Copy of Copy of PMW Tutong District (Press Release) Ogos and September18

Total Page:16

File Type:pdf, Size:1020Kb

Copy of Copy of PMW Tutong District (Press Release) Ogos and September18 English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 8 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 14th August 2018 lines Wednesday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 9 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 15th August 2018 lines Thursday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 10 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 16th August 2018 lines 08.30 am to 03.00 pm Monday Kampong Pengkalan Tangsi, Mukim 11 Maintenance works for Distribution Transformer. A part of Kampong Pengkalan Tangsi and surrounding areas. 20th August 2018 Lamunin, Tutong. Tuesday Kampong Sungai Paku Telisai, Mukim Golden Chick Hatshery & Breeding Farm Sdn Bhd, Spg 1795 Kg. 12 8.30 am to 03.00 pm Maintenance works for Distribution Transformer. 21st August 2018 Telisai, Tutong Sungai Paku and surrounding areas. Thursday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead A part of Kampong Lamunin , Sekolah Rendah Lamunin and 13 8.30 am to 04.00 pm 23rd August 2018 Tutong. lines. surrounding areas. Tuesday 08.30 am to 11.30 am Erection of 8.5m poles and stringing of existing 14 Kampong Keriam, Mukim Keriam , Tutong Spg 655 Kampong Keriam and surrounding areas. 28th August 2018 bare conductor LV Cable Wednesday Erection of 8.5m poles and stringing of existing Spg 1020 Kampong Sinaut Kelugos, Keriam and surrounding 15 8.30 am to 11.30 am Kampong Sinaut, Mukim Keriam, Tutong. 29th August 2018 bare conductor LV Cable areas. Page 1 Thursday Kampong Kupang, Mukim Keriam, Erection of 8.5m poles and stringing of existing 16 8.30 am to 11.30 am Jalan Ikas Bandung kg. Kupang and surrounding areas. 30th August 2018 Tutong. LV Aerial Bundle Cable Saturday Kampong Kupang, Mukim Keriam, Straightening of existing 8.5m poles and 17 8.30 am to 4.30 pm Spg 436 Kampong Kupang and surrounding areas 01st Sept 2018 Tutong. retentioning of LV Aerial Bundle Cable Monday Erection of 8.5m poles and stringing of existing 18 8.30 am to 11.30 am Kampong Keriam, Mukim Keriam , Tutong Lot 4256 Spg 442 Kampong Keriam and surrounding areas. 03rd Sept 2018 LV Aerial Bundle Cable Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Ogos dan September , 2018: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik Khamis 08.30 pagi hingga 02.30 petang Kampong Kiudang, Mukim Kiudang, Spg 860 Kg Kiudang, Mukim Kiudang 1 Pemeliharan rangkaian kawat atas voltan rendah. 02hb Ogos 2018 Tutong dan sekitarnya Sabtu 08.30 pagi hingga 12.30 tenghari Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong dan 2 Kampong Sg Kelugos, Keriam, Tutong Pemeliharan rangkaian kawat atas voltan rendah. 04hb Ogos 2018 sekitarnya Isnin 3 08.30 pagi hingga 4.00 petang Kampong Birau, Mukim Kiudang, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Jln Kecil Kg Birau , Mukim Kiudang dan sekitarnya 06hb Ogos 2018 Selesa 08.30 pagi hingga 4.00 petang Kampong Kupang, Mukim Keriam, 4 Pemeliharan rangkaian kawat atas voltan rendah. Spg 554 Kg Kupang, Mukim Keriam dan sekitarnya 07hb Ogos 2018 Tutong. Rabu Kampong Lamunin, Mukim Lamunin, 5 08.30 pagi hingga 12.00 tenghari Pemeliharan rangkaian kawat atas voltan rendah. Sebahagian kampong Lamunin, Tutong. 08hb Ogos 2018 Tutong Khamis 08.30 pagi hingga 4.00 petang 6 Kampong Telamba, Mukim Telisai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Sebahagian Kampong Telamba, Mukim Telisai,Tutong. 