.30 pagi hingga 4.30 petang 15 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 15hb Ogos2018 Khamis 08.30 pagi hingga 4.30 petang 16 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 16hb Ogos 2018 Page 4.
Recommended publications
  • Preliminary Report of BPP 2011
    ! ! ! Kerajaan!Kebawah!Duli!Yang!Maha!Mulia!Paduka!Seri!Baginda!Sultan!dan!Yang!Di8Pertuan! Negara! Brunei! Darussalam! melalui! Jabatan! Perancangan! dan! Kemajuan! Ekonomi! (JPKE),! Jabatan!Perdana!Menteri,!telah!mengendalikan!Banci!Penduduk!dan!Perumahan!(BPP)!pada! tahun! 2011.! BPP! 2011! merupakan! banci! kelima! seumpamanya! dikendalikan! di! negara! ini.! Banci!terdahulu!telah!dijalankan!pada!tahun!1971,!1981,!1991!dan!2001.! ! Laporan! Awal! Banci! Penduduk! dan! Perumahan! 2011! ini! merupakan! penerbitan! pertama! dalam! siri! laporan8laporan! banci! yang! akan! dikeluarkan! secara! berperingkat8peringkat.! Laporan! ini! memberikan! data! awal! mengenai! jumlah! penduduk,! isi! rumah! dan! tempat! kediaman!serta!taburan!dan!pertumbuhan!mengikut!daerah.!! ! Saya! berharap! penerbitan! ini! dan! laporan8laporan! seterusnya! akan! dapat! memenuhi! keperluan! pelbagai! pengguna! di! negara! ini! bagi! maksud! perancangan,! penyelidikan,! penyediaan!dasar!dan!sebagai!bahan!rujukan!awam.! ! Saya! sukacita! merakamkan! setinggi8tinggi! penghargaan! dan! terima! kasih! kepada! Penerusi! dan! ahli8ahli! Komiti! Penyelarasan! Kebangsaan! BPP! 2011,! kementerian8kementerian,! jabatan8jabatan! dan! sektor! swasta! yang! telah! memberikan! bantuan! dan! kerjasama! yang! diperlukan! kepada! Jabatan! ini! semasa! banci! dijalankan.! Seterusnya! saya! juga! sukacita! mengucapkan! terima! kasih! kepada! rakyat! dan! penduduk! di! negara! ini! di! atas! kerjasama! dalam! memberikan! maklumat! yang! dikehendaki! kepada! pegawai8pegawai! banci!
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • Perlaksanaan Pengurusan Jenazah Di
    مﺳﺑ ﷲ نﻣﺣرﻟا مﯾﺣرﻟا PELAKSANAAN PENYEMPURNAAN JENAZAH DI MASJID-MASJID Rabu, 02 Muharram 1443H bersamaan 11 Ogos 2021M- Merujuk Sidang Media Kementerian Kesihatan pada hari Isnin, 29 Zulhijjah 1442 bersamaan dengan 09 Ogos 2021, bahawa sebagai langkah berjaga-jaga dan seterusnya bagi membantu pihak kerajaan untuk mengawal penularan wabak Covid-19 di Negara Brunei Darussalam. Sehubungan dengan itu Kementerian Hal Ehwal Ugama melalui Jabatan Hal Ehwal Masjid memaklumkan bagi mana-mana pihak yang berhajat untuk menyempurnakan jenazah biasa(bukan dari pesakit COVID-19) bolehlah dibuat di masjid-masjid terpilih seluruh negara seperti berikut; Daerah Brunei dan Muara: BIL NAMA MASJID 1 Jame’ ‘ Asr Hassanil Bolkiah, Kampong Kiarong 2 Masjid Hassanal Bolkiah, Kampong Mentiri 3 Masjid Al-Ameerah Al-Hajjah Maryam, Kampong Jerudong 4 Masjid RPN Kampong Lambak Kanan 5 Masjid Kampong Pulaie 6 Masjid STKRJ Kampong Lambak Kiri 7 Masjid Setia Ali Pekan Muara 8 Masjid Sultan Sharif Ali, Sengkurong 9 Masjid Pehin Khatib Abdullah, Kampong Kulapis 10 Masjid Duli Raja Isteri Pengiran Anak Damit, Kampong Bebatik Kilanas 11 Masjid Pengiran Muda Abdul Malik, Kampong Tungku Katok 12 Masjid Al-Muhtadee Billah, Kampong Sungai Kebun 13 Masjid Yayasan Sultan Haji Hassanal Bolkiah, Kampong Bolkiah A 14 Masjid Kampong Pintu Malim 15 Masjid Perdana Wangsa Haji Mohammad, Kampong Setia A 16 Masjid Raja Isteri Pengiran Anak Hajah Saleha, Kampong Rimba 17 Masjid Pengiran Muda Abdul Mateen, Kampong Mulaut 18 Balai Ibadat Kampong Mata-Mata Daerah Tutong: BIL NAMA MASJID 1 Masjid Hassanal Bolkiah, Pekan Tutong 2 Masjid Pengiran Muda Abdul Wakeel, Mukim Kiudang 3 Masjid Ar-Rahim, Kampong Bukit Penggal 4 Masjid RPN Kampong Bukit Beruang 5 Masjid Kampong Sinaut 6 Balai Ibadat Hajah Aminah, Kampong Long Mayan M.S: 1 - 2 _ BAHAGIAN PERHUBUNGAN AWAM, KEMENTERIAN HAL EHWAL UGAMA, JALAN DEWAN MAJLIS, BERAKAS, BB3910, NEGARA BRUNEI DARUSSALAM.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • MEMO 029 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday 8.30 am to 11.30 am Kampong Rambai, 1 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 2 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 3 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 4 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 5 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 6 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas. Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • PMW 22 20 Tutong District (Autosaved)
    English Section Listed below are the designated areas for the planned maintenance work as for August and September 2020: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Benutan dan Kampong Thursday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 1 Keranching, Replacement of ovehead line 20th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Kampong Kiudang and Jalan Thursday 8.00 am to 04.00 pm Installation of the "Pole Mounted" on the A part of Jalan Kampong Kiudang and overall 2 Piasan, Mukim Kiudang and Mukim 20th August 2020 Electric pole Jalan Piasan Lamunin Kampong Benutan dan Kampong Monday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 3 Keranching, Replacement of ovehead line 24th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Monday 8.00 am to 04.00 pm Kampong Panchong, Installation of the "Pole Mounted" on the A part of Kampong Panchong and Jalan Sulap 4 24th August 2020 Mukim Lamunin Electric pole Samat Monday 8.30 am to 11.30 am Kampong Maraburong, 5 Replacement of ovehead line Overall Small Road Kampong Maraburong 24th August 2020 1.30 pm to 4.30 pm Mukim Keriam Kampong Benutan dan Kampong Tuesday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 6 Keranching, Replacement of ovehead line 25th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Tuesday 8.00 am to 04.00 pm Kampong Ukong, Installation of the "Pole Mounted" on the A part of Jalan Bang Pangan dan Jalan Penapar 7 25th August 2020 Mukim Ukong Electric pole Ukong Tuesday 8.30 am