Copy of PMW Tutong District (Press Release) 1Wk July18

Total Page:16

File Type:pdf, Size:1020Kb

Copy of PMW Tutong District (Press Release) 1Wk July18 English Section Listed below are the designated areas for the planned maintenance work as for July, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 11.30 am Tuesday Kampong Sulap Samat, Mukim Lamunin, 1 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 03rd July 2018 Tutong 08.30 am to 11.30 am Wednesday Kampong Sulap Samat, Mukim Lamunin, 2 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 04th July 2018 Tutong 08.30 am to 11.30 am Thursday Kampong Sulap Samat, Mukim Lamunin, 3 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 05th July 2018 Tutong 08.30 am to 11.30 am Friday Kampong Sulap Samat, Mukim Lamunin, 4 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 06th July 2018 Tutong Satuday 08.30 am to 11.30 am kampong Rambai and Kampong Kuala Maintenance works for Low voltage overhead A part of Kampong Rambai and 5 07th July 2018 Ungar, Mukim Rambai, Tutong lines Kampong Kuala Ungar, Tutong. 08.30 am to 11.30 am Satuday Kampong Sulap Samat, Mukim Lamunin, 6 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 07th July 2018 Tutong Monday 08.30 am to 11.30 am Kampong Padnunok, Mukim Kiudang, Maintenance works for Low voltage overhead 7 A part of Kampong Padnunok, Tutong. 09th July 2018 Tutong lines 08.30 am to 11.30 am Monday Kampong Sulap Samat, Mukim Lamunin, 8 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 09th July 2018 Tutong Tuesday 08.30 am to 02.00 pm Kampong Lamunin,Mukim Lamunin, Maintenance works for Low voltage overhead 9 A part of Kampong Lamunin, Tutong. 10th July 2018 Tutong lines 08.30 am to 11.30 am Tuesday Kampong Sulap Samat, Mukim Lamunin, 10 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 10th July 2018 Tutong Wednesday 08.30 am to 11.30 am Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 11 A part of Kampong Lamunin, Tutong. 11th July 2018 Tutong lines 08.30 am to 11.30 am Wednesday Kampong Sulap Samat, Mukim Lamunin, 12 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 11th July 2018 Tutong Page 1 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Julai , 2018: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik 08.30 pagi hingga 11.30 pagi Selesa Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 1 1.30 petang hingga 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 03hb. Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 11.30 pagi Rabu Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 2 1.30 petang hingga 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 04hb. Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 11.30 pagi Khamis Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 3 1.30 pm to 4.30 pm Kampong Sulap Samat, Mukim Lamunin, Tutong 05hb Julai 2018 Tutong 11,000 volt. 08.30 pagi to 11.30 pagi Jumaat Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 4 2.00 petang to 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 06hb Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 11.30 pagi Sebahagian Kampong Rambai dan kampong Kuala Ungar, Sabtu Kampong Rambai dan Kampong Kuala Pemeliharan rangkaian kawat atas voltan 5 Tutong 07hb. Julai 2018 Ungar, Mukim Rambai, Tutong rendah. 08.30 pagi to 11.30 pagi Sabtu Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 6 2.00 petang to 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 07hb Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 11.30 pagi Isnin Kampong Padnunok, Mukim Kiudang, Sebahagian Padnunok, Tutong 7 Pemeliharan rangkaian kawat atas voltan rendah. 09hb. Julai 2018 Tutong 08.30 pagi to 11.30 pagi Isnin Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 8 2.00 petang to 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 09hb Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 02.00 petang. Selasa Kampong Lamunin, Mukim Lamunin, Sebahagian Kampong Lamunin, Tutong 9 Pemeliharan rangkaian kawat atas voltan rendah. 10hb. Julai 2018 Tutong 08.30 pagi to 11.30 pagi Selesa Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 10 2.00 petang to 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 10hb Julai 2018 Tutong 11,000 volt. 08.30 pagi hingga 11.30 pagi Rabu Kampong Rambai dan Kampong Kuala Sebahagian Kampong Lamunin, Tutong 11 Pemeliharan rangkaian kawat atas voltan rendah. 11hb. Julai 2018 Ungar, Tutong 08.30 pagi to 11.30 pagi Rabu Kampong Sulap Samat, Mukim Lamunin, Penambahan rangkaian kawat atas voltan tinggi 12 2.00 petang to 4.30 petang Kampong Sulap Samat, Mukim Lamunin, Tutong 11hb Julai 2018 Tutong 11,000 volt. Page 2.