09hb Ogos 2018 Isnin 08.30 pagi hingga 4.30 petang 7 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 13hb Ogos 2018 Selesa 08.30 pagi hingga 4.30 petang 8 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 14hb Ogos 2018 Rabu 08.30 pagi hingga 4.30 petang 9 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 15hb Ogos2018 Khamis 08.30 pagi hingga 4.30 petang 10 Kampong Rambai, Mukim Rambai, Tutong Pemeliharan rangkaian kawat atas voltan rendah. Spg 1038, Kampong Rambai dan sekitarnya 16hb Ogos 2018 Isnin Kampong Pengkalan Tangsi, Mukim 11 8.30 pagi hingga 03.00 petang Penyelenggaraan "Distribution Transformer" Sebahagian Kampong Pengkalan Tangsi dan sekitarnya. 20hb Ogos 2018 Lamunin, Tutong. Selasa Kampong Sungai Paku Telisai, Mukim Golden Chick Hatshery & Breeding Farm Sdn Bhd, Spg 1795 Kg. 12 8.30 pagi hingga 03.00 petang Penyelenggaraan "Distribution Transformer" 21hb Ogos 2018 Telisai, Tutong Sungai Paku dan sekitarnya. Khamis Kampong Lamunin, Mukim Lamunin, penyelenggaraan rangkaian kawat atas voltan Sebahagian Kampong Lamunin , Sekolah Rendah Lamunin dan 13 8.30 pagi hingga 04.00 petang 23hb Ogos 2018 Tutong. rendah sekitarnya. Selasa penyelenggaraan rangkaian kawat atas voltan 14 8.30 pagi hingga 11.30 pagi Kampong Keriam, Mukim Keriam , Tutong Spg 655 Kampong Keriam sekitarnya. 28hb Ogos 2018 rendah Rabu penyelenggaraan rangkaian kawat atas voltan 15 8.30 pagi hingga 11.30 pagi Kampong Sinaut, Mukim Keriam, Tutong. Spg 1020 Kampong Sinaut Kelugos, Keriam dan sekitarnya. 29hb Ogos 2018 rendah Page 3 Khamis Kampong Kupang, Mukim Keriam, penyelenggaraan rangkaian kawat atas voltan 16 8.30 pagi hingga 11.30 pagi Jalan Ikas Bandung kg. Kupang sekitarnya. 30hb Ogos 2018 Tutong. rendah Sabtu Kampong Kupang, Mukim Keriam, penyelenggaraan rangkaian kawat atas voltan 17 8.30 pagi hingga 04.30 petang Spg 436 Kampong Kupang dan sekitarnya. 01hb Sept 2018 Tutong. rendah Isnin penyelenggaraan rangkaian kawat atas voltan 18 8.30 pagi hingga 11.30 pagi Kampong Keriam, Mukim Keriam , Tutong Lot 4256 Spg 442 Kampong Keriam sekitarnya. 03hb Sept 2018 rendah Page 4.
Recommended publications
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for February, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.00 am to 4.00 pm Monday Substation Ikas Bandung, Kupang, Extension of 11kV network to New Industrial 1 (For info: Department of Electrical Service will supply Kampong Ikas Bandung and surrounding areas. 12th February 2018 temporary electricity to the affected areas through mobile Tutong. areas Kg Lugu. generator service at the substation) Thursday 08.30 am to 04.00 pm Kampong Pengkalan Pinang, Jln Spg 193 dan Spg 205 Kampong Pengkalan Pinang 2 Replacement of Distribution Feeder pillar. 15th February 2018 Penanjong. Tutong and surrounding areas. Thursday Wayleave clearing works for Low voltage Spg 1304, Spg 1274 Kampong Sungai Kelugos and surrounding 3 08.30 am to 09.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1048, Spg 1030 Kampong Sungai Kelugos and surrounding 4 09.30 am to 11.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1179, Spg 1148, Spg 1080 Kampong Sungai Kelugos and 5 01.30 pm to 04.30 pm Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines surrounding areas. Monday 08.30 am to 04.00 pm Substation Sungai Damuan, Kupang, 6 Replacement of Distribution Feeder pillar. Part of Kampong Kupang, Tutong 19th February 2018 Tutong Monday 08.30 am to 11.30 am Wayleave clearing works for Low voltage Spg 935, Spg 873, Spg 861 Kampong Sungai Kelugos and 7 Kampong Sungai Kelugos, Tutong 19th February 2018 overhead lines surrounding areas.
