Listed below are the designated areas for the planned maintenance work as for November and December, 2018:

No. Day & Date Time Location Work Description Affected Areas for Outages

Monday 1 8.00 am to 4.30 pm Earth Satelite , Mukim Telisai Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 19th Nov 2018

Wednesday 2 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 21st Nov 2018

Thursday 3 8.00 am to 4.30 pm Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Lorong 105 Penanjong Kem 22nd Nov 2018

Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 4 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Rambai Tutong.

Saturday 8.00 am to 12.00 noon Spg 509 Jln Kecil Nong Janang, 5 Wayleave Clearing Whole Spg 509 Jln Kecil Nong Janang and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Udal, , Tutong.

Monday 8.00 am to 12.00 noon Jln Kecil Bukit Kukob, Kampong , 6 Wayleave Clearing A whole area Jln Kecil Bukit Kukob and surrounding areas. 26th Nov 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong.

Monday 8.00 am to 12.00 noon Jln Kampong Sebakit Atas Bangunggus, Mukim A whole of Kampong Sebakit Atas Bangunggus, Spg 49 Kampong 7 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Tanjong Maya Tutong Sebakit Atas and surrounding area.

Monday 8.00 am to 12.00 noon Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh, A whole Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh and 8 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Mukim Pengkalan Batu, Muara. surrounding area.

Monday 9 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Padang Kawat Penanjong Kem. 26th Nov 2018

Tuesday 8.00 am to 12.00 noon Jalan Sebakit Bawah Dalam, Mukim Tanjong 10 Wayleave Clearing A whole Jalan Sebakit Bawah Dalam and surrounding area. 27th Nov 2018 1.30 pm to 4.30 pm Maya Tutong

Tuesday 8.00 am to 12.00 noon A main road Kampong Tanjong Maya to and surrounding 11 Kampong Tanjong Maya, Mukim Tanjong Maya Wayleave Clearing 27th Nov 2018 1.30 pm to 4.30 pm area.

Tuesday (ABDB) Markas, Surau, Cook House, Quarter Master Penanjong 12 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. 27th Nov 2018 Kem and surrounding area.

Wednesday 8.00 am to 12.00 noon Kampong Penapar, Mukim Tanjong Maya From Klinik Lama Substation to Masjid Penapar Substation and 13 Wayleave Clearing 28th Nov 2018 1.30 pm to 4.30 pm Tutong. surrounding area.

Wednesday 14 8.00 am to 4.30 pm Tutong Kem, Mukim Pekan Tutong. Maintenance works for Distribution Transformer. Station Transformer No #1 Main Intake Tutong Kem. 28th Nov 2018

Page 1 Thursday 8.00 am to 12.00 noon Spg 507 Kampong Penapar, Mukim Tanjong 15 Wayleave Clearing A part of Kampong Penapar and surrounding area. 29th Nov 2018 1.30 pm to 4.30 pm Maya tutong

Thursday 16 8.00 am to 4.30 pm Asalati Telisai Substation, Mukim Telisai Tutong. Maintenance works for Distribution Transformer. A part of Jalan Telisai and surrounding area. 29th Nov 2018

Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 17 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong

Saturday 8.00 am to 12.00 noon 18 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm

Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 19 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area.

Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 20 Pertanian Birau, Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area.

Monday Perumahan Baitul Mal Keriam, A whole of Perumahan Baitul Mal, a part of and 21 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area.

Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 22 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas.

Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 23 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm surrounding area.

Tuesday A whole of Jalan Pantai Penanjong, Masjid Kg. Penanjong and a 24 8.00 am to 4.30 pm Kampong Penanjong, Mukim Pekan Tutong. Maintenance works for Distribution Transformer. 4th Dec 2018 part of Jalan Kecil Padang Baru, Penanjong.

Wednesday 8.00 am to 12.00 noon Kampong Lubok Pulau, Kampong Meranti, A part of Kampong Lubok Pulau, Kampong Bukit Sibut , Kampong 25 Wayleave Clearing 5th Dec 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong. Meranti and surrounding areas.