Recommended publications
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam
    IJASOS- International E-Journal of Advances in Social Sciences, Vol. I, Issue 1, 2015 THE VITALITY AND REVITALISATION OF MINORITY LANGUAGES: THE CASE OF DUSUN IN BRUNEI DARUSSALAM Hjh. Dyg. Fatimah binti Hj Awg. Chuchu1*, Najib Noorashid2 1Dr., Universiti Brunei Darussalam, Brunei Darussalam, [email protected] 2 Mr., Radio Televisyen Brunei, Brunei Darussalam, [email protected] *Corresponding author Abstract Language extinction or language death is a sociolinguistic phenomenon that is often discussed among linguists or speakers in general (Crystal, 2000; Aitchison, 2001; Dalby, 2003; Fishman, 2002; 2007; Mufwene, 2004; Nelson, 2007). Due to rapid globalisation, the effect of ‘superstratum and substratum’ languages is inevitable (Crystal, 2003), particularly with regard to the languages of ethnic minorities; those in Brunei Darussalam are no exception (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are susceptible to becoming endangered due to urbanisation, the educational system, migration and other factors; all of these factors lead to language shift and, consequently, to extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah Chuchu & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous ethnic groups in Brunei under the Citizenship Status Laws 1961 of the Constitution of Negari Brunei 1959, the Dusun ethnic group are alleged to have and practise their own code of dialect. In Brunei Darussalam, all dialects and languages spoken by indigenous ethnic groups are regarded as minority languages, except for Brunei Malay.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 1 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 19th Nov 2018 Wednesday 2 8.00 am to 4.30 pm Earth Satelite Telisai, Mukim Telisai Tutong Maintenance works for Distribution Transformer. Earth SateliteTelisai Building and surrounding area. 21st Nov 2018 Thursday 3 8.00 am to 4.30 pm Penanjong Kem, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Station Transformer Main Intake Lorong 105 Penanjong Kem 22nd Nov 2018 Saturday 8.00 am to 12.00 noon Kampong Kuala Ungar and Rambai, Mukim 4 Wayleave Clearing A part of Kampong Kuala Ungar Rambai and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Rambai Tutong. Saturday 8.00 am to 12.00 noon Spg 509 Jln Kecil Nong Janang, Kampong Bukit 5 Wayleave Clearing Whole Spg 509 Jln Kecil Nong Janang and surrounding area. 24th Nov 2018 1.30 pm to 4.30 pm Udal, Mukim Tanjong Maya, Tutong. Monday 8.00 am to 12.00 noon Jln Kecil Bukit Kukob, Kampong Bukit Udal, 6 Wayleave Clearing A whole area Jln Kecil Bukit Kukob and surrounding areas. 26th Nov 2018 1.30 pm to 4.30 pm Mukim Tanjong Maya Tutong. Monday 8.00 am to 12.00 noon Jln Kampong Sebakit Atas Bangunggus, Mukim A whole of Kampong Sebakit Atas Bangunggus, Spg 49 Kampong 7 Wayleave Clearing 26th Nov 2018 1.30 pm to 4.30 pm Tanjong Maya Tutong Sebakit Atas and surrounding area.
