Appendix a – Summary of Responses to Stakeholder and Community Input
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Please Sign in So We Can Provide Updates and Information on Future Events
HURONTARIO LIGHT RAIL TRANSIT PROJECT Welcome Please sign in so we can provide updates and information on future events. metrolinx.com/HurontarioLRT [email protected] @HurontarioLRT WHAT IS THE HURONTARIO LRT PROJECT? The Hurontario Light Rail Transit (LRT) Project will bring 20 kilometres of fast, reliable, rapid transit to the cities of Mississauga and Brampton along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right-of-way and serve 22 stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway. Metrolinx is working in coordination with the cities of Mississauga and Brampton and the Region of Peel to advance the Hurontario LRT project. Preparatory construction is underway. The project is expected to be completed at the end of 2022. The Hurontario LRT project is funded through a $1.4 billion commitment from the Province of Ontario as part of the Moving Ontario Forward plan. Allandale LAKE SIMCOE Waterfront OUR RAPID TRANSIT NETWORK Barrie South Innisfil SIMCOE Bradford East Gwillimbury Newmarket NewmarketSouthlakeHuron Heights Leslie TODAY AND TOMORROW GO Bus Terminal Hwy 404 Eagle LEGEND Mulock Main Mulock Savage Longford Aurora Lincolnville Every train, subway and bus helps to keep us moving, connecting us to the people and places Bloomington King City Stouffville GO Rail that matter most. As our region grows, our transit system is growing too. Working with 19th- Gamble Bernard Gormley municipalities across the Greater Toronto and Hamilton Area, and beyond, we’re delivering Kirby Elgin Mills Mount Joy Crosby Centennial new transit projects,making it easier, better, and faster for you to get around. -
(BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion. -
5700 Cancross Court Mississauga, Ontario
5700 CANCROSS COURT MISSISSAUGA, ONTARIO FOR LEASE Parking Ratio: OFFICE & WAREHOUSE SPACE 4.0 per 1,000 sq. ft. For More Information, Please Contact: Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca 5700 CANCROSS COURT MISSISSAUGA, ONTARIO OFFICE & WAREHOUSE SPACE FOR LEASE AVAILABILITY (AVAILABLE MAY 2020) SUITE 1 3,305 sq. ft. SUITE 2 3,580 sq. ft. WAREHOUSE 3,574 sq. ft. SUITE 1 & WAREHOUSE 6,879 sq. ft. SUITE 2 & WAREHOUSE 7,154 sq. ft. SUITES 1 & 2 & WAREHOUSE 10,459 sq. ft. PROPERTY DETAILS NET RENT $11.00 per sq. ft. per annum ADDITIONAL RENT $13.11 per sq. ft. per annum (2020 estimate)1 Warehouse Space Has 1 Dock Door Bell, Rogers, Telus Available in Building 1Taxes are estimated based on 2020 assessment and 2020 Mississauga CT rates FLOOR PLAN SUITE 1 WAREHOUSE SUITE 2 3,305 sq. ft. 3,574 sq. ft. 3,3580 sq. ft. 5700 CANCROSS COURT MISSISSAUGA, ONTARIO PROPERTYPROPERTY LOCATION LOCATION Route 19: Hurontario & 407 Park & Ride Platform (NB) to Port Credit Go Station Platform (SB) Route 43: Commerce Blvd at Renforth Station (EB) to Meadowvale Town Centre Drop Off (WB) Route 70: Islington Subway Bus Terminal Platform (EB) to Matheson Blvd W of Hurontario St (WB) Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca *Sales Representative February 2020.This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). -
VIVA Port Credit White Paper, May 27, 2008
VIVA Port Credit White Paper re: Port Credit District Policies Review May 27, 2008 1 » Table of Contents Port Credit: An Urban Village for the 21 st Century A Model Community for the World www. VIVA PortCredit.ca VIVA Port Credit White Paper re: Port Credit District Policies Review May 27, 2008 2 TABLE OF CONTENTS PAGE 1. MASTHEAD ………………………………………………………………………………………………..…. 3 2. VIVA Port Credit …………………………………………………………………………………………….... 6 3. EXECUTIVE SUMMARY …………………………………………………………………………….……… 7 4. INTRODUCTION ………………………………………………………………………………….…………. 8 5. VISION OF PORT CREDIT ……………..………………………………………………………….……….. 9 6. THEMES 6.1 Waterfront …………………………………………………………………………...………….10 6.2 Heritage …………………………………………………………………………………………11 6.3 Public Open Spaces ……………………………………………………………..…………… 12 6.4 Main Streetscape ………………………………………………………………………………13 6.5 Neighbourhoods ……………………………………………………………………….……… 14 6.6 Density ……………………………………………………………………………….………… 15 6.7 Motorized Transportation ………………………………………………………………………16 6.8 Parking ………………………………………………………………………………….……… 17 6.9 Walking and Biking (Active Transportation)....…………………………………….…………18 6.10 Environment …….………………………………………………………………………………19 6.11 Built Form ………………………………………………………………………………….……20 6.12 Built Function ……………………………………………………………………………..…… 21 6.13 Social Matrix …………………………………………………………………………………… 22 6.14 Economic Development ……………………………………………………………………… 23 7. SPECIAL SITES (Place Making) 7.1 Lakeshore Corridor Concepts ……………………………………………………………...... 24 7.1A Lakeshore Corridor Compendium ……………………………………………………….….. 25 -
14 Bus Time Schedule & Line Route
14 bus time schedule & line map 14 Eastbound View In Website Mode The 14 bus line (Eastbound) has 2 routes. For regular weekdays, their operation hours are: (1) Eastbound: 5:10 AM - 10:36 PM (2) Westbound: 5:01 AM - 10:15 PM Use the Moovit App to ƒnd the closest 14 bus station near you and ƒnd out when is the next 14 bus arriving. Direction: Eastbound 14 bus Time Schedule 32 stops Eastbound Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:10 AM - 10:36 PM Clarkson Go Station Platform 6 1110 Southdown Road, Peel Tuesday 5:10 AM - 10:36 PM Southdown Rd at Hartland Dr Wednesday 5:10 AM - 10:36 PM 2020 Hartland Drive, Peel Thursday 5:10 AM - 10:36 PM Southdown Rd at Wiseman Crt Friday 5:10 AM - 10:36 PM 2105 Wiseman Court, Peel Saturday Not Operational Southdown Rd at Truscott Dr 1405 Southdown Road, Mississauga Truscott Dr at Davebrook Rd 2104 Truscott Drive, Mississauga 14 bus Info Direction: Eastbound Truscott Dr at Robillard Rd Stops: 32 1914 Truscott Drive, Mississauga Trip Duration: 18 min Line Summary: Clarkson Go Station Platform 6, Truscott Dr at Delaney Dr Southdown Rd at Hartland Dr, Southdown Rd at 1836 Truscott Drive, Mississauga Wiseman Crt, Southdown Rd at Truscott Dr, Truscott Dr at Davebrook Rd, Truscott Dr at Robillard Rd, Truscott Dr at Clarkson Rd Truscott Dr at Delaney Dr, Truscott Dr at Clarkson Rd, 1780 Truscott Drive, Mississauga Truscott Dr at Mazo Cres, Truscott Dr at Merrow Rd, Truscott Dr at Elite Rd, Truscott Dr at Chasehurst Dr, Truscott Dr at Mazo Cres Truscott Dr at Lorne Park Rd, Lorne Park -
Transportation
Transportation AMO Conference 2018 Ministry of Transportation Topics: Hurontario Light Rail Transit & Extension Mobility Hubs Regional Express Rail (RER) & High Speed Rail (HSR) Hwy 407/410 Connections to Brampton “Uptown” GTA West Corridor Transportation AMO Conference 2018 Transit & Regional Connections - Overview Connecting Brampton to the GTHA and Beyond Building on the strength of existing local and regional transportation networks, the City is working towards a seamless integration of all transportation networks connecting Brampton with the Greater Toronto and Hamilton Area (GTHA) and beyond. Ongoing projects that improve and enhance transit and active transportation connectivity include: Queen Street Rapid Transit Master Plan study, Hurontario LRT Extension Environmental Assessment (EA), and an Active Transportation Master Plan study. Brampton Transit Brampton Transit is one of the fastest growing transit systems in Ontario with ridership outpacing population growth: o In 2017, annual transit ridership increased to 27.4 million riders, an astonishing 18.4% increase over 2016 o Second fastest growing city in Canada, with the lowest average age of 36.5 Brampton Transit Ridership Growth Transportation AMO Conference 2018 Hurontario LRT & Extension Our Ask: Metrolinx partner with the City of Brampton to advance the Light Rail Transit Extension Environmental Assessment study, connecting transit to Downtown Brampton. The Hurontario LRT (HuLRT) will make connections to Brampton Transit including Brampton Züm as well as GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, and the Mississauga Transitway along Highway 403. Why is the Hurontario LRT (HuLRT) important to Brampton? The Hurontario LRT (HuLRT) will bring 20 kilometres of fast, reliable, rapid transit to the Hurontario corridor between the Brampton Gateway Terminal at Steeles Avenue and the Port Credit GO station in Mississauga. -
Letter-From-City-Of-Brampton-Dated-Feb-19-2020-Re-FRTN.Pdf
ZÜM Network Expansion 1. Airport Road Extension 2. Main Street North Extension 3. Bramalea Road 4. Chinguacousy-Mavis 5. Other Corridors o Dixie Road o Kennedy o Mississauga Road o Sandalwood o Castlemore o Steeles Extension 1 2. Extension of 502 Züm Main to Caledon – in conjunction with the Hurontario LRT to Brampton Gateway Terminal 2. Hurontario LRT between 1. Extension of 505 Züm Bovaird Brampton Gateway Terminal to Pearson Airport Area via Note: details to be confirmed through future work and Port Credit GO Station Airport Road to Caledon to North to North Brampton Brampton 4. Future 504 Züm Chinguacousy-Mavis to Mississauga Meadowvale Area to Port Credit 3. Future 515 Züm Bramalea GO Station to Pearson Airport Note: details to be confirmed through future work to Caledon to North to North Brampton Brampton to Mississauga Meadowvale to Port Credit to Pearson GO Station Airport & Area Note: details to be confirmed through future work 5.1 Dixie/Bramalea Priority Bus to Dixie Transitway Station to Caledon to North to North Brampton to North Brampton Brampton 5.2 Future Züm Kennedy to Mississauga to Mississauga Meadowvale to Port Credit to Pearson GO Station to Dixie Airport & Area Note: details to be confirmed through future work Transitway Station to Caledon to North to North Brampton to North Brampton Brampton to Mississauga 5.3 Erin Mills / Meadowvale Mississauga Road to Mississauga Priority Bus (TBC) to Port Credit to Pearson GO Station to Dixie Airport & Area Note: details to be confirmed through future work Transitway TBC = to -
Hurontario Light Rail Transit Backgrounder
City of Mississauga 300 City Centre Drive Backgrounder Mississauga, ON L5B 3C1 mississauga.ca facebook.com/citymississauga twitter.com/citymississauga Hurontario Light Rail Transit Project June 28, 2017 The Metrolinx-led Hurontario Light Rail Transit (HuLRT) Project includes: • 20 kilometres of new dedicated rapid transit between Port Credit GO Station in Mississauga to the Gateway Terminal at Steeles Avenue in Brampton • 22 surface stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway • New, modern Alstom Citadis Spirit light rail vehicles • An operations, maintenance and storage facility for light rail vehicles at Highway 407 Quick Facts: • Construction is anticipated to start in 2018, with an estimated in-service date in 2022. • The Hurontario LRT project is being delivered using Infrastructure Ontario’s Alternative Financing and Procurement (AFP) delivery model. AFP transfers appropriate project risks to the private sector. • Metrolinx and Infrastructure Ontario have been working closely with the Cities of Mississauga and Brampton to integrate their transit system standards and requirements into the new LRT project. • The Hurontario LRT is an example of the Ontario government’s commitment to invest in priority rapid transit to create an integrated transit system throughout the Greater Toronto and Hamilton Area (GTHA). Key Objectives: • Provide a seamless customer experience between the new Hurontario LRT line, GO Transit and the Mississauga and -
Value-For-Money Audit: Metrolinx Operations and Governance (2020)
Office of the Auditor General of Ontario Value-for-Money Audit Metrolinx Operations and Governance December 2020 Metrolinx Metrolinx Operations and Governance Metrolinx employed the equivalent of 4,197 1.0 Summary full-time staff. Since 2014/15, Metrolinx has had increasing operating deficits that have been subsid- ized by the province. It will face further financial Metrolinx is a government agency that plays a key pressure as a result of the COVID-19 pandemic. role in public transit services in Ontario. Metrolinx Regarding its train and bus operations, Metro- operates GO Transit trains and buses in the Greater linx’s on-time performance for GO trains—its Toronto and Hamilton Area (GTHA) and the ability to keep the trains on schedule—has been Union Pearson (UP) Express from Union Station in between 92% and 95% during the last five years, downtown Toronto to the Toronto Pearson Airport. and for buses approximately 95% consistently. Its It also awards and manages the contracts for the on-time performance for trains is comparable to electronic fare system PRESTO, which enables rid- that of other transit agencies in the United States ers to tap a PRESTO card to pay for fares on buses and the United Kingdom. While overall on-time and trains in municipalities across the GTHA and in performance for trains and buses is positive, Ottawa on OC Transpo. Metrolinx should continue to focus on improving Metrolinx has also been tasked with planning the performance of those train and bus routes and and rolling out a fare system that would be inte- lines with a high number of delays or cancellations. -
23 Bus Time Schedule & Line Route
23 bus time schedule & line map 23 Eastbound View In Website Mode The 23 bus line (Eastbound) has 2 routes. For regular weekdays, their operation hours are: (1) Eastbound: 12:15 AM - 11:45 PM (2) Westbound: 12:15 AM - 11:45 PM Use the Moovit App to ƒnd the closest 23 bus station near you and ƒnd out when is the next 23 bus arriving. Direction: Eastbound 23 bus Time Schedule 48 stops Eastbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:17 AM - 10:29 PM Monday 4:20 AM - 11:45 PM Clarkson Go Station Platform 7 1110 Southdown Road, Peel Tuesday 12:15 AM - 11:45 PM Lakeshore Rd W at Inverhouse Dr Wednesday 12:15 AM - 11:45 PM 966 Inverhouse Drive, Peel Thursday 12:15 AM - 11:45 PM Lakeshore Rd W West Of Clarkson Rd Friday 12:15 AM - 11:45 PM 1834 Lakeshore Road West, Peel Saturday 12:15 AM - 11:53 PM Lakeshore Rd W at Clarkson Rd Lakeshore Road West, Peel Lakeshore Rd W at Meadow Wood Rd 1672 Lakeshore Road West, Peel 23 bus Info Direction: Eastbound Lakeshore Rd at Johnsons Lane Stops: 48 1654 Lakeshore Road West, Peel Trip Duration: 31 min Line Summary: Clarkson Go Station Platform 7, Lakeshore Rd W at Silver Birch Trail Lakeshore Rd W at Inverhouse Dr, Lakeshore Rd W 1510 Lakeshore Road West, Peel West Of Clarkson Rd, Lakeshore Rd W at Clarkson Rd, Lakeshore Rd W at Meadow Wood Rd, Lakeshore Lakeshore Rd W at Bexhill Rd Rd at Johnsons Lane, Lakeshore Rd W at Silver Birch 1376 Lakeshore Road West, Mississauga Trail, Lakeshore Rd W at Bexhill Rd, Lakeshore Rd W at Festavon Crt, Lakeshore Rd at Owenwood Dr, Lakeshore Rd W at Festavon Crt -
Executive Summary
Environmental Project Report Table of Contents EXECUTIVE SUMMARY ................................................................................................................................................................... E-1 ES.1 INTRODUCTION AND STUDY PROCESS ......................................................................................................................................... E-1 ES.2 PROJECT DESCRIPTION .............................................................................................................................................................. E-2 ES.3 EXISTING CONDITIONS/POTENTIAL IMPACTS/MITIGATION AND NET EFFECTS ............................................................................... E-6 ES.4 PERMITS AND APPROVALS REQUIRED FOR PROJECT IMPLEMENTATION ...................................................................................... E-10 ES.5 CONSULTATION AND COMMITMENTS TO FURTHER WORK ........................................................................................................... E-11 List of Figures Figure ES-1: Hurontario-Main LRT Project in the Regional Context .............................................................................................. E-1 Figure ES-2: Hurontario-Main LRT Alignment and Stop Locations ................................................................................................ E-3 Figure ES-3: Key Plan for New and Upgraded Structures .............................................................................................................. -
Project Data
íê~åëáíJçêáÉåíÉÇ=ÇÉîÉäçéãÉåí Å~ëÉ=ëíìÇó PORT CREDIT VILLAGE, Mississauga, Ontario HURONTARIO ST. AND LAKESHORE DR. Figure 1—Port Credit Village waterfront development with rail corridor and GO Transit station in background Project data Project name Port Credit Village (phase 1) Developer FRAM Building Group and Slokker Canada (FRAM/Slokker) Date completed 2005 Site area 10.5 ha (26 acres) Number, type, size of 410 units total residential units 225 condominium apartments ranging in size from 68 to 310 m2 (730 to 3,340 sq. ft.) 167 townhouses ranging in size from 126 m2 (1,350 sq. ft.) to 600 m2 (6,500 sq. ft.); average size 233 m2 (2,500 sq. ft.); 18 live-work ground-oriented townhouses ranging in size from 42 m2 (450 sq. ft.) retail + 186 m2 (2,000 sq. ft.) residential or 60 m2 (650 sq. ft.) retail + 209 m2 (2,250 sq. ft.) residential Other land uses on the site Approximately 1,400 m2 (15,000 sq. ft.) office and 3,700 m2 (40,000 sq. ft.) mixed retail Gross residential density 39 uph (units per hectare) Maximum height Six storeys, average of three storeys Parking 70 commercial spaces, plus 3+ spaces per townhouse unit and 1.5 to 1.7 spaces per condominium apartment unit Unit selling prices (2004) $300,000 to $1,150,000 Type of transit GO Transit (commuter rail) and Mississauga Transit (Local Authority) Distance to GO Station 400–800 m (1,300–2,600 ft.) Pedestrian connectivity Excellent residential to retail connections in and around the site. Connections to the GO station are along a major arterial (Hurontario St.) or through residential street sidewalk.1 1 Phase II of the project should greatly improve connections to the station with the proposed mid- and high-rise mixed use development by FRAM/Slokker along Hurontario St.