Wednesday 8.00 am to 12.00 noon Kampong Luagan Timbaran, Mukim Kiudang 26 Wayleave Clearing A part of Kampong Luagan Timbaran and surrounding areas. 5th Dec 2018 1.30 pm to 4.30 pm Tutong

Wednesday 8.00 am to 12.00 noon A whole of Simpang 1030 Kampong Keriam and surrounding 27 Kampong Keriam, Mukim Keriam Tutong Maintenance works for LV network. 5th Dec 2018 1.30 pm to 4.30 pm areas.

Wednesday Sekolah Rendah Birau, Masjid Kampong Birau and surrounding 28 8.00 am to 4.30 pm Kampong Birau, Mukim Kiudang Tutong. Maintenance works for Distribution Transformer. 5th Dec 2018 areas.

Thursday 8.00 am to 12.00 noon Kampong Tanjong Maya, Mukim Tanjong Maya 29 Wayleave Clearing A whole of Jalan Kecil Sepakon and surrounding areas. 6th Dec 2018 1.30 pm to 4.30 pm Tutpng.

Thursday 8.00 am to 12.00 noon Kampong Luagan Timbaran, Mukim Kiudang 30 Wayleave Clearing Kampong Luagan Timbaran and surrounding areas. 6th Dec 2018 1.30 pm to 4.30 pm Tutong.

Page 2 Thursday Kampong Lubok Pulau, Mukim Tanjong Maya A part of Kampong Lubok Pulau, Masjid Lubok Pulau and 31 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 6th Dec 2018 Tutong. surrounding areas.

Saturday 8.00 am to 12.00 noon Kampong Tanjong maya, Mukim Tanjong Maya 32 Wayleave Clearing A part of Jalan Kecil Bukit Nibong and surrounding areas 8th Dec 2018 1.30 pm to 4.30 pm Tutong.

Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 33 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding areas. 8th Dec 2018 1.30 pm to 4.30 pm Rambai Tutong.

Monday 8.00 am to 12.00 noon 34 Kampong Pad Nunok, Mukim Kiudang Tutong. Wayleave Clearing A part of Kampong Pad Nunok and surrounding areas. 10th Dec 2018 1.30 pm to 4.30 pm

Monday A part of Kampong Telisai, Kampong Sungai Jambu and 35 8.00 am to 4.30 pm Kampong Sungai Jambu, Mukim Telisai Tutong. Maintenance works for Distribution Transformer. 10th Dec 2018 surrounding areas.

Tuesday 8.00 am to 12.00 noon A part of , Kampong Mungkom and surrounding 36 Kampong Mungkom, Mukim Kiudang Tutong. Wayleave Clearing 11th Dec 2018 1.30 pm to 4.30 pm areas.

Tuesday A whole of Balai Polis , a part of Kg. Lamunin, Kg. Bang 37 8.00 am to 4.30 pm Kampong Lamunin, Tutong. Maintenance works for Distribution Transformer. 11th Dec 2018 Nukat, Kg. Pengkalan Tangsi, Kg. Biong and surrounding areas.

Wednesday 8.00 am to 12.00 noon 38 Kampong Pad Nunok, Mukim Kiudang Tutong. 8.00 am to 4.30 pm A part of Kampong Pad Nunok and surrounding areas. 12th Dec 2018 1.30 pm to 4.30 pm

Wednesday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 39 Wayleave Clearing A part of Kampong Bukit Udal and surrounding areas. 12th Dec 2018 1.30 pm to 4.30 pm Tutong

Wednesday A part of Kampong Birau, Sekolah Menengah RIPAS, Tutong and 40 8.00 am to 4.30 pm Kampong Birau, Mukim Kiudang Tutong. Maintenance works for Distribution Transformer. 12th Dec 2018 surrounding areas.

Thursday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 41 Wayleave Clearing A part of Kampong Bukit Udal and surrounding areas. 13th Dec 2018 1.30 pm to 4.30 pm Tutong

Thursday 8.00 am to 12.00 noon A part of Kampong Kiudang, Kampong Mungkom and 42 Kampong Mungkom, Mukim Kiudang Tutong. Wayleave Clearing 13th Dec 2018 1.30 pm to 4.30 pm surrounding areas.

Thursday A part of Kampong Kupang, Sekolah Rendah Kupang, Jalan 43 8.00 am to 4.30 pm Kampong Kupang, Mukim Keriam Tutong. Maintenance works for Distribution Transformer. 13th Dec 2018 Kerakas Payau and surrounding areas.

Saturday 8.00 am to 12.00 noon A Part of Kampong Panchong, Jalan Sulap Samat and 44 Kampong Panchong, Mukim Lamunin Tutong. Wayleave Clearing 15th Dec 2018 1.30 pm to 4.30 pm surrounding areas.

Page 3 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan November dan Disember 2018:

Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik

Isnin 1 8.00 pagi hingga 4.30 petang Earth Satelite Telisai, Mukim Telisai Tutong Pemeliharan "Distribution Transformer." Bangunan Satelite Bumi Telisai dan kawasan sekitarnya. 19hb Nov 2018

Rabu 2 8.00 pagi hingga 4.30 petang Earth Satelite Telisai, Mukim Telisai Tutong Pemeliharan "Distribution Transformer." Bangunan Satelite Bumi Telisai dan kawasan sekitarnya. 21hb Nov 2018

Khamis "Station Transformer" di Station Utama Elektrik Lorong 105 3 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 22hb Nov 2018 Penanjong Kem

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Kuala Ungar and Rambai, Mukim Sebahagian Kampong Kuala Ungar Rambai dan kawasan 4 Pembersihan Rangkaian Kawad Atas 24hb Nov 2018 1:30 petang hingga 4.30 petang Rambai Tutong. sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Spg 509 Jln Kecil Nong Janang, Kampong Bukit Keseluruhan Spg 509 Jln Kecil Nong Janang dan kawasan 5 Pembersihan Rangkaian Kawad Atas 24hb Nov 2018 1:30 petang hingga 4.30 petang Udal, Mukim Tanjong Maya, Tutong. sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Jln Kecil Bukit Kukob, Kampong Bukit Udal, 6 Pembersihan Rangkaian Kawad Atas Keseluruhan Jln Kecil Bukit Kukob dan kawasan sekitarnya. 26hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Tanjong Maya Tutong.

Isnin 8.00 pagi hingga 12.00 tenghari Jln Kampong Sebakit Atas Bangunggus, Mukim Keseluruhan Kampong Sebakit Atas Bangunggus, Spg 49 7 Pembersihan Rangkaian Kawad Atas 26hb Nov 2018 1:30 petang hingga 4.30 petang Tanjong Maya Tutong Kampong Sebakit Atas dan kawasan sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh, Keseluruhan Spg 657 Jalan Bebuloh Kiri Kampong Bebuloh dan 8 Pembersihan Rangkaian Kawad Atas 26hb Nov 2018 1:30 petang hingga 4.30 petang Mukim Pengkalan Batu, Brunei Muara. kawasan sekitarnya.

Isnin "Station Transformer" di Station Utama Elektrik Padang Kawat 9 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 26hb Nov 2018 Penanjong Kem.

Selasa 8.00 pagi hingga 12.00 tenghari Jalan Sebakit Bawah Dalam, Mukim Tanjong 10 Pembersihan Rangkaian Kawad Atas Keseluruhan Jalan Sebakit Bawah Dalam dan kawasan sekitarnya. 27hb Nov 2018 1:30 petang hingga 4.30 petang Maya Tutong

Selasa 8.00 pagi hingga 12.00 tenghari Jalan Utama Kampong Tanjong Maya hingga Penapar dan 11 Kampong Tanjong Maya, Mukim Tanjong Maya Pembersihan Rangkaian Kawad Atas 27hb Nov 2018 1:30 petang hingga 4.30 petang kawasan sekitarnya.

Selasa (ABDB) Markas, Surau, Rumah Masak, Quarter Master Penanjong 12 8.00 pagi hingga 4.30 petang Penanjong Kem, Mukim Pekan Tutong Pemeliharan "Distribution Transformer." 27hb Nov 2018 Kem dan kawasan sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Penapar, Mukim Tanjong Maya Station kecil Elektrik Klinik Lama hingga Station Kecil Masjid 13 Pembersihan Rangkaian Kawad Atas 28hb Nov 2018 1:30 petang hingga 4.30 petang Tutong. Penapar dan kawasan sekitarnya.

Rabu 14 8.00 pagi hingga 4.30 petang Tutong Kem, Mukim Pekan Tutong. Pemeliharan "Distribution Transformer." "Station Transformer No #1" Station Utama Elektrik Tutong Kem. 28hb Nov 2018

Page 4 Khamis 8.00 pagi hingga 12.00 tenghari Spg 507 Kampong Penapar, Mukim Tanjong 15 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Penapar dan kawasan sekitarnya. 29hb Nov 2018 1:30 petang hingga 4.30 petang Maya Tutong.

Khamis Station Kecil Elektrik Asalati Telisai , Mukim 16 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." Sebahagian Jalan Keramut Telisai dan kawasan sekitarnya. 29hb Nov 2018 Telisai Tutong.

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Bukit Udal, Mukim Tanjong Maya 17 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Bukit Udal Tutong dan kawasan sekitarnya. 1hb Dis 2018 1:30 petang hingga 4.30 petang Tutong

Sabtu 8.00 pagi hingga 12.00 tenghari Sebahagian Kampong Long Mayan Tutong dan kawasan 18 Kampong Long Mayan, Mukim Ukong Tutong Pembersihan Rangkaian Kawad Atas 1hb Dis 2018 1:30 petang hingga 4.30 petang sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Jalan Sekolah Rendah Penapar, Mukim Tanjong Sebahagian Kampong Penapar, Jalan Sekolah Rendah Penapar 19 Pembersihan Rangkaian Kawad Atas 3hb Dis 2018 1:30 petang hingga 4.30 petang Maya Tutong. dan kawasan sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari Sebahagian Kampong Birau, Pejabat Pertanian Birau dan 20 Pertanian Birau, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas 3hb Dis 2018 1:30 petang hingga 4.30 petang kawasan sekitarnya.

Isnin Perumahan Baitul Mal Keriam, Mukim Keriam Keseluruhan Perumahan Baitul Mal, sebahagian Kampong Keriam 21 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." 3hb Dis 2018 Tutong. dan kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Kampong Serambangun, Mukim Tanjong Maya Keseluruhan Spg 333-37-39-16 Kampong Serambangundan 22 Pembersihan Rangkaian Kawad Atas 4hb Dis 2018 1:30 petang hingga 4.30 petang Tutong. kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Sebahagian Kampong Birau, Pejabat Pertanian Birau dan 23 Pertanian Birau, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas 4hb Dis 2018 1:30 petang hingga 4.30 petang kawasan sekitarnya.

Selasa Keseluruhan Jalan Pantai Penanjong, Masjid Kg. Penanjong dan 24 8.00 pagi hingga 4.30 petang Kampong Penanjong, Mukim Pekan Tutong. Pemeliharan "Distribution Transformer." 4hb Dis 2018 sebahagian Jalan Kecil Padang Baru, Penanjong.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Lubok Pulau, Kampong Meranti, Sebahagian Kampong Lubok Pulau, Kampong Bukit Sibut , 25 Pembersihan Rangkaian Kawad Atas 5hb Dis 2018 1:30 petang hingga 4.30 petang Mukim Tanjong Maya Tutong. Kampong Meranti dan kawasan sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Luagan Timbaran, Mukim Kiudang 26 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Luagan Timbaran dan kawasan sekitarnya. 5hb Dis 2018 1:30 petang hingga 4.30 petang Tutong

Rabu 8.00 pagi hingga 12.00 tenghari Keseluruhan Simpang 1030 Kampong Keriam dan kawasan 27 Kampong Keriam, Mukim Keriam Tutong Pemeliharan Rangkaian Kawad Atas 5hb Dis 2018 1:30 petang hingga 4.30 petang sekitarnya.

Rabu Sekolah Rendah Birau, Masjid Kampong Biraudan kawasan 28 8.00 pagi hingga 4.30 petang Kampong Birau, Mukim Kiudang Tutong. Pemeliharan "Distribution Transformer." 5hb Dis 2018 sekitarnya.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Tanjong Maya, Mukim Tanjong Maya 29 Pembersihan Rangkaian Kawad Atas Keseluruhan Jalan Kecil Sepakon dan kawasan sekitarnya. 6hb Dis 2018 1:30 petang hingga 4.30 petang Tutpng.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Luagan Timbaran, Mukim Kiudang 30 Pembersihan Rangkaian Kawad Atas Kampong Luagan Timbaran dan kawasan sekitarnya. 6hb Dis 2018 1:30 petang hingga 4.30 petang Tutong.

Page 5 Khamis Kampong Lubok Pulau, Mukim Tanjong Maya Sebahagian Kampong Lubok Pulau, Masjid Lubok Pulau dan 31 8.00 pagi hingga 4.30 petang Pemeliharan "Distribution Transformer." 6hb Dis 2018 Tutong. kawasan sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Tanjong maya, Mukim Tanjong Maya 32 Pembersihan Rangkaian Kawad Atas Sebahagian Jalan Kecil Bukit Nibong dan kawasan sekitarnya. 8hb Dis 2018 1:30 petang hingga 4.30 petang Tutong.

Sabtu 8.00 pagi hingga 12.00 tenghari Kampong Kuala Ungar and Rambai, Mukim Sebahagian Kampong Kuala Ungar Rambai dan kawasan 33 Pembersihan Rangkaian Kawad Atas 8hb Dis 2018 1:30 petang hingga 4.30 petang Rambai Tutong. sekitarnya.

Isnin 8.00 pagi hingga 12.00 tenghari 34 Kampong Pad Nunok, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Pad Nunok dan kawasan sekitarnya. 10hb Dis 2018 1:30 petang hingga 4.30 petang

Isnin Sebahagian Kampong Telisai, Kampong Sungai Jambu dan 35 8.00 pagi hingga 4.30 petang Kampong Sungai Jambu, Mukim Telisai Tutong. Pemeliharan "Distribution Transformer." 10hb Dis 2018 kawasan sekitarnya.

Selasa 8.00 pagi hingga 12.00 tenghari Sebahagian kampong Kiudang, Kampong Mungkom dan kawasan 36 Kampong Mungkom, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas 11hb Dis 2018 1:30 petang hingga 4.30 petang sekitarnya.

Keseluruhan Balai Polis Lamunin, sebahagian Kg. Lamunin, Kg. Selasa 37 8.00 pagi hingga 4.30 petang Kampong Lamunin, Mukim Lamunin Tutong. Pemeliharan "Distribution Transformer." Bang Nukat, Kg. Pengkalan Tangsi, Kg. Biong dan kawasan 11hb Dis 2018 sekitarnya.

Rabu 8.00 pagi hingga 12.00 tenghari 38 Kampong Pad Nunok, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Pad Nunok dan kawasan sekitarnya. 12hb Dis 2018 1:30 petang hingga 4.30 petang

Rabu 8.00 pagi hingga 12.00 tenghari Kampong Bukit Udal, Mukim Tanjong Maya 39 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Bukit Udal dan kawasan sekitarnya. 12hb Dis 2018 1:30 petang hingga 4.30 petang Tutong

Rabu Sebahagian Kampong Birau, Sekolah Menengah RIPAS, Tutong 40 8.00 pagi hingga 4.30 petang Kampong Birau, Mukim Kiudang Tutong. Pemeliharan "Distribution Transformer." 12hb Dis 2018 dan kawasan sekitarnya.

Khamis 8.00 pagi hingga 12.00 tenghari Kampong Bukit Udal, Mukim Tanjong Maya 41 Pembersihan Rangkaian Kawad Atas Sebahagian Kampong Bukit Udal dan kawasan sekitarnya. 13hb Dis 2018 1:30 petang hingga 4.30 petang Tutong

Khamis 8.00 pagi hingga 12.00 tenghari Sebahagian kampong Kiudang, Kampong Mungkom dan kawasan 42 Kampong Mungkom, Mukim Kiudang Tutong. Pembersihan Rangkaian Kawad Atas 13hb Dis 2018 1:30 petang hingga 4.30 petang sekitarnya.

Khamis Sebahagian Kampong Kupang, Sekolah Rendah Kupang, Jalan 43 8.00 pagi hingga 4.30 petang Kampong Kupang, Mukim Keriam Tutong. Pemeliharan "Distribution Transformer." 13hb Dis 2018 Kerakas Payau dan kawasan sekitarnya.

Sabtu 8.00 pagi hingga 12.00 tenghari Sebahagian Kampong Panchong, Jalan Sulap Samat dan kawasan 44 Kampong Panchong, Mukim Lamunin Tutong. Pembersihan Rangkaian Kawad Atas 15hb Dis 2018 1:30 petang hingga 4.30 petang sekitarnya.

Page 6