    [Show full text]
  • SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017
    SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 07.02.2017 DAERAH RESTORAN / KEDAI MAKAN Belait 1 ADIANN RESTORAN & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/12/2017 Gerai No. 05, Jalan Bunga Simpur, Kuala Belait, Negara Brunei Darussalam. 2 ALBAASITHU RASA RESTAURANT & CATERING Tarikh Mansuh Catatan SERVICES 13/2/2018 Cawangan : - Lot 7563, Unit 12B, Block B, Jalan Pandan Enam, Kuala Belait, Negara Brunei Darussalam. 3 ALL SEASONS RESTAURANT Tarikh Mansuh Catatan Cawangan : - 18/12/2018 Unit No. F5 & F6, Sentral Shopping Centre, Jalan Seri Maharaja, Kampung Mumong 'A' KA1531, Negara Brunei Darussalam 4 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 4, Belait 17/12/2017 Unit No. 14, Bangunan Haji Hassan bin Haji Abd Ghani & Anak-Anak, Pandan 4, Kuala Belait, Negara Brunei Darussalam. 5 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 7, Belait 17/12/2017 (P/P) A4. Lot. 7268, Jalan Pandan 7, Kuala Belait, Negara Brunei Darussalam. 6 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Mukim Liang, Belait 17/12/2017 Lot. 2061, B-3, Ground Floor, Kampong Gana, Mukim Liang, Daerah Belait, Negara Brunei Darussalam. 7 AMEY & MIMI'S RESTAURANT & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/9/2017 Lot 4005,Jalan Setia Negara, Negara Brunei Darussalam 8 AMIRA SDN BHD Tarikh Mansuh Catatan Cawangan : - 19/8/2018 Lot 4838, No 188 D, No 4, Kampong Sungai Bakong, Lumut, Negara Brunei Darussalam Hak Cipta Terpelihara Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam Page 1 of 175 DAERAH RESTORAN / KEDAI MAKAN 9 ANISA RESTAURANT& CATERING Tarikh Mansuh Catatan Cawangan : - 9/4/2017 Lot 4486 , No.2 Simpang 131, Jalan Pantai, Sungai Liang, Kuala Belait, Negara Brunei Darussalam 10 ANJUNG WARISAN RESTAURANT & CAFÉ Tarikh Mansuh Catatan Cawangan : - 14/11/2017 Lot 7065, Block B, Unit No.
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Memo004rev1
    English Section Listed below are the designated areas for the planned maintenance work as for March and April , 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 1 8.30 am to 12.00 noon Kampong Padnunok, Tutong Wayleave clearing for overhead lines Spg 1183 kampong Padnunok, Tutong and surrounding areas 25th March 2019 Tuesday Spg 1266 to Spg 1324, kampong Padnunok, Tutong and 2 8.30 am to 12.00 noon Kampong Padnunok, Tutong Wayleave clearing for overhead lines 26th March 2019 surrounding areas Wednesday Spg 1340 to Spg 1394 kampong Padnunok, Tutong and 3 8.30 am to 12.00 noon Kampong Padnunok, Tutong Wayleave clearing for overhead lines 27th March 2019 surrounding areas Thursday Spg 181, Peladang Muda Birau, kampong Birau, Tutong and 4 8.30 am to 12.00 noon Kampong Birau, Tutong Wayleave clearing for overhead lines 28th March 2019 surrounding areas Monday 8.00 am to 12.00 noon Kampong Birau, 5 Wayleave Clearing of Overhead line A part of Kampong Birau and its surrounding areas. 1st April 2019 Tutong Monday 9.00 am to 12.00 noon Kampong Batang Mitus, Maintenance works for High voltage overhead Bangunan Ideal Hatchery (B) Sdn Bhd, 6 1st April 2019 Tutong lines. Jln Ternakan Kerbau, Kampong Batang Mitus. Tuesday Kampong Bukit Sulang, A part of Kampong Menengah dan a part of kampong Bukit 7 9.00 am to 5.00 pm Replacement Distribution Feeder Pillar 2nd April 2019 Tutong Sulang and its surrounding areas. Thursday 8.30 am to 11.30 noon Kampong Keranching and A part of Kampong Keranching, Kampong Benutan and its 8 Wayleave Clearing of Overhead line 4th April 2019 1.30pm to 4.30 pm Kampong Benutan, Tutong surrounding areas.
    [Show full text]
  • Laporan Akhir Kemaskini Banci Penduduk Dan Perumahan 2016
    L A P O R A N A K H I R K P E O M LAPORAN AKHIR KEMASKINI BANCI P A U S L PENDUDUK DAN PERUMAHAN K A T I I N O Population and Housing Census Update Final Report I N B A A N N D C H I O P 2016 U E S N I N D G U C D E U N S K U D S A U N P D P A T E E R U F I N M A A L H R A E P N O R ( K T B ( K P B P P ) P 2 ) JABATAN PERANGKAAN DEPARTMENT OF STATISTICS 0 2 JABATAN PERANCANGAN DAN KEMAJUAN EKONOMI (JPKE) DEPARTMENT OF ECONOMIC PLANNING AND DEVELOPMENT (DEPD) 0 1 KEMENTERIAN KEWANGAN DAN EKONOMI MINISTRY OF FINANCE AND ECONOMY 1 6 NEGARA BRUNEI DARUSSALAM BRUNEI DARUSSALAM 6 Kata Pengantar Kerajaan Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan dan Yang Di-Pertuan Negara Brunei Darussalam melalui Jabatan Perancangan dan Kemajuan Ekonomi (JPKE) telah mengendalikan Kemaskini Banci Penduduk dan Perumahan (KBPP) 2016 bermula dari bulan Mei hingga September 2016. Laporan Kemaskini Banci Penduduk dan Perumahan (KBPP) 2016 ini memaparkan data akhir mengenai bilangan dan ciri-ciri utama demografi penduduk, isirumah dan unit perumahan di Negara Brunei Darussalam pada tahun 2016. Oleh itu data ini menggantikan data dalam Laporan Awal KBPP 2016 yang telah dikeluarkan pada Oktober 2017. Saya berharap penerbitan ini akan dapat memenuhi keperluan pelbagai pengguna di negara ini bagi maksud perancangan, penyelidikan, penyediaan dasar dan sebagai bahan rujukan awam.
    [Show full text]
  • SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
    SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY I B01 [email protected] 05 Apr 2018 4 Apr 2021 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0158/2018 2 A.G.DEKEN CONSTRUCTION I KA01, B01, E01 [email protected] 05 Mar 2018 4 Mar 2021 Tel No: Fax: 8366444, No 58 Simpang 791-103-4 No 6 Simpang 717 2650309 Skim Tanah Kurnia Rakyat Jati Kampong Tasek Meradun Km 8 1/2 Sungai Buloh Jalan Tutong BF 1520 Jalan Muara BU 1229 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0243/2018 3 A.J. CONSTRUCTION AND TRADING COMPANY I KA01, B01 [email protected] 26 Jun 2018 25 Jun 2021 Tel No: Fax: 8767838, No 30 Simpang 766 No 30 Simpang 766 8281194 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0347/2018 4 A.LEEZIQ CONTRACTOR I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 10 Oct 2020 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Ogos Dan 15 September18rev1
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday Kampong Kupang, Mukim Keriam, Erection of 8.5m poles and stringing of existing 1 8.30 am to 11.30 am Jalan Ikas Bandung kg. Kupang and surrounding areas. 30th August 2018 Tutong. LV Aerial Bundle Cable Saturday Kampong Kupang, Mukim Keriam, Straightening of existing 8.5m poles and 2 8.30 am to 4.30 pm Spg 436 Kampong Kupang and surrounding areas 01st Sept 2018 Tutong. retentioning of LV Aerial Bundle Cable Monday Kampong Keriam, Mukim Keriam , Erection of 8.5m poles and stringing of existing 3 8.30 am to 11.30 am Spg 442 Kampong Keriam and surrounding areas. 03rd Sept 2018 Tutong LV Aerial Bundle Cable Saturday Kampong Birau, Mukim Kiudang, 4 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Birau and surrounding areas. 08th Sep 2018 Tutong. Saturday Kampong Pengkalan Pinang, Penanjong, Maintenance works for Low voltage overhead Spg 42-21 Jln Pangkalan Pinang, Kampong Penanjong and 5 8.30 am to 12.00 noon 08th Sept 2018 Mukim Pekan Tutong lines. surrounding areas. Saturday Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 6 2.00 pm to 4.30 pm Spg 550 Kampong Kupang and surrounding areas. 08th Sep 2018 Tutong. lines. Monday Kampong Lubuk Pulau, MukimTanjong 7 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Lubuk Pulau and surrounding areas.
    [Show full text]