    [Show full text]
  • Preliminary Report of BPP 2011
    ! ! ! Kerajaan!Kebawah!Duli!Yang!Maha!Mulia!Paduka!Seri!Baginda!Sultan!dan!Yang!Di8Pertuan! Negara! Brunei! Darussalam! melalui! Jabatan! Perancangan! dan! Kemajuan! Ekonomi! (JPKE),! Jabatan!Perdana!Menteri,!telah!mengendalikan!Banci!Penduduk!dan!Perumahan!(BPP)!pada! tahun! 2011.! BPP! 2011! merupakan! banci! kelima! seumpamanya! dikendalikan! di! negara! ini.! Banci!terdahulu!telah!dijalankan!pada!tahun!1971,!1981,!1991!dan!2001.! ! Laporan! Awal! Banci! Penduduk! dan! Perumahan! 2011! ini! merupakan! penerbitan! pertama! dalam! siri! laporan8laporan! banci! yang! akan! dikeluarkan! secara! berperingkat8peringkat.! Laporan! ini! memberikan! data! awal! mengenai! jumlah! penduduk,! isi! rumah! dan! tempat! kediaman!serta!taburan!dan!pertumbuhan!mengikut!daerah.!! ! Saya! berharap! penerbitan! ini! dan! laporan8laporan! seterusnya! akan! dapat! memenuhi! keperluan! pelbagai! pengguna! di! negara! ini! bagi! maksud! perancangan,! penyelidikan,! penyediaan!dasar!dan!sebagai!bahan!rujukan!awam.! ! Saya! sukacita! merakamkan! setinggi8tinggi! penghargaan! dan! terima! kasih! kepada! Penerusi! dan! ahli8ahli! Komiti! Penyelarasan! Kebangsaan! BPP! 2011,! kementerian8kementerian,! jabatan8jabatan! dan! sektor! swasta! yang! telah! memberikan! bantuan! dan! kerjasama! yang! diperlukan! kepada! Jabatan! ini! semasa! banci! dijalankan.! Seterusnya! saya! juga! sukacita! mengucapkan! terima! kasih! kepada! rakyat! dan! penduduk! di! negara! ini! di! atas! kerjasama! dalam! memberikan! maklumat! yang! dikehendaki! kepada! pegawai8pegawai! banci!
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • Perlaksanaan Pengurusan Jenazah Di
    مﺳﺑ ﷲ نﻣﺣرﻟا مﯾﺣرﻟا PELAKSANAAN PENYEMPURNAAN JENAZAH DI MASJID-MASJID Rabu, 02 Muharram 1443H bersamaan 11 Ogos 2021M- Merujuk Sidang Media Kementerian Kesihatan pada hari Isnin, 29 Zulhijjah 1442 bersamaan dengan 09 Ogos 2021, bahawa sebagai langkah berjaga-jaga dan seterusnya bagi membantu pihak kerajaan untuk mengawal penularan wabak Covid-19 di Negara Brunei Darussalam. Sehubungan dengan itu Kementerian Hal Ehwal Ugama melalui Jabatan Hal Ehwal Masjid memaklumkan bagi mana-mana pihak yang berhajat untuk menyempurnakan jenazah biasa(bukan dari pesakit COVID-19) bolehlah dibuat di masjid-masjid terpilih seluruh negara seperti berikut; Daerah Brunei dan Muara: BIL NAMA MASJID 1 Jame’ ‘ Asr Hassanil Bolkiah, Kampong Kiarong 2 Masjid Hassanal Bolkiah, Kampong Mentiri 3 Masjid Al-Ameerah Al-Hajjah Maryam, Kampong Jerudong 4 Masjid RPN Kampong Lambak Kanan 5 Masjid Kampong Pulaie 6 Masjid STKRJ Kampong Lambak Kiri 7 Masjid Setia Ali Pekan Muara 8 Masjid Sultan Sharif Ali, Sengkurong 9 Masjid Pehin Khatib Abdullah, Kampong Kulapis 10 Masjid Duli Raja Isteri Pengiran Anak Damit, Kampong Bebatik Kilanas 11 Masjid Pengiran Muda Abdul Malik, Kampong Tungku Katok 12 Masjid Al-Muhtadee Billah, Kampong Sungai Kebun 13 Masjid Yayasan Sultan Haji Hassanal Bolkiah, Kampong Bolkiah A 14 Masjid Kampong Pintu Malim 15 Masjid Perdana Wangsa Haji Mohammad, Kampong Setia A 16 Masjid Raja Isteri Pengiran Anak Hajah Saleha, Kampong Rimba 17 Masjid Pengiran Muda Abdul Mateen, Kampong Mulaut 18 Balai Ibadat Kampong Mata-Mata Daerah Tutong: BIL NAMA MASJID 1 Masjid Hassanal Bolkiah, Pekan Tutong 2 Masjid Pengiran Muda Abdul Wakeel, Mukim Kiudang 3 Masjid Ar-Rahim, Kampong Bukit Penggal 4 Masjid RPN Kampong Bukit Beruang 5 Masjid Kampong Sinaut 6 Balai Ibadat Hajah Aminah, Kampong Long Mayan M.S: 1 - 2 _ BAHAGIAN PERHUBUNGAN AWAM, KEMENTERIAN HAL EHWAL UGAMA, JALAN DEWAN MAJLIS, BERAKAS, BB3910, NEGARA BRUNEI DARUSSALAM.
    [Show full text]
  • Copy of PMW Tutong District (Press Release) 1Wk July18
    English Section Listed below are the designated areas for the planned maintenance work as for July, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 11.30 am Tuesday Kampong Sulap Samat, Mukim Lamunin, 1 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 03rd July 2018 Tutong 08.30 am to 11.30 am Wednesday Kampong Sulap Samat, Mukim Lamunin, 2 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 04th July 2018 Tutong 08.30 am to 11.30 am Thursday Kampong Sulap Samat, Mukim Lamunin, 3 1.30 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 05th July 2018 Tutong 08.30 am to 11.30 am Friday Kampong Sulap Samat, Mukim Lamunin, 4 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 06th July 2018 Tutong Satuday 08.30 am to 11.30 am kampong Rambai and Kampong Kuala Maintenance works for Low voltage overhead A part of Kampong Rambai and 5 07th July 2018 Ungar, Mukim Rambai, Tutong lines Kampong Kuala Ungar, Tutong. 08.30 am to 11.30 am Satuday Kampong Sulap Samat, Mukim Lamunin, 6 2.00 pm to 4.30 pm Extension of 11kV network Kampong Sulap Samat, Mukim Lamunin, Tutong 07th July 2018 Tutong Monday 08.30 am to 11.30 am Kampong Padnunok, Mukim Kiudang, Maintenance works for Low voltage overhead 7 A part of Kampong Padnunok, Tutong.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • Senarai Ppbt
    SENARAI PUSAT PENYEMBELIHAN BINATANG TEMPATAN YANG AKTIF Jenis Daging Tarikh Tarikh Bil. Nama Syarikat & Alamat Sembelihan Kebenaran Mansuh Daerah Brunei Muara Syarikat Penternak Hj Bakri dan Anak-Anak 1 Ayam 8-Dec-20 7-Dec-21 Lot 107, Ladang komersial Luahan Jerudong, Negara Brunei Darussalam. Syarikat Yana Agriculture Farm 2 Ayam 8-Dec-20 7-Dec-21 Lot 37 & 38, Simpang 525-149, Kg Batumpu Masin, Negara Brunei Darussalam. Syarikat Perusahaan Mazlan bin Hj Maidin 3 Tapak Lot 68, Kawasan Kemajuan Pertanian Batumpu, Kg. Masin, Mukim Puyuh 11-Jan-21 10-Jan-22 Pengkalan Baty, Negara Brunei Darussalam. Syarikat BHB Ayam, Ayam 4 Lot 102, Kawasan Kemajuan Pertanian Luahan, Simpang 544-46, Jalan Pulau Kampong, Itik, 11-Jan-21 10-Jan-22 Kubu, Jerudong, Negara Brunei Darussalam. Patu/Angsa Sykt Golden Chicks Sdn Bhd 5 Plot 43 & 44, Jalan Kulapis, Panchur Murai, Kg. Pengkalan Batu, Negara Brunei Ayam 18-Jan-21 17-Jan-22 Darussalam. Sykt Hj Jamahat Hj Liman Abattoir 6 Simpang 362, Kawasan Kemajuan Pertanian Limpaki, Jalan Mulaut/Limau Ayam 19-May-21 18-May-22 Manis, Negara Brunei Darussalam. Syarikat Norfaidzal & Anak-Anak Kerbau, Lembu, 7 Lot G, Simpang 31, Projek Ladaing Pertanian Lampaki, Negara Brunei 9-Jun-21 8-Jun-22 Darussalam. Kambing Syarikat Siti Nogayah & Anak-Anak 8 No.17, Simpang 432, Kampong Lambak 'B', Jalan Berakas BB1714, Negara Ayam, Puyuh 9-Jun-21 8-Jun-22 Brunei Darussalam. Syarikat Ayamku Slaughterhouse Sdn Bhd 9 Lot 62459, Simpang 362, Kawasan Kemajuan Pertanian, Kg Limpaki, Jalan Ayam 6-Aug-20 5-Aug-21 Mulaut, Negara Brunei Darussalam